CN106056366A - Automatic office data processing method and automatic office data processing system - Google Patents
Automatic office data processing method and automatic office data processing system Download PDFInfo
- Publication number
- CN106056366A CN106056366A CN201610615171.4A CN201610615171A CN106056366A CN 106056366 A CN106056366 A CN 106056366A CN 201610615171 A CN201610615171 A CN 201610615171A CN 106056366 A CN106056366 A CN 106056366A
- Authority
- CN
- China
- Prior art keywords
- information
- user
- project
- training
- data processing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/105—Human resources
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Economics (AREA)
- Marketing (AREA)
- Data Mining & Analysis (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention belongs to the technical field of computer, and provides an automatic office data processing method and an automatic office data processing system. The method comprises the following steps: a client acquires the user basic information of a user, and acquires at least one of project information and employment information; the client associates the project information with the user basic information to form project management information according to the project type of the project information as well as job information and/or training information, and associates the employment information with the user basic information to form training management information according to the skill requirements of the employment information; and the client configures a project execution process corresponding to the project information for the project management information according to the project type of the project information, and configures a training service process corresponding to the employment information for the training management information according to the skill requirements of the employment information. Through the automatic office data processing method and the automatic office data processing system of the invention, users can process project information and employment information conveniently and quickly, and the office efficiency and flexibility are improved.
Description
Technical field
The present invention relates to field of computer technology, be specifically related to a kind of office data processing method and system automatically.
Background technology
At present, company needs for responsibility and the workflow of clear and definite all departments, how can use office automation software, real
Existing information management and data sharing, meet internal institution issued transaction needs.
But, in actual application, have problems.The employee of such as IT class company can perform one or more
Project, or training universities and colleges wish keep track of student multi-aspect information, such as talent market etc..User needs repeatedly to look into
Asking, can obtain talent market and the training information of target person, office efficiency reduces.Even, when running into special flow process,
Existing OA system can not meet the demand of employee, or, need to be adjusted according to existing OA system, reduce office effect
Rate, brings great inconvenience also to user company.
How to facilitate user processing item information and talent market quickly, improve office efficiency, be people in the art
The problem that member needs solution badly.
Summary of the invention
For defect of the prior art, the present invention provides a kind of office data processing method and system automatically, it is possible to side
Just user's processing item information and talent market quickly, improves office efficiency and degree of flexibility.
First aspect, the present invention provides a kind of office data processing method automatically, including:
Information acquiring step: user side obtains the user basic information of user, and obtains project information and talent market
In at least one, user basic information includes post information and/or training information;
Information association step: user side according to the item types of project information, and post information and/or training information,
Project information is associated with user basic information, forms Project Management Information, according to the skill set requirements of talent market, and post
Information and/or training information, associate talent market with user basic information, form training management information;
Flow process configuration step: according to the item types of project information, corresponding with project information for Project Management Information configuration
Project implementation flow process, according to the skill set requirements of talent market, for the training that training management information configuration is corresponding with talent market
Operation flow.
Further, the present embodiment automatic office data processing method also includes: user side receive user account information and
User profile query statement, and send to server;
User side receives the user profile mated with user profile query statement of server feedback, and server is used for storing
User profile.
Further, the present embodiment automatic office data processing method also includes: user side also receives user profile operation
Instruction, according to user profile operational order Edit Profile, and preserves the user profile after editor to server.
Further, flow process configuration step specifically includes: according to the item types of project information, searches and item types pair
The template type operation flow answered, and template type operation flow is configured to the project implementation flow process of Project Management Information, or according to
The item types of project information, edits the self-built formula operation flow corresponding with item types, and self-built formula operation flow is configured
Project implementation flow process for Project Management Information;
According to the skill set requirements of talent market, search the template type Training Business Process corresponding with skill set requirements, and by mould
Board-like Training Business Process is configured to the Training Business Process of training management information, or the item types according to project information, compiles
Collect the self-built formula Training Business Process corresponding with skill set requirements, and self-built formula Training Business Process is configured to training management information
Training Business Process.
Based on above-mentioned office data processing method embodiment the most automatically, further, the method also includes: according in advance
The user's work attendance information obtained, and the Project Management Information corresponding with user's work attendance information, determine user's wages of this user.
Further, the present embodiment automatic office data processing method also includes:
Obtain the user basic information of user;
According to the job information in user basic information and/or training information, mate user right for user basic information
And user account information;
According to user right, for the permissions data scope that user basic information association is corresponding with user right.
Based on above-mentioned office data processing method embodiment the most automatically, further, the method also includes:
Real time record user test information in Training Business Process;
According to test information and the skill set requirements of talent market, determine the training examination information of this user.
Further, the present embodiment automatic office data processing method also includes:
The access time of real time record client and access purpose.
Second aspect, the present invention provides a kind of office data processing system automatically, this system include information acquisition subsystem,
Information association subsystem and flow process configuration subsystem, information acquisition subsystem makes user side obtain the user basic information of user,
And obtaining at least one in project information and talent market, user basic information includes post information and/or training information;
Information association subsystem make user side according to the item types of project information, and post information and/or training information, by project
Information associates with user basic information, forms Project Management Information;And the skill set requirements according to talent market, and post letter
Breath and/or training information, associate talent market with user basic information, form training management information;Flow process configuration subsystem
For the item types according to project information, for the project implementation flow process that Project Management Information configuration is corresponding with project information;With
And the skill set requirements according to talent market, for the Training Business Process that training management information configuration is corresponding with talent market.
As shown from the above technical solution, the present invention automatic office data processing method and system, information acquisition subsystem energy
Enough obtain the user basic information of user, and the project information paid close attention to of this user or talent market, information association subsystem
According to the item types of project information, project information is associated with user basic information, so that the user of different position can divide
It is fitted on the project being suitable for individual, it is also possible to guarantee that different types of project can obtain appropriate personnel and perform.It it is project simultaneously
Management information configuration project implementation flow process, it is ensured that this project can be successfully executed.
Further, flow process configuration subsystem can also be according to the skill set requirements of talent market, by basic to talent market and user
Information association, allows the user to the skill set requirements corresponding to the talent market according to individual's expectation, is assigned to suitably train
Project, configures Training Business Process for training management information, it is ensured that user can obtain corresponding professional training simultaneously.
Therefore, the present invention automatic office data processing method and system, it is possible to facilitate user in project management and employment training
The aspects such as instruction carry out information processing, it is possible to be greatly increased office degree of flexibility, improve office efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly that the specific embodiment of the invention or technical scheme of the prior art, below will be to specifically
In embodiment or description of the prior art, the required accompanying drawing used is briefly described.In all of the figs, similar element
Or part is typically by the reference mark being similar to.In accompanying drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 shows one provided by the present invention automatic office data process flow figure;
Fig. 2 shows a kind of self cooled server architecture schematic diagram provided by the present invention;
Fig. 3 shows one provided by the present invention automatic office data processing system structural representation.
Detailed description of the invention
Below in conjunction with accompanying drawing, the embodiment of technical solution of the present invention is described in detail.Following example are only used for
Technical scheme is clearly described, is therefore intended only as example, and the protection of the present invention can not be limited with this
Scope.
It should be noted that except as otherwise noted, technical term used in this application or scientific terminology should be this
The ordinary meaning that bright one of ordinary skill in the art are understood.
First aspect, the present invention provides a kind of office data processing method automatically, in conjunction with Fig. 1, at this automatic office data
Reason method includes:
Information acquiring step S1: user side obtains the user basic information of user, and obtains project information and employment letter
At least one in breath, user basic information includes post information and/or training information;
Information association step S2: user side is according to the item types of project information, and post information and/or training are believed
Breath, associates project information with user basic information, forms Project Management Information, according to the skill set requirements of talent market, and
Post information and/or training information, associate talent market with user basic information, form training management information;
Flow process configuration step S3: according to the item types of project information, for Project Management Information configuration and project information pair
The project implementation flow process answered, according to the skill set requirements of talent market, for the training that training management information configuration is corresponding with talent market
Instruction operation flow.
As shown from the above technical solution, the present embodiment automatic office administration method, it is possible to the user obtaining user believes substantially
Breath, and the project information paid close attention to of this user or talent market, according to the item types of project information, by project information and use
Family essential information association, so that the user of different position can be assigned to be suitable for the project of individual, it is also possible to guarantee dissimilar
Project can obtain appropriate personnel perform.Configure project implementation flow process for Project Management Information, it is ensured that this project energy simultaneously
Access execution smoothly.
Further, talent market can also be associated with user basic information by the method according to the skill set requirements of talent market,
Allow the user to the skill set requirements corresponding to the talent market according to individual's expectation, be assigned to suitable training project, simultaneously
Training Business Process is configured, it is ensured that user can obtain corresponding professional training for training management information.
Therefore, the present embodiment automatic office data processing method, it is possible to facilitate user in project management and career training etc.
Aspect carries out information processing, improves office efficiency.
In order to improve the treatment effeciency of office data processing method further, improving degree of automatically handling official business, the present embodiment is certainly
The information acquiring step S1 of dynamic office data processing method specifically includes: user side obtains the user basic information of user, and
Obtaining at least one in project information and talent market, user basic information includes post information and/or training information;
Information association step S2 specifically includes: user side according to the item types of project information, and post information and/or
Training information, associates project information with user basic information, forms Project Management Information, wants according to the technical ability of talent market
Ask, and post information and/or training information, talent market is associated with user basic information, formation training management information;
Flow process configuration step S3 specifically includes: self cooled server is according to the item types of project information, for project pipe
The project implementation flow process that reason information configuration is corresponding with project information;According to the skill set requirements of talent market, for training management information
Configure the Training Business Process corresponding with talent market.
The method can perform information acquiring step S1 and information association step S2 at user side, at self cooled server
Upper execution flow process configuration step S3, it is also possible to be to perform information acquiring step S1, information association step S2 and flow process at user side
Configuration step S3, improves the efficiency that data process, and office automatic degree.
In order to improve the degree of flexibility of office data processing method further, meet different user to business perform flow process or
The demand of training business, the flow process configuration step S3 of the present embodiment automatic office data processing method specifically includes: according to project
The item types of information, searches the template type operation flow corresponding with item types, and template type operation flow is configured to item
The project implementation flow process of mesh management information, or the item types according to project information, edit the self-built formula corresponding with item types
Operation flow, and self-built formula operation flow is configured to the project implementation flow process of Project Management Information;
According to the skill set requirements of talent market, search the template type Training Business Process corresponding with skill set requirements, and by mould
Board-like Training Business Process is configured to the Training Business Process of training management information, or the item types according to project information, compiles
Collect the self-built formula Training Business Process corresponding with skill set requirements, and self-built formula Training Business Process is configured to training management information
Training Business Process.
The method, when performing flow process for user's configuration item purpose business, can use server end automatically for the item of user
Mesh configuration project implementation flow process or Training Business Process, such as, sequentially pass through project evaluation step, project by pending project
Testing procedure, project examination & verification steps etc., this project implementation flow process can also be the attendance time of employee, skills training, post tune
Move.To treat that training program sequentially passes through training stage, test phase etc..Meanwhile, the method can also provide the user self-built
Formula operation flow or Training Business Process, meet the specific demand of user, sets up application mode flexibly for user, it is possible to realizes
The combination of greater demand, it is not necessary to limited by existing office system basic function.
In order to meet the application demand of user further, specifically, for information inquiry, the automatic office data of the present embodiment
Processing method also includes: user side receives user account information and user profile query statement, and sends to server;User side
Receiving the user profile mated with user profile query statement of server feedback, server is used for storing user profile.Management
Member uses the method can inquire about employee information, and employee information includes the essential information of employee, such as name, age, identity card
Number, affiliated function, overtime information, basic wage, work attendance information and all kinds of reimbursements of employee etc., begin a project or lower item understanding employee
Mesh situation, such as whether work in project team, and understands employee and goes to work situation and overtime work situation, as employee goes to work on certain days sky
Number and natural law absent from duty, and certain date employee works overtime period and overtime work duration.
Specifically, for information management, the present embodiment automatic office data processing method also includes: user side also receives use
Family information operating instruction, according to user profile operational order Edit Profile, and preserves the user profile after editor to clothes
Business device.Wherein, managing user information includes the storage operations such as the amendment to user basic information and increase.
Additionally, domestic consumer uses the method can also upload work attendance, typing overtime work situation, and individual's reimbursement application
Deng.Domestic consumer can use the method to propose reimbursement application according to consumption invoice etc. in the range of company submits an expense account.
Specifically, for the employee of enterprise, the present embodiment automatic office data processing method also includes: according to obtaining in advance
User's work attendance information, and the Project Management Information corresponding with user's work attendance information, determine user's wages of this user.In conjunction with
User's work attendance information of user and Project Management Information, take into account user's office hours and project management capability, provides the user complete
The wages appraisement system in face, it is simple to the accounting of user's wages.Meanwhile, the user to different positions, according to job information, it is also possible to
Use according to the user's work attendance information obtained in advance, determine user's wages of this user, or according to the project management obtained in advance
Information, determines user's wages of this user.To meet the demand that different types of employee is calculated user's wages of enterprise.Its
In, the acquisition methods of user's work attendance information includes: the office hours submitted in advance according to user, determines the work attendance information of user.
Its office hours can be the commuter time of user's preentry of goods.
Student for training, it would however also be possible to employ the present embodiment automatic office data processing method, specific as follows:
According to the user's work attendance information obtained in advance, and the training management information corresponding with user's work attendance information, determine
The evaluation of training of this user.In conjunction with user's work attendance information and the training management information of user, take into account user training time and training
Technical ability difficulty, provides the user and comprehensively trains appraisement system.
Meanwhile, the method is it may also is that real time record user test information in Training Business Process;According to test letter
Breath and the skill set requirements of talent market, determine the training examination information of this user.Test information and talent market in conjunction with user
Skill set requirements, provide the user and comprehensively train appraisement system.Meet difference training universities and colleges or the reality of internal training enterprise
The demand of application.
In order to ensure that different types of user processes data, and the transmission that ensures information security more quickly, the present embodiment is certainly
Dynamic office data processing method also includes:
Obtain the user basic information of user;
According to the job information in user basic information and/or training information, mate user right for user basic information
And user account information;
According to user right, for the permissions data scope that user basic information association is corresponding with user right.As user can
To be respectively set to manager, operator and viewer, operator obtains the process that implements of authority and can be: according to operation
The job information of person's essential information, for operator's essential information matching operation person's authority and operator's account;Weigh according to operator
Limit, for the permissions data scope that the association of operator's essential information is corresponding with operator's authority, operator i.e. can realize information and look into
Ask and information editing.Meanwhile, operator can realize the examination & verification to each application interface information and approval, and viewer can realize
Each application interface information is browsed, understands in time documentary whip or training notice etc. that each department issues.Meanwhile, this reality
Execute example automatic office data processing method also to include: the access time of real time record client and access purpose.Real time record is used
Place, family company or the visiting personnel of enterprise, visiting personnel can be to arrive the important leader of examination, cooperative venture, employee's interview
Etc., it is simple to company or the record management of enterprise.
In order to effectively reduce the temperature of server internal, electronic component is made to operate in Suitable ranges, to improve certainly
The data-handling efficiency of dynamic office data processing method, and ensure above-mentioned information inquiry, manage and the stablizing of the computing such as storage
Property, using following server architecture, this server includes housing 1 and pcb board 2, specifically, in conjunction with Fig. 2, first of pcb board 2
On electronic component 22 is installed, pcb board is provided with the electronic circuit for electrically connecting electronic component 22, and electronic circuit is in series with
The coil 17 of electrically operated valve, coil 17 is set on the coil fixing body 21 being connected fixing with valve plate 15, when coil 17 moves
Time dynamic, coil fixing body 21 also can drive valve plate 15 to be moved, and coil 17 is arranged in magnetic field, the direction in magnetic field in the drawings by
⊙ represents, magnetic field can be produced by U magnet, and magnetic field is for controlling valve core movement to change the openings of sizes of electrically operated valve, magnetic
It is axial that magnetic induction line in Chang is perpendicular to coil, and the opening part of electrically operated valve is provided with the spring 23 being connected with valve plate 15, spring 23
Being set on sliding axle 14, sliding axle 14 is also fixing with valve plate 15 to be connected, and the other end of spring 23 is against and is fixedly mounted on cooling
On spring support 19 on pipeline 13, spring 23 is for promoting valve plate 15 to close the opening of electrically operated valve, and electrically operated valve is arranged
On cooling line 13, gas outlet 16 setting direction of electrically operated valve is so that the air-flow sprayed by opening is towards electronic component 22
Ejection, cooling line 13 is positioned at second side of pcb board 2, and second is the reverse side of first, and cooling line 13 is used with cooling
Gas input device or cooling gas generating unit connect.
Wherein the air inlet of cooling line 13 uses the mode from housing external admission, particularly, by cooling gas inlet
Device air inlet, through defecator 12, then has cooling fan 11 to be blown in cooling line 13.
When using gas produced by the cooling gas or cooling gas generating unit introduced from the external world, pass through pipeline
The electronic component 22 importing to heating is other, it is possible to use temperature lower, the most heated by other electronic component 22
These electronic components 22 are cooled down by cooling gas, and cooling effect is more preferable, and rate of cooling faster, is beneficial to realize electricity
The temperature of sub-element 22 maintains in lower level.And, by coil 17 being connected in series to circuit board in order to connect electronics unit
In the circuit of part 22, when electronic component 22 more needs to dispel the heat, and all thermal powers produced by it, derive from electrical power, and
Electrical power is the biggest, and its electric current is the biggest, so coil 17 can produce bigger active force, band moving winding fixing body 21 and valve
The plate 15 right side in figure is moved, to resist elastic force produced by spring 23.When bigger elastic force can be produced, its elastic shape
Becoming the biggest so that the opening of electrically operated valve is the biggest, the flow of the cooling gas that it can pass through is the biggest, and cooling capacity is more
By force.It is achieved thereby that the different cooling effects of the electronic component 22 for different operating temperature, or for same electronic component 22,
Different cooling effects when different temperatures, thus improve cooling gas input device or cooling gas generating unit exists
Import work efficiency during equal number cooling gas, improve cooling capacity.
Meanwhile, spring is spiral compression spring, and this spring is used for promoting valve plate, so that gas outlet is closed, it is also possible to replace
Being changed to spiral stretching spring and torsionspring, the mode of air inlet introduces cooling gas, and liquid nitrogen actually can also be utilized to produce
Raw food nitrogen but, it is achieved cooling, uses the mode of liquid nitrogen to cool down, and not only gas temperature is the lowest, and cooling capacity is strong, and
And the dust that will not produce in air cooling pollutes electronical elements surface, the problem reducing electronic element radiating ability.
Second aspect, the present invention provides a kind of office data processing system automatically, and in conjunction with Fig. 3, this system includes that information obtains
Taking subsystem 31, information association subsystem 32 and flow process configuration subsystem 33, information acquisition subsystem 31 makes user side obtain use
The user basic information at family, and obtain at least one in project information and talent market, user basic information includes post
Information and/or training information;Information association subsystem 32 make user side according to the item types of project information, and post information
And/or training information, project information is associated with user basic information, forms Project Management Information;And according to talent market
Skill set requirements, and post information and/or training information, talent market associate with user basic information, formed train manage
Reason information;Flow process configuration subsystem 33, for the item types according to project information, is believed with project for Project Management Information configuration
The project implementation flow process that breath is corresponding;And the skill set requirements according to talent market, for training management information configuration and talent market
Corresponding Training Business Process.
As shown from the above technical solution, the present embodiment automatic office data processing method and system, information acquisition subsystem
31 user basic information that can obtain user, and the project information paid close attention to of this user or talent market, information association
Project information, according to the item types of project information, is associated by system 32 with user basic information, so that the user of different position
Can be assigned to be suitable for the project of individual, it is also possible to guarantee that different types of project can obtain appropriate personnel and perform.Simultaneously
Project implementation flow process is configured, it is ensured that this project can be successfully executed for Project Management Information.
Further, flow process configuration subsystem 33 can also be according to the skill set requirements of talent market, by talent market and user's base
This information association, allows the user to the skill set requirements corresponding to the talent market according to individual's expectation, is assigned to suitably train
Instruction project, configures Training Business Process for training management information, it is ensured that user can obtain corresponding professional training simultaneously.
Therefore, the present embodiment automatic office data processing system, it is possible to facilitate user in project management and career training etc.
Aspect carries out information processing, it is possible to be greatly increased office degree of flexibility, improves office efficiency.
Last it is noted that various embodiments above is only in order to illustrate technical scheme, it is not intended to limit;To the greatest extent
The present invention has been described in detail by pipe with reference to foregoing embodiments, it will be understood by those within the art that: it depends on
So the technical scheme described in foregoing embodiments can be modified, or the most some or all of technical characteristic is entered
Row equivalent;And these amendments or replacement, do not make the essence of appropriate technical solution depart from various embodiments of the present invention technology
The scope of scheme, it all should be contained in the middle of the claim of the present invention and the scope of description.
Claims (9)
1. an automatic office data processing method, it is characterised in that including:
Information acquiring step: user side obtains the user basic information of user, and obtains in project information and talent market
At least one, described user basic information includes post information and/or training information;
Information association step: described user side is according to the item types of described project information, and described post information and/or institute
State training information, described project information is associated with described user basic information, form Project Management Information, according to described employment
The skill set requirements of information, and described post information and/or described training information, by basic with described user for described talent market
Information association, forms training management information;
Flow process configuration step: according to the item types of described project information, for the configuration of described Project Management Information and described project
The project implementation flow process that information is corresponding, according to the skill set requirements of described talent market, for the configuration of described training management information and institute
State the Training Business Process that talent market is corresponding.
The most automatic office data processing method, it is characterised in that the method also includes: described user
End receives user account information and user profile query statement, and sends to server;
Described user side receives the user profile mated with described user profile query statement of described server feedback, described clothes
Business device is used for storing user profile.
The most automatic office data processing method, it is characterised in that the method also includes: described user
End also receives user profile operational order, according to user profile described in described user profile operational order editor, and by after editor
Described user profile preserve to described server.
The most automatic office data processing method, it is characterised in that
Described flow process configuration step specifically includes:
According to the item types of described project information, search the template type operation flow corresponding with described item types, and by institute
State template type operation flow and be configured to the project implementation flow process of described Project Management Information, or the project according to described project information
Type, edits the self-built formula operation flow corresponding with described item types, and described self-built formula operation flow is configured to described
The project implementation flow process of Project Management Information;
According to the skill set requirements of described talent market, search the template type Training Business Process corresponding with described skill set requirements, and
Described template type Training Business Process is configured to the Training Business Process of described training management information, or believes according to described project
The item types of breath, edits the self-built formula Training Business Process corresponding with described skill set requirements, and by described self-built formula training industry
Business flow process is configured to the Training Business Process of described training management information.
5. according to office data processing method automatic described in Claims 1 to 4 any one, it is characterised in that the method is also wrapped
Include:
According to the user's work attendance information obtained in advance, and the Project Management Information corresponding with described user's work attendance information, determine
User's wages of this user.
The most automatic office data processing method, it is characterised in that the method also includes:
Obtain the user basic information of described user;
According to the job information in described user basic information and/or training information, mate user for described user basic information
Authority and user account information;
According to described user right, for the permissions data scope that the association of described user basic information is corresponding with described user right.
7. according to office data processing method automatic described in claim 1~6 any one, it is characterised in that the method is also wrapped
Include:
Real time record user test information in described Training Business Process;
According to described test information and the skill set requirements of described talent market, determine the training examination information of this user.
The most automatic office data processing method, it is characterised in that the method also includes: real time record
The access time of client and access purpose.
9. an automatic office data processing system, it is characterised in that include information acquisition subsystem, information association subsystem and
Flow process configuration subsystem,
Described information acquisition subsystem, makes user side obtain the user basic information of user, and obtains project information and employment
At least one in information, described user basic information includes post information and/or training information;
Described information association subsystem, make user side according to the item types of described project information, and described post information and/
Or described training information, described project information is associated with described user basic information, forms Project Management Information;And according to
The skill set requirements of described talent market, and described post information and/or described training information, by described talent market with described
User basic information associates, and forms training management information;
Described flow process configuration subsystem, for the item types according to described project information, configures for described Project Management Information
The project implementation flow process corresponding with described project information;And the skill set requirements according to described talent market, for described training pipe
The Training Business Process that reason information configuration is corresponding with described talent market.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610615171.4A CN106056366A (en) | 2016-07-29 | 2016-07-29 | Automatic office data processing method and automatic office data processing system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610615171.4A CN106056366A (en) | 2016-07-29 | 2016-07-29 | Automatic office data processing method and automatic office data processing system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106056366A true CN106056366A (en) | 2016-10-26 |
Family
ID=57197009
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610615171.4A Pending CN106056366A (en) | 2016-07-29 | 2016-07-29 | Automatic office data processing method and automatic office data processing system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106056366A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109510840A (en) * | 2018-12-24 | 2019-03-22 | 中国南方电网有限责任公司 | Sharing method, device, computer equipment and the storage medium of unstructured data |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050033670A1 (en) * | 2003-08-06 | 2005-02-10 | Cheng Kung Chieh | System and method for dynamically controlling attendance of a group of employees |
CN102147895A (en) * | 2011-04-28 | 2011-08-10 | 江苏欧索软件有限公司 | Software talent information service platform |
CN105139181A (en) * | 2015-07-17 | 2015-12-09 | 苏州朗捷通智能科技有限公司 | Enterprise collaborative office management system |
-
2016
- 2016-07-29 CN CN201610615171.4A patent/CN106056366A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20050033670A1 (en) * | 2003-08-06 | 2005-02-10 | Cheng Kung Chieh | System and method for dynamically controlling attendance of a group of employees |
CN102147895A (en) * | 2011-04-28 | 2011-08-10 | 江苏欧索软件有限公司 | Software talent information service platform |
CN105139181A (en) * | 2015-07-17 | 2015-12-09 | 苏州朗捷通智能科技有限公司 | Enterprise collaborative office management system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109510840A (en) * | 2018-12-24 | 2019-03-22 | 中国南方电网有限责任公司 | Sharing method, device, computer equipment and the storage medium of unstructured data |
CN109510840B (en) * | 2018-12-24 | 2021-07-13 | 中国南方电网有限责任公司 | Method and device for sharing unstructured data, computer equipment and storage medium |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dowlatshahi* | Strategic success factors in enterprise resource-planning design and implementation: a case-study approach | |
Purchase et al. | Enterprise transformation: Why are we interested, what is it, and what are the challenges? | |
CN103617498A (en) | System for managing university sports teaching equipment | |
Wang et al. | Resources, state ownership and innovation capability: evidence from Chinese automakers | |
Moritz et al. | On the economic value of open source hardware–case study of an open source magnetic resonance imaging scanner | |
CN106056366A (en) | Automatic office data processing method and automatic office data processing system | |
CN112800021A (en) | Artificial intelligence type human resource management system | |
Pawlish et al. | A decision support system for green data centers | |
Mao et al. | [Retracted] E‐Commerce Enterprise Supply Chain Cost Control under the Background of Big Data | |
Singh et al. | Data center maturity model | |
CN114219424A (en) | Large-scale instrument and equipment opening sharing management system and reservation management method thereof | |
Yang et al. | Research on performance management of financial shared service center based on cloud accounting | |
Yu et al. | Study on continuous internal audit system modeling and application | |
Wang et al. | Optimization of asset management system based on computer aided technology of internet of things | |
Wang et al. | Stochastic neural network based data analysis‐related talent recruitment optimization via CDN server | |
Tuttle et al. | Assessing and reducing plug and process loads in office buildings | |
Li et al. | Design and realization of college student employment management system based on intelligent optimization algorithm | |
Lakshmi et al. | Design and Development of Timesheet Management System | |
Yuan et al. | Management information system for compensation under multihoming network architecture | |
Yang | Quantitative Modeling of the Correlation Between Cognitive Motivation and Behavioral Incentives of Small and Medium-Sized Enterprises based on Intelligent Punch-In Information System and Matlab Implement | |
Zhang | Design of Russian Digital Resource Construction Platform | |
Peng et al. | Research on the impact of executive incentive on the business performance of listed tourism companies based on multiple regression model | |
Flatt et al. | Federal parameters on the definition of avoided cost under PURPA and legal methods currently used and acceptable under PURPA application for states to encourage or discourage distributed generation | |
Azeem et al. | Reducing Network Computing by Adopting Intelligent Approach | |
OLUWAFEMI et al. | DESIGN AND CONSTRUCTION OF IoT-BASED LIBRARY MANAGEMENT SYSTEM |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20161026 |