CN106050196A - Method for determining good transfer-injection opportunity for early polymer injection of offshore heavy oil reservoir - Google Patents
Method for determining good transfer-injection opportunity for early polymer injection of offshore heavy oil reservoir Download PDFInfo
- Publication number
- CN106050196A CN106050196A CN201610407102.4A CN201610407102A CN106050196A CN 106050196 A CN106050196 A CN 106050196A CN 201610407102 A CN201610407102 A CN 201610407102A CN 106050196 A CN106050196 A CN 106050196A
- Authority
- CN
- China
- Prior art keywords
- water
- injection
- heavy oil
- timing
- early
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229920000642 polymer Polymers 0.000 title claims abstract description 45
- 238000002347 injection Methods 0.000 title claims abstract description 37
- 239000007924 injection Substances 0.000 title claims abstract description 37
- 238000000034 method Methods 0.000 title claims abstract description 24
- 239000000295 fuel oil Substances 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 75
- 230000035699 permeability Effects 0.000 claims abstract description 19
- 238000002474 experimental method Methods 0.000 claims abstract description 5
- 238000006073 displacement reaction Methods 0.000 claims description 13
- 239000012530 fluid Substances 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 4
- 239000010779 crude oil Substances 0.000 claims description 4
- 230000007423 decrease Effects 0.000 claims description 4
- 238000009825 accumulation Methods 0.000 claims description 2
- 238000007405 data analysis Methods 0.000 claims description 2
- 239000008398 formation water Substances 0.000 claims 1
- 238000012546 transfer Methods 0.000 abstract description 7
- 238000011161 development Methods 0.000 description 10
- 239000003921 oil Substances 0.000 description 8
- 238000004519 manufacturing process Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 5
- 238000011160 research Methods 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 238000011084 recovery Methods 0.000 description 3
- 238000004458 analytical method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000007872 degassing Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000003208 petroleum Substances 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004088 simulation Methods 0.000 description 1
- 239000000243 solution Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/01—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells specially adapted for obtaining from underwater installations
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/16—Enhanced recovery methods for obtaining hydrocarbons
- E21B43/20—Displacing by water
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Abstract
本发明公开了一种利用确定海上稠油油藏早期注聚较佳转注时机的一种方法,步骤如下:(1)通过岩心的油水/油聚相渗实验获得两者的相渗关系为基础;(2)通过流度比公式分析流度比随着含水饱和度的变化关系,以M≤1为界限判断转注时机;(3)进一步分析含水率及含水率变化速率与油藏含水饱和度的关系;(4)通过对比发现含水率变化速率的峰值与M=1的含水饱和度一致。即通过含水率变化速率的峰值来确定早期注聚的转注时机。该方法以理论基础来指导聚合物驱转注时机,能够快速准确的确定海上稠油油藏较佳的转注时机。
The invention discloses a method for determining the optimal timing of early polymer injection in offshore heavy oil reservoirs. The steps are as follows: (1) Obtaining the phase-permeability relationship between the two through the oil-water/oil-polymer phase permeability experiment of the core ; (2) Analyze the relationship between the mobility ratio and the water saturation through the formula of the mobility ratio, and judge the injection timing with M≤1; (3) Further analyze the water cut and the rate of change of the water cut and the reservoir water saturation (4) By comparison, it is found that the peak value of the water content change rate is consistent with the water saturation of M=1. That is, the timing of early polymer injection transfer is determined by the peak value of water cut change rate. This method is based on theoretical basis to guide the injection timing of polymer flooding, and can quickly and accurately determine the optimal timing of injection in offshore heavy oil reservoirs.
Description
技术领域technical field
本发明属于石油加工技术领域,具体涉及一种海上稠油油藏早期注聚较佳转注时机的确定方法。The invention belongs to the technical field of petroleum processing, and in particular relates to a method for determining a better timing for early polymer injection in offshore heavy oil reservoirs.
背景技术Background technique
聚合物驱技术在我国陆上油田发展成熟,经过不断技术攻关,在2007年运用于海上稠油油藏的聚合物驱开发。但是由于受海上平台的寿命影响,加快开发效率势在必行(张贤松,孙福街,冯国智等.渤海稠油油田聚合物驱影响因素研究及现场试验[J].中国海上油气,2007,19(1):30-34)。Polymer flooding technology has matured in my country's onshore oilfields. After continuous technical research, it was applied to the polymer flooding development of offshore heavy oil reservoirs in 2007. However, due to the influence of the life of the offshore platform, it is imperative to speed up the development efficiency (Zhang Xiansong, Sun Fujie, Feng Guozhi, etc. Research and field test on the influencing factors of polymer flooding in heavy oil fields in Bohai Sea[J]. China Offshore Oil and Gas, 2007,19 (1):30-34).
周守卫院士提出了海上油藏开发新模式:模糊一、二、三次采油界限,通过技术创新和创新技术集成,使油田在投产初期迅速达到高峰产量并高速采出,始终保持旺盛生产力。所以,早期注聚是开发新模式的核心内容。对于稠油油藏的聚合物驱开发而言,理应存在一个相对最佳的注聚时机,相对于高含水转注聚,能够进一步增加采收率增幅,获得最理想的采收率。经过物理模型实验以及数值模拟不断研究:得出稠油油藏聚合物驱在油藏含水率为0%或者较低时含水率条件下转注聚效果最佳,该结果也得业内学者广泛认可。油藏含水率为0%,即油藏生产开发未见出水,这个时间段是一个十分宽广的时间范围。而且室内研究也是针对某一个区块的实验研究,存在一定的局限性,不能指导不同类别的其他油藏,也不能快速确定转注时机。所以,需要一种手段来判别海上油藏聚驱开发的最佳转注时机点。Academician Zhou Shouwei proposed a new model of offshore oil reservoir development: blurring the boundaries of primary, secondary, and tertiary oil recovery, and through technological innovation and innovative technology integration, the oil field can quickly reach peak production and high-speed production in the early stage of production, and maintain strong productivity. Therefore, early injection is the core content of developing new models. For the polymer flooding development of heavy oil reservoirs, there should be a relatively optimal polymer injection timing, which can further increase the recovery rate and obtain the most ideal recovery rate compared with high water-cut polymer injection. After continuous research on physical model experiments and numerical simulations, it is concluded that polymer flooding in heavy oil reservoirs has the best effect of polymer injection under the condition of reservoir water cut of 0% or lower, and this result is also widely recognized by industry scholars. The water cut of the reservoir is 0%, that is, no water is produced in the production and development of the reservoir. This time period is a very wide time range. Moreover, the indoor research is also an experimental research for a certain block, which has certain limitations, and cannot guide other oil reservoirs of different types, nor can it quickly determine the timing of re-injection. Therefore, there is a need for a means to judge the best timing of transfer injection in the development of offshore oil reservoirs.
发明内容Contents of the invention
本发明的目的是提供一种针对海上油藏聚合物驱开发早期注聚最佳转注时机的确定方式,该方法能够快速、准确的判断油藏聚合物驱的最佳转注时机,为稠油聚合物驱生产实际开发提供转注指导。The purpose of the present invention is to provide a method for determining the optimal timing of polymer flooding in the early stage of polymer flooding development in offshore oil reservoirs. The method can quickly and accurately judge the optimal timing of polymer flooding in reservoirs. The actual development of physical flooding production provides transfer guidance.
为实现上述技术目的,本发明提出了这样一种稠油油藏早期注聚最佳转注时机判断方法,该方法包括如下步骤:In order to achieve the above-mentioned technical purpose, the present invention proposes such a judging method for judging the optimal timing of early polymer injection in heavy oil reservoirs. The method includes the following steps:
步骤1,通过室内相渗实验获取油水相对渗透率曲线;Step 1. Obtain the oil-water relative permeability curve through the indoor relative permeability experiment;
步骤2,对油水相渗曲线利用流度比公式,分析出含水饱和度与流度比M的关系;Step 2, using the mobility ratio formula for the oil-water phase permeability curve, analyzing the relationship between the water saturation and the mobility ratio M;
步骤3,利用油水相渗曲线数据,通过分流方程,获得含水率关于含水饱和度的关系;Step 3, using the oil-water phase permeability curve data, through the shunt flow equation, to obtain the relationship between water content and water saturation;
步骤4,对含水率fw求导,获得dfw/dt,获得含水率变化速率关于含水饱和度的关系;Step 4, deriving the water content fw, obtaining df w /dt, and obtaining the relationship between the water content change rate and the water saturation;
步骤5,通过数据分析,即可通过含水率变化速率的大小来判断聚合物驱早期注聚的最佳转注时机。Step 5, through data analysis, the best timing for polymer injection in the early stage of polymer flooding can be judged by the change rate of water cut.
进一步,所述步骤1中,油水/油聚相对渗透率曲线,是通过现场取心φ25×80mm的短岩心,以及现场地面脱气原油,地层注入水,在地层温度条件下,采用“非稳态法”测定相对渗透率曲线。Further, in the step 1, the oil-water/oil-accumulation relative permeability curve is obtained by taking a short core of φ25×80mm on site, degassing crude oil on the ground, and injecting water into the formation. Under the condition of formation temperature, the “unsteady State method" to measure the relative permeability curve.
进一步,通过对步骤2所得数据图的分析,获得聚合物驱的最佳转注时机范围为M≤1。步骤2中,在流度比M=1时是等粘度驱替,是通常理解为“近活塞式”驱替,驱替效率较好;在M<1时是高粘流体驱替低粘流体,驱替效率好;在M>1时,是低粘驱替高粘,即出现最为常见的“指进现象”,驱替效率下降,波及效率也相应降低。Further, through the analysis of the data map obtained in step 2, it is obtained that the optimal injection timing range of polymer flooding is M≤1. In step 2, when the mobility ratio M=1, it is isoviscosity displacement, which is generally understood as "near-piston" displacement, and the displacement efficiency is better; when M<1, it is the high-viscosity fluid that displaces the low-viscosity fluid , the displacement efficiency is good; when M>1, low viscosity displaces high viscosity, that is, the most common "fingering phenomenon" occurs, the displacement efficiency decreases, and the sweep efficiency decreases accordingly.
进一步,所述步骤2中,根据流度比公式,Further, in said step 2, according to the mobility ratio formula,
计算分析所得含水饱和度与流度比M的关系。Calculate and analyze the relationship between water saturation and mobility ratio M.
进一步,所述步骤3中,利用分流方程Further, in the step 3, using the shunt equation
将相对渗透率关系转化成分流量,获得含水率关于含水饱和度的关系。Converting the relative permeability relationship to component flow yields the water cut versus water saturation relationship.
进一步,所述步骤5中将关于流度比的含水饱和度与含水率变化速率的含水饱和度进行对比,发现含水率变化速率最大值就是M=1的值;即可通过含水率变化速率的大小来判断聚合物驱早期注聚的最佳转注时机。Further, in the step 5, the water saturation about the mobility ratio is compared with the water saturation of the rate of change of the water content, and it is found that the maximum value of the rate of change of the water content is the value of M=1; The size can be used to judge the best timing of polymer injection in the early stage of polymer flooding.
聚合物驱技术就是为了控制油水驱替前缘,扩大波及效率,提高驱替效率;而含水率变化速率达到最快时,表明注入水突破油藏,油藏中注水开发过程中,水驱优势通道形成,而且油水流度比M>1之后,M上升十分迅速,均不利于聚合物的流度控制作用的发挥。所以,在含水率变化速率来判断转注时机。The polymer flooding technology is to control the oil-water displacement front, expand the sweep efficiency, and improve the displacement efficiency; when the rate of water cut change reaches the fastest, it indicates that the injected water breaks through the reservoir. Channels are formed, and after the oil-water mobility ratio M>1, M rises very rapidly, which is not conducive to the fluidity control function of the polymer. Therefore, the timing of re-injection should be judged by the rate of change of moisture content.
本发明有益效果:本发明提供的确定海上稠油油藏聚合物驱早期注聚最佳转注时机的方法,该方法能够较简单快速,准确获得稠油油藏聚合物驱的转注时机范围,为稠油聚合物驱生产实际开发提供转注指导。Beneficial effects of the present invention: the method provided by the present invention for determining the optimum transfer timing of polymer flooding in offshore heavy oil reservoirs can be relatively simple and fast, and can accurately obtain the range of transfer timings for polymer flooding in heavy oil reservoirs, which is The actual development of heavy oil polymer flooding production provides guidance for transfer injection.
附图说明Description of drawings
下面结合附图和具体实施方式对本发明作进一步详细的说明。The present invention will be further described in detail below in conjunction with the accompanying drawings and specific embodiments.
图1为油藏条件下的油水相对渗透率曲线图;Fig. 1 is the oil-water relative permeability curve diagram under the reservoir condition;
图2为含水率、含水率变化速率关于含水饱和度的变化关系曲线图;Fig. 2 is the curve diagram of water content and water content change rate with respect to water saturation;
图3为流度比关于含水饱和度的变化关系图;Fig. 3 is the relationship diagram of the variation of the mobility ratio with respect to the water saturation;
图4为特定油藏条件下最佳转注时机的判断界限图。Fig. 4 is a judgment limit diagram of the optimal reinjection timing under specific reservoir conditions.
具体实施方式detailed description
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
如图1~图4所述为本发明的一种实施例,一种稠油油藏早期注聚最佳转注时机判断方法,该方法包括如下步骤:As shown in Figures 1 to 4, it is an embodiment of the present invention, a method for judging the optimal timing of early polymer injection in heavy oil reservoirs, and the method includes the following steps:
(1)首先准备相关实验流程及实验材料,①岩心:现场取心φ25×80mm;②原油:地面脱气原油粘度122.8mPa·s;③注入水:地层模拟混注水。按照国家行业标准的“非稳态法”测定油/水相对渗透率曲线,如图1。(1) First prepare the relevant experimental procedures and experimental materials, ① core: on-site coring φ25×80mm; ② crude oil: surface degassed crude oil viscosity 122.8mPa·s; ③ injection water: formation simulated mixed water injection. The oil/water relative permeability curve is measured according to the "unsteady state method" of the national industry standard, as shown in Figure 1.
(2)对油水相渗曲线利用式2流度比,分析出流度比M与含水饱和度的关系,见图2;(2) Utilize formula 2 mobility ratio to oil-water relative permeability curve, analyze the relationship between mobility ratio M and water saturation, see Fig. 2;
(3)运用式1的分流方程将相对渗透率关系转化成分流量,获得含水率关于含水饱和度的关系;(3) Using the shunt equation of formula 1 to convert the relative permeability relationship into component flow rate, and obtain the relationship between water cut and water saturation;
(4)对含水率fw求导,获得dfw/dt,获得含水率变化速率关于含水饱和度的关系,见图3。(4) Deriving the water content f w to obtain df w /dt, and obtaining the relationship between the water content change rate and the water saturation, as shown in Figure 3.
(5)在油藏物理中提到,驱替相与被驱替相的流度比M≤1时,是有利于驱替效果;所以在M小的1这里划线,开展转注聚,提高驱替相粘度,有利于控制流度比,提高波及效率。(5) It is mentioned in reservoir physics that when the mobility ratio of the displacing phase to the displacing phase is M≤1, it is beneficial to the displacing effect; The viscosity of the displacement phase is beneficial to control the mobility ratio and improve the sweep efficiency.
(6)通过对(3)(5)所得数据图的分析,见图4,发现在M=1所在的含水饱和度是0.175与含水率上升速率达到最大值时的含水饱和度一样。由于流度比在实际运用中,不容易获得,所以通过含水率及含水率变化速率来进行判断,即含水率上升速率达到最大值时为较佳转注时机。(6) Through the analysis of the data diagram obtained in (3)(5), see Fig. 4, it is found that the water saturation at M=1 is 0.175 and the same as the water saturation when the rate of increase of the water content reaches the maximum value. Since the mobility ratio is not easy to obtain in practical applications, it is judged by the water content and the rate of change of the water content, that is, when the rate of increase of the water content reaches the maximum value, it is the best timing for injection.
本发明提供的海上稠油油藏聚合物驱早期注聚较佳转注时机的方法,能够简单快速获得海上稠油油藏聚合物驱的转注时机,能够为稠油聚合物驱生产实际开发提供转注指导。The method provided by the present invention for polymer flooding at the early stage of polymer flooding in offshore heavy oil reservoirs can simply and quickly obtain the timing of polymer flooding in offshore heavy oil reservoirs, and can provide transfer injection for the actual development of heavy oil polymer flooding production. guide.
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present invention shall be included in the scope of the present invention. within the scope of protection.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610407102.4A CN106050196B (en) | 2016-06-08 | 2016-06-08 | A method for determining the optimal timing of early polymer injection in offshore heavy oil reservoirs |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610407102.4A CN106050196B (en) | 2016-06-08 | 2016-06-08 | A method for determining the optimal timing of early polymer injection in offshore heavy oil reservoirs |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106050196A true CN106050196A (en) | 2016-10-26 |
CN106050196B CN106050196B (en) | 2019-03-08 |
Family
ID=57169911
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610407102.4A Active CN106050196B (en) | 2016-06-08 | 2016-06-08 | A method for determining the optimal timing of early polymer injection in offshore heavy oil reservoirs |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106050196B (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915652A (en) * | 2018-07-18 | 2018-11-30 | 西南石油大学 | A kind of method of effective judgement polymer flooding fluidity control time range |
CN110688779A (en) * | 2019-10-17 | 2020-01-14 | 东北石油大学 | A method for determining viscosity characteristics of oil-water emulsion system considering phase separation behavior |
CN111322054A (en) * | 2018-12-17 | 2020-06-23 | 中国石油天然气股份有限公司 | Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage |
CN112228055A (en) * | 2020-11-10 | 2021-01-15 | 中国石油天然气股份有限公司 | Method and device for determining conversion opportunity in two-three combined development mode |
CN114136838A (en) * | 2021-11-19 | 2022-03-04 | 中国海洋石油集团有限公司 | Method for determining viscosity limit of water injection flooding crude oil at different water-containing stages of offshore heavy oil |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104329082A (en) * | 2014-10-24 | 2015-02-04 | 中国海洋石油总公司 | Method for determining high-permeability thick-oil oil reservoir polymer flooding early stage polymer injection transfer occasion |
CN104790928A (en) * | 2015-04-07 | 2015-07-22 | 东北石油大学 | Method for increasing crude oil recovery ratio of post-polymer flooding slug combination system |
CN104912528A (en) * | 2014-03-10 | 2015-09-16 | 中国石油化工股份有限公司 | Method for identifying inflection point of water flooding characteristic curve in extra-high water cut stage |
CN105606509A (en) * | 2015-12-22 | 2016-05-25 | 中国石油大学(华东) | Measuring method of high-temperature oil-water relative permeability of heavy oil reservoir |
WO2016079121A1 (en) * | 2014-11-18 | 2016-05-26 | Basf Se | Method of mineral oil production |
-
2016
- 2016-06-08 CN CN201610407102.4A patent/CN106050196B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104912528A (en) * | 2014-03-10 | 2015-09-16 | 中国石油化工股份有限公司 | Method for identifying inflection point of water flooding characteristic curve in extra-high water cut stage |
CN104329082A (en) * | 2014-10-24 | 2015-02-04 | 中国海洋石油总公司 | Method for determining high-permeability thick-oil oil reservoir polymer flooding early stage polymer injection transfer occasion |
WO2016079121A1 (en) * | 2014-11-18 | 2016-05-26 | Basf Se | Method of mineral oil production |
CN104790928A (en) * | 2015-04-07 | 2015-07-22 | 东北石油大学 | Method for increasing crude oil recovery ratio of post-polymer flooding slug combination system |
CN105606509A (en) * | 2015-12-22 | 2016-05-25 | 中国石油大学(华东) | Measuring method of high-temperature oil-water relative permeability of heavy oil reservoir |
Non-Patent Citations (1)
Title |
---|
陈金凤,等: ""大庆油田三元复合驱注入时机"", 《大庆石油地质与开发》 * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108915652A (en) * | 2018-07-18 | 2018-11-30 | 西南石油大学 | A kind of method of effective judgement polymer flooding fluidity control time range |
CN108915652B (en) * | 2018-07-18 | 2020-06-09 | 西南石油大学 | Method for effectively judging polymer flooding degree control time range |
CN111322054A (en) * | 2018-12-17 | 2020-06-23 | 中国石油天然气股份有限公司 | Three-three combined excavation and potential optimization mining method for sandstone oil reservoir in chemical flooding stage |
CN110688779A (en) * | 2019-10-17 | 2020-01-14 | 东北石油大学 | A method for determining viscosity characteristics of oil-water emulsion system considering phase separation behavior |
CN112228055A (en) * | 2020-11-10 | 2021-01-15 | 中国石油天然气股份有限公司 | Method and device for determining conversion opportunity in two-three combined development mode |
CN112228055B (en) * | 2020-11-10 | 2024-03-26 | 中国石油天然气股份有限公司 | Method and device for determining conversion time under two-three combined development mode |
CN114136838A (en) * | 2021-11-19 | 2022-03-04 | 中国海洋石油集团有限公司 | Method for determining viscosity limit of water injection flooding crude oil at different water-containing stages of offshore heavy oil |
CN114136838B (en) * | 2021-11-19 | 2023-11-17 | 中国海洋石油集团有限公司 | Method for determining viscosity limit of crude oil driven by water injection at different water-containing stages of offshore thick oil |
Also Published As
Publication number | Publication date |
---|---|
CN106050196B (en) | 2019-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106050196A (en) | Method for determining good transfer-injection opportunity for early polymer injection of offshore heavy oil reservoir | |
CN106097118A (en) | A kind of permeability saturation curve determines the method for heavy crude reservoir polymer flooding scope on opportunity | |
CN107045671A (en) | Water-producing gas well hydrops Risk Forecast Method | |
CN104237098A (en) | Method for measuring gradient of rock starting pressure | |
CN106484933A (en) | A kind of method and system for determining shale gas well well control dynamic holdup | |
CN201724866U (en) | Device for measuring rock fracture toughness on deep stratum | |
CN111075441B (en) | Three-dimensional physical simulation experiment device and method for cold recovery after thermal recovery of side-bottom water heavy oil reservoir | |
CN103630467B (en) | A kind of device and method for measuring pitch particle profile control performance parameter | |
CN105041280A (en) | Method and device for realizing carbon dioxide miscible-phase displacement laboratory experiment | |
CN106837269A (en) | Low, the extra-low permeability oil reservoirs CO of one kind2Drive nearly miscible pressure area determination method | |
Sun et al. | Comparison of oil displacement mechanisms and performances between continuous and dispersed phase flooding agents | |
CN104329082B (en) | Method for determining high-permeability thick-oil oil reservoir polymer flooding early stage polymer injection transfer occasion | |
CN102654045B (en) | Top air injection gravity assisted flooding oil extraction one-dimensional physical simulation experiment system | |
CN105574320A (en) | Evaluation method for effective seepage capability of low-permeability sandstone reservoir | |
CN106096300A (en) | The parameter interpretation method of Low permeable oil and gas reservoirs and solution release system | |
CN106014359A (en) | Method for judging earliest injection transfer opportunity of early-stage polymer injection of offshore oil deposit | |
Zhe et al. | Comparison of oil displacement mechanisms and performances between continuous and dispersed phase flooding agents | |
CN107402290A (en) | Study CO2Experimental method of the drive process Crude Oil studies on asphaltene precipitation to reservoir properties and development effect influence | |
CN110146424A (en) | Simulation device and method for formation breathing effect | |
CN107391778A (en) | A kind of Analytic Calculation Method of circular tunnel seepage discharge | |
CN111350498B (en) | Method for describing weak flooding distribution characteristics of medium-high permeability oil reservoir in ultra-high water content development period | |
CN109915122B (en) | A method for calculating steady-state water influx in fractured-cavity reservoirs using global equations | |
CN203796254U (en) | Skid-mounted cone combination device for measuring volume flow of saturated steam | |
CN111209687A (en) | For judging and identifying CO2Method for expelling gas channeling | |
CN207829870U (en) | A kind of oil-field flooding fouling experimental provision |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |