CN106049676B - Steel construction bracket - Google Patents
Steel construction bracket Download PDFInfo
- Publication number
- CN106049676B CN106049676B CN201610081368.4A CN201610081368A CN106049676B CN 106049676 B CN106049676 B CN 106049676B CN 201610081368 A CN201610081368 A CN 201610081368A CN 106049676 B CN106049676 B CN 106049676B
- Authority
- CN
- China
- Prior art keywords
- tube wall
- hole
- tube
- tank
- sleeve pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2406—Connection nodes
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/24—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
- E04B1/2403—Connection details of the elongated load-supporting parts
- E04B2001/2421—Socket type connectors
Abstract
The invention discloses a kind of steel construction brackets, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds casing lumen;The first through hole through described sleeve pipe tube wall is provided on described sleeve pipe tube wall;The first through hole is connected to described sleeve pipe lumen.Steel construction bracket in the present invention is able to satisfy any design requirement of current steel reinforced concrete system, and can reduce the cost of labor of construction and installation.Structural principle of the invention is used in the intensity of continuous, structure the fixation for solving the problems, such as beam of steel structure in steel structure, node, is cleverly welded using the condition of back concrete casting slot, completely solve steel structure problem.
Description
Technical field
Present invention relates particularly to a kind of steel construction brackets.
Background technique
Steel construction is largely used in modern house construction.In steel house, structure includes column and beam.Column branch
Support beam.Difference is required according to bearing capacity, beam is divided into girder and secondary beam again.Beam leans on upright supports.In the prior art, column and beam
Connection realized using positive bracket structure.Positive bracket is arranged on column outer surface.The end of beam is connect with positive bracket.It is such
Structure setting carrys out many restrictions to the out tape of steel construction, first is that appearance is many and diverse, positive bracket is arranged in column outer surface, sees it
Get up mixed and disorderly, appearance disunity;Second is that the length of restraint beam, since the structure of positive bracket limits, so that the length of beam can only be set
The length being set between two root posts, the both ends of the beam of the length limitation exceeded will be unable to the positive bracket for being mounted on two root posts
On.Third is that the structure of limitation steel construction product, chooses platform for example, needing to be arranged one in the position of some height, due to existing
The beam end of some structures is required to be supported on column, if only there is column in one end, beam can not be arranged, also can not just set
It sets and chooses platform.It is arranged and chooses platform, the both ends of beam must be supported on column or by means of reinforcing member ability is in addition arranged
It realizes.
Summary of the invention
Purpose of the invention is to overcome the shortcomings in the prior art, provides a kind of using more flexible steel construction ox
Leg.
In order to achieve the above object, the invention is realized by the following technical scheme:
Steel construction bracket, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds
Casing lumen;The first through hole through described sleeve pipe tube wall is provided on described sleeve pipe tube wall;The first through hole and the set
The connection of pipe lumen.
It according to one embodiment of present invention, further include connector, the connector is set in described sleeve pipe lumen, institute
Connector is stated to connect with described sleeve pipe tube wall
According to one embodiment of present invention, the connector includes one or more bottom plate, described bottom plate one end or more
End is connect with described sleeve pipe tube wall;The setting of muti-piece bottom plate interval.
According to one embodiment of present invention, the connector further includes one or more sidewall paneling, the sidewall paneling with
The bottom plate is connected and/or is connect with described sleeve pipe tube wall, the setting of muti-piece sidewall paneling interval.
According to one embodiment of present invention, the connector further includes top plate, and the top plate is set with the bottom plate interval
It sets;The top plate is connect with the sidewall paneling, and the top plate is connect with described sleeve pipe tube wall.
According to one embodiment of present invention, the top plate be provided with through slot or the top plate number be two pieces with
Upper and interval setting.
According to one embodiment of present invention, the connector number is two or more, arranged in a crossed manner or along described sleeve pipe
Short transverse interval setting.
According to one embodiment of present invention, the connector and described sleeve pipe tube wall are welded to connect.
According to one embodiment of present invention, described sleeve pipe is quadrangle pipe, and the first through hole is set to two sides, three faces
Or on the set tube wall at four sides.
Steel construction bracket, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds
Casing lumen, the first through hole through described sleeve pipe tube wall is provided on described sleeve pipe tube wall, and the first through hole number is one
It is a or multiple.
According to one embodiment of present invention, further include connector, the connector include the first connecting tube, described first
Connecting tube has the first tube wall, and first tube wall surrounds the first lumen;First connecting tube is set to described sleeve pipe lumen
Interior, first connecting tube both ends are connect with described sleeve pipe tube wall;At least one described first through hole and first connecting tube
The first lumen position opposite the structural member being inserted into from the first through hole is inserted into first lumen.
According to one embodiment of present invention, it is provided with the first through slot on the first tube wall of first connecting tube, it is described
First through slot runs through the first tube wall of first connecting tube, and first through slot prolongs along the length direction of first connecting tube
Stretch selected length.
According to one embodiment of present invention, one or more the first connecting plate, institute are provided in first connecting tube
The first connecting plate is stated to connect with the first tube wall of first through slot two sides;First connecting plate of muti-piece is along first connection
The length direction of pipe is spaced apart.
According to one embodiment of present invention, one end of the first tube wall of first connecting tube is around described in one of them
First through hole is connect with described sleeve pipe tube wall.
According to one embodiment of present invention, the connector further includes the second connecting tube, and second connecting tube has
Second tube wall, second tube wall surround the second lumen;Second connecting tube is set in described sleeve pipe lumen, and described second
Connecting tube both ends are connect with described sleeve pipe tube wall, at least one described first through hole is opposite with second lumen position so that certainly
The structural member of the first through hole insertion is inserted into second lumen.
According to one embodiment of present invention, it is provided with the second through slot on the second tube wall of second connecting tube, it is described
Second through slot runs through the tube wall of second connecting tube, and second through slot extends choosing along the length direction of second connecting tube
Fixed length.
According to one embodiment of present invention, one or more the second connecting plate, institute are provided in second connecting tube
The second connecting plate is stated to connect with the second tube wall of second through slot two sides;Second connecting plate of muti-piece is along second connection
The length direction of pipe is spaced apart.
According to one embodiment of present invention, one end of the second tube wall of second connecting tube is around described in one of them
First through hole is simultaneously connect with described sleeve pipe tube wall.
According to one embodiment of present invention, first connecting tube runs through second connecting tube, first connection
Length of tube direction is vertical with the second connecting tube length direction;Or second connecting tube runs through first connecting tube,
The first connecting tube length direction is vertical with the second connecting tube length direction.
According to one embodiment of present invention, the second through-hole is offered on the first tube wall of first connecting tube;It is described
First connecting tube both ends are connect with set tube wall respectively;The second connecting tube number is one or more, each second connection
Pipe one end is connect with set tube wall, and the other end is connect with the first tube wall;Second lumen one end is opposite with first through hole position
And be connected to, the other end is opposite with the second lead to the hole site and is connected to.
According to one embodiment of present invention, described sleeve pipe is quadrangle pipe, and the first through hole every two is one group, until
First through hole described in one group few is opposite with first lumen position from the first sleeve both ends respectively and communicates;It is at least one set of
The first through hole is opposite with second lumen position from second casing both ends respectively and communicates.
According to one embodiment of present invention, first connecting tube and/or second connecting tube and described sleeve pipe pipe
Wall is welded to connect.
Steel construction bracket, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds
Casing lumen is provided with the first through hole through described sleeve pipe tube wall on described sleeve pipe tube wall.
It according to one embodiment of present invention, further include connector, the connector includes the first tank-type connecting component, described
First tank-type connecting component has the first cell wall, and first cell wall surrounds the first groove;First tank-type connecting component is set to
In described sleeve pipe lumen, first tank-type connecting component both ends are connect with described sleeve pipe tube wall;At least one described first through hole
It is opposite with the first groove location of first tank-type connecting component that the structural member being inserted into from the first through hole is inserted into
In first groove.
According to one embodiment of present invention, the connection of one or more third is provided on first tank-type connecting component
Plate, the third connecting plate are connect with first cell wall;The muti-piece third connecting plate is along the length side of first groove
To being spaced apart.
According to one embodiment of present invention, the first cell wall of first tank-type connecting component around the first through hole with
The connection of described sleeve pipe tube wall.
According to one embodiment of present invention, the connector includes the second tank-type connecting component, the second groove profile connection
Part has the second cell wall, and second cell wall surrounds the second groove;Second tank-type connecting component is set to described sleeve pipe lumen
Interior, second tank-type connecting component both ends are connect with described sleeve pipe tube wall;At least one described first through hole and second slot
Second groove location of type connector is opposite to make the structural member being inserted into from the first through hole be inserted into second groove
It is interior.
According to one embodiment of present invention, one or more the 4th connection is provided on second tank-type connecting component
Plate, the 4th connecting plate are connect with second cell wall;The 4th connecting plate of muti-piece is along the length side of second groove
To being spaced apart.
According to one embodiment of present invention, the second cell wall of second tank-type connecting component surrounds the first through hole simultaneously
It is connect with described sleeve pipe tube wall.
According to one embodiment of present invention, first tank-type connecting component runs through second tank-type connecting component, described
First tank-type connecting component length direction is vertical with the second tank-type connecting component length direction;Or second tank-type connecting component
Through first tank-type connecting component, the first tank-type connecting component length direction and the second tank-type connecting component length direction
Vertically.
According to one embodiment of present invention, opened up on the first cell wall of first tank-type connecting component it is jagged, it is described
First tank-type connecting component both ends are connect with set tube wall respectively;The second tank-type connecting component number is one or more, each
Second tank-type connecting component one end is connect with set tube wall, and the other end is connect with the first cell wall;Second groove one end and first
Lead to the hole site is opposite, and the other end is opposite with the gap position.
According to one embodiment of present invention, described sleeve pipe is quadrangle pipe, and the first through hole every two is one group, until
First through hole described in one group few is opposite with first groove location from first tank-type connecting component both ends respectively and communicates;Extremely
First through hole described in one group few is opposite with second groove location from second tank-type connecting component both ends respectively and communicates.
According to one embodiment of present invention, first tank-type connecting component and/or second tank-type connecting component and institute
Set tube wall is stated to be welded to connect.
Steel construction bracket structure in the present invention using negative bracket structure, using when may be provided on column or beam,
Negative bracket can be consistent in appearance with column, beam, and appearance is neat uniform, not in a jumble.Bracket structure in the present invention is using set
First through hole is opened up on pipe, connector is arranged in the lumen of casing, can both support structural member, the ratio being inserted into from first through hole
Such as beam, the loss of bearing capacity caused by due to casing opens up first through hole can also be supplied.Bottom plate is set, so that structure of the invention
Simply, it is readily produced.Sidewall paneling is arranged when bearing capacity is problematic in cavity bracket on bottom plate, so that the present invention carries energy
Power enhancing.Connector is set as tubulose, and tubular connection is welded on set tube wall around first through hole, and connector is by casing pipe
Wall is connected as one, and further enhances the bearing capacity of casing, makes up bearing capacity caused by due to casing opens up first through hole
Loss, so that the present invention is stronger.Bracket structure in the present invention can produce respectively with column, beam to be independent component and welds again
It connects in succession, the present invention is assembled at the construction field (site) in factory floor processing, again, mark can be provided for the production of scale
Quasi- part, it is high-efficient.First through slot is set on the first tube wall, and facilitating welder to protrude into the first lumen will protrude into the first lumen
Structural member and the first tube wall be welded to connect.The first connecting plate is arranged to connect the first tube wall of the first through slot two sides, can avoid
Opening up through slot bring bearing capacity reduces problem, keeps the first connecting tube stronger reliable.After the completion of welding, it can also pass through
First through slot penetration concrete, keeps steel construction stronger.Second through slot is set on the second tube wall, welder is facilitated to protrude into
The second intraluminal structural member will be protruded into two lumens and the second tube wall is welded to connect.Second connecting plate is set by the second through slot two
Second tube wall of side connects, and can avoid opening up through slot bring bearing capacity reduction problem, keeps the first connecting tube stronger reliable.
After the completion of welding, steel construction can also be kept stronger by the second through slot penetration concrete.Use the steel knot in the present invention
Structure bracket allows column and beam to be made into standard component according to standard and easily constructs at the construction field (site).Even if the length of beam
Degree is also not required to cut beyond the distance between two root posts, and beam can pass through steel construction bracket, still can be used.Use this hair
Steel construction bracket in bright can make steel construction room have more variation structures, for example a hanging platform is arranged, only
Beam is wanted to pass through the steel construction bracket in the present invention, prominent certain length.
Existing steel building, it is necessary first to design figure then factory process, be manufactured not according to design requirement by figure
Isomorphic product is used for in-site installation.Using the steel construction bracket in the present invention, each building block first can be made as standard structure
Part carries out different buildings and Demand Design.Current any of steel reinforced concrete system that be able to satisfy in steel construction bracket in the present invention sets
Meter demand, and the cost of labor of construction and installation can be reduced.Structural principle of the invention, the company of beam can be solved by being used in steel structure
The continuous, fixation of structure, node intensity the problem of, cleverly welded using the condition of back concrete casting slot, completely
Solves steel structure problem.
Positive bracket structure in compared with the existing technology, the present invention in bracket structure can save 30% or more steel using amount.
And the bracket structure in the present invention can be processed as standard component in factory floor, then assemble at the construction field (site) with column or beam, and it is existing
The field construction time is short, can at least save 60% or more on-site construction time.
Detailed description of the invention
Fig. 1 is the steel construction bracket structure schematic diagram in the embodiment of the present invention 1.
Fig. 2 is the connecting-piece structure schematic diagram in the embodiment of the present invention 1.
Fig. 3 is the first connecting pipe structure schematic diagram in the embodiment of the present invention 1.
Fig. 4 is the second connecting pipe structure schematic diagram in the embodiment of the present invention 1.
Fig. 5 is the connecting-piece structure schematic diagram in the embodiment of the present invention 2.
Fig. 6 is the first tank-type connecting component structural schematic diagram in the embodiment of the present invention 2.
Fig. 7 is the second tank-type connecting component structural schematic diagram in the embodiment of the present invention 2.
Fig. 8 is the steel construction bracket partial structural diagram in the embodiment of the present invention 3.
Fig. 9 is the steel construction bracket partial structural diagram in the embodiment of the present invention 4.
It is as shown in Figure 10 the using effect schematic diagram of the steel construction bracket in the present invention.
Specific embodiment
The present invention is described in detail with reference to the accompanying drawing:
Embodiment 1
As shown in Figure 1, steel construction bracket, including casing 10 and connector 20.Described sleeve pipe 10 has set tube wall 11, institute
It states set tube wall 11 and surrounds casing lumen 12.The first through hole through described sleeve pipe tube wall 11 is provided on described sleeve pipe tube wall 11
13.The shape of the shape and casing lumen 12 that cover tube wall 11 can be quadrangle or circle, can also select according to actual needs
It is selected as other shapes.The quadrangle can also be square or other available shapes either rectangle.Such as scheming
Shown in example, set tube wall 11 is rectangle, and casing lumen 12 is also rectangle.First through hole 13 can select according to actual needs
Its position and quantity.In the present embodiment, opened up respectively on four faces of the set tube wall 11 of quadrangle there are four first through hole 13.
Every two is one group, and aligned in position, size are identical two-by-two.
As shown in Figure 1, Figure 2 and Figure 3, the connector 20 includes the first connecting tube 30.First connecting tube 30 has
First tube wall 31, first tube wall 31 surround the first lumen 32.First connecting tube 30 is set to described sleeve pipe lumen 12
Interior, 30 both ends of the first connecting tube are connect with described sleeve pipe tube wall 11.At least one described first through hole 13 and described first
32 position of the first lumen of connecting tube 30 is opposite, so that being inserted into described first from the structural member that the first through hole 13 is inserted into
In lumen 32.The size of first through hole 13 both can be identical as the size of the first lumen 32, can also be with mutual difference, such as first
The size of through-hole 13 is greater than the size of the first lumen 32, and the size of first through hole 13 can also be greater than with the size of the first lumen 32.
If the size of first through hole 13 is greater than the size of the first lumen 32, then the first lumen 32 is arranged in a staggered manner with first through hole 13, so that
First tube wall 31 can be in contact with set tube wall 11 and is welded to connect, and can make the structural member being inserted into from the first through hole 13
It is inserted into first lumen 32.In the present embodiment as shown in the figure, the size of the first lumen 32 is equal to or slightly greater than
The size of first through hole 13, the first connecting tube 30 are arranged around first through hole 13.First connecting tube 30 is contacted with set tube wall 11
And utilize both welded connectings.First connecting tube, 30 both ends are centered around respectively around two first through hole 13, so that the first lumen
32 both ends are connected to two first through hole 13 respectively.
The first through slot 33 is provided on first tube wall 31 of first connecting tube 30, first through slot 33 is through described
First tube wall 31 of the first connecting tube, first through slot 33 are selected along the extension of the direction length L1 of first connecting tube 30
Length.It is provided with one or more first connecting plate 34 in first connecting tube 30, first connecting plate 34 and described the
First tube wall 31 of one through slot, 33 two sides connects.Length direction of first connecting plate of muti-piece 34 along first connecting tube 30
It is spaced apart.First connecting plate 34 can both be located at the outer wall of the first connecting tube 30, can also be located in the first lumen 32, may be used also
To be located in the first through slot 33, both ends are connect with the first tube wall 31.In the preferred example shown in the figure, first connection
Plate 34 is located in the first through slot 33.The second through-hole 35 is also provided on first tube wall 31 of first connecting tube 30.It can think
See, the first through slot 33 and the second through-hole 35 are provided in the different sides of the first tube wall 31.In the example shown in the figure, second is logical
35 number of hole is two, aligned in position setting.
As shown in Figure 1, Figure 2 and Figure 4, the connector 20 further includes the second connecting tube 40.Second connecting tube 40 has
There is the second tube wall 41, second tube wall 41 surrounds the second lumen 42;Second connecting tube 40 is set to described sleeve pipe lumen
In 12,40 both ends of the second connecting tube are connect with described sleeve pipe tube wall 11, at least one described first through hole 13 and described the
Two lumens, 42 position is opposite so as to be inserted into second lumen 42 from the structural member that the first through hole 13 is inserted into.First
The size of through-hole 13 both can be identical as the size of the second lumen 42, can also be with mutual difference, such as the size of first through hole 13
Greater than the size of the second lumen 42, the size of first through hole 13 can also be greater than with the size of the second lumen 42.Such as first through hole 13
Size be greater than the second lumen 42 size, then the second lumen 42 is arranged in a staggered manner with first through hole 13, so that 41 energy of the second tube wall
It is enough to be in contact and be welded to connect with set tube wall 11, but it is described that the structural member being inserted into from the first through hole 13 can be made to be inserted into
In first lumen 32.In the present embodiment as shown in the figure, the size of the second lumen 42 is equal to or slightly greater than first through hole 13
Size, the second connecting tube 40 are arranged around first through hole 13.Second connecting tube 40 is contacted with set tube wall 11 and is connected using welding
Both connect.
The second through slot 44 is provided on second tube wall 41 of second connecting tube 40, second through slot 44 is through described
Second tube wall 41 of the second connecting tube 40, second through slot 44 extend selected along the length direction L2 of second connecting tube 40
Length.Be provided with one or more second connecting plate 44 in second connecting tube 40, second connecting plate 44 with it is described
Second tube wall 41 of 44 two sides of the second through slot connects;Length L2 of second connecting plate of muti-piece 44 along second connecting tube 40
Direction is spaced apart.Second connecting plate 44 can both be located at the outer wall of the second connecting tube 40, can also be located in the second lumen 42,
It may be located in the second through slot 44.In the preferred example shown in the figure, second connecting plate 44 is located at the second through slot 44
Interior, both ends are connect with the second tube wall 41.
In the example shown in the figure, a first sleeve 30 and two the second casings 40 are provided in casing lumen 12.
30 both ends of first sleeve and set tube wall 11 are welded to connect.First tube wall 31 is arranged around first through hole 13.Two first through hole
13 opposite with 12 position of the first lumen from both ends respectively and connections.Each second casing, 40 one end and the set welding of tube wall 11 connect
It connects, the other end and the first tube wall 31 are welded to connect.Second tube wall, 41 one end surrounds first through hole 13, and the other end surrounds the second through-hole
35.Second lumen, 32 one end is opposite with 13 position of first through hole and is connected to, and the other end is opposite with 35 position of the second through-hole and is connected to.
It is of the present invention to surround, either being surrounded from two sides, it is also possible to three faces and surrounds or surround on four sides.
The structural member being inserted into from one of first through hole 13 may pass through after the first lumen 32 from another first through hole 13
It stretches out except the first lumen 32 and casing 10.The structural member being inserted into from one of first through hole 13 may pass through two second connections
It is stretched out except the second lumen 42 and casing 10 after second lumen 42 of pipe 40 from another first through hole 13.
In the present embodiment, two the second connecting tubes 40 can be one, and both ends are connected on set tube wall 11.Second
Connecting tube 40 runs through the first connecting tube 30 from the second through-hole 35.
Embodiment 2
As shown in figure 5, steel construction bracket, including casing 10 and connector 20.10 structure of casing is as shown in Figure 1.The set
Pipe 10 has set tube wall 11, and described sleeve pipe tube wall 11 surrounds casing lumen 12, is provided on described sleeve pipe tube wall 11 through institute
State the first through hole 13 of set tube wall 11.The shape of the shape and casing lumen 12 that cover tube wall 11 can be quadrangle or circle
Shape can also be selected as other shapes according to actual needs.The quadrangle either rectangle, can also be square or
Other available shapes.In the example shown in the figure, set tube wall 11 is rectangle, and casing lumen 12 is also rectangle.First is logical
Hole 13 can select its position and quantity according to actual needs.In the present embodiment, on four faces of the set tube wall 11 of rectangle respectively
First through hole 13 there are four opening up.Every two is one group, and aligned in position, size are identical two-by-two.
As shown in Figure 5, Figure 6, the connector 20 includes the first tank-type connecting component 50.First tank-type connecting component 50 has
There is the first cell wall 51, first cell wall 51 surrounds the first groove 52.First tank-type connecting component 50 is set to described sleeve pipe
In lumen 12,50 both ends of the first tank-type connecting component and described sleeve pipe tube wall 11 are welded to connect.At least one is described first logical
The structure for be inserted into from the first through hole 13 opposite with 52 position of the first groove of first tank-type connecting component 50 of hole 13
Part is inserted into first groove 52.The size of first through hole 13 both can be identical as the size of the first groove 52, can also
It is greater than the size of the first groove 52 with the size of mutual difference, such as first through hole 13, it can also be big with the size of the first groove 52
In the size of first through hole 13.If the size of first through hole 13 is greater than the size of the first groove 52, then the first groove 52 and first
Through-hole 13 is arranged in a staggered manner, so that the first tube wall 51 can be in contact and be welded to connect with set tube wall 11, and can make from described the
The structural member of one through-hole 13 insertion is inserted into first groove 52.In the present embodiment as shown in the figure, the first groove
52 size is equal to or slightly greater than the size of first through hole 13, and the first tank-type connecting component 50 is set from three faces around first through hole 13
It sets.First tank-type connecting component 50 contacts with set tube wall 11 and utilizes both welded connectings.First tank-type connecting component, 50 both ends point
Not Wei Rao two first through hole 13 so that 52 both ends of the first groove are connected to two first through hole 13 respectively.
Jagged 54 are opened up on first cell wall 51 of first tank-type connecting component 50.In the example shown in the figure, institute
Stating 54 number of notch is two, is oppositely arranged.One or more third connecting plate is provided on first tank-type connecting component 50
55, the third connecting plate 55 is connect with first cell wall 51;The muti-piece third connecting plate 55 is along first groove 52
The direction length L3 be spaced apart.
As shown in Figure 5, Figure 7, the connector 20 further includes the second tank-type connecting component 60.Second tank-type connecting component 60
With the second cell wall 61, second cell wall 61 surrounds the second groove 62.Second tank-type connecting component 60 is set to the set
In pipe lumen 12,60 both ends of the second tank-type connecting component and described sleeve pipe tube wall 11 are welded to connect.At least one described first
The knot for be inserted into from the first through hole 13 opposite with 62 position of the second groove of second tank-type connecting component 60 of through-hole 13
Component is inserted into second groove 62.The size of first through hole 13 both can be identical as the size of the second groove 62,
Can be with mutual difference, for example the size of first through hole 13 is greater than the size of the second groove 62, it can also be with the size of the second groove 62
Greater than the size of first through hole 13.If the size of first through hole 13 is greater than the size of the second groove 62, then the second groove 62 and the
One through-hole 13 is arranged in a staggered manner, so that the second tube wall 61 can be in contact with set tube wall 11 and is welded to connect, and can make described in
The structural member that first through hole 13 is inserted into is inserted into second groove 62.In the present embodiment as shown in the figure, second is recessed
The size of slot 62 is equal to or slightly greater than the size of first through hole 13, and the second tank-type connecting component 60 is set from three faces around first through hole 13
It sets.Second tank-type connecting component 60 contacts with set tube wall 11 and utilizes both welded connectings.Second tank-type connecting component, 60 both ends point
It is not centered around around two first through hole 13, so that 62 both ends of the second groove are connected to two first through hole 13 respectively.
Be provided with one or more the 4th connecting plate 64 on second tank-type connecting component 60, the 4th connecting plate 64 with
Second cell wall 61 connects.The 4th connecting plate 64 of muti-piece is along the direction the length L4 interval of second groove 62 point
In the example shown in the figure, described sleeve pipe 10 is rectangular tube, and 13 every two of first through hole is one group, two-by-two
It is aligned and size is identical.First tank-type connecting component, 50 both ends are connect with set tube wall 11 respectively;The second groove profile connection
60 number of part is two, and each second tank-type connecting component, 60 one end is connect with set tube wall 11, and the other end and the first cell wall 51 connect
It connects.Each described second groove, 62 one end is opposite with 13 position of first through hole, and the other end is opposite with 54 position of notch.Wherein
First through hole 13 described in one group is respectively from 50 both ends of the first tank-type connecting component simultaneously phase opposite with 51 position of the first groove
It is logical;First through hole 13 described in another group is opposite with 62 position of the second groove from 60 both ends of the second tank-type connecting component respectively
And it communicates.
Embodiment 3
Fig. 8 shows casing lumen internal structure.As shown in figure 8, the steel construction bracket includes casing 10 and connector
20.10 structure of casing is as shown in Figure 1.Described sleeve pipe 10 has set tube wall 11, and described sleeve pipe tube wall 11 surrounds casing lumen 12.
The first through hole 13 through described sleeve pipe tube wall 11 is provided on described sleeve pipe tube wall 11.Cover the shape and casing pipe of tube wall 11
The shape of chamber 12 can be quadrangle or circle, can also be selected as other shapes according to actual needs.The quadrangle was both
It can be rectangle, can also be square or other available shapes.In the example shown in the figure, set tube wall 11 is square
Shape, casing lumen 12 are also rectangle.First through hole 13 can select its position and quantity according to actual needs.In the present embodiment, four
First through hole 13 there are four being opened up respectively on four faces of the set tube wall 11 of side shape.Every two is one group, two-by-two aligned in position,
Size is identical.The connector 20 includes one or more bottom plate 170, and the bottom plate 170 is inserted for holding from the through-hole 131
Enter the structural member in the lumen 12.Axial along casing 10, the bottom plate 170 is located at 13 lower section of through-hole.The bottom plate 170
Either identical as 12 cross-sectional shape of lumen, size, four sides edge is contacted and is welded with set tube wall 11, can also be with
It is that shape and/or size are different, only two sides edge or three face edges are contacted and welded with set tube wall 11.
Structure in the above various embodiments can also use other combination, such as using the second through-hole in embodiment 1
35 replace the notch 54 in embodiment 2.
Embodiment 4
Fig. 9 shows casing lumen internal structure.As shown in figure 9, the present embodiment on the basis of embodiment 3, increases by two
Block sidewall paneling 71, two pieces of sidewall panelings 71 are welded on bottom plate 170, interval setting.Two pieces of 71 both ends of sidewall paneling are also welded on casing
On tube wall 11.170, two pieces of sidewall panelings 71 of bottom plate are arranged around first through hole 13.
It is as shown in Figure 10 the using effect schematic diagram of the steel construction bracket in the present invention.As shown in figure 9, in the present invention
Steel construction bracket 100 is mounted on column 200.Beam 300 is inserted through steel construction bracket 100 from first through hole 13.Column 200
With 100 supporting beam 300 of steel construction bracket.Using the steel construction bracket 100 in the present invention, protruded so that 300 right end of beam is extensible
In the certain length of column 200, the not set column 200 of the right end of beam 300 is supported.Therefore, using the steel construction ox in the present invention
Leg 100 may make the structure of steel house more various, and can freely arrange in pairs or groups setting as needed.
Steel construction bracket structure in the present invention using negative bracket structure, using when may be provided on column or beam,
Negative bracket can be consistent in appearance with column, beam, and appearance is neat uniform, not in a jumble.Bracket structure in the present invention is using set
First through hole is opened up on pipe, connector is arranged in the lumen of casing, can both support structural member, the ratio being inserted into from first through hole
Such as beam, the loss of bearing capacity caused by due to casing opens up first through hole can also be supplied.Bottom plate is set, so that structure of the invention
Simply, it is readily produced.Sidewall paneling is arranged when bearing capacity is problematic in cavity bracket on bottom plate, so that the present invention carries energy
Power enhancing.Connector is set as tubulose, and tubular connection is welded on set tube wall around first through hole, and connector is by casing pipe
Wall is connected as one, and further enhances the bearing capacity of casing, makes up bearing capacity caused by due to casing opens up first through hole
Loss, so that the present invention is stronger.Bracket structure in the present invention can produce respectively with column, beam to be independent component and welds again
It connects in succession, the present invention is assembled at the construction field (site) in factory floor processing, again, mark can be provided for the production of scale
Quasi- part, it is high-efficient.First through slot is set on the first tube wall, and facilitating welder to protrude into the first lumen will protrude into the first lumen
Structural member and the first tube wall be welded to connect.The first connecting plate is arranged to connect the first tube wall of the first through slot two sides, can avoid
Opening up through slot bring bearing capacity reduces problem, keeps the first connecting tube stronger reliable.After the completion of welding, it can also pass through
First through slot penetration concrete, keeps steel construction stronger.Second through slot is set on the second tube wall, welder is facilitated to protrude into
The second intraluminal structural member will be protruded into two lumens and the second tube wall is welded to connect.Second connecting plate is set by the second through slot two
Second tube wall of side connects, and can avoid opening up through slot bring bearing capacity reduction problem, keeps the first connecting tube stronger reliable.
After the completion of welding, steel construction can also be kept stronger by the second through slot penetration concrete.Use the steel knot in the present invention
Structure bracket allows column and beam to be made into standard component according to standard and easily constructs at the construction field (site).Even if the length of beam
Degree is also not required to cut beyond the distance between two root posts, and beam can pass through steel construction bracket, still can be used.Use this hair
Steel construction bracket in bright can make steel construction room have more variation structures, for example a hanging platform is arranged, only
Beam is wanted to pass through the steel construction bracket in the present invention, prominent certain length.
Existing steel building, it is necessary first to design figure then factory process, be manufactured not according to design requirement by figure
Isomorphic product is used for in-site installation.Using the steel construction bracket in the present invention, it can be first made as standard element, carried out different
Building and Demand Design.Steel construction bracket in the present invention is able to satisfy any design requirement of current steel reinforced concrete system, and can reduce
The cost of labor of construction and installation.Structural principle of the invention, the continuous, the structure of beam that solve for being used in steel structure in steel structure are consolidated
It the problem of fixed, node intensity, is cleverly welded using the condition of back concrete casting slot, it is difficult to completely solve steel structure
Topic.
Embodiment in the present invention is only used for that the present invention will be described, and is not construed as limiting the scope of claims limitation,
Other substantially equivalent substitutions that those skilled in that art are contemplated that, all fall in the scope of protection of the present invention.
Claims (22)
1. steel construction bracket, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds set
Pipe lumen, the first through hole through described sleeve pipe tube wall is provided on described sleeve pipe tube wall, and the first through hole number is one
Or it is multiple;Connector is provided in described sleeve pipe lumen, the connector includes the first connecting tube;The first connecting tube tool
There is the first tube wall, first tube wall surrounds the first lumen, and first connecting tube both ends are connect with described sleeve pipe tube wall, at least
One first through hole knot for be inserted into from the first through hole opposite with the first lumen position of first connecting tube
Component is inserted into first lumen.
2. steel construction bracket according to claim 1, which is characterized in that be arranged on the first tube wall of first connecting tube
There is the first through slot, first through slot runs through the first tube wall of first connecting tube, and first through slot connects along described first
The length direction of adapter tube extends selected length.
3. steel construction bracket according to claim 2, which is characterized in that be provided with one piece or more in first connecting tube
The first connecting plate of block, first connecting plate are connect with the first tube wall of first through slot two sides;The muti-piece first connects
Plate is spaced apart along the length direction of first connecting tube.
4. steel construction bracket according to claim 1, which is characterized in that one end of the first tube wall of first connecting tube
It is connect around first through hole described in one of them with described sleeve pipe tube wall.
5. steel construction bracket according to claim 1, which is characterized in that the connector further includes the second connecting tube, institute
The second connecting tube is stated with the second tube wall, second tube wall surrounds the second lumen;Second connecting tube is set to the set
In pipe lumen, second connecting tube both ends are connect with described sleeve pipe tube wall, at least one described first through hole and described second
Lumen position is opposite so as to be inserted into second lumen from the structural member that the first through hole is inserted into.
6. steel construction bracket according to claim 5, which is characterized in that be arranged on the second tube wall of second connecting tube
There is the second through slot, second through slot runs through the tube wall of second connecting tube, and second through slot is along second connecting tube
Length direction extend selected length.
7. steel construction bracket according to claim 6, which is characterized in that be provided with one piece or more in second connecting tube
The second connecting plate of block, second connecting plate are connect with the second tube wall of second through slot two sides;The muti-piece second connects
Plate is spaced apart along the length direction of second connecting tube.
8. steel construction bracket according to claim 5, which is characterized in that one end of the second tube wall of second connecting tube
It is connect around first through hole described in one of them and with described sleeve pipe tube wall.
9. steel construction bracket according to claim 5, which is characterized in that first connecting tube is through second connection
Pipe, the first connecting tube length direction are vertical with the second connecting tube length direction;Or second connecting tube runs through
First connecting tube, the first connecting tube length direction are vertical with the second connecting tube length direction.
10. steel construction bracket according to claim 5, which is characterized in that opened on the first tube wall of first connecting tube
Equipped with the second through-hole;First connecting tube both ends are connect with set tube wall respectively;The second connecting tube number be one or
Multiple, each second connecting tube one end is connect with set tube wall, and the other end is connect with the first tube wall;Second lumen one end with
First through hole position is opposite and is connected to, and the other end is opposite with the second lead to the hole site and is connected to.
11. steel construction bracket according to claim 5, which is characterized in that described sleeve pipe is quadrangle pipe, and described first is logical
Hole every two is one group, and at least one set of first through hole is respectively from the first described sleeve pipe both ends and first lumen position phase
To and communicate;At least one set of first through hole is respectively from the second described sleeve pipe both ends simultaneously phase opposite with second lumen position
It is logical.
12. steel construction bracket according to claim 5, which is characterized in that first connecting tube and/or second company
Adapter tube is welded to connect with described sleeve pipe tube wall.
13. steel construction bracket, which is characterized in that including casing;Described sleeve pipe has set tube wall, and described sleeve pipe tube wall surrounds set
Pipe lumen is provided with the first through hole through described sleeve pipe tube wall on described sleeve pipe tube wall;It is provided in described sleeve pipe lumen
Connector, the connector include the first tank-type connecting component;First tank-type connecting component has the first cell wall, first slot
Wall surrounds the first groove, and first tank-type connecting component both ends are connect with described sleeve pipe tube wall, at least one described first through hole
It is opposite with the first groove location of first tank-type connecting component that the structural member being inserted into from the first through hole is inserted into
In first groove.
14. steel construction bracket according to claim 13, which is characterized in that be provided with one on first tank-type connecting component
Block or muti-piece third connecting plate, the third connecting plate are connect with first cell wall;The muti-piece third connecting plate is described in
The length direction of first groove is spaced apart.
15. steel construction bracket according to claim 13, which is characterized in that the first cell wall of first tank-type connecting component
It is connect around the first through hole with described sleeve pipe tube wall.
16. steel construction bracket according to claim 13, which is characterized in that the connector is connected including the second groove profile
Part, second tank-type connecting component have the second cell wall, and second cell wall surrounds the second groove;Second tank-type connecting component
It is set in described sleeve pipe lumen, second tank-type connecting component both ends are connect with described sleeve pipe tube wall;At least one described
The one through-hole structural member being inserted into from the first through hole that enables opposite with the second groove location of second tank-type connecting component
It is enough inserted into second groove.
17. steel construction bracket according to claim 16, which is characterized in that be provided with one on second tank-type connecting component
The 4th connecting plate of block or muti-piece, the 4th connecting plate are connect with second cell wall;The 4th connecting plate of muti-piece is described in
The length direction of second groove is spaced apart.
18. steel construction bracket according to claim 16, which is characterized in that the second cell wall of second tank-type connecting component
It is connect around the first through hole and with described sleeve pipe tube wall.
19. steel construction bracket according to claim 16, which is characterized in that first tank-type connecting component is through described the
Two tank-type connecting components, the first tank-type connecting component length direction are vertical with the second tank-type connecting component length direction;Or
Second tank-type connecting component runs through first tank-type connecting component, the first tank-type connecting component length direction and described second
Tank-type connecting component length direction is vertical.
20. steel construction bracket according to claim 19, which is characterized in that the first cell wall of first tank-type connecting component
On open up it is jagged, first tank-type connecting component both ends respectively with set tube wall connect;The second tank-type connecting component number
For one or more, each second tank-type connecting component one end is connect with set tube wall, and the other end is connect with the first cell wall;Described
Two groove one end are opposite with first through hole position, and the other end is opposite with the gap position.
21. steel construction bracket according to claim 16, which is characterized in that described sleeve pipe be quadrangle pipe, described first
Through-hole every two is one group, and at least one set of first through hole is recessed from first tank-type connecting component both ends and described first respectively
Groove location is opposite and communicates;At least one set of first through hole is recessed from second tank-type connecting component both ends and described second respectively
Groove location is opposite and communicates.
22. steel construction bracket according to claim 16, which is characterized in that first tank-type connecting component and/or described
Second tank-type connecting component and described sleeve pipe tube wall are welded to connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610081368.4A CN106049676B (en) | 2016-02-04 | 2016-02-04 | Steel construction bracket |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610081368.4A CN106049676B (en) | 2016-02-04 | 2016-02-04 | Steel construction bracket |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106049676A CN106049676A (en) | 2016-10-26 |
CN106049676B true CN106049676B (en) | 2019-08-20 |
Family
ID=57484310
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610081368.4A Active CN106049676B (en) | 2016-02-04 | 2016-02-04 | Steel construction bracket |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049676B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107268786A (en) * | 2017-06-22 | 2017-10-20 | 李新华 | Construction set |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1587018A (en) * | 1968-10-17 | 1970-03-06 | ||
JPH08333807A (en) * | 1995-06-08 | 1996-12-17 | Nippon Steel Corp | Joint structure of composite material structural member |
CN103669579A (en) * | 2012-08-30 | 2014-03-26 | 昆山华英博五金建材有限公司 | Connector |
CN204983145U (en) * | 2015-04-30 | 2016-01-20 | 河南杭萧钢构有限公司 | Connection structure of square steel column and steel I -beam |
CN205399659U (en) * | 2016-02-04 | 2016-07-27 | 李新华 | Steel construction bracket |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE9212546U1 (en) * | 1992-05-19 | 1992-12-17 | Jung-Leisner, Dorothea, 7760 Radolfzell, De | |
CN203334436U (en) * | 2013-05-30 | 2013-12-11 | 山东科技大学 | Novel dog-bone type beam column joint |
-
2016
- 2016-02-04 CN CN201610081368.4A patent/CN106049676B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1587018A (en) * | 1968-10-17 | 1970-03-06 | ||
JPH08333807A (en) * | 1995-06-08 | 1996-12-17 | Nippon Steel Corp | Joint structure of composite material structural member |
CN103669579A (en) * | 2012-08-30 | 2014-03-26 | 昆山华英博五金建材有限公司 | Connector |
CN204983145U (en) * | 2015-04-30 | 2016-01-20 | 河南杭萧钢构有限公司 | Connection structure of square steel column and steel I -beam |
CN205399659U (en) * | 2016-02-04 | 2016-07-27 | 李新华 | Steel construction bracket |
Also Published As
Publication number | Publication date |
---|---|
CN106049676A (en) | 2016-10-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104264795B (en) | A kind of beam column flexible connecting device and construction method thereof | |
CN106049676B (en) | Steel construction bracket | |
CN106049753B (en) | Steel structure support structure | |
CN106049677B (en) | Steel construction | |
KR20140068641A (en) | Scaffold for construction and launching method of the scaffold | |
CN103826505A (en) | Plate stacking device | |
CN109881779A (en) | House frame connection structure | |
CN206780344U (en) | A kind of polygonal truss makes frock moulding bed | |
CN205476071U (en) | Steel structure support structure | |
CN104453089A (en) | Steel beam device of steel structure house | |
CN203256899U (en) | Demountable modularized combined house | |
CN205530685U (en) | Steel construction | |
CN205399659U (en) | Steel construction bracket | |
CN205557825U (en) | Novel steel construction bracket and steel structure support structure | |
CN107386516B (en) | Intersecting bar-shaped grille and installation method thereof | |
CN104533005A (en) | Ceiling connecting piece and ceiling with ceiling connecting pieces | |
CN204553438U (en) | A kind of Multipurpose connecting part and detachable cabinet | |
CN209817104U (en) | House frame connection structure | |
CN106836480A (en) | New steel structure bracket and steel structure support structure | |
CN205369903U (en) | A building structure | |
CN209458488U (en) | Centrosymmetric oblique pull frame-type fixes device | |
KR101379586B1 (en) | Cable-tray construction method | |
CN205896397U (en) | Prop up hanger device | |
CN105064558A (en) | Modular curtain wall combined structure | |
CN206408750U (en) | A kind of house box connector and house box system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |