CN106054113A - Metering stability testing system for electric energy meter and testing method thereof - Google Patents

Metering stability testing system for electric energy meter and testing method thereof Download PDF

Info

Publication number
CN106054113A
CN106054113A CN201610601160.0A CN201610601160A CN106054113A CN 106054113 A CN106054113 A CN 106054113A CN 201610601160 A CN201610601160 A CN 201610601160A CN 106054113 A CN106054113 A CN 106054113A
Authority
CN
China
Prior art keywords
electric energy
energy meter
load
scalable
pressure regulator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610601160.0A
Other languages
Chinese (zh)
Other versions
CN106054113B (en
Inventor
代燕杰
陈祉如
王平欣
张志�
李琮琮
杜艳
朱红霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Marketing Service Center of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610601160.0A priority Critical patent/CN106054113B/en
Publication of CN106054113A publication Critical patent/CN106054113A/en
Application granted granted Critical
Publication of CN106054113B publication Critical patent/CN106054113B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R35/00Testing or calibrating of apparatus covered by the other groups of this subclass
    • G01R35/04Testing or calibrating of apparatus covered by the other groups of this subclass of instruments for measuring time integral of power or current

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a metering stability testing system for electric energy meter and testing method thereof, including a power supply unit interface configured with a power supply interface and a voltage regulator in connection with the power supply interface through a circuit breaker and an electric energy meter support configured with a meter to be tested. The meter support is provided with a communication interface connected with the to-be-tested electric energy meter, an output interface connected with the communication interface, and a sliding groove cooperating with the bottom of the to-be-tested electric energy meter as well as a rotation clamped metering acquisition unit that has the to-be-tested electric energy meter fixedly arranged in the sliding groove. The meter support is also configured with an industrial control computer and an error instrument connected with industrial control computer. The error instrument can be connected with the output end of all types of standard electric energy meters and is interfaced to the output end of the electric energy meters. The industrial control machine controls the metering calibration unit and the loading unit of the voltage regulator simultaneously.

Description

A kind of quantification stability for electric energy meter tests system and method for testing thereof
Technical field
The present invention relates to a kind of quantification stability for electric energy meter and test system and method for testing thereof.
Background technology
Ammeter before being taken into use, needs that the quantification stability of ammeter is carried out test and considers.Existing method of testing is Fictitious power steady load is used to carry out the calibrating of electric energy metrical precision at laboratory before dispatching from the factory.
But in actually used, electric energy meter is arranged on scene, circumstance complication, need to carry capacitive load, inductive load etc. Multiple load, runs on the multiple running status such as light running, heavy service, and along with load and the change of running status, The error in dipping of electric energy meter also can change.
Existing method of testing cannot simulate the various situations of on-the-spot actual motion, therefore cannot test out tested electric energy Table use at the scene during quantification stability.
Summary of the invention
The present invention is to solve the problems referred to above, it is proposed that a kind of quantification stability for electric energy meter tests system and survey thereof Method for testing, the present invention has the pressure regulator that can be adjusted in real time and scalable load by industrial PC, and when test Can also be automatically switched testing scheme by industrial PC, it is possible to simulate the various situations of on-the-spot actual motion, test effect Good, test result has reference value.
To achieve these goals, the present invention adopts the following technical scheme that
A kind of quantification stability for electric energy meter tests system, including power subsystem, metering collecting unit, measurement verification Unit and load unit, wherein:
Described power subsystem, is configured with power interface and the pressure regulator being connected by chopper with power interface;
Described metering collecting unit, is configured with the table torr installing tested electric energy meter, and described table torr has the tested electric energy of connection The communication interface of table and the output interface being connected with communication interface and with the chute matched bottom tested electric energy meter and use In the rotary buckle that tested electric energy meter is fixed in chute;
Described measurement verification unit, is configured with industrial computer and the error instrument being connected with industrial computer, and described error instrument connects Having the outfan of all types of standard electric energy meter and the table torr output interface of tested electric energy meter, described industrial computer controls to adjust simultaneously Depressor;
Described load unit, is provided with the scalable load being controlled by industrial computer.
Described load unit is additionally provided with and loads, with scalable, the PLC being connected, and described PLC connects to be had Touch control device, described touch control device is simultaneously connected with industrial computer.
The outfan of described pressure regulator passes sequentially through tested electric energy meter and is connected with scalable load with standard electric energy meter.
The outfan of described pressure regulator passes sequentially through standard electric energy meter and is connected with scalable load with tested electric energy meter.
Described table torr includes phase mutual inductance type table torr, single-phase meter torr and/or three-phase direct table torr, and corresponding installation three is mutual Sense formula electric energy meter, single-phase electric energy meter and/or three-phase direct electric energy meter.
The outfan of described pressure regulator connects the voltmeter head for showing pressure regulator output voltage amplitude.
A kind of quantification stability method of testing for electric energy meter, comprises the following steps:
(1) some groups of testing schemes are determined according to the actually used operating mode of tested electric energy meter;
(2) adjust test system, progressively adjust the output voltage extremely test required voltage value of pressure regulator, then adjust scalable It is loaded to test required load, needs the range of switching standards electric energy meter, and the theoretical arteries and veins of pre-set criteria electric energy meter according to test Strokes per minute and the number of turns;
(3) according to the output voltage needing adjustment pressure regulator in real time and scalable load, the Real-time Collection quilt of testing scheme Survey electric energy meter and the variable of standard electric energy meter, and ask difference to obtain the error in dipping value of tested electric energy meter;
(4) first the range of standard electric energy meter is switched to maximum range, then according to another testing scheme need adjust The output voltage of whole pressure regulator and scalable load, further according to range the preset mark of another testing scheme switching standards electric energy meter The theoretical umber of pulse of quasi-electric energy meter and the number of turns;
(5) step (3)-(4) are repeated, until completing the test job of all testing schemes.
In described step (2), first confirm that the power supply of power subsystem and chopper are off-state and load unit Scalable load for off-state, then switch on power by power interface, close circuit breaker, start scalable load to connect Enter scalable load.
In described step (2), adjust the adjustment mode of pressure regulator output voltage be directly adjust manually or It is to pressure regulator Indirect method by industrial computer, by selecting switch to select adjustment mode before adjusting.
In described step (5), it is completed backed off after random test mode, first adjusts scalable and be loaded to zero load, then adjust The output voltage of whole pressure regulator, to 0V, is then shut off scalable load and loads to disconnect scalable, and cut-off breaker finally disconnects Power subsystem power supply.
The invention have the benefit that
The present invention has the pressure regulator that can be adjusted in real time and scalable load by industrial computer, and goes back when test Can be automatically switched testing scheme by industrial computer, it is possible to simulate the various situations of on-the-spot actual motion, good test effect, survey Test result has reference value;
(2) present invention is capable of Self-pressurizing agri, loading and calculating error, and artificial participation amount is low, has certainty of measurement High, simple to operate, applied widely and that efficiency is high advantage;
(3) table torr has and the chute matched bottom tested electric energy meter and for tested electric energy meter is fixed on chute In rotary buckle, it is possible to realize the fast assembling-disassembling of tested electric energy meter, save the time dismounting tested electric energy meter, carry further High testing efficiency.
Accompanying drawing explanation
Fig. 1 is the population structure schematic diagram of the present invention.
Detailed description of the invention:
The invention will be further described with embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1, quantification stability system safety testing device, including power subsystem, measure collecting unit, measurement verification unit and bear Carrier unit;
Described power subsystem has power interface and the pressure regulator being connected by chopper with power interface;Described tune Depressor have for selecting pressure regulator to be manual mode or automatic mode selection switch, described pressure regulator also have outfan and Controlling end, the control end of described pressure regulator is connected with industrial computer;By selecting switch to select adjustment mode, operator before adjusting Pressure regulator can be directly adjusted by member manually, it is also possible to by industrial computer to pressure regulator Indirect method;Described The outfan of pressure regulator connects the voltmeter head for showing pressure regulator output voltage amplitude;
Being provided with tested electric energy meter in described metering collecting unit, described metering collecting unit also has for installing tested The table torr of electric energy meter: described tested electric energy meter includes 1,3 pieces of three-phase direct electric energy meters 2 of 3 pieces of single-phase electric energy meters and 3 pieces of three-phases Mutual inductance type electric energy meter 3, described table torr include for install 3 pieces of single-phase electric energy meters 1 single-phase meter torr 4, for install 3 pieces of three-phases straight Connect the three-phase direct table torr 5 of formula electric energy meter 2 and for installing the phase mutual inductance type table torr of 3 pieces of phase mutual inductance type electric energy meters 3 6;Described phase mutual inductance type table torr 6 is often respectively provided with no-load voltage ratio is 220/57.7 and accuracy class is 0.02 grade PT mutually and no-load voltage ratio is 100/5 and CT that accuracy class is 0.02 grade;Device can be controlled by host computer simultaneously, is appointed by the input of operation interface Meaning voltage and current, is adjusted controlling.
Each table torr has the communication interface connecting tested electric energy meter and the output interface being connected with communication interface;Each described Table torr also has and the chute matched bottom each tested electric energy meter and for the rotation being fixed in chute by tested electric energy meter Turn buckle to realize the fast assembling-disassembling of tested electric energy meter;
Being provided with standard electric energy meter in described measurement verification unit, described standard electric energy meter includes 1 piece of single-phase standard scale and 1 Block three-phase standard scale;Described measurement verification unit also has industrial computer and the error instrument being connected with industrial computer;Described error Instrument is connected respectively with the outfan of each standard electric energy meter;
Described load unit has scalable load and loads, with scalable, the touch control being connected by PLC Device processed;Described touch control device is also connected with industrial computer;When adjusting scalable load, touch control device can be passed through Directly adjust, it is also possible to by industrial computer, scalable load is adjusted the most automatically;
Such as Fig. 1, the first piece of phase mutual inductance type electric energy meter 3 in phase mutual inductance type table torr 6 in metering collecting unit is carried out Test;Before testing, the outfan of pressure regulator is passed sequentially through phase mutual inductance type electric energy meter 3 to be measured and three-phase standard scale with Scalable load is connected, and is connected by the output interface of error instrument with phase mutual inductance type table torr 6.
The outfan of described pressure regulator is also associated with the voltmeter head for showing pressure regulator output voltage amplitude.
Method of testing comprises the steps:
(A) testing scheme is formulated: determine some groups of testing schemes according to the actually used operating mode of tested electric energy meter;This enforcement Example lists 3 groups of typical testing schemes:
In testing scheme one, scalable load set is the resistive load for simulating electric filament lamp;
In testing scheme two, scalable load set is for simulating the RL type of air-conditioning, the load of pf=0.8, and wants Seek the current spike when test starts with starting of air conditioner moment, be gradually lowered at spike after current;
In testing scheme three, scalable load set is for simulating the load of the L-type of electric drill, and requires to start in test Time have electric drill start moment current spike, slowly decline at spike after current, then simulation people operate during electric drill handshaking The rotating speed caused is too fast, electric current rises;
(B) test mode is entered: first confirm that the power supply of power subsystem and chopper are off-state and load list The scalable load of unit for off-state, then switches on power by power interface, close circuit breaker, start scalable load with Access scalable load, adjust pressure regulator output voltage to test required voltage value, then adjust scalable be loaded to test institute Need load;Need to switch the range of three-phase standard scale, and the theoretical umber of pulse of preset three-phase standard scale and the number of turns according to test;
(C) test inspection table: according to the output voltage needing adjustment pressure regulator in real time and the scalable load of testing scheme, by mistake Differ from the tested phase mutual inductance type electric energy meter 3 of instrument Real-time Collection and the variable of three-phase standard scale, and ask difference to obtain tested three-phase The error in dipping value of mutual inductance type electric energy meter 3, is then transferred to industrial computer by error in dipping;
(D) switch test scheme as required: first the range of three-phase standard scale is switched to maximum range, then basis The output voltage needing adjustment pressure regulator of new testing scheme and scalable load, switch three-phase standard further according to new testing scheme The range of table the theoretical umber of pulse of preset three-phase standard scale and the number of turns;
(E) step (C) and step (D) are repeated until completing the test job of 3 groups of testing schemes;
(F) test mode is exited: first adjust scalable and be loaded to zero load, then adjust the output voltage of pressure regulator extremely 0V, is then shut off scalable load to disconnect scalable load, cut-off breaker, last deenergization unit power supply.
The adjustment mode further defining that adjustment pressure regulator output voltage as this method is the most direct Adjust or by industrial computer to pressure regulator Indirect method, by selecting switch to select adjustment mode before adjusting.
The adjustment mode further defining that adjustment scalable load as this method is direct by touch control device Adjust or by industrial computer, scalable loaded Indirect method.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not the present invention is protected model The restriction enclosed, one of ordinary skill in the art should be understood that on the basis of technical scheme, and those skilled in the art are not Need to pay various amendments or deformation that creative work can make still within protection scope of the present invention.

Claims (10)

1. for electric energy meter quantification stability test a system, it is characterized in that: include power subsystem, metering collecting unit, Measurement verification unit and load unit, wherein:
Described power subsystem, is configured with power interface and the pressure regulator being connected by chopper with power interface;
Described metering collecting unit, is configured with the table torr installing tested electric energy meter, and described table torr has the tested electric energy meter of connection Communication interface and the output interface being connected with communication interface and with the chute matched bottom tested electric energy meter and for will Tested electric energy meter is fixed on the rotary buckle in chute;
Described measurement verification unit, is configured with industrial computer and the error instrument being connected with industrial computer, and described error instrument has connected Having the outfan of the standard electric energy meter of type and the table torr output interface of tested electric energy meter, described industrial computer controls pressure regulation simultaneously Device;
Described load unit, is provided with the scalable load being controlled by industrial computer.
A kind of quantification stability for electric energy meter tests system, it is characterized in that: described load is single Unit is additionally provided with and loads, with scalable, the PLC being connected, and described PLC connects touch control device, described Touch control device is simultaneously connected with industrial computer.
A kind of quantification stability for electric energy meter tests system, it is characterized in that: described pressure regulator Outfan pass sequentially through tested electric energy meter and standard electric energy meter and be connected with scalable load.
A kind of quantification stability for electric energy meter tests system, it is characterized in that: described pressure regulator Outfan pass sequentially through standard electric energy meter and tested electric energy meter and be connected with scalable load.
A kind of quantification stability for electric energy meter tests system, it is characterized in that: described Biao Tuobao Include phase mutual inductance type table torr, single-phase meter torr and/or three-phase direct table torr, corresponding installation phase mutual inductance type electric energy meter, single-phase electricity Can table and/or three-phase direct electric energy meter.
A kind of quantification stability for electric energy meter tests system, it is characterized in that: described pressure regulator Outfan connect have the voltmeter head for showing pressure regulator output voltage amplitude.
7., for a quantification stability method of testing for electric energy meter, it is characterized in that: comprise the following steps:
(1) some groups of testing schemes are determined according to the actually used operating mode of tested electric energy meter;
(2) adjust test system, progressively adjust the output voltage extremely test required voltage value of pressure regulator, then adjust scalable load To the required load of test, need the range of switching standards electric energy meter, and the theoretical umber of pulse of pre-set criteria electric energy meter according to test And the number of turns;
(3) according to the output voltage needing adjustment pressure regulator in real time and scalable load, the tested electricity of Real-time Collection of testing scheme Energy table and the variable of standard electric energy meter, and ask difference to obtain the error in dipping value of tested electric energy meter;
(4) first the range of standard electric energy meter is switched to maximum range, then adjust according to the needs of another testing scheme and adjust The output voltage of depressor and scalable load, further according to range the pre-set criteria electricity of another testing scheme switching standards electric energy meter The theoretical umber of pulse of energy table and the number of turns;
(5) step (3)-(4) are repeated, until completing the test job of all testing schemes.
A kind of quantification stability method of testing for electric energy meter, is characterized in that: described step (2), in, it is disconnected for first confiring that the power supply of power subsystem and chopper are the scalable load of off-state and load unit Open state, is then switched on power by power interface, close circuit breaker, starts scalable load to access scalable load.
A kind of quantification stability method of testing for electric energy meter, is characterized in that: described step (2), in, the adjustment mode adjusting pressure regulator output voltage is directly to adjust manually or exchanged by industrial computer Depressor Indirect method, by selecting switch to select adjustment mode before adjusting.
A kind of quantification stability method of testing for electric energy meter, is characterized in that: described step (5) in, it is completed backed off after random test mode, first adjusts scalable and be loaded to zero load, then adjust the output electricity of pressure regulator It is depressed into 0V, is then shut off scalable load to disconnect scalable load, cut-off breaker, last deenergization unit power supply.
CN201610601160.0A 2016-07-27 2016-07-27 A kind of quantification stability for electric energy meter tests system and its test method Active CN106054113B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610601160.0A CN106054113B (en) 2016-07-27 2016-07-27 A kind of quantification stability for electric energy meter tests system and its test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610601160.0A CN106054113B (en) 2016-07-27 2016-07-27 A kind of quantification stability for electric energy meter tests system and its test method

Publications (2)

Publication Number Publication Date
CN106054113A true CN106054113A (en) 2016-10-26
CN106054113B CN106054113B (en) 2018-09-11

Family

ID=57418473

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610601160.0A Active CN106054113B (en) 2016-07-27 2016-07-27 A kind of quantification stability for electric energy meter tests system and its test method

Country Status (1)

Country Link
CN (1) CN106054113B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109916438A (en) * 2019-03-04 2019-06-21 苏州市计量测试院 A kind of ageing tester and ageing testing method of gas alarm
CN111965587A (en) * 2020-08-26 2020-11-20 安徽南瑞中天电力电子有限公司 Automatic test method and automatic test platform for stability of electric energy meter
CN113447880A (en) * 2021-05-28 2021-09-28 国网河北省电力有限公司营销服务中心 Fault diagnosis method and device for electric energy meter and terminal equipment

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066508A (en) * 1992-05-11 1992-11-25 江西省电力试验研究所 Intelligence testing device of watthour meter
CN102135608A (en) * 2011-01-29 2011-07-27 四川电力科学研究院 Electric energy metering and monitoring system of intelligent gateway
CN102901945A (en) * 2012-09-27 2013-01-30 陕西富集电力科技股份有限公司 Integrated error checking system of electric energy meter
CN202770986U (en) * 2012-05-25 2013-03-06 海盐新跃电器有限公司 Portable field test device of high voltage electric energy meter
CN103777172A (en) * 2013-12-27 2014-05-07 珠海中慧微电子有限公司 Reliability testing system of intelligent electric meter and method thereof
CN103792508A (en) * 2014-01-27 2014-05-14 国家电网公司 Error test system and method for digitized metering device
CN103983942A (en) * 2014-05-26 2014-08-13 国家电网公司 Intelligent ammeter calibrating device with switchable virtual and true loads and method thereof
CN203909112U (en) * 2014-06-19 2014-10-29 郭峰铨 Spinning type wire-connecting meter support of electric energy meter
CN104783994A (en) * 2014-12-29 2015-07-22 毕辉琴 Multifunctional two-layer portable tray
CN104914402A (en) * 2015-06-19 2015-09-16 国网天津市电力公司 Stability test method for straight-type three-phase intelligent electric energy meter automatic verification system
CN204832487U (en) * 2015-06-19 2015-12-02 国网天津市电力公司 A 0. 05 grade of miniature standard electric energy meter for passing through it is experimental that mutual -inductor inserts formula three -phase intelligent ammeter examination system stability
CN204989450U (en) * 2015-07-31 2016-01-20 四川德阳德仪电子仪器有限公司 Portable electric energy meter calibration device and electric energy meter verification system
CN105487043A (en) * 2016-01-28 2016-04-13 云南电网有限责任公司电力科学研究院 Metering accuracy simulation test system of digital electric energy meter

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1066508A (en) * 1992-05-11 1992-11-25 江西省电力试验研究所 Intelligence testing device of watthour meter
CN102135608A (en) * 2011-01-29 2011-07-27 四川电力科学研究院 Electric energy metering and monitoring system of intelligent gateway
CN202770986U (en) * 2012-05-25 2013-03-06 海盐新跃电器有限公司 Portable field test device of high voltage electric energy meter
CN102901945A (en) * 2012-09-27 2013-01-30 陕西富集电力科技股份有限公司 Integrated error checking system of electric energy meter
CN103777172A (en) * 2013-12-27 2014-05-07 珠海中慧微电子有限公司 Reliability testing system of intelligent electric meter and method thereof
CN103792508A (en) * 2014-01-27 2014-05-14 国家电网公司 Error test system and method for digitized metering device
CN103983942A (en) * 2014-05-26 2014-08-13 国家电网公司 Intelligent ammeter calibrating device with switchable virtual and true loads and method thereof
CN203909112U (en) * 2014-06-19 2014-10-29 郭峰铨 Spinning type wire-connecting meter support of electric energy meter
CN104783994A (en) * 2014-12-29 2015-07-22 毕辉琴 Multifunctional two-layer portable tray
CN104914402A (en) * 2015-06-19 2015-09-16 国网天津市电力公司 Stability test method for straight-type three-phase intelligent electric energy meter automatic verification system
CN204832487U (en) * 2015-06-19 2015-12-02 国网天津市电力公司 A 0. 05 grade of miniature standard electric energy meter for passing through it is experimental that mutual -inductor inserts formula three -phase intelligent ammeter examination system stability
CN204989450U (en) * 2015-07-31 2016-01-20 四川德阳德仪电子仪器有限公司 Portable electric energy meter calibration device and electric energy meter verification system
CN105487043A (en) * 2016-01-28 2016-04-13 云南电网有限责任公司电力科学研究院 Metering accuracy simulation test system of digital electric energy meter

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
陈俊等: "智能电能表自助误差校准装置设计", 《电测与仪表》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109916438A (en) * 2019-03-04 2019-06-21 苏州市计量测试院 A kind of ageing tester and ageing testing method of gas alarm
CN111965587A (en) * 2020-08-26 2020-11-20 安徽南瑞中天电力电子有限公司 Automatic test method and automatic test platform for stability of electric energy meter
CN111965587B (en) * 2020-08-26 2024-01-26 安徽南瑞中天电力电子有限公司 Automatic test method and automatic test platform for stability of electric energy meter
CN113447880A (en) * 2021-05-28 2021-09-28 国网河北省电力有限公司营销服务中心 Fault diagnosis method and device for electric energy meter and terminal equipment
CN113447880B (en) * 2021-05-28 2022-07-22 国网河北省电力有限公司营销服务中心 Fault diagnosis method and device for electric energy meter and terminal equipment

Also Published As

Publication number Publication date
CN106054113B (en) 2018-09-11

Similar Documents

Publication Publication Date Title
CN102305919B (en) Calibration device and method capable of synchronously measuring multiple voltage transformers at one time
CN103267949A (en) Motor type test testing system
CN106054113B (en) A kind of quantification stability for electric energy meter tests system and its test method
CN101782638B (en) Calibration device and method capable of measuring multiple current transformers once
CN102520248A (en) Insulation resistance and grounding resistance comprehensive tester based on programmable power supply
CN201166700Y (en) Apparatus for measuring voltage mutual inductor error base on parameter measurement
CN100501440C (en) Insulated on-line monitoring system checker of high-voltage electric equipment
CN203720282U (en) Transformer comprehensive parameter testing device
CN101887085B (en) Zinc oxide arrester DC characteristic testing device and method
CN103698730A (en) Current transformer checking system of alternating current-direct current double power supplies
CN203337792U (en) Motor type test system
CN106154160A (en) A kind of servomotor test system
CN101950010A (en) Full-automatic measuring device of load tank
CN206515459U (en) A kind of actual loading test system of electric energy meter
CN102353823B (en) A kind of electronic load of semi-passive programmable simulation LED characteristic
CN112526383A (en) Automatic calibration device and calibration method for alternating current/direct current stabilized power supply
CN112904126A (en) Detection method using arc suppression system detection device
CN111693924A (en) System and method for detecting monitoring performance of voltage transformer metering performance on-line monitoring device
CN105954676A (en) Servo motor testing system
CN110221199A (en) A kind of Aftercurrent protection circuit breaker test machine
CN202305841U (en) Test device of air data computer
CN212301809U (en) Alternating current power supply test bed
CN202159132U (en) Verification apparatus for synchronously verifying plurality of voltage transformers at one time
CN105487947A (en) Method for testing power conversion efficiency
CN204758790U (en) Automatic fault diagnostic of mining ac motor

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250002 Wang Yue Road, Ji'nan City, Shandong Province, No. 2000

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250002 Wang Yue Road, Ji'nan City, Shandong Province, No. 2000

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210401

Address after: No. 150, Jinger Road, Daguanyuan, Shizhong District, Jinan City, Shandong Province

Patentee after: Shandong Electric Power Marketing Center

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250002 Wang Yue Road, Ji'nan City, Shandong Province, No. 2000

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee before: STATE GRID CORPORATION OF CHINA