CN106049446A - Fastening combination pile wall forming device - Google Patents

Fastening combination pile wall forming device Download PDF

Info

Publication number
CN106049446A
CN106049446A CN201610521586.5A CN201610521586A CN106049446A CN 106049446 A CN106049446 A CN 106049446A CN 201610521586 A CN201610521586 A CN 201610521586A CN 106049446 A CN106049446 A CN 106049446A
Authority
CN
China
Prior art keywords
recessed
arrangement
stake
cylinder
motor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610521586.5A
Other languages
Chinese (zh)
Inventor
于洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610521586.5A priority Critical patent/CN106049446A/en
Publication of CN106049446A publication Critical patent/CN106049446A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/18Bulkheads or similar walls made solely of concrete in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/16Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/001Drilling a non circular hole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/1628Shapes rectangular
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/165Shapes polygonal

Abstract

The invention discloses a fastening combination pile wall forming device. The fastening combination pile wall forming device comprises a concave V-shaped head drilling machine and a rhombic drilling machine; multiple concrete concave V-shaped head piles spaced by one rhombic pile are manufactured; and cement soil rhombic piles are respectively manufactured at the front and back parts in gaps between every two concave V-shaped head piles by the rhombic pile drilling machine according to a working mode of the rhombic pile drilling machine to form a pile wall for mutual fastening of multiple concrete concave V-shaped head piles and the front and back cement soil rhombic piles between every two concave V-shaped head piles for soil retaining and seepage prevention of a building foundation.

Description

Snapping combination piling wall wall-forming device
Technical field
The present invention relates to a kind of piling wall wall-forming device, the snapping used in a kind of foundation engineering combination piling wall becomes wall Device.
Background technology
Soil cement rig be by the multiple drill bit of power drive rotate, multiple drill bits in rotation process by drill bit bottom Earth cutting with cement mortar stir into cement earth pile, be presently used for building basis gear soil, antiseep cement-soil pile all It is to be formed by multiple soil cement cylinders overlap joint.
Summary of the invention
The invention provides a kind of snapping combination that can manufacture recessed V-arrangement head stake and rhombus stake mutual snapping formation combination piling wall Stake wall-forming device.
The present invention is achieved through the following technical solutions:
A kind of snapping combination piling wall wall-forming device, including recessed V-arrangement head rig and rhombus rig.
The structure of recessed V-arrangement head rig includes: mobile jib lower end is fixed in the middle of middle bar, and the front lower portion of middle bar is fixed on drilling rod The upper end of one, the lower end of drilling rod one is fixed with motor three, and the lower end output shaft of motor three is fixed with drill bit one;After middle bar The upper end of drilling rod two is fixed in end bottom, and the lower end of drilling rod two is fixed with motor four, and the lower end output shaft of motor four is fixed There is drill bit two;The middle left part of middle bar is fixed with left bar, and the upper end of left support is fixed in the left end bottom of left bar, and the lower end of left support is solid Determining in the middle of the shell of motor one, the front end output shaft of motor one is fixed with front recessed V-arrangement cylinder one, and the rear end of motor one is defeated Shaft is fixed with rear recessed V-arrangement cylinder one;The middle right part of middle bar is fixed with right bar, and the upper of right support is fixed in the right-hand member bottom of right bar End, in the middle of the shell of the lower end fixed motor two of right support, the front end output shaft of motor two is fixed with front recessed V-arrangement cylinder two, The rear end output shaft of motor two is fixed with rear recessed V-arrangement cylinder two;The surface of front recessed V-arrangement cylinder one and rear recessed V-arrangement cylinder one Surface be separately installed with multiple stirring knife;The surface of front recessed V-arrangement cylinder two and the surface of rear recessed V-arrangement cylinder two are separately installed with Multiple stirring knife.
The structure of rhombus rig includes: the upper end of the lower end fixed motor five of drilling rod three, and motor five lower end is provided with change Speed case, the output shaft of change speed gear box lower end is fixed with drill bit three;Change speed gear box to left back, left front, right back, right front respectively the most defeated Going out a power transmission shaft, the outer end of each power transmission shaft fixes a triangular knife respectively.
The present invention has a following feature:
The present invention can manufacture between the recessed V-arrangement head stake of multiple concrete and each two recessed V-arrangement head stake before and after two soil cement rhombuses The piling wall of stake mutually snapping, for gear soil, the antiseep on building basis.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of recessed V-arrangement head rig;
Fig. 2 is the rearview of recessed V-arrangement head rig
Fig. 3 is the A A view of Fig. 1;
Fig. 4 is the B B view of Fig. 1;
Fig. 5 is the structural representation of rhombus rig;
Fig. 6 is the C C view of Fig. 5;
Fig. 7 is the cross-sectional view that recessed V-arrangement head stake and the mutual snapping of rhombus stake form combination piling wall.
In figure: 1, middle bar, 2, drilling rod one, 3, drilling rod two, 4, front recessed V-arrangement cylinder one, 5, front recessed V-arrangement cylinder two, 6, electronic Machine one, 7, motor two, 8, stirring knife, 9, rear recessed V-arrangement cylinder one, 10, rear recessed V-arrangement cylinder two, 11, output shaft, 12, mobile jib, 13, Left bar, 14, right bar, 15, left support, 16, right support, 17, motor three, 18, drill bit one, 19, motor four, 20, drill bit two;21、 Drilling rod three, 22, motor five, 23, change speed gear box, 24, drill bit three, 25, power transmission shaft, 26, triangular knife.
Detailed description of the invention
A kind of snapping built pile wall-forming device, including recessed V-arrangement head rig and rhombus rig.
Recessed V-arrangement head rig includes the structure in Fig. 1, Fig. 2, Fig. 3, Fig. 4, and concrete structure includes: mobile jib 12 lower end is fixed on In the middle of middle bar 1, the front lower portion of middle bar is fixed on the upper end of drilling rod 1, and the lower end of drilling rod one is fixed with motor 3 17, electronic The lower end output shaft of machine three is fixed with drill bit 1;The rear end lower of middle bar is fixed on the upper end of drilling rod 23, the lower end of drilling rod two Being fixed with motor 4 19, the lower end output shaft of motor four is fixed with drill bit 2 20;The middle left part of middle bar is fixed with left bar 13, the upper end of left support 15 is fixed in the left end bottom of left bar, in the middle of the shell of the lower end fixed motor 1 of left support, and motor The front end output shaft 11 of one is fixed with front recessed V-arrangement cylinder 1, and the rear end output shaft 11 of motor one is fixed with rear recessed V-arrangement cylinder One 9;The middle right part of middle bar is fixed with right bar 14, and the upper end of right support 16 is fixed in the right-hand member bottom of right bar, and the lower end of right support is solid Determining in the middle of the shell of motor 27, the front end output shaft 11 of motor two is fixed with front recessed V-arrangement cylinder 25, after motor two End output shaft 11 is fixed with rear recessed V-arrangement cylinder 2 10;The surface of front recessed V-arrangement cylinder one and the surface of rear recessed V-arrangement cylinder one are divided Multiple stirring knife 8 is not installed;The surface of front recessed V-arrangement cylinder two and the surface of rear recessed V-arrangement cylinder two are separately installed with multiple stirring Cutter 8.
The working method of recessed V-arrangement head rig is: during work, grouting pump by pipeline to the lower end of front recessed V-arrangement cylinder one, after The lower end of recessed V-arrangement cylinder one, the lower end of front recessed V-arrangement cylinder two, the lower end of rear recessed V-arrangement cylinder two and drill bit one, drill bit two Lower end be injected separately into water under high pressure, motor three, motor four drive the drill bit of its lower end to rotate respectively when working, motor one Front recessed V-arrangement cylinder one and rear recessed V-arrangement cylinder one is driven to rotate forward during work, recessed V-arrangement cylinder two He before driving when motor two works Rear recessed V-arrangement cylinder two inverts;Drill bit one, drill bit two in rotation process by the soil cutting of its lower end, front recessed V-arrangement cylinder one, Rear recessed V-arrangement cylinder one and front recessed V-arrangement cylinder two, rear recessed V-arrangement cylinder two in rotation by the soil cutting of its lower end;Front recessed V Left end is cut into former and later two recessed V-arrangements, front recessed V-arrangement cylinder two, rear recessed V-arrangement in rotation by shape cylinder one, rear recessed V-arrangement cylinder one Right-hand member is cut into former and later two recessed V-arrangements in rotation by cylinder two;The soil body cut is blended in mud, and water under high pressure is continuous Adding, mud constantly flows out to outside hole from hole, and mobile jib forms about one two ends during being pressed into downwards and is respectively provided with two The hole of individual recessed V-arrangement casting concrete in this hole, produces concrete recessed V-arrangement head stake.
Rhombus rig includes the structure in Fig. 4, Fig. 5;Concrete structure is as follows: the lower end fixed motor 5 22 of drilling rod 3 21 Upper end, motor five lower end is provided with change speed gear box 23, and the output shaft of change speed gear box lower end is fixed with drill bit 3 24;Change speed gear box is to left back Side, left front, right back, right front export a power transmission shaft 25 respectively, and the outer end of each power transmission shaft fixes a triangle respectively Cutter 26.
The specific works mode of rhombus rig is as follows: during work, drill bit three grout injection, motor five are driven by grouting pump Dynamic change speed gear box operating, change speed gear box drives drill bit three to rotate in operation process, drill bit three in rotary course by drill bit lower end Soil cutting stirs with cement mortar;Change speed gear box drives left back, left front, right back, right front in operation process respectively Power transmission shaft drives triangular knife to rotate respectively, four triangular knifes in rotary course by soil cutting and the soil cement at four angles Stirring;Drilling rod three forms soil cement rhombus stake during being pressed into.
The convex V-arrangement of rhombus stake coincide with the recessed V-arrangement at two ends, recessed V-arrangement head stake left and right.
The work process that recessed V-arrangement head rig manufactures snapping piling wall with rhombus rig associated working is as follows: at needs pile axle The original position of line, manufactures a concrete recessed V-arrangement head with recessed V-arrangement head rig according to the working method of above-mentioned recessed V-arrangement head rig Stake, at this, the right side of recessed V-arrangement head stake, the distance of one the rhombus stake in interval remanufacture second concrete recessed V-arrangement head stake, so make Make one, multiple intervals rhombus pilespacing from the recessed V-arrangement head stake of multiple concrete;When the concrete strength of the recessed V-arrangement head stake on both sides reaches To a timing, then front and rear in the spacing between each two recessed V-arrangement head stake, with rhombus stake rig according to above-mentioned rhombus The working method of stake rig manufactures a soil cement rhombus stake respectively, makes the convex V-arrangement head of anterior soil cement rhombus stake left end coincide Recessed V-arrangement head, the convex V-arrangement head of anterior soil cement rhombus stake right-hand member that in the left side, recessed V-arrangement head stake right-hand member is anterior are fit to the right coagulation The recessed V-arrangement head that the recessed V-arrangement head stake left end of soil is anterior, makes the convex V-arrangement head of rear portion soil cement rhombus stake left end be fit to the left side recessed V-arrangement head The stake recessed V-arrangement head at right-hand member rear portion, the convex V-arrangement head of rear portion soil cement rhombus stake right-hand member are fit to a concrete recessed V-arrangement head stake left side, the right The recessed V-arrangement head at end rear portion, two water before and after being thusly-formed between the recessed V-arrangement head stake of multiple concrete and each two recessed V-arrangement head stake The piling wall of the mutual snapping of earth rhombus stake, for gear soil, the antiseep on building basis.

Claims (2)

1. a snapping combination piling wall wall-forming device, including recessed V-arrangement head rig and rhombus rig, it is characterised in that:
The concrete structure of described recessed V-arrangement head rig includes: mobile jib (12) lower end is fixed in the middle of middle bar (1), under the front end of middle bar The upper end of drilling rod one (2) is fixed in portion, and the lower end of drilling rod one is fixed with motor three (17), and the lower end output shaft of motor three is solid Surely there is drill bit one (18);The rear end lower of middle bar is fixed on the upper end of drilling rod two (3), and the lower end of drilling rod two is fixed with motor four (19), the lower end output shaft of motor four is fixed with drill bit two (20);The middle left part of middle bar is fixed with left bar (13), left bar The upper end of left support (15) is fixed in left end bottom, in the middle of the shell of the lower end fixed motor one (6) of left support, before motor one End output shaft (11) is fixed with front recessed V-arrangement cylinder one (4), and the rear end output shaft (11) of motor one is fixed with rear recessed V-arrangement cylinder One (9);The middle right part of middle bar is fixed with right bar (14), and the upper end of right support (16) is fixed in the right-hand member bottom of right bar, right support In the middle of the shell of lower end fixed motor two (7), the front end output shaft (11) of motor two is fixed with front recessed V-arrangement cylinder two (5), The rear end output shaft (11) of motor two is fixed with rear recessed V-arrangement cylinder two (10);The surface of front recessed V-arrangement cylinder one and rear recessed V The surface of shape cylinder one is separately installed with multiple stirring knife (8);The surface of front recessed V-arrangement cylinder two and the table of rear recessed V-arrangement cylinder two Face is separately installed with multiple stirring knife (8);
The working method of described recessed V-arrangement head rig is: during work, grouting pump by pipeline to the lower end of front recessed V-arrangement cylinder one, after The lower end of recessed V-arrangement cylinder one, the lower end of front recessed V-arrangement cylinder two, the lower end of rear recessed V-arrangement cylinder two and drill bit one, drill bit two Lower end be injected separately into water under high pressure, motor three, motor four drive the drill bit of its lower end to rotate respectively when working, motor one Front recessed V-arrangement cylinder one and rear recessed V-arrangement cylinder one is driven to rotate forward during work, recessed V-arrangement cylinder two He before driving when motor two works Rear recessed V-arrangement cylinder two inverts;Drill bit one, drill bit two in rotation process by the soil cutting of its lower end, front recessed V-arrangement cylinder one, Rear recessed V-arrangement cylinder one and front recessed V-arrangement cylinder two, rear recessed V-arrangement cylinder two in rotation by the soil cutting of its lower end;Front recessed V Left end is cut into former and later two recessed V-arrangements, front recessed V-arrangement cylinder two, rear recessed V-arrangement in rotation by shape cylinder one, rear recessed V-arrangement cylinder one Right-hand member is cut into former and later two recessed V-arrangements in rotation by cylinder two;The soil body cut is blended in mud, and water under high pressure is continuous Adding, mud constantly flows out to outside hole from hole, and mobile jib forms about one two ends during being pressed into downwards and is respectively provided with two The hole of individual recessed V-arrangement casting concrete in this hole, produces concrete recessed V-arrangement head stake;
The concrete structure of described rhombus rig includes: the upper end of the lower end fixed motor 4 22 of drilling rod 2 21, motor four times End is provided with change speed gear box 23, and the output shaft of change speed gear box lower end is fixed with drill bit 2 24;Change speed gear box to left back, left front, right back, Right front exports a power transmission shaft 25 respectively, and the outer end of each power transmission shaft fixes a triangular knife 2 26 respectively;
The specific works mode of described rhombus rig is: during work, drill bit two grout injection, motor four are driven by grouting pump Change speed gear box operate, change speed gear box drives drill bit two to rotate in operation process, drill bit two in rotary course by the soil of drill bit lower end Body cutting is stirred with cement mortar;Change speed gear box drives the biography of left back, left front, right back, right front in operation process respectively Moving axis drives the rotation of a triangular knife two respectively, four triangular knifes two in rotary course by soil cutting and the cement at four angles Soil stirring;Drilling rod two forms soil cement rhombus stake during being pressed into;
The work process that described recessed V-arrangement head rig manufactures snapping piling wall with rhombus rig associated working is: at needs pile axis Original position, with recessed V-arrangement head rig according to above-mentioned recessed V-arrangement head rig working method manufacture a concrete recessed V-arrangement head stake, At this, the right side of recessed V-arrangement head stake, the distance of one the rhombus stake in interval remanufacture second concrete recessed V-arrangement head stake, so manufacture One, multiple intervals rhombus pilespacing from the recessed V-arrangement head stake of multiple concrete;When the concrete strength of the recessed V-arrangement head stake on both sides reaches One timing, then front and rear in the spacing between each two recessed V-arrangement head stake, with rhombus stake rig according to above-mentioned rhombus stake The working method of rig manufactures a soil cement rhombus stake respectively, makes the convex V-arrangement head of anterior soil cement rhombus stake left end be fit to The recessed V-arrangement head of recessed V-arrangement head stake right-hand member front portion, the left side, the convex V-arrangement head of anterior soil cement rhombus stake right-hand member are fit to the right concrete The recessed V-arrangement head that recessed V-arrangement head stake left end is anterior, makes the convex V-arrangement head of rear portion soil cement rhombus stake left end be fit to the left side recessed V-arrangement head stake The recessed V-arrangement head at right-hand member rear portion, the convex V-arrangement head of rear portion soil cement rhombus stake right-hand member are fit to the right concrete recessed V-arrangement head stake left end The recessed V-arrangement head at rear portion, two cement before and after being thusly-formed between the recessed V-arrangement head stake of multiple concrete and each two recessed V-arrangement head stake The piling wall of the soil mutual snapping of rhombus stake, for gear soil, the antiseep on building basis.
Snapping the most according to claim 1 combination piling wall wall-forming device, it is characterised in that: the convex V-arrangement of described rhombus stake with The recessed V-arrangement at two ends, described recessed V-arrangement head stake left and right coincide.
CN201610521586.5A 2016-07-06 2016-07-06 Fastening combination pile wall forming device Pending CN106049446A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610521586.5A CN106049446A (en) 2016-07-06 2016-07-06 Fastening combination pile wall forming device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610521586.5A CN106049446A (en) 2016-07-06 2016-07-06 Fastening combination pile wall forming device

Publications (1)

Publication Number Publication Date
CN106049446A true CN106049446A (en) 2016-10-26

Family

ID=57200999

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610521586.5A Pending CN106049446A (en) 2016-07-06 2016-07-06 Fastening combination pile wall forming device

Country Status (1)

Country Link
CN (1) CN106049446A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009007808A (en) * 2007-06-27 2009-01-15 Chiyoda Soiltec Kk Soil cement column construction apparatus and soil cement column construction method
CN101619572A (en) * 2009-06-30 2010-01-06 孙刚 Hydraulic pressure milling deep-mixing underground-wall machine
CN105586959A (en) * 2016-03-13 2016-05-18 陈兆英 Triangular pile and T-shaped pile locking and buckling equipment
CN105714783A (en) * 2016-02-18 2016-06-29 吕文娥 Arc splicing equipment for Y-shaped piles and rectangular piles

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009007808A (en) * 2007-06-27 2009-01-15 Chiyoda Soiltec Kk Soil cement column construction apparatus and soil cement column construction method
CN101619572A (en) * 2009-06-30 2010-01-06 孙刚 Hydraulic pressure milling deep-mixing underground-wall machine
CN105714783A (en) * 2016-02-18 2016-06-29 吕文娥 Arc splicing equipment for Y-shaped piles and rectangular piles
CN105586959A (en) * 2016-03-13 2016-05-18 陈兆英 Triangular pile and T-shaped pile locking and buckling equipment

Similar Documents

Publication Publication Date Title
CN105970925A (en) Buckle type retaining wall
CN106013101A (en) Lock opening retaining wall
CN105887854A (en) Buckle piling wall forming device
CN105970923A (en) Joint wall manufacturing device
CN105862829A (en) Manufacturing device for inserting opening wall
CN105951757A (en) Socket connection combination retaining wall
CN106013102A (en) Locking connection retaining wall
CN106013100A (en) Combined wall manufacturing device
CN105951758A (en) Insertion connection retaining wall
CN105970924A (en) Locking type diaphragm wall
CN105887853A (en) Lock piling wall forming device
CN106013099A (en) Fastening wall manufacturing device
CN105951756A (en) Wall forming device for latching piling wall
CN105951755A (en) Manufacturing device for buckle connection wall
CN105887852A (en) Occlusion wall manufacturing device
CN105696581A (en) Regular octagonal pile and rectangular pile T-shaped inserting device
CN105696566A (en) Cross inserting-buckling device for rhombic piles and rectangular piles
CN105735264A (en) Combined device for octagonal piles and H-shaped piles
CN106088034A (en) Eye-splice built pile manufactures device
CN106193001A (en) A kind of double-hasp wall-forming device
CN106049446A (en) Fastening combination pile wall forming device
CN105714806A (en) Orthohexagonal-pile and cross-pile inserting and buckling device
CN105696565A (en) Buckling device for rhombic piles and rectangular piles
CN105696564A (en) Engagement device for rhombic piles and rectangular piles
CN105696572A (en) V-shaped inserting-buckling device for rhombic piles and rectangular piles

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20161026

RJ01 Rejection of invention patent application after publication