CN106058887B - Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power - Google Patents

Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power Download PDF

Info

Publication number
CN106058887B
CN106058887B CN201610534707.XA CN201610534707A CN106058887B CN 106058887 B CN106058887 B CN 106058887B CN 201610534707 A CN201610534707 A CN 201610534707A CN 106058887 B CN106058887 B CN 106058887B
Authority
CN
China
Prior art keywords
photo
power supply
voltage
node
distribution network
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610534707.XA
Other languages
Chinese (zh)
Other versions
CN106058887A (en
Inventor
贾清泉
赵凡凡
高朋
王宁
吴杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yanshan University
Original Assignee
Yanshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yanshan University filed Critical Yanshan University
Priority to CN201610534707.XA priority Critical patent/CN106058887B/en
Publication of CN106058887A publication Critical patent/CN106058887A/en
Application granted granted Critical
Publication of CN106058887B publication Critical patent/CN106058887B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/18Arrangements for adjusting, eliminating or compensating reactive power in networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • H02J3/46Controlling of the sharing of output between the generators, converters, or transformers
    • H02J3/383
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/50Photovoltaic [PV] energy
    • Y02E10/56Power conversion systems, e.g. maximum power point trackers
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/30Reactive power compensation

Abstract

A kind of idle work optimization method improving the qualification rate of distribution network voltage containing distributed photovoltaic power, mainly comprises the following steps:When photo-voltaic power supply is worked in a manner of MPPT, with the minimum target of whole network voltage deviation, idle work optimization is carried out to photovoltaic DC-to-AC converter residual capacity with particle cluster algorithm;If the situation that optimum results still have node voltage out-of-limit, uses and improve and optimizate scheme:First, under the premise of ensureing whole network voltage qualification, target is up to the total active power output of photo-voltaic power supply and is optimized, show that the optimal of each photo-voltaic power supply has work value;Then using this result as the active output valve of each photo-voltaic power supply, with the minimum target of whole network voltage deviation, idle work optimization is carried out to photovoltaic DC-to-AC converter residual capacity again.The method of the present invention considers power distribution network performance driving economy and reliability, and the active and idle output of optimum distribution photovoltaic DC-to-AC converter effectively improves the rate of qualified voltage of the power distribution network containing photo-voltaic power supply.

Description

Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power
Technical field
The present invention relates to GA for reactive power optimization technology field more particularly to a kind of raising distribution containing distributed photovoltaic power The idle work optimization method of net rate of qualified voltage.
Background technology
With becoming increasingly conspicuous for problem of energy crisis, regenerative resource more has been favored by people, and especially cleans, without dirt Dye, resource distribution is wide, exploits convenient solar energy.Photovoltaic generation as a kind of efficient form using solar energy in the world Inside increase rapidly.Photo-voltaic power supply makes original single supply radial structure become more power supply architectures after being incorporated to power distribution network, changes Original direction of tide and size, with the raising of photovoltaic permeability, the grid-connected influence to distribution network voltage is increasingly Greatly.Some scholars propose that photovoltaic DC-to-AC converter while active power of output, can also export certain reactive power at present, can be with It is participated in the spare capacity of photovoltaic DC-to-AC converter as continuously adjustable reactive power source in the idle work optimization of power distribution network.In addition, Since inverter active output and idle output have coupling on capacity, when photovoltaic active power output occupancy capacity is excessive, It is possible that all residual capacities is called to carry out the situation that voltage can not be adjusted in prescribed limit by reactive-load compensation.
But in the prior art, optimization method of completing the square, nothing are lacked to the active output of photovoltaic DC-to-AC converter and idle output Method realizes the active output maximum of photo-voltaic power supply, the target of whole network voltage deviation minimum.
Invention content
Present invention aims at a kind of active output for capableing of optimum distribution photovoltaic DC-to-AC converter of offer and idle output, realities Existing photo-voltaic power supply is active to export maximum, whole network voltage deviation minimum the raising qualification rate of distribution network voltage containing distributed photovoltaic power Idle work optimization method.
To achieve the above object, following technical scheme is used:The method of the invention is by using Particle Swarm Optimization Method optimizes operation, solve photovoltaic DC-to-AC converter active reactive output optimal value, on-load transformer tap changer gear and Reactive-load compensation capacitor group number so that each node voltage deviation of power distribution network is minimum, improves distribution network voltage qualification rate;Specific steps It is as follows:
Step 1, under the premise of photo-voltaic power supply is exported with MPPT, the object function for making whole network voltage deviation minimum is established;
Step 2, Load flow calculation is carried out according to distribution net work structure parameter, establishes the GA for reactive power optimization etc. containing photo-voltaic power supply Formula constrains;
Step 3, with the residual capacity of photovoltaic DC-to-AC converter, on-load transformer tap changer gear and reactive-load compensation capacitor Variable, each node voltage of power distribution network are state variable to group in order to control, establish the GA for reactive power optimization inequality containing photo-voltaic power supply Constraint;
Step 4, it according to object function, equality constraint and the inequality constraints established, is carried out using particle cluster algorithm excellent Change operation, solves the idle output valve of each inverter, load tap changer gear and capacitor group input group number;
Step 5,
5.1, in the optimum results obtained in each control variable adjustable range, if occurring without the out-of-limit situation of node voltage, It is optimal case at this time, terminates optimization process
5.2, in the optimum results obtained in each control variable adjustable range, if still there is the out-of-limit situation of node voltage to go out It is existing, then continue prioritization scheme;The first step optimizes, under the premise of ensureing whole network voltage qualification, with all photovoltaic electrics of power distribution network The sum of source active power output is up to target, is respectively to control variable adjustable range in the active output upper limit of current photovoltaic and step 3 Inequality constraints solves each inverter active output optimal value;Second step optimizes, and each photo-voltaic power supply is in active output optimal value Under the premise of, return to step 1 with the minimum target of whole network voltage deviation, and carries out step 2,3,4 operations, finally solves successively Each inverter active is idle output valve, load tap changer gear and capacitor group input group number.
Further, establishing in step 1 makes the object function of whole network voltage deviation minimum, as shown in formula (1)
Wherein
In formula, UiFor the voltage of each node of power distribution network in addition to balance nodes,For each node voltage desired value, λ is The out-of-limit penalty coefficient of node voltage, Uimax、UiminThe respectively bound value of node voltage, n are except balance nodes external system Number of nodes.
Further, the GA for reactive power optimization equality constraint containing photo-voltaic power supply is established in step 2, as shown in formula (2)
In formula, Gij、BijAnd θijConductance, susceptance respectively between node i, j and phase difference of voltage, PZi、QZiRespectively The injection active power and reactive power of node i, PPVi、QPViThe respectively node i access active power of photo-voltaic power supply and idle Power, PLi、QLiThe active power and reactive power of load, Q respectively at node iCiThe idle of capacitor group is connect by node i Power generating value.
Further, the GA for reactive power optimization inequality constraints containing photo-voltaic power supply is established in step 3, such as formula (3) institute Show
In formula, QPViFor the reactive power that i-th of photo-voltaic power supply is sent out, QPVi.maxIt can be sent out for i-th of photo-voltaic power supply Reactive power maximum value and satisfactionNPVFor the quantity of photo-voltaic power supply, QCjFor jth platform compensating electric capacity The capacity of device input, LjFor jth platform compensation capacitor maximum group number, QCj0For the appearance of jth platform compensation capacitor single group capacitor Amount, NCThe number of units of compensation capacitor group, TtkFor the tap joint position of kth platform on-load regulator transformer, Ttk.min、Ttk.maxRespectively The tap joint position upper lower limit value of kth platform on-load regulator transformer, NTThe quantity of on-load regulator transformer, N are system node number, Ui.min、Ui.maxThe voltage upper lower limit value of respectively i-th node.
Further, the specific method is as follows for the first step optimization described in step 5.2:
Under the premise of ensureing that whole network voltage is qualified, it is up to target with the sum of all photo-voltaic power supply active power outputs of power distribution network Object function is established,
Wherein
In formula, PPViFor the active power of i-th of photo-voltaic power supply output, UiFor each node of power distribution network in addition to balance nodes Voltage, λ is the out-of-limit penalty coefficient of node voltage (for negative value), Uimax、UiminThe respectively bound value of node voltage, NPV By the number for the photo-voltaic power supply that power distribution network accesses, n is the number of nodes except balance nodes external system;
Step 2,3,4 are carried out successively, solve the active output optimal value of each photo-voltaic power supply.
Compared with prior art, the invention has the advantages that:Considering power distribution network performance driving economy and reliability On the basis of, the active output and idle output of optimum distribution photovoltaic DC-to-AC converter, under the premise of ensureing that whole network voltage is qualified, It realizes the active output maximum of photo-voltaic power supply, the target of whole network voltage deviation minimum, effectively improves the electricity of the power distribution network containing photo-voltaic power supply Press qualification rate.
Description of the drawings
Fig. 1 is the flow chart of the method for the present invention.
Drawing reference numeral:1 be in step 5.2 the first step optimization, 2 be in step 5.2 second step optimization.
Specific implementation mode
The present invention will be further described below in conjunction with the accompanying drawings:
As shown in Figure 1, the method for the invention optimizes operation by using particle swarm optimization algorithm, photovoltaic is solved Output optimal value that inverter active is idle, on-load transformer tap changer gear and reactive-load compensation capacitor group number so that match Each node voltage deviation of power grid is minimum, improves distribution network voltage qualification rate;It is as follows:
A establishes the object function for making whole network voltage deviation minimum under the premise of photo-voltaic power supply is exported with MPPT;Such as formula (1) shown in
Wherein
In formula, UiFor the voltage of each node of power distribution network in addition to balance nodes,For each node voltage desired value, λ is The out-of-limit penalty coefficient of node voltage, Uimax、UiminThe respectively bound value of node voltage, n are except balance nodes external system Number of nodes.
B carries out Load flow calculation according to distribution net work structure parameter, establishes the GA for reactive power optimization equation containing photo-voltaic power supply about Beam;As shown in formula (2)
In formula, Gij、BijAnd θijConductance, susceptance respectively between node i, j and phase difference of voltage, PZi、QZiRespectively The injection active power and reactive power of node i, PPVi、QPViThe respectively node i access active power of photo-voltaic power supply and idle Power, PLi、QLiThe active power and reactive power of load, Q respectively at node iCiThe idle of capacitor group is connect by node i Power generating value.
C is with the residual capacity of photovoltaic DC-to-AC converter, on-load transformer tap changer gear and reactive-load compensation capacitor group Variable is controlled, each node voltage of power distribution network is state variable, establishes the GA for reactive power optimization inequality constraints containing photo-voltaic power supply; As shown in formula (3)
In formula, QPViFor the reactive power that i-th of photo-voltaic power supply is sent out, QPVi.maxIt can be sent out for i-th of photo-voltaic power supply Reactive power maximum value and satisfactionNPVFor the quantity of photo-voltaic power supply, QCjFor jth platform compensating electric capacity The capacity of device input, LjFor jth platform compensation capacitor maximum group number, QCj0For the appearance of jth platform compensation capacitor single group capacitor Amount, NCThe number of units of compensation capacitor group, TtkFor the tap joint position of kth platform on-load regulator transformer, Ttk.min、Ttk.maxRespectively The tap joint position upper lower limit value of kth platform on-load regulator transformer, NTThe quantity of on-load regulator transformer, N are system node number, Ui.min、Ui.maxThe voltage upper lower limit value of respectively i-th node.
D optimizes fortune according to object function, equality constraint and the inequality constraints established using particle cluster algorithm It calculates, solves the idle output valve of each inverter, load tap changer gear and capacitor group input group number;
E, judges whether the optimum results obtained in each control variable adjustable range still have the out-of-limit situation of node voltage to occur, Terminate optimization process if the out-of-limit situation of no-voltage;If still there is node voltage out-of-limit situation occur, using the scheme of improving and optimizating into Row optimization, improves and optimizates scheme optimization process and is divided into two steps, in Fig. 1 in the signified dotted line frame of label 1 step f, g, h be improve it is excellent The change scheme first step optimizes, and step i, j, k are to improve and optimizate the optimization of scheme second step in the signified dotted line frame 2 of label 2 in Fig. 1.
Improve and optimizate the optimization of the scheme first step:
F is up to mesh under the premise of ensureing that whole network voltage is qualified with the sum of all photo-voltaic power supply active power outputs of power distribution network Mark establishes object function, as shown in formula (4)
Wherein
In formula, PPViFor the active power of i-th of photo-voltaic power supply output, UiFor each node of power distribution network in addition to balance nodes Voltage, λ is the out-of-limit penalty coefficient of node voltage (for negative value), Uimax、UiminThe respectively bound value of node voltage, NPV By the number for the photo-voltaic power supply that power distribution network accesses, n is the number of nodes except balance nodes external system;
G, according to the structural parameters of power distribution network carry out Load flow calculation, establish the GA for reactive power optimization containing photo-voltaic power supply etc. Formula constrains, as shown in formula (2).
With the active output upper limit value of photovoltaic DC-to-AC converter, photovoltaic DC-to-AC converter residual capacity, on-load transformer tap changer shelves Variable, each node voltage of power distribution network are state variable in order to control for position and reactive-load compensation capacitor group, establish matching containing photo-voltaic power supply Reactive power optimization inequality constraints, as shown in formula (5)
In formula, PPViFor photovoltaic active power output valve, PPVi.maxIt is i-th of photo-voltaic power supply in current time active power It can be output maximum value, NPVFor the quantity of photo-voltaic power supply, QPViFor the reactive power that i-th of photo-voltaic power supply is sent out, QPVi.maxIt is The reactive power maximum value and satisfaction that i photo-voltaic power supply can be sent outQCjElectricity is compensated for jth platform The capacity of container input, LjFor jth platform compensation capacitor maximum group number, QCj0For the appearance of jth platform compensation capacitor single group capacitor Amount, NCThe number of units of compensation capacitor group, Ttk.min、Ttk.maxRespectively above and below the tap joint position of kth platform on-load regulator transformer Limit value, NTThe quantity of on-load regulator transformer, N are system node number, Ui.min、Ui.maxAbove and below the voltage of respectively i-th node Limit value;
H optimizes operation using particle cluster algorithm, solves each inverter active output optimal value.
Improve and optimizate the optimization of scheme second step:
I, it is minimum with whole network voltage deviation under the premise of the active output optimal value of each photo-voltaic power supply of gained during the first step optimizes It is established shown in object function such as formula (1) for target;
G, according to the structural parameters of power distribution network carry out Load flow calculation, establish the GA for reactive power optimization containing photo-voltaic power supply etc. Formula constrains, as shown in formula (2);
In order to control with photovoltaic DC-to-AC converter residual capacity, on-load transformer tap changer gear and reactive-load compensation capacitor group Variable, each node voltage of power distribution network are state variable, the GA for reactive power optimization inequality constraints containing photo-voltaic power supply are established, such as formula (6) shown in
In formula, QPViFor the reactive power that i-th of photo-voltaic power supply is sent out, QPVi.maxIt can be sent out for i-th of photo-voltaic power supply Reactive power maximum value and satisfactionNPVFor the quantity of photo-voltaic power supply, QCjFor jth platform compensating electric capacity The capacity of device input, LjFor jth platform compensation capacitor maximum group number, QCj0For the appearance of jth platform compensation capacitor single group capacitor Amount, NCThe number of units of compensation capacitor group, Ttk.min、Ttk.maxRespectively above and below the tap joint position of kth platform on-load regulator transformer Limit value, NTThe quantity of on-load regulator transformer, N are system node number, Ui.min、Ui.maxAbove and below the voltage of respectively i-th node Limit value;
K carries out optimizing according to the GA for reactive power optimization mathematical model containing photo-voltaic power supply with particle cluster algorithm Solving-optimizing operation finally solves the idle output valve of each inverter active, load tap changer gear and capacitor group input Group number, terminates optimization process.
Embodiment described above is only that the preferred embodiment of the present invention is described, not to the model of the present invention It encloses and is defined, under the premise of not departing from design spirit of the present invention, technical side of the those of ordinary skill in the art to the present invention The various modifications and improvement that case is made should all be fallen into the protection domain of claims of the present invention determination.

Claims (5)

1. a kind of idle work optimization method improving the qualification rate of distribution network voltage containing distributed photovoltaic power, which is characterized in that described Method optimizes operation by using particle swarm optimization algorithm, solves photovoltaic DC-to-AC converter active reactive output optimal value, has Voltage adjustment of on-load load tap changer gear and reactive-load compensation capacitor group number so that each node voltage deviation of power distribution network is minimum, improves Distribution network voltage qualification rate;It is as follows:
Step 1, under the premise of photo-voltaic power supply is exported with MPPT, the object function for making whole network voltage deviation minimum is established;
Step 2, Load flow calculation is carried out according to distribution net work structure parameter, establishes the GA for reactive power optimization equation containing photo-voltaic power supply about Beam;
Step 3, it is with the residual capacity of photovoltaic DC-to-AC converter, on-load transformer tap changer gear and reactive-load compensation capacitor group Variable is controlled, each node voltage of power distribution network is state variable, establishes the GA for reactive power optimization inequality constraints containing photo-voltaic power supply;
Step 4, according to object function, equality constraint and the inequality constraints established, fortune is optimized using particle cluster algorithm It calculates, solves the idle output valve of each inverter, load tap changer gear and capacitor group input group number;
Step 5,
5.1, in the optimum results obtained in each control variable adjustable range, if occurring without the out-of-limit situation of node voltage, at this time For optimal case, terminate optimization process
5.2, in the optimum results obtained in each control variable adjustable range, if still there is the out-of-limit situation of node voltage to occur, Continue prioritization scheme;The first step optimizes, active with all photo-voltaic power supplies of power distribution network under the premise of ensureing whole network voltage qualification The sum of output is up to target, respectively to control variable adjustable range as inequality in the active output upper limit of current photovoltaic and step 3 Constraint solves each inverter active output optimal value;Second step optimizes, and each photo-voltaic power supply is in active output optimal value premise Under, return to step 1 with the minimum target of whole network voltage deviation, and carries out step 2,3,4 operations, finally solves each inverse successively Become device active reactive output valve, load tap changer gear and capacitor group input group number.
2. the idle work optimization method according to claim 1 for improving the qualification rate of distribution network voltage containing distributed photovoltaic power, It is characterized in that:Establishing in step 1 makes the object function of whole network voltage deviation minimum, as shown in formula (1)
Wherein
In formula, UiFor the voltage of each node of power distribution network in addition to balance nodes,For each node voltage desired value, λ is node Voltage out-of-limit penalty coefficient, Uimax、UiminThe respectively bound value of node voltage, n are the node except balance nodes external system Number.
3. the idle work optimization method according to claim 1 for improving the qualification rate of distribution network voltage containing distributed photovoltaic power, It is characterized in that:The GA for reactive power optimization equality constraint containing photo-voltaic power supply is established in step 2, as shown in formula (2)
In formula, Gij、BijAnd θijConductance, susceptance respectively between node i, j and phase difference of voltage, PZi、QZiRespectively node i Injection active power and reactive power, PPVi、QPViThe respectively active power and reactive power of node i access photo-voltaic power supply, PLi、QLiThe active power and reactive power of load, Q respectively at node iCiThe idle output of capacitor group is connect by node i Value.
4. the idle work optimization method according to claim 1 for improving the qualification rate of distribution network voltage containing distributed photovoltaic power, It is characterized in that:The GA for reactive power optimization inequality constraints containing photo-voltaic power supply is established in step 3, as shown in formula (3)
In formula, QPViFor the reactive power that i-th of photo-voltaic power supply is sent out, QPVi.maxIt can be sent out for i-th of photo-voltaic power supply idle Power maximum value and satisfactionNPVFor the quantity of photo-voltaic power supply, QCjIt is thrown for jth platform compensation capacitor The capacity entered, LjFor jth platform compensation capacitor maximum group number, QCj0For the capacity of jth platform compensation capacitor single group capacitor, NCIt mends Repay the number of units of capacitor group, TtkFor the tap joint position of kth platform on-load regulator transformer, Ttk.min、Ttk.maxRespectively kth platform has The tap joint position upper lower limit value of voltage adjustment of on-load transformer, NTThe quantity of on-load regulator transformer, N are system node number, Ui.min、 Ui.maxThe voltage upper lower limit value of respectively i-th node.
5. the idle work optimization method according to claim 1 for improving the qualification rate of distribution network voltage containing distributed photovoltaic power, It is characterized in that, the specific method is as follows for the first step optimization described in step 5.2:
Under the premise of ensureing that whole network voltage is qualified, it is up to target with the sum of all photo-voltaic power supply active power outputs of power distribution network and establishes Object function,
Wherein
In formula, PPViFor the active power of i-th of photo-voltaic power supply output, UiFor the electricity of each node of power distribution network in addition to balance nodes Pressure, λ is the out-of-limit penalty coefficient of node voltage, and λ is negative value, Uimax、UiminThe respectively bound value of node voltage, NPVFor The number for the photo-voltaic power supply that power distribution network is accessed, n are the number of nodes except balance nodes external system;
Step 2,3,4 are carried out successively, solve the active output optimal value of each photo-voltaic power supply.
CN201610534707.XA 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power Active CN106058887B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610534707.XA CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610534707.XA CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Publications (2)

Publication Number Publication Date
CN106058887A CN106058887A (en) 2016-10-26
CN106058887B true CN106058887B (en) 2018-10-16

Family

ID=57184990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610534707.XA Active CN106058887B (en) 2016-07-08 2016-07-08 Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power

Country Status (1)

Country Link
CN (1) CN106058887B (en)

Families Citing this family (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786610B (en) * 2016-11-27 2019-04-05 东北电力大学 A kind of distributed photovoltaic high permeability network voltage optimization method based on energy-storage battery
CN106712083B (en) * 2017-01-03 2019-08-13 国能日新科技股份有限公司 A kind of photovoltaic AGC&AVC control method and system based on fuzzy control
CN106655174B (en) * 2017-01-03 2019-04-09 昆明理工大学 A kind of power distribution network synthesis reconstruction and optimization method
CN107134788B (en) * 2017-06-15 2019-09-27 清华大学 A kind of photovoltaic power generation cluster participation voltage-controlled method of Electrical Power System Dynamic
CN107437813B (en) * 2017-07-17 2021-02-09 安徽大学 Power distribution network reactive power optimization method based on cuckoo-particle swarm
CN109167368B (en) * 2018-09-18 2020-05-15 国网湖南省电力有限公司 User voltage optimization and regulation method and system with distributed photovoltaic
CN109586305B (en) * 2018-12-12 2022-04-19 国网山西省电力公司大同供电公司 Power distribution network operation control strategy based on flexible multi-state switch
CN109742765B (en) * 2019-02-19 2020-08-11 国网江西省电力有限公司电力科学研究院 Power distribution station gear adjusting method and device
CN110120670B (en) * 2019-04-25 2020-11-17 国网河北省电力有限公司邢台供电分公司 DPV-containing power distribution network reactive voltage optimization method, terminal equipment and storage medium
CN110739698B (en) * 2019-11-20 2023-07-28 国网山东省电力公司潍坊市寒亭区供电公司 Method and system for allocating 10kV bus voltage and public distribution transformer outlet voltage
CN113629723B (en) * 2021-07-05 2024-01-12 燕山大学 SVG (static var generator) optimal configuration method considering DG and APF to participate in voltage management
CN113991732B (en) * 2021-10-21 2023-11-28 国电南瑞科技股份有限公司 Double-target voltage control method and device for distributed power distribution network

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103701132B (en) * 2013-12-20 2015-09-30 清华大学 A kind of superpotential method of control active distribution network based on meritorious-idle coordination
CN104269855B (en) * 2014-10-22 2017-01-18 贵州电力试验研究院 Rapid site reactive voltage adjusting method adaptable to multiple energy accesses
CN105281360B (en) * 2015-09-14 2018-05-11 国家电网公司 A kind of distributed photovoltaic automatic power generation control method based on sensitivity
CN105207274B (en) * 2015-10-29 2017-12-08 许继集团有限公司 A kind of distributed photovoltaic power generation control method of the idle output of automatic adjusument

Also Published As

Publication number Publication date
CN106058887A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106058887B (en) Improve the idle work optimization method of the qualification rate of distribution network voltage containing distributed photovoltaic power
CN108988402B (en) Optimization control method for alternating current-direct current power distribution network based on optimization scheduling
CN106549392B (en) A kind of power distribution network control method for coordinating
CN107332234A (en) One kind considers the intermittent active distribution network multiple faults correcting strategy of regenerative resource
CN107565576B (en) Reactive voltage optimization method for active power distribution network coordinated by multiple active management means
CN105870949B (en) A kind of micro-capacitance sensor energy-storage units optimal control method based on distributed gradient algorithm
CN106921164A (en) The MIXED INTEGER Second-order cone programming method and system of distribution voltage power-less collaboration optimization
CN110556856A (en) communication-independent multi-mode electric energy router and seamless switching control method thereof
CN106505558B (en) A kind of the energy conveyance control method and device of DC distribution net
CN110544961A (en) dynamic economic dispatching method for isolated grid type alternating current-direct current hybrid micro-grid
CN113644693B (en) Distributed operation control method for renewable energy/hydrogen-containing alternating current-direct current hybrid system
CN104158198A (en) Optimization trend control apparatus and method for power distribution network
CN105896575A (en) Hundred megawatt energy storage power control method and system based on self-adaptive dynamic programming
CN106058858A (en) Power distribution network optimization method and power distribution network optimization device
CN104659812B (en) A kind of many microgrid control method for coordinating based on PREDICTIVE CONTROL
CN106655253A (en) Single-/three-phase multi-micro-grid region dynamic partitioning method
CN108695875A (en) The power distribution network running optimizatin method of intelligent Sofe Switch and energy storage device joint access
CN114928057A (en) Multi-objective power flow optimization method suitable for new energy multi-terminal flexible-straight system
CN105426985B (en) Urban distribution network voltage distribution optimization method suitable for roof photovoltaic access
CN111478335B (en) Power distribution network load flow calculation method and system considering distributed photovoltaic
CN105896613B (en) A kind of micro-capacitance sensor distribution finite-time control method for considering communication time lag
Almousawi et al. Control strategy for a PV-BESS-SC hybrid system in islanded microgrid
CN106451477A (en) Reactive power voltage coordination control method adaptable to clustered wind-solar-electricity access system
CN106655245B (en) A kind of light storage output power Active Control Method
CN104600746B (en) Region photovoltaic energy-storage system grid-connected converter Passive Nonlinear control method

Legal Events

Date Code Title Description