CN106058887A - Reactive optimization method for improving qualified rate of power distribution network comprising distributed photovoltaic power sources - Google Patents

Reactive optimization method for improving qualified rate of power distribution network comprising distributed photovoltaic power sources Download PDF

Info

Publication number
CN106058887A
CN106058887A CN201610534707.XA CN201610534707A CN106058887A CN 106058887 A CN106058887 A CN 106058887A CN 201610534707 A CN201610534707 A CN 201610534707A CN 106058887 A CN106058887 A CN 106058887A
Authority
CN
China
Prior art keywords
node
voltage
photo
distribution network
power supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610534707.XA
Other languages
Chinese (zh)
Other versions
CN106058887B (en
Inventor
贾清泉
赵凡凡
高朋
王宁
吴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanshan University
Original Assignee
Yanshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanshan University filed Critical Yanshan University
Priority to CN201610534707.XA priority Critical patent/CN106058887B/en
Publication of CN106058887A publication Critical patent/CN106058887A/en
Application granted granted Critical
Publication of CN106058887B publication Critical patent/CN106058887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/383
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

The invention discloses a reactive optimization method for improving a qualified rate of a power distribution network comprising distributed photovoltaic power sources. The method mainly comprises the following steps: when the photovoltaic power sources work in an MPPT mode, by taking minimization of whole-network voltage deviations as a target, performing reactive optimization on residual capacities of photovoltaic inverters by use of a particle swarm algorithm; if an optimization result still comprises a node voltage off-limit condition, employing an improved optimization scheme: first of all, under the condition that it is ensured that whole-network voltages are qualified, by taking maximization of total active output of the photovoltaic power sources as a target, obtaining an optimal active value of each photovoltaic power source; and then by taking the result as an active output value of each photovoltaic power source and by taking the minimization of the whole-network deviations as the target, performing the reactive optimization on the residual capacities of the photovoltaic inverters again. According to the invention, operation economic benefits and reliability of the power distribution network are taken into integrated consideration, distribution of active and reactive output of the photovoltaic inverters is optimized, and the voltage qualified rate of the power distribution network comprising the photovoltaic power sources is effectively improved.

Description

Improve the idle work optimization method containing distributed photovoltaic power distribution network voltage qualification rate
Technical field
The present invention relates to GA for reactive power optimization technical field, particularly relate to a kind of raising distribution Han distributed photovoltaic power The idle work optimization method of net rate of qualified voltage.
Background technology
Along with becoming increasingly conspicuous of problem of energy crisis, regenerative resource is more favored by people, especially cleaning, nothing dirt Contaminate, resource distribution is wide, exploit convenient solar energy.Photovoltaic generation efficiently utilizes the form of solar energy in the world as a kind of Inside increase rapidly.Photo-voltaic power supply makes original single supply radial structure become many power supply architectures after being incorporated to power distribution network, change Original direction of tide and size, along with the raising of photovoltaic permeability, the grid-connected impact on distribution network voltage is increasingly Greatly.At present some scholars propose photovoltaic DC-to-AC converter while active power of output, also can export certain reactive power, permissible The spare capacity of photovoltaic DC-to-AC converter is participated in the middle of the idle work optimization of power distribution network as continuously adjustable reactive power source.It addition, Owing to inverter active output and idle output have coupling on capacity, when photovoltaic is meritorious exert oneself take capacity excessive time, It is possible that call all residual capacities carry out reactive-load compensation cannot be by the situation in Voltage Cortrol to prescribed limit.
But, in prior art, meritorious output and idle output to photovoltaic DC-to-AC converter lack optimization method of completing the square, nothing Method realizes photo-voltaic power supply and gains merit the target that output is maximum, the whole network voltage deviation is minimum.
Summary of the invention
Present invention aim at providing a kind of can the meritorious output of optimum distribution photovoltaic DC-to-AC converter and idle output, reality Existing photo-voltaic power supply is gained merit and is exported raising distribution network voltage qualification rate Han distributed photovoltaic power maximum, that the whole network voltage deviation is minimum Idle work optimization method.
For achieving the above object, have employed techniques below scheme: the method for the invention is by utilizing Particle Swarm Optimization Method is optimized computing, solve photovoltaic DC-to-AC converter active reactive output optimal value, on-load transformer tap changer gear and Compensation capacitors number so that power distribution network each node voltage deviation is minimum, improves distribution network voltage qualification rate;Concrete steps As follows:
Step 1, on the premise of photo-voltaic power supply exports with MPPT, sets up the object function making the whole network voltage deviation minimum;
Step 2, carries out Load flow calculation according to distribution net work structure parameter, sets up the GA for reactive power optimization etc. containing photo-voltaic power supply Formula retrains;
Step 3, with residual capacity, on-load transformer tap changer gear and the reactive-load compensation capacitor of photovoltaic DC-to-AC converter Group is control variable, and each node voltage of power distribution network is state variable, sets up the GA for reactive power optimization inequality containing photo-voltaic power supply Constraint;
Step 4, according to the object function set up, equality constraint and inequality constraints, utilizes particle cluster algorithm to carry out excellent Change computing, solve the idle output valve of each inverter, load tap changer gear and Capacitor banks input group number;
Step 5,
5.1, in the optimum results obtained in each control variable range of accommodation, if occurring without the out-of-limit situation of node voltage, It is now optimal case, terminates optimization process
5.2, in the optimum results obtained in each control variable range of accommodation, if still there being the out-of-limit situation of node voltage to go out Existing, then proceed prioritization scheme;The first step optimizes, it is ensured that under the most qualified premise of the whole network voltage, with all photovoltaic electrics of power distribution network The meritorious sum of exerting oneself in source is target to the maximum, with each control variable range of accommodation in the current photovoltaic meritorious output upper limit and step 3 is Inequality constraints, solves each inverter active output optimal value;Second step optimizes, and each photo-voltaic power supply is in meritorious output optimal value Under premise, return step 1, with the minimum target of the whole network voltage deviation, and carry out step 2,3,4 operations successively, finally solve Output valve that each inverter active is idle, load tap changer gear and Capacitor banks input group number.
Further, the object function making the whole network voltage deviation minimum is set up in step 1, as shown in formula (1)
min F = min { Σ i = 1 n | U i - U i s p e c | + λ Σ i = 1 n ( ΔU i U i max + U i min ) 2 } - - - ( 1 )
Wherein
&Delta;U i = U i m i n - U i U i < U i min 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, UiFor the voltage of each node of power distribution network in addition to balance node,For each node voltage expected value, λ is The out-of-limit penalty coefficient of node voltage, Uimax、UiminBeing respectively the bound value of node voltage, n is except balance node external system Nodes.
Further, the GA for reactive power optimization equality constraint containing photo-voltaic power supply is set up in step 2, as shown in formula (2)
P Z i + P P V i - P L i = U i &Sigma; j &Element; i U j ( G i j cos&theta; i j + B i j sin&theta; i j ) Q Z i + Q c i + Q P V i - Q L i = U i &Sigma; j &Element; i U j ( G i j sin&theta; i j - B i j cos&theta; i j ) - - - ( 2 )
In formula, Gij、BijAnd θijIt is respectively conductance, susceptance and the phase difference of voltage between node i, j, PZi、QZiIt is respectively The injection active power of node i and reactive power, PPVi、QPViIt is respectively node i and accesses the active power of photo-voltaic power supply and idle Power, PLi、QLiIt is respectively active power and reactive power, the Q of load at node iCiIdle by the connect Capacitor banks of node i Go out force value.
Further, the GA for reactive power optimization inequality constraints containing photo-voltaic power supply is set up in step 3, such as formula (3) institute Show
- Q P V i . m a x &le; Q P V i &le; Q P V i . m a x i = 1 , 2 ... , N P V 0 &le; Q C j &le; L j &times; Q C j 0 j = 1 , 2 ... , N C T t k . min &le; T t k &le; T t k . m a x k = 1 , 2 ... , N T U i . min &le; U i &le; U i . max i &Element; N - - - ( 3 )
In formula, QPViThe reactive power sent for i-th photo-voltaic power supply, QPVi.maxCan send for i-th photo-voltaic power supply Reactive power maximum and meetNPVFor the quantity of photo-voltaic power supply, QCjElectric capacity is compensated for jth platform The capacity that device puts into, LjCapacitor maximum group number, Q is compensated for jth platformCj0The appearance of capacitor list group capacitor is compensated for jth platform Amount, NCCompensate the number of units of Capacitor banks, TtkFor the tap joint position of kth platform ULTC, Ttk.min、Ttk.maxIt is respectively The tap joint position upper lower limit value of kth platform ULTC, NTThe quantity of ULTC, N is system node number, Ui.min、Ui.maxIt is respectively the voltage upper lower limit value of i-th node.
Further, the first step optimization concrete grammar described in step 5.2 is as follows:
Under ensureing the most qualified premise of the whole network voltage, it is target to the maximum with the meritorious sum of exerting oneself of all photo-voltaic power supplies of power distribution network Set up object function,
max F = max { &Sigma; i = 1 N P V P P V i + &lambda; &Sigma; i = 1 n ( &Delta;U i U i max + U i min ) 2 }
Wherein
&Delta;U i = U i m i n - U i U i < U i min 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, PPViFor the active power of i-th photo-voltaic power supply output, UiFor each node of power distribution network in addition to balance node Voltage, λ is the out-of-limit penalty coefficient of node voltage (for negative value), Uimax、UiminIt is respectively the bound value of node voltage, NPV By the number of the photo-voltaic power supply that power distribution network is accessed, n is except the nodes of balance node external system;
Carry out successively step 2,3,4, solve each photo-voltaic power supply meritorious output optimal value.
Compared with prior art, present invention have the advantage that and considering power distribution network performance driving economy and reliability On the basis of, the meritorious output of optimum distribution photovoltaic DC-to-AC converter and idle output, on the premise of ensureing that the whole network voltage is the most qualified, Realize photo-voltaic power supply to gain merit the target that output is maximum, the whole network voltage deviation is minimum, be effectively improved the electricity containing photo-voltaic power supply power distribution network Pressure qualification rate.
Accompanying drawing explanation
Fig. 1 is the flow chart of the inventive method.
Drawing reference numeral: 1 be first step optimization in step 5.2,2 be the second step optimization in step 5.2.
Detailed description of the invention
The present invention will be further described below in conjunction with the accompanying drawings:
As it is shown in figure 1, the method for the invention is by utilizing particle swarm optimization algorithm to be optimized computing, solve photovoltaic Output optimal value that inverter active is idle, on-load transformer tap changer gear and compensation capacitors number so that join Electrical network each node voltage deviation is minimum, improves distribution network voltage qualification rate;Specifically comprise the following steps that
A, on the premise of photo-voltaic power supply exports with MPPT, sets up the object function making the whole network voltage deviation minimum;Such as formula (1) shown in
min F = min { &Sigma; i = 1 n | U i - U i s p e c | + &lambda; &Sigma; i = 1 n ( &Delta;U i U i max + U i min ) 2 } - - - ( 1 )
Wherein
&Delta;U i = U i m i n - U i U i < U i min 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, UiFor the voltage of each node of power distribution network in addition to balance node,For each node voltage expected value, λ is The out-of-limit penalty coefficient of node voltage, Uimax、UiminBeing respectively the bound value of node voltage, n is except balance node external system Nodes.
B, carries out Load flow calculation according to distribution net work structure parameter, sets up the GA for reactive power optimization equation containing photo-voltaic power supply about Bundle;As shown in formula (2)
P Z i + P P V i - P L i = U i &Sigma; j &Element; i U j ( G i j cos&theta; i j + B i j sin&theta; i j ) Q Z i + Q c i + Q P V i - Q L i = U i &Sigma; j &Element; i U j ( G i j sin&theta; i j - B i j cos&theta; i j ) - - - ( 2 )
In formula, Gij、BijAnd θijIt is respectively conductance, susceptance and the phase difference of voltage between node i, j, PZi、QZiIt is respectively The injection active power of node i and reactive power, PPVi、QPViIt is respectively node i and accesses the active power of photo-voltaic power supply and idle Power, PLi、QLiIt is respectively active power and reactive power, the Q of load at node iCiIdle by the connect Capacitor banks of node i Go out force value.
C, with residual capacity, on-load transformer tap changer gear and the compensation capacitors of photovoltaic DC-to-AC converter be Control variable, each node voltage of power distribution network is state variable, sets up the GA for reactive power optimization inequality constraints containing photo-voltaic power supply; As shown in formula (3)
- Q P V i . m a x &le; Q P V i &le; Q P V i . m a x i = 1 , 2 ... , N P V 0 &le; Q C j &le; L j &times; Q C j 0 j = 1 , 2 ... , N C T t k . min &le; T t k &le; T t k . m a x k = 1 , 2 ... , N T U i . min &le; U i &le; U i . max i &Element; N - - - ( 3 )
In formula, QPViThe reactive power sent for i-th photo-voltaic power supply, QPVi.maxCan send for i-th photo-voltaic power supply Reactive power maximum and meetNPVFor the quantity of photo-voltaic power supply, QCjElectric capacity is compensated for jth platform The capacity that device puts into, LjCapacitor maximum group number, Q is compensated for jth platformCj0The appearance of capacitor list group capacitor is compensated for jth platform Amount, NCCompensate the number of units of Capacitor banks, TtkFor the tap joint position of kth platform ULTC, Ttk.min、Ttk.maxIt is respectively The tap joint position upper lower limit value of kth platform ULTC, NTThe quantity of ULTC, N is system node number, Ui.min、Ui.maxIt is respectively the voltage upper lower limit value of i-th node.
D, according to the object function set up, equality constraint and inequality constraints, utilizes particle cluster algorithm to be optimized fortune Calculate, solve the idle output valve of each inverter, load tap changer gear and Capacitor banks input group number;
E, it is judged that the optimum results obtained in each control variable range of accommodation the most still has the out-of-limit situation of node voltage to occur, If the out-of-limit situation of no-voltage, terminate optimization process;If still there being node that voltage out-of-limit situation occurs, the scheme of improving and optimizating is utilized to enter Row optimizes, and improves and optimizates scheme optimization process and is divided into two steps, and in Fig. 1, in the dotted line frame of label 1 indication, step f, g, h are that improvement is excellent The change scheme first step optimize, in Fig. 1 in the dotted line frame 2 of label 2 indication step i, j, k for improving and optimizating scheme second step optimization.
Improve and optimizate scheme first step optimization:
F, under ensureing the most qualified premise of the whole network voltage, is mesh to the maximum with the meritorious sum of exerting oneself of all photo-voltaic power supplies of power distribution network Mark sets up object function, as shown in formula (4)
max F = max { &Sigma; i = 1 N P V P P V i + &lambda; &Sigma; i = 1 n ( &Delta;U i U i max + U i min ) 2 } - - - ( 4 )
Wherein
&Delta;U i = U i m i n - U i U i < U i min 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, PPViFor the active power of i-th photo-voltaic power supply output, UiFor each node of power distribution network in addition to balance node Voltage, λ is the out-of-limit penalty coefficient of node voltage (for negative value), Uimax、UiminIt is respectively the bound value of node voltage, NPV By the number of the photo-voltaic power supply that power distribution network is accessed, n is except the nodes of balance node external system;
G, carries out Load flow calculation according to the structural parameters of power distribution network, the foundation GA for reactive power optimization containing photo-voltaic power supply etc. Formula retrains, as shown in formula (2).
With photovoltaic DC-to-AC converter meritorious output higher limit, photovoltaic DC-to-AC converter residual capacity, on-load transformer tap changer shelves Position and compensation capacitors are control variable, and each node voltage of power distribution network is state variable, set up joining containing photo-voltaic power supply Reactive power optimization inequality constraints, as shown in formula (5)
0 &le; P P V i &le; P P V i . m a x i = 1 , 2 ... , N P V - Q P V i . m a x &le; Q P V i &le; Q P V i . m a x i = 1 , 2 ... , N P V 0 &le; Q C j &le; L j &times; Q C j 0 j = 1 , 2 ... , N C T t k . m i n &le; T t k &le; T t k . m a x k = 1 , 2 ... , N T U i . m i n &le; U i &le; U i . max i &Element; N - - - ( 5 )
In formula, PPViFor photovoltaic active power output valve, PPVi.maxFor i-th photo-voltaic power supply in current time active power Can be output by maximum, NPVFor the quantity of photo-voltaic power supply, QPViThe reactive power sent for i-th photo-voltaic power supply, QPVi.maxIt is Reactive power maximum that i photo-voltaic power supply can send and meetingQCjElectricity is compensated for jth platform The capacity that container puts into, LjCapacitor maximum group number, Q is compensated for jth platformCj0The appearance of capacitor list group capacitor is compensated for jth platform Amount, NCCompensate the number of units of Capacitor banks, Ttk.min、Ttk.maxThe tap joint position being respectively kth platform ULTC is upper and lower Limit value, NTThe quantity of ULTC, N is system node number, Ui.min、Ui.maxThe voltage being respectively i-th node is upper and lower Limit value;
H, utilizes particle cluster algorithm to be optimized computing, solves each inverter active output optimal value.
Improve and optimizate scheme second step optimization:
I, in the first step optimizes under each photo-voltaic power supply of gained meritorious output optimal value premise, minimum with the whole network voltage deviation Set up shown in object function such as formula (1) for target;
G, carries out Load flow calculation according to the structural parameters of power distribution network, the foundation GA for reactive power optimization containing photo-voltaic power supply etc. Formula retrains, as shown in formula (2);
With photovoltaic DC-to-AC converter residual capacity, on-load transformer tap changer gear and compensation capacitors for controlling Variable, each node voltage of power distribution network is state variable, sets up the GA for reactive power optimization inequality constraints containing photo-voltaic power supply, such as formula (6) shown in
- Q P V i . m a x &le; Q P V i &le; Q P V i . m a x i = 1 , 2 ... , N P V 0 &le; Q C j &le; L j &times; Q C j 0 j = 1 , 2 ... , N C T t k . min &le; T t k &le; T t k . m a x k = 1 , 2 ... , N T U i . min &le; U i &le; U i . max i &Element; N - - - ( 6 )
In formula, QPViThe reactive power sent for i-th photo-voltaic power supply, QPVi.maxCan send for i-th photo-voltaic power supply Reactive power maximum and meetNPVFor the quantity of photo-voltaic power supply, QCjElectric capacity is compensated for jth platform The capacity that device puts into, LjCapacitor maximum group number, Q is compensated for jth platformCj0The appearance of capacitor list group capacitor is compensated for jth platform Amount, NCCompensate the number of units of Capacitor banks, Ttk.min、Ttk.maxThe tap joint position being respectively kth platform ULTC is upper and lower Limit value, NTThe quantity of ULTC, N is system node number, Ui.min、Ui.maxThe voltage being respectively i-th node is upper and lower Limit value;
K, uses particle cluster algorithm to carry out optimizing according to the described GA for reactive power optimization mathematical model containing photo-voltaic power supply Solving-optimizing computing, finally solves the idle output valve of each inverter active, load tap changer gear and Capacitor banks and puts into Group number, terminates optimization process.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not model to the present invention Enclose and be defined, on the premise of designing spirit without departing from the present invention, the those of ordinary skill in the art technical side to the present invention Various deformation that case is made and improvement, all should fall in the protection domain that claims of the present invention determines.

Claims (5)

1. the idle work optimization method improved containing distributed photovoltaic power distribution network voltage qualification rate, it is characterised in that described Method, by utilizing particle swarm optimization algorithm to be optimized computing, solves photovoltaic DC-to-AC converter active reactive output optimal value, has Voltage adjustment of on-load load tap changer gear and compensation capacitors number so that power distribution network each node voltage deviation is minimum, improve Distribution network voltage qualification rate;Specifically comprise the following steps that
Step 1, on the premise of photo-voltaic power supply exports with MPPT, sets up the object function making the whole network voltage deviation minimum;
Step 2, carries out Load flow calculation according to distribution net work structure parameter, sets up the GA for reactive power optimization equation containing photo-voltaic power supply about Bundle;
Step 3, with residual capacity, on-load transformer tap changer gear and the compensation capacitors of photovoltaic DC-to-AC converter be Control variable, each node voltage of power distribution network is state variable, sets up the GA for reactive power optimization inequality constraints containing photo-voltaic power supply;
Step 4, according to the object function set up, equality constraint and inequality constraints, utilizes particle cluster algorithm to be optimized fortune Calculate, solve the idle output valve of each inverter, load tap changer gear and Capacitor banks input group number;
Step 5,
5.1, in the optimum results obtained in each control variable range of accommodation, if occurring without the out-of-limit situation of node voltage, now For optimal case, terminate optimization process
5.2, in the optimum results obtained in each control variable range of accommodation, if still there being the out-of-limit situation of node voltage to occur, then Proceed prioritization scheme;The first step optimizes, it is ensured that under the most qualified premise of the whole network voltage, gains merit with all photo-voltaic power supplies of power distribution network Sum of exerting oneself is target to the maximum, and in the current photovoltaic meritorious output upper limit and step 3, each control variable range of accommodation is as inequality Constraint, solves each inverter active output optimal value;Second step optimizes, and each photo-voltaic power supply is in meritorious output optimal value premise Under, return step 1, with the minimum target of the whole network voltage deviation, and carry out step 2,3,4 operations successively, finally solve each inverse Become device active reactive output valve, load tap changer gear and Capacitor banks input group number.
The raising the most according to claim 1 idle work optimization method containing distributed photovoltaic power distribution network voltage qualification rate, It is characterized in that: set up the object function making the whole network voltage deviation minimum in step 1, as shown in formula (1)
min F = min { &Sigma; i = 1 n | U i - U i s p e c | + &lambda; &Sigma; i = 1 n ( &Delta;U i U i max + U i min ) 2 } - - - ( 1 )
Wherein
&Delta;U i = U i m i n - U i U i < U i min 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, UiFor the voltage of each node of power distribution network in addition to balance node,For each node voltage expected value, λ is node Voltage out-of-limit penalty coefficient, Uimax、UiminBeing respectively the bound value of node voltage, n is except the node of balance node external system Number.
The raising the most according to claim 1 idle work optimization method containing distributed photovoltaic power distribution network voltage qualification rate, It is characterized in that: set up the GA for reactive power optimization equality constraint containing photo-voltaic power supply in step 2, as shown in formula (2)
P Z i + P P V i - P L i = U i &Sigma; j &Element; i U j ( G i j cos&theta; i j + B i j sin&theta; i j ) Q Z i + Q c i + Q P V i - Q L i = U i &Sigma; j &Element; i U j ( G i j sin&theta; i j - B i j cos&theta; i j ) - - - ( 2 )
In formula, Gij、BijAnd θijIt is respectively conductance, susceptance and the phase difference of voltage between node i, j, PZi、QZiIt is respectively node i Injection active power and reactive power, PPVi、QPViIt is respectively node i and accesses active power and the reactive power of photo-voltaic power supply, PLi、QLiIt is respectively active power and reactive power, the Q of load at node iCiIdle exerting oneself by the connect Capacitor banks of node i Value.
The raising the most according to claim 1 idle work optimization method containing distributed photovoltaic power distribution network voltage qualification rate, It is characterized in that: set up the GA for reactive power optimization inequality constraints containing photo-voltaic power supply in step 3, as shown in formula (3)
- Q P V i . m a x &le; Q P V i &le; Q P V i . m a x i = 1 , 2 ... , N P V 0 &le; Q C j &le; L j &times; Q C j 0 j = 1 , 2 ... , N C T t k . min &le; T t k &le; T t k . m a x k = 1 , 2 ... , N T U i . min &le; U i &le; U i . max i &Element; N - - - ( 3 )
In formula, QPViThe reactive power sent for i-th photo-voltaic power supply, QPVi.maxFor i-th photo-voltaic power supply can send idle Power maximum and meetNPVFor the quantity of photo-voltaic power supply, QCjCompensate capacitor for jth platform to throw The capacity entered, LjCapacitor maximum group number, Q is compensated for jth platformCj0The capacity of capacitor list group capacitor, N is compensated for jth platformCMend Repay the number of units of Capacitor banks, TtkFor the tap joint position of kth platform ULTC, Ttk.min、Ttk.maxIt is respectively kth platform to have The tap joint position upper lower limit value of voltage adjustment of on-load transformator, NTThe quantity of ULTC, N is system node number, Ui.min、 Ui.maxIt is respectively the voltage upper lower limit value of i-th node.
The raising the most according to claim 1 idle work optimization method containing distributed photovoltaic power distribution network voltage qualification rate, It is characterized in that, it is as follows that the first step described in step 5.2 optimizes concrete grammar:
Under ensureing the most qualified premise of the whole network voltage, it is target to the maximum with the meritorious sum of exerting oneself of all photo-voltaic power supplies of power distribution network and sets up Object function,
max F = max { &Sigma; i = 1 N P V P P V i + &lambda; &Sigma; i = 1 n ( &Delta;U i U i max + U i min ) 2 }
Wherein
&Delta;U i = U i m i n - U i U i < U i m i n 0 U i m i n &le; U i &le; U i m a x U i - U i m a x U i > U i m a x
In formula, PPViFor the active power of i-th photo-voltaic power supply output, UiFor the electricity of each node of power distribution network in addition to balance node Pressure, λ is the out-of-limit penalty coefficient of node voltage (for negative value), Uimax、UiminIt is respectively the bound value of node voltage, NPVFor joining The number of the photo-voltaic power supply that electrical network is accessed, n is except the nodes of balance node external system;
Carry out successively step 2,3,4, solve each photo-voltaic power supply meritorious output optimal value.
CN201610534707.XA 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power Active CN106058887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610534707.XA CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610534707.XA CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Publications (2)

Publication Number Publication Date
CN106058887A true CN106058887A (en) 2016-10-26
CN106058887B CN106058887B (en) 2018-10-16

Family

ID=57184990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610534707.XA Active CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Country Status (1)

Country Link
CN (1) CN106058887B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106655174A (en) * 2017-01-03 2017-05-10 昆明理工大学 Comprehensive reconstruction optimization method for power distribution network
CN106712083A (en) * 2017-01-03 2017-05-24 北京国能日新系统控制技术有限公司 Photovoltaic AGC (Automatic Gain Control) and AVC (Automatic Volume Control) control method and system based on fuzzy control
CN106786610A (en) * 2016-11-27 2017-05-31 东北电力大学 A kind of photovoltaic high permeability line voltage optimization method based on energy-storage battery
CN107134788A (en) * 2017-06-15 2017-09-05 清华大学 A kind of photovoltaic generation cluster participates in the voltage-controlled method of Electrical Power System Dynamic
CN107437813A (en) * 2017-07-17 2017-12-05 安徽大学 Power distribution network wattles power economic equivalent method based on cuckoo population
CN109167368A (en) * 2018-09-18 2019-01-08 国网湖南省电力有限公司 A kind of user's voltage optimization adjusting method and system containing distributed photovoltaic
CN109586305A (en) * 2018-12-12 2019-04-05 国网山西省电力公司大同供电公司 A kind of power distribution network operation control strategy based on flexible multimode switch
CN109742765A (en) * 2019-02-19 2019-05-10 国网江西省电力有限公司电力科学研究院 Power distribution station gear adjusting method and device
CN110120670A (en) * 2019-04-25 2019-08-13 国网河北省电力有限公司邢台供电分公司 The optimization method of electric distribution network reactive-voltage containing DPV, terminal device and storage medium
CN110739698A (en) * 2019-11-20 2020-01-31 国网山东省电力公司潍坊市寒亭区供电公司 10kV bus voltage and public distribution transformer outlet voltage allocation method and system
CN113629723A (en) * 2021-07-05 2021-11-09 燕山大学 SVG optimal configuration method considering DG and APF participating in voltage control
CN113991732A (en) * 2021-10-21 2022-01-28 国电南瑞科技股份有限公司 Distributed power distribution network double-target voltage control method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103701132A (en) * 2013-12-20 2014-04-02 清华大学 Method for controlling overvoltage of active power distribution network on basis of active-reactive coordination
CN104269855A (en) * 2014-10-22 2015-01-07 贵州电力试验研究院 Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN105207274A (en) * 2015-10-29 2015-12-30 许继集团有限公司 Self-adaptive adjusting reactive output distributed photovoltaic power generation control method
CN105281360A (en) * 2015-09-14 2016-01-27 国家电网公司 Distributed photovoltaic automatic generating control method based on sensitivity

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103701132A (en) * 2013-12-20 2014-04-02 清华大学 Method for controlling overvoltage of active power distribution network on basis of active-reactive coordination
CN104269855A (en) * 2014-10-22 2015-01-07 贵州电力试验研究院 Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN105281360A (en) * 2015-09-14 2016-01-27 国家电网公司 Distributed photovoltaic automatic generating control method based on sensitivity
CN105207274A (en) * 2015-10-29 2015-12-30 许继集团有限公司 Self-adaptive adjusting reactive output distributed photovoltaic power generation control method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
吴红斌 等: "光伏并网发电系统的MPPT_电压控制策略仿真", 《农业工程学报》 *
贾清泉等: "分散光伏并网系统参与电压无功调节的控制策略研究", 《太阳能学报》 *

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786610A (en) * 2016-11-27 2017-05-31 东北电力大学 A kind of photovoltaic high permeability line voltage optimization method based on energy-storage battery
CN106712083B (en) * 2017-01-03 2019-08-13 国能日新科技股份有限公司 A kind of photovoltaic AGC&AVC control method and system based on fuzzy control
CN106712083A (en) * 2017-01-03 2017-05-24 北京国能日新系统控制技术有限公司 Photovoltaic AGC (Automatic Gain Control) and AVC (Automatic Volume Control) control method and system based on fuzzy control
CN106655174A (en) * 2017-01-03 2017-05-10 昆明理工大学 Comprehensive reconstruction optimization method for power distribution network
CN106655174B (en) * 2017-01-03 2019-04-09 昆明理工大学 A kind of power distribution network synthesis reconstruction and optimization method
CN107134788A (en) * 2017-06-15 2017-09-05 清华大学 A kind of photovoltaic generation cluster participates in the voltage-controlled method of Electrical Power System Dynamic
CN107437813A (en) * 2017-07-17 2017-12-05 安徽大学 Power distribution network wattles power economic equivalent method based on cuckoo population
CN107437813B (en) * 2017-07-17 2021-02-09 安徽大学 Power distribution network reactive power optimization method based on cuckoo-particle swarm
CN109167368A (en) * 2018-09-18 2019-01-08 国网湖南省电力有限公司 A kind of user's voltage optimization adjusting method and system containing distributed photovoltaic
CN109167368B (en) * 2018-09-18 2020-05-15 国网湖南省电力有限公司 User voltage optimization and regulation method and system with distributed photovoltaic
CN109586305A (en) * 2018-12-12 2019-04-05 国网山西省电力公司大同供电公司 A kind of power distribution network operation control strategy based on flexible multimode switch
CN109742765A (en) * 2019-02-19 2019-05-10 国网江西省电力有限公司电力科学研究院 Power distribution station gear adjusting method and device
CN109742765B (en) * 2019-02-19 2020-08-11 国网江西省电力有限公司电力科学研究院 Power distribution station gear adjusting method and device
CN110120670A (en) * 2019-04-25 2019-08-13 国网河北省电力有限公司邢台供电分公司 The optimization method of electric distribution network reactive-voltage containing DPV, terminal device and storage medium
CN110120670B (en) * 2019-04-25 2020-11-17 国网河北省电力有限公司邢台供电分公司 DPV-containing power distribution network reactive voltage optimization method, terminal equipment and storage medium
CN110739698A (en) * 2019-11-20 2020-01-31 国网山东省电力公司潍坊市寒亭区供电公司 10kV bus voltage and public distribution transformer outlet voltage allocation method and system
CN113629723A (en) * 2021-07-05 2021-11-09 燕山大学 SVG optimal configuration method considering DG and APF participating in voltage control
CN113629723B (en) * 2021-07-05 2024-01-12 燕山大学 SVG (static var generator) optimal configuration method considering DG and APF to participate in voltage management
CN113991732A (en) * 2021-10-21 2022-01-28 国电南瑞科技股份有限公司 Distributed power distribution network double-target voltage control method and device
CN113991732B (en) * 2021-10-21 2023-11-28 国电南瑞科技股份有限公司 Double-target voltage control method and device for distributed power distribution network

Also Published As

Publication number Publication date
CN106058887B (en) 2018-10-16

Similar Documents

Publication Publication Date Title
CN106058887A (en) Reactive optimization method for improving qualified rate of power distribution network comprising distributed photovoltaic power sources
Sikkabut et al. Control of high-energy high-power densities storage devices by Li-ion battery and supercapacitor for fuel cell/photovoltaic hybrid power plant for autonomous system applications
Kakigano et al. Distribution voltage control for DC microgrid by converters of energy storages considering the stored energy
CN102142693A (en) Solar photovoltaic grid-connected inversion control system based on field programmable gate array (FPGA)
CN102856899B (en) Method of reducing network loss of micro power grid
CN103580030A (en) Reactive voltage control method and system for grid-connected photovoltaic power station
CN107565576B (en) Reactive voltage optimization method for active power distribution network coordinated by multiple active management means
Reddy et al. A fuzzy logic MPPT controller based three phase grid-tied solar PV system with improved CPI voltage
Singh et al. Frequency regulation of an isolated hybrid power system with battery energy storage system
CN108879735A (en) Energy storage SOC balance control method is pressed in one kind
CN104993525A (en) Active power distribution network coordination optimization control method considering ZIP loads
CN105896613B (en) A kind of micro-capacitance sensor distribution finite-time control method for considering communication time lag
Truong et al. Dynamic Stability Improvement Issues with a Grid-Connected Microgrid System
Al-Badi et al. Performance of a stand-alone renewable energy system based on hydrogen energy storage
Liaqat et al. Nonlinear controllers for fuel cell, photovoltaic cell and battery based hybrid energy management system
Anand et al. Power electronics for renewable energy systems
Karun et al. Fuzzy logic based load frequency control of grid connected distributed generators
CN104600746B (en) Region photovoltaic energy-storage system grid-connected converter Passive Nonlinear control method
Aljarhizi et al. Control Management System of a Lithium-ion Battery Charger Based MPPT algorithm and Voltage Control
Zhang Optimization and design of photovoltaic micro-inverter
Khenissi et al. Artificial neural network and space vector pulse width modulation control technique for a photovoltaic system with a power grid connection and lead acid battery storage
CN104821588B (en) Microgrid voltage-stabilizing device and control method thereof
CN113824154B (en) Centralized operation control method for alternating current-direct current hybrid system containing renewable energy sources/hydrogen energy
CN113708412B (en) Weak connection structure and method for micro-grid group and low-voltage power distribution network
Teng et al. Multi-input converter with shared inductor for PV-battery system using deadbeat control

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant