CN106013100A - Combined wall manufacturing device - Google Patents

Combined wall manufacturing device Download PDF

Info

Publication number
CN106013100A
CN106013100A CN201610354293.2A CN201610354293A CN106013100A CN 106013100 A CN106013100 A CN 106013100A CN 201610354293 A CN201610354293 A CN 201610354293A CN 106013100 A CN106013100 A CN 106013100A
Authority
CN
China
Prior art keywords
arrangement
recessed
tool post
rhombus
arrangement tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201610354293.2A
Other languages
Chinese (zh)
Inventor
王乐贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610354293.2A priority Critical patent/CN106013100A/en
Publication of CN106013100A publication Critical patent/CN106013100A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/22Component parts
    • E02F3/24Digging wheels; Digging elements of wheels; Drives for wheels
    • E02F3/241Digging wheels; Digging elements of wheels; Drives for wheels digging wheels
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F3/00Dredgers; Soil-shifting machines
    • E02F3/04Dredgers; Soil-shifting machines mechanically-driven
    • E02F3/18Dredgers; Soil-shifting machines mechanically-driven with digging wheels turning round an axis, e.g. bucket-type wheels
    • E02F3/22Component parts
    • E02F3/24Digging wheels; Digging elements of wheels; Drives for wheels
    • E02F3/246Digging wheels; Digging elements of wheels; Drives for wheels drives
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/02Dredgers or soil-shifting machines for special purposes for digging trenches or ditches
    • E02F5/08Dredgers or soil-shifting machines for special purposes for digging trenches or ditches with digging wheels turning round an axis
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B4/00Drives for drilling, used in the borehole
    • E21B4/16Plural down-hole drives, e.g. for combined percussion and rotary drilling; Drives for multi-bit drilling units
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B7/00Special methods or apparatus for drilling
    • E21B7/001Drilling a non circular hole
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2200/00Geometrical or physical properties
    • E02D2200/16Shapes
    • E02D2200/165Shapes polygonal
    • E02D2200/1657Shapes polygonal made from single element

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Mechanical Engineering (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Paleontology (AREA)
  • Earth Drilling (AREA)

Abstract

Disclosed is a combined wall manufacturing device. The combined wall manufacturing device comprises a concave V-shaped head drill machine and a rhombus drill machine. A plurality of concrete rhombus piles spaced by the distance of one concave V-shaped head pile are manufactured; when concrete strength of the rhombus piles on the two sides reaches a certain, a concrete concave V-shaped head pile is manufactured in the interval between every two rhombus piles through the concave V-shaped head drill machine according to the working manner of the concave V-shaped head drill machine; the front portion and the rear portion of each rhombus pile are each provided with a concrete concave V-shaped head pile through the concave V-shaped head drill machine according to the working manner of the concave V-shaped head drill machine; and accordingly, a wall body is formed and used for soil blockage and seepage prevention of a building foundation, wherein the wall body is formed through combining of the multiple concrete rhombus piles, the concrete concave V-shaped head pile between every two rhombus piles and the concrete concave V-shaped piles on the front portion and the rear portion of each rhombus pile.

Description

A kind of assembled wall manufactures device
Technical field
The present invention relates to a kind of body of wall and manufacture device, the recessed V-arrangement head stake used in a kind of foundation engineering and rhombus stake are mutually combined the manufacture device of a kind of assembled wall of formation.
Background technology
Soil cement pile-formation machine is to be rotated by the multiple drill bit of power drive, the earth of drill bit bottom is cut in rotation process and stirs into cement earth pile with cement mortar by multiple drill bits, the soil cement body of wall of the consolidation process being presently used for weak base foundation is all to be formed by multiple soil cement cylinders overlap joint.
Summary of the invention
The invention provides a kind of energy recessed V-arrangement head stake of manufacture and be mutually combined the assembled wall manufacture device forming assembled wall with rhombus stake.
The present invention is achieved through the following technical solutions:
A kind of assembled wall manufactures device, including recessed V-arrangement head rig and rhombus rig.
The structure of recessed V-arrangement head rig includes: the middle upper portion of steel pipe support one is fixed in the lower end of drilling rod one, the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support two, the shell middle upper portion of motor two is fixed in the lower end of steel plate support two, the front end output shaft of motor two is fixed with front semi-convex V-arrangement tool post, and the rear end output shaft of motor two is fixed with rear semi-convex V-arrangement tool post;The upper end of steel plate support one is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor one is fixed in the lower end of steel plate support one, the front end output shaft of motor one is fixed with first half recessed V-arrangement tool post one, and the rear end output shaft of motor one is fixed with later half recessed V-arrangement tool post one;The upper end of steel plate support three is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor three is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed V-arrangement tool post two, and the rear end output shaft of motor three is fixed with later half recessed V-arrangement tool post two;First half recessed V-arrangement tool post one and later half recessed V-arrangement tool post one form a umbilicate recessed V-arrangement tool post, first half recessed V-arrangement tool post two and later half recessed V-arrangement tool post two and form another umbilicate recessed V-arrangement tool post, and the side surface of each recessed V-arrangement tool post is separately installed with multiple cutter head;Front semi-convex V-arrangement tool post and rear semi-convex V-arrangement tool post form the convex V-arrangement tool post that a centre is convex, and the side surface of convex V-arrangement tool post is provided with multiple cutter head;The recessed V-arrangement of recessed V-arrangement tool post cross section coincide with the convex V-arrangement of convex V-arrangement tool post cross section.
The structure of rhombus rig includes: the upper end of the lower end fixed motor four of drilling rod two, and motor four lower end is provided with change speed gear box, and the output shaft of change speed gear box lower end is fixed with drill bit two;Change speed gear box to left back, left front, right back, right front export a power transmission shaft respectively, the outer end of each power transmission shaft fixes a triangular knife two respectively.
The present invention has a following feature:
The present invention can manufacture the body of wall that the concrete recessed V-arrangement stake at the concrete recessed V-arrangement head stake between multiple concrete rhombus stake and each two rhombus stake and rhombus stake front portion and rear portion is mutually combined, for gear soil, the antiseep on building basis.
Accompanying drawing explanation
The present invention is further illustrated below in conjunction with the accompanying drawings:
Fig. 1 is the front view of recessed V-arrangement head rig;
Fig. 2 is the rearview of recessed V-arrangement head rig
Fig. 3 is the A A view of Fig. 1;
Fig. 4 is the structural representation of rhombus stake rig;
Fig. 5 is the B B view of Fig. 3;
Fig. 6 is the cross-sectional view that recessed V-arrangement head stake is mutually combined the assembled wall of formation with rhombus stake.
In figure: 1, drilling rod one, 2, steel pipe support one, 3, steel plate support one, 4, steel plate support two, 5, steel plate support three, 6, motor one, 7, motor two, 8, motor three, 9, first half recessed V-arrangement tool post one, 10, front semi-convex V-arrangement tool post, 11, first half recessed V-arrangement tool post two, 12, cutter head, 13, later half recessed V-arrangement tool post one, 14, rear semi-convex V-arrangement tool post, 15, later half recessed V-arrangement tool post two, 16, output shaft;21, drilling rod two, 22, motor four, 23, change speed gear box, 24, drill bit two, 25, power transmission shaft, 26, triangular knife two.
Detailed description of the invention
A kind of assembled wall manufactures device, including recessed V-arrangement head rig and rhombus rig.
Recessed V-arrangement head rig includes the structure in Fig. 1, Fig. 2, Fig. 3, concrete structure includes: the middle upper portion of steel pipe support 1 is fixed in the lower end of drilling rod 1, the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support 24, the shell middle upper portion of motor 27 is fixed in the lower end of steel plate support two, the front end output shaft 16 of motor two is fixed with front semi-convex V-arrangement tool post 10, and the rear end output shaft of motor two is fixed with rear semi-convex V-arrangement tool post 14;The upper end of steel plate support 1 is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor 1 is fixed in the lower end of steel plate support one, the front end output shaft 16 of motor one is fixed with first half recessed V-arrangement tool post 1, and the rear end output shaft of motor one is fixed with later half recessed V-arrangement tool post 1;The upper end of steel plate support 35 is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor 38 is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed V-arrangement tool post 2 11, and the rear end output shaft of motor three is fixed with later half recessed V-arrangement tool post 2 15;First half recessed V-arrangement tool post one and later half recessed V-arrangement tool post one form a umbilicate recessed V-arrangement tool post, first half recessed V-arrangement tool post two and later half recessed V-arrangement tool post two and form another umbilicate recessed V-arrangement tool post, and the side surface of each recessed V-arrangement tool post is separately installed with multiple cutter head 12;Front semi-convex V-arrangement tool post and rear semi-convex V-arrangement tool post form the convex V-arrangement tool post that a centre is convex, and the side surface of convex V-arrangement tool post is provided with multiple cutter head 12;The recessed V-arrangement of recessed V-arrangement tool post cross section coincide with the convex V-arrangement of convex V-arrangement tool post cross section.
The working method of recessed V-arrangement head rig is: during work, the position between grouting pump V-arrangement recessed to left side tool post and centre convex V-arrangement tool post and between the right recessed V-arrangement tool post and centre convex V-arrangement tool post irrigates water under high pressure respectively, motor one drives first half recessed V-arrangement tool post one and the rotating forward of later half recessed V-arrangement tool post one, motor three drives first half recessed V-arrangement tool post two and the reversion of later half recessed V-arrangement tool post two, motor two drives front semi-convex V-arrangement tool post to rotate forward, after motor two drives, semi-convex V-arrangement tool post inverts, first half recessed V-arrangement tool post one, later half recessed V-arrangement tool post one, first half recessed V-arrangement tool post two, later half recessed V-arrangement tool post two and front semi-convex V-arrangement tool post, rear semi-convex V-arrangement tool post in rotation by the soil cutting of its lower end;Left end is cut into recessed V-arrangement head in rotation by first half recessed V-arrangement tool post one, later half recessed V-arrangement tool post one, and right-hand member is cut into recessed V-arrangement head in rotation by first half recessed V-arrangement tool post two, later half recessed V-arrangement tool post two;The soil body machined away is mixed in mud, and water under high pressure constantly fills, and mud constantly flows out from hole, and drilling rod one forms about one two ends during being pressed into downwards and is respectively provided with the hole of recessed V-arrangement head, casting concrete, formation concrete recessed V-arrangement head stake in this hole.
Rhombus rig includes the structure in Fig. 4, Fig. 5;Concrete structure is as follows: the upper end of the lower end fixed motor 4 22 of drilling rod 2 21, and motor four lower end is provided with change speed gear box 23, and the output shaft of change speed gear box lower end is fixed with drill bit 2 24;Change speed gear box to left back, left front, right back, right front export a power transmission shaft 25 respectively, the outer end of each power transmission shaft fixes a triangular knife 2 26 respectively.
The specific works mode of rhombus rig is as follows: during work, grouting pump irrigates water under high pressure to drill bit two, and motor four drives change speed gear box to operate, and change speed gear box drives drill bit two to rotate in operation process, drill bit two in rotary course by the soil cutting of drill bit lower end;Change speed gear box drives left back, left front, right back, the power transmission shaft of right front to drive the rotation of a triangular knife two respectively in operation process respectively, four triangular knifes two in rotary course by the soil cutting at four angles;The soil body machined away is mixed in mud, and water under high pressure constantly fills, and mud constantly flows out from diamond hole hole, and drilling rod two forms the diamond hole of certain depth during being pressed into, casting concrete, formation concrete rhombus stake in this diamond hole.
The convex V-arrangement of rhombus stake coincide with the recessed V-arrangement at two ends, recessed V-arrangement head stake left and right.
The work process that recessed V-arrangement head rig manufactures assembled wall with rhombus rig associated working is as follows: in the original position needing pile axis, a concrete rhombus stake is manufactured according to the working method of above-mentioned rhombus rig with rhombus rig, on the right side of this rhombus stake, the distance of one the recessed V-arrangement head stake in interval remanufacture second concrete rhombus stake, so manufacture one, multiple intervals recessed V-arrangement head pilespacing from multiple concrete rhombus stakes;When the concrete strength of the rhombus stake on both sides reaches a timing, in spacing between each two rhombus stake, manufacture a concrete recessed V-arrangement head stake with recessed V-arrangement head rig according to the working method of above-mentioned recessed V-arrangement head rig, make the recessed V-arrangement at two ends, each concrete recessed V-arrangement head stake left and right be fit to the convex V-arrangement of rhombus stake of this recessed V-arrangement head stake the right and left respectively;Front portion and rear portion in each rhombus stake, manufacture a concrete recessed V-arrangement head stake with recessed V-arrangement head rig respectively according to the working method of above-mentioned recessed V-arrangement head rig, make the recessed V-arrangement of the concrete recessed V-arrangement head stake at each rhombus stake front portion and rear portion be fit to the convex V-arrangement of this rhombus stake;The body of wall that the concrete recessed V-arrangement head stake being thusly-formed between multiple concrete rhombus stake and each two rhombus stake and anterior and rear portion the concrete recessed V-arrangement stake of rhombus stake are mutually combined, for gear soil, the antiseep on building basis.

Claims (3)

1. assembled wall manufactures a device, including recessed V-arrangement head rig and rhombus rig, it is characterised in that:
The concrete structure of described recessed V-arrangement head rig includes: the middle upper portion of steel pipe support one (2) is fixed in the lower end of drilling rod one (1), the middle lower portion of steel pipe support one is fixed on the upper end of steel plate support two (4), the shell middle upper portion of motor two (7) is fixed in the lower end of steel plate support two, the front end output shaft (16) of motor two is fixed with front semi-convex V-arrangement tool post (10), and the rear end output shaft of motor two is fixed with rear semi-convex V-arrangement tool post (14);The upper end of steel plate support one (3) is fixed in the left end bottom of steel pipe support one, the shell middle upper portion of motor one (6) is fixed in the lower end of steel plate support one, the front end output shaft (16) of motor one is fixed with first half recessed V-arrangement tool post one (9), and the rear end output shaft of motor one is fixed with later half recessed V-arrangement tool post one (13);The upper end of steel plate support three (5) is fixed in the right-hand member bottom of steel pipe support one, the shell middle upper portion of motor three (8) is fixed in the lower end of steel plate support three, the front end output shaft of motor three is fixed with first half recessed V-arrangement tool post two (11), and the rear end output shaft of motor three is fixed with later half recessed V-arrangement tool post two (15);First half recessed V-arrangement tool post one and later half recessed V-arrangement tool post one form a umbilicate recessed V-arrangement tool post, first half recessed V-arrangement tool post two and later half recessed V-arrangement tool post two form another umbilicate recessed V-arrangement tool post, and the side surface of each recessed V-arrangement tool post is separately installed with multiple cutter head (12);Front semi-convex V-arrangement tool post and rear semi-convex V-arrangement tool post form the convex V-arrangement tool post that a centre is convex, and the side surface of convex V-arrangement tool post is provided with multiple cutter head (12);
The working method of described recessed V-arrangement head rig is: during work, the position between grouting pump V-arrangement recessed to left side tool post and centre convex V-arrangement tool post and between the right recessed V-arrangement tool post and centre convex V-arrangement tool post irrigates water under high pressure respectively, motor one drives first half recessed V-arrangement tool post one and the rotating forward of later half recessed V-arrangement tool post one, motor three drives first half recessed V-arrangement tool post two and the reversion of later half recessed V-arrangement tool post two, motor two drives front semi-convex V-arrangement tool post to rotate forward, after motor two drives, semi-convex V-arrangement tool post inverts, first half recessed V-arrangement tool post one, later half recessed V-arrangement tool post one, first half recessed V-arrangement tool post two, later half recessed V-arrangement tool post two and front semi-convex V-arrangement tool post, rear semi-convex V-arrangement tool post in rotation by the soil cutting of its lower end;Left end is cut into recessed V-arrangement head in rotation by first half recessed V-arrangement tool post one, later half recessed V-arrangement tool post one, and right-hand member is cut into recessed V-arrangement head in rotation by first half recessed V-arrangement tool post two, later half recessed V-arrangement tool post two;The soil body machined away is mixed in mud, and water under high pressure constantly fills, and mud constantly flows out from hole, and drilling rod one forms about one two ends during being pressed into downwards and is respectively provided with the hole of recessed V-arrangement head, casting concrete, formation concrete recessed V-arrangement head stake in this hole;
The concrete structure of described rhombus rig includes: the upper end of the lower end fixed motor 4 22 of drilling rod 2 21, and motor four lower end is provided with change speed gear box 23, and the output shaft of change speed gear box lower end is fixed with drill bit 2 24;Change speed gear box to left back, left front, right back, right front export a power transmission shaft 25 respectively, the outer end of each power transmission shaft fixes a triangular knife 2 26 respectively;
The specific works mode of described rhombus rig is: during work, grouting pump irrigates water under high pressure to drill bit two, and motor four drives change speed gear box to operate, and change speed gear box drives drill bit two to rotate in operation process, drill bit two in rotary course by the soil cutting of drill bit lower end;Change speed gear box drives left back, left front, right back, the power transmission shaft of right front to drive the rotation of a triangular knife two respectively in operation process respectively, four triangular knifes two in rotary course by the soil cutting at four angles;The soil body machined away is mixed in mud, and water under high pressure constantly fills, and mud constantly flows out from diamond hole hole, and drilling rod two forms the diamond hole of certain depth during being pressed into, casting concrete, formation concrete rhombus stake in this diamond hole;
Described recessed V-arrangement head rig manufactures the work process of assembled wall with rhombus rig associated working: in the original position needing pile axis, a concrete rhombus stake is manufactured according to the working method of above-mentioned rhombus rig with rhombus rig, on the right side of this rhombus stake, the distance of one the recessed V-arrangement head stake in interval remanufacture second concrete rhombus stake, so manufacture one, multiple intervals recessed V-arrangement head pilespacing from multiple concrete rhombus stakes;When the concrete strength of the rhombus stake on both sides reaches a timing, in spacing between each two rhombus stake, manufacture a concrete recessed V-arrangement head stake with recessed V-arrangement head rig according to the working method of above-mentioned recessed V-arrangement head rig, make the recessed V-arrangement at two ends, each concrete recessed V-arrangement head stake left and right be fit to the convex V-arrangement of rhombus stake of this recessed V-arrangement head stake the right and left respectively;Front portion and rear portion in each rhombus stake, manufacture a concrete recessed V-arrangement head stake with recessed V-arrangement head rig respectively according to the working method of above-mentioned recessed V-arrangement head rig, make the recessed V-arrangement of the concrete recessed V-arrangement head stake at each rhombus stake front portion and rear portion be fit to the convex V-arrangement of this rhombus stake;The body of wall that the concrete recessed V-arrangement head stake being thusly-formed between multiple concrete rhombus stake and each two rhombus stake and anterior and rear portion the concrete recessed V-arrangement stake of rhombus stake are mutually combined, for gear soil, the antiseep on building basis.
Assembled wall the most according to claim 1 manufactures device, it is characterised in that: the recessed V-arrangement of the recessed V-arrangement tool post cross section of recessed V-arrangement head rig coincide with the convex V-arrangement of convex V-arrangement tool post cross section.
Assembled wall the most according to claim 1 manufactures device, it is characterised in that: the convex V-arrangement of described rhombus stake coincide with the recessed V-arrangement at two ends, described recessed V-arrangement head stake left and right.
CN201610354293.2A 2016-05-25 2016-05-25 Combined wall manufacturing device Withdrawn CN106013100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610354293.2A CN106013100A (en) 2016-05-25 2016-05-25 Combined wall manufacturing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610354293.2A CN106013100A (en) 2016-05-25 2016-05-25 Combined wall manufacturing device

Publications (1)

Publication Number Publication Date
CN106013100A true CN106013100A (en) 2016-10-12

Family

ID=57094684

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610354293.2A Withdrawn CN106013100A (en) 2016-05-25 2016-05-25 Combined wall manufacturing device

Country Status (1)

Country Link
CN (1) CN106013100A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887852A (en) * 2016-05-25 2016-08-24 刘玉香 Occlusion wall manufacturing device
CN105887853A (en) * 2016-05-25 2016-08-24 刘玉香 Lock piling wall forming device
CN105951755A (en) * 2016-05-25 2016-09-21 刘玉香 Manufacturing device for buckle connection wall
CN105951756A (en) * 2016-05-25 2016-09-21 刘玉香 Wall forming device for latching piling wall
CN106013099A (en) * 2016-05-25 2016-10-12 刘玉香 Fastening wall manufacturing device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105887852A (en) * 2016-05-25 2016-08-24 刘玉香 Occlusion wall manufacturing device
CN105887853A (en) * 2016-05-25 2016-08-24 刘玉香 Lock piling wall forming device
CN105951755A (en) * 2016-05-25 2016-09-21 刘玉香 Manufacturing device for buckle connection wall
CN105951756A (en) * 2016-05-25 2016-09-21 刘玉香 Wall forming device for latching piling wall
CN106013099A (en) * 2016-05-25 2016-10-12 刘玉香 Fastening wall manufacturing device

Similar Documents

Publication Publication Date Title
CN105970925A (en) Buckle type retaining wall
CN106013100A (en) Combined wall manufacturing device
CN106013102A (en) Locking connection retaining wall
CN105970923A (en) Joint wall manufacturing device
CN105887853A (en) Lock piling wall forming device
CN106013101A (en) Lock opening retaining wall
CN105970924A (en) Locking type diaphragm wall
CN105887854A (en) Buckle piling wall forming device
CN105951757A (en) Socket connection combination retaining wall
CN105862829A (en) Manufacturing device for inserting opening wall
CN105804070A (en) Wall forming device for inserted built pile wall
CN105951758A (en) Insertion connection retaining wall
CN106013099A (en) Fastening wall manufacturing device
CN105951756A (en) Wall forming device for latching piling wall
CN105951755A (en) Manufacturing device for buckle connection wall
CN105887852A (en) Occlusion wall manufacturing device
CN105862795A (en) V-shaped insertion buckling pile manufacturing facility
CN105887849A (en) Socket-connection V-shaped folded line pile wall
CN105862793A (en) V-shaped locking connection pile manufacturing facility
CN105862794A (en) V-shaped locking buckling pile manufacturing facility
CN105804646A (en) Lock catch X pile forming machine
CN105821859A (en) Device for forming inserted and buckled type V-shaped piles
CN105735291A (en) Pile forming machine for combined cross pile
CN105862797A (en) X-shaped locking connection pile forming machine
CN105862818A (en) Manufacturing device for circular arc buckling broken-line pile wall

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20161012