CN106049355B - Hard ground water blocking wall construction and construction method - Google Patents

Hard ground water blocking wall construction and construction method Download PDF

Info

Publication number
CN106049355B
CN106049355B CN201610644592.XA CN201610644592A CN106049355B CN 106049355 B CN106049355 B CN 106049355B CN 201610644592 A CN201610644592 A CN 201610644592A CN 106049355 B CN106049355 B CN 106049355B
Authority
CN
China
Prior art keywords
water blocking
guide rail
wallboard
positioning guide
support base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610644592.XA
Other languages
Chinese (zh)
Other versions
CN106049355A (en
Inventor
贺立军
石健
陈百国
马云龙
季东波
马利鑫
陈大伟
孙国富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jianancheng Geotechnical Engineering Co Ltd
Original Assignee
Beijing Jianancheng Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jianancheng Geotechnical Engineering Co Ltd filed Critical Beijing Jianancheng Geotechnical Engineering Co Ltd
Priority to CN201610644592.XA priority Critical patent/CN106049355B/en
Publication of CN106049355A publication Critical patent/CN106049355A/en
Application granted granted Critical
Publication of CN106049355B publication Critical patent/CN106049355B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B7/00Barrages or weirs; Layout, construction, methods of, or devices for, making same
    • E02B7/20Movable barrages; Lock or dry-dock gates

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to a kind of hard ground water blocking wall constructions, the positioning guide rail and waterwall being arranged along the line including prolonging flood control, the cross section of the positioning guide rail is the U-shaped section of opening upwards, positioning guide rail is laid on hard ground, by several water blocking wallboards, longitudinally occlusion splicing forms waterwall, the both sides long side of water blocking wallboard is equipped with the lock being mutually twisted, and the ground terminal of water blocking wallboard is arranged in the face water side of the positioning guide rail, and the land side of water blocking wallboard is equipped with support device.Waterwall main body of the present invention using sliceable waterwall board group at, good integrity, the advantage of safety and firmness can be played by being resisted in flood-fighting on flood, and use assembled detachable structure, it is quick to mount and dismount all very simples, it solves that low traditional flood-fighting efficiency, heavy workload, the construction time is long, security performance is low, expends the shortcomings of very big man power and material, provides that a kind of installation is fast, performance of controlling flood is good, safety and firmness, reusable emergency repair structure for flood-fighting.

Description

Hard ground water blocking wall construction and construction method
Technical field
The present invention relates to the waterwalls in hydraulic engineering, and in particular to a kind of hard ground water blocking wall construction and construction party Method.
Background technology
Traditional flood-fighting is using the flood-fighting of the methods of frame timber sand bag, when having low efficiency, heavy workload, construction Between it is long, security performance is low, expends the shortcomings of very big man power and material, made great difficulty and safety for emergent flood-fighting Hidden danger.
River dykes and dams include soft foundation and hard ground at present, and wherein hard ground refers to concrete or rock texture Dykes and dams or ground (such as city inner village road and bridge, tunnel, subway, moat bank etc.), or basis by processing The dykes and dams (such as side slope etc. of reservoir, rivers and lakes) of reinforcing.But hard ground hardness is big, surface is carefully and neatly done, it is difficult to fixed wood Stake or sandbag, a kind of method that the prior art is suitable for hard ground not yet, it is therefore desirable to water blocking suitable for hard ground Structure.
Invention content
The object of the present invention is to provide a kind of hard ground water blocking wall construction and construction method, there is assembly, portable Property, high efficiency, it is reusable the advantages that hard ground water blocking wall construction.
The purpose of the present invention is be achieved through the following technical solutions:
A kind of hard ground water blocking wall construction, including prolong positioning guide rail and waterwall that flood control is arranged along the line, the positioning The cross section of guide rail is the U-shaped section of opening upwards, and the positioning guide rail is laid on hard ground, and the waterwall is by several Longitudinally occlusion splicing forms water blocking wallboard, and the lock being mutually twisted is respectively equipped in the both sides long side of the water blocking wallboard, described The ground terminal of water blocking wallboard is arranged in the face water side of the positioning guide rail, and the land side of the water blocking wallboard is equipped with support device.
In preferred embodiments, the bottom land side of the water blocking wallboard is equipped with dismountable first clamping plate, described Relative distance between first clamping plate and water blocking wallboard is adjusted by bolt, and institute is clamped between the first clamping plate and water blocking wallboard State positioning guide rail.
In preferred embodiments, the support device includes supporting rod and support base, and one end of the supporting rod can The connection water blocking wallboard of rotation, the rotatable connection support base of the other end of the supporting rod, the support base are solid It is scheduled on the hard ground.
In preferred embodiments, the supporting rod includes the connector positioned at the intermediate body of rod and positioned at both ends, institute The both ends for stating the body of rod are respectively equipped with positive silk and anti-silk, and the threaded one end of the connector connects the body of rod, the connector The other end rotatable connection water blocking wallboard or support base.
In preferred embodiments, the cross section of the support base is the U-shaped section of opening upwards, and the support base hangs down Directly in the land side of the positioning guide rail, the center line of the support base and the center line of the water blocking wallboard are mutually coplanar.
In preferred embodiments, one end of the support base is equipped with dismountable second clamping plate, the second clamping plate Relative distance between support base is adjusted by bolt, and the positioning guide rail is clamped between the second clamping plate and support base.
In preferred embodiments, further include several backwater gates for prolonging waterwall distribution, by the waterwall point At several sections, the backwater gate includes being located at the symmetrically arranged gate column in both sides, and the inside of the gate column, which is equipped with, prolongs The slot of the gate column distribution, the slot is interior to be inserted into multiple door-plates for prolonging slot stacking, the both ends difference of the door-plate It is inserted into the slot of both sides, the outside of the gate column is equipped with the lock being connected with water blocking wallboard.
In preferred embodiments, the ground terminal of the water blocking wallboard is equipped with the sealing strip for preventing water leakage and/or prevents Water coiled material.
In preferred embodiments, the water blocking wallboard lock junction be equipped with for preventing water leakage sealing strip and/ Or waterproof roll.
In preferred embodiments, the water blocking wallboard is Larsen steel sheet pile.
A kind of hard ground waterwall construction method, including it is laid with positioning guide rail, the initial water blocking wallboard of installation, installation Support base, installation supporting rod, installation waterwall:
It is laid with positioning guide rail:Prolong on hard ground and be laid with positioning guide rail along flood control, the positioning guide rail passes through expansion Bolt is fixed on the hard ground, is bolted between adjacent positioning guide rail.
Initial water blocking wallboard is installed:By water blocking wallboard vertical display positioning guide rail initial end, in the water blocking wallboard Land side first clamping plate is installed, the relative distance between the first clamping plate and water blocking wallboard is adjusted by bolt, described the The positioning guide rail is clamped between one clamping plate and water blocking wallboard.
Support base is installed:The center line of the support base is conllinear with the center line of water blocking wallboard, and the support base passes through swollen Swollen bolt is fixed on the hard ground.
Supporting rod is installed:One end of supporting rod is installed to the land side of the water blocking wallboard, the supporting rod it is another End is installed on the support base, is rotated the body of rod, is adjusted the length of supporting rod.
Waterwall is installed:A side lock on water blocking wallboard is carried out being engaged spelling with the lock on the initial water blocking wallboard Dress, then carries out installation support base described in step and installation supporting rod, the water blocking wallboard prolong positioning guide rail and be vertically placed in firmly On quality base.
Step installation waterwall, installation support base and installation supporting rod are repeated, waterwall is obtained.
In preferred embodiments, installation gate column and installation door-plate are additionally provided with before the laying positioning guide rail;
Gate column is installed:Prolong on along flood control and choose several gate installation positions, and the two of the gate installation position Side is symmetrical arranged gate column, and the bottom end of the gate column is fixed on by expansion bolt on the hard ground;
Door-plate is installed:Door-plate is horizontally arranged, and is inserted into from top to bottom in the slot of the gate column, several institutes Door-plate vertical stacking between gate column is stated, backwater gate is formed, initial water blocking wallboard is inserted vertically into from top to bottom, makes institute The lock stated on initial water blocking wallboard is mutually engaged with the lock on gate column.
Beneficial effects of the present invention are:
1, waterwall main body of the present invention uses sliceable waterwall board group at being resisted in flood-fighting can play on flood Good integrity, the advantage of safety and firmness, and assembled detachable structure is used, installation and removal all very simples are quick, are Flood-fighting provide the quality time, solve low traditional flood-fighting efficiency, heavy workload, the construction time is long, security performance is low, The shortcomings of expending very big man power and material, provides that a kind of installation is fast, flood control performance is good, safety and firmness, can weigh for flood-fighting The emergency repair structure used again.
2, the connection between positioning guide rail of the invention, water blocking wallboard, support device is and is detachably connected, and water blocking Wallboard, support device may be mounted to any position on positioning guide rail, reduce positioning guide rail, water blocking wallboard, support device Processing request and installation requirement, improve work efficiency, reduce the production cost.
3, the present invention is equipped with the multiple backwater gates for prolonging waterwall distribution, and the door-plate of backwater gate is very light, can pass through It is manually installed, if wanting to observe water level conditions, remove door-plate successively from top to bottom, removes the degree of door-plate and determined with water level, it cannot Less than water level line, backwater gate is made to become the lowest order of waterwall, after whole door-plates is removed, detachable entire water blocking Wall, if occur flood throughout the year, such as thousand lakes Cheng Wuhan, usually can only remove door-plate, passed through for people, vehicle, retain gear When waterwall, rainfall to appear are exceeded, it is only necessary to transverse slat be installed, block the lowest order of waterwall, it can be achieved that quickly increasing dykes and dams Effect, installation effectiveness is high, avoids unnecessary loss.
4, the obliquity of water blocking wallboard is adjusted in support device of the invention, and the both ends of supporting rod are positive and negative link knot Structure realizes the rotation body of rod, it will be able to while the length of supporting rod is adjusted, it is easy to operate, it adjusts efficient.
Description of the drawings
Below according to attached drawing, invention is further described in detail.
Fig. 1 is the overall structure figure of the hard ground water blocking wall construction described in the embodiment of the present invention;
Fig. 2 is the facing structure figure of the face water side of Fig. 1;
Fig. 3 be in Fig. 1 A to amplification assumption diagram;
Fig. 4 be in Fig. 1 B to amplification assumption diagram;
Fig. 5 is the amplification assumption diagram of supporting rod in Fig. 1.
In figure:
1, positioning guide rail;2, water blocking wallboard;3, it latches;4, first clamping plate;5, supporting rod;6, support base;7, the body of rod;8, even Junctor;9, second clamping plate;10, gate column;11, slot;12, door-plate;13, waterproof roll.
Specific implementation mode
In order to make the object, technical scheme and advantages of the embodiment of the invention clearer, below in conjunction with the embodiment of the present invention In attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is A part of the embodiment of the present invention, instead of all the embodiments.The present invention being usually described and illustrated herein in the accompanying drawings is implemented The component of example can be arranged and be designed with a variety of different configurations.Therefore, below to the reality of the present invention provided in the accompanying drawings The detailed description for applying example is not intended to limit the range of claimed invention, but is merely representative of the selected implementation of the present invention Example.Based on the embodiments of the present invention, those of ordinary skill in the art are obtained without creative efforts Every other embodiment, shall fall within the protection scope of the present invention.
The embodiment of the present invention is described below in detail, the example of embodiment is shown in the accompanying drawings, wherein identical from beginning to end Or similar label indicates same or similar element or element with the same or similar functions.It is retouched below with reference to attached drawing The embodiment stated is exemplary, it is intended to for explaining the present invention, and is not considered as limiting the invention.
The present invention is further illustrated with specific embodiment below with reference to accompanying drawings.
As shown in Figure 1, a kind of hard ground water blocking wall construction of the embodiment of the present invention, including that prolongs that flood control is arranged along the line determine Position guide rail 1 and waterwall, the cross section of positioning guide rail 1 are the U-shaped section (such as channel steel) of opening upwards, and positioning guide rail 1 is laid on On hard ground, preformed hole at the center of positioning guide rail 1, and be fixed on hard ground by expansion bolt, the length of positioning guide rail 1 Degree is 1 meter to 5 meters one section, and by being bolted between every section, sealing is equipped with the contact surface of hard ground on positioning guide rail 1 Item.
Waterwall is made of the longitudinal occlusion splicing of several water blocking wallboards 2, and the both sides long side of water blocking wallboard 2, which is equipped with, to be mutually twisted Lock 3, water blocking wallboard 2 is inserted vertically into from top to bottom, so that 3 phase of lock between two water blocking wallboards 2 is engaged, water blocking wallboard 2 Preferably Larsen steel sheet pile, as shown in Fig. 2, the ground terminal of the water blocking wallboard 2 is equipped with the sealing strip for preventing water leakage and/or prevents Water coiled material 13, sealing strip are used to block the gap in waterwall board bottom portion, wherein sealing strip and waterproof roll with waterproof roll 13 13 can be used simultaneously, and waterproof roll 13 is additionally operable to block the gap between sealing strip and water blocking wallboard, the lock of the water blocking wallboard 2 It detains 3 junctions and is equipped with the sealing strip and/or waterproof roll 13 for being used for preventing water leakage, wherein sealing strip is located in lock 3, for blocking Gap between lock 3, waterproof roll 13 is located at the face water side of the lock junction of water blocking wallboard 2, for preventing water from entering In gap between lock, sealing strip can be replaced fluid sealant.
Water blocking wallboard 2 is arranged in the face water side of positioning guide rail 1, and the bottom of water blocking wallboard 2 is equipped with threaded hole, in water blocking wallboard 2 land side is equipped with dismountable first clamping plate 4 by bolt, is adjusted between first clamping plate 4 and water blocking wallboard 2 by bolt Relative distance, the outer side elevation of clamping and positioning guide rail 1 between first clamping plate 4 and water blocking wallboard 2, this connection structure realize water blocking Quickly removing and installing between wallboard 2 and positioning guide rail 1, water blocking wallboard 2 can be fixed on the arbitrary position on positioning guide rail 1 It sets, can adapt to the requirement of different terrain, reduce the processing request to positioning guide rail 1 and water blocking wallboard 2.
The land side of water blocking wallboard 2 is equipped with support device, as shown in figure 3, support device includes supporting rod 5 and support base 6, The rotatable connection water blocking wallboard 2 in one end of supporting rod 5, the rotatable connecting support seat 6 of the other end of supporting rod 5, such as Fig. 5 institutes Show, supporting rod 5 includes the connector 8 positioned at the intermediate body of rod 7 and positioned at both ends, the both ends of the body of rod 7 be respectively equipped with positive silk with it is anti- Silk, the threaded one end connecting-rod body 7 of connector 8, the rotatable connection water blocking wallboard 2 of the other end or support base 6 of connector 8, By rotating the body of rod 7, the body of rod 7 and the connector 8 at both ends is set to generate relative rotation, due to the rotation direction phase of the both ends screw thread of the body of rod 7 Instead, make connector 8 simultaneously to overhanging or simultaneously to inside contracting, realize the length for adjusting supporting rod 5.
Support base 6 is fixed on by expansion bolt on hard ground, and the cross section of support base 6 is U-shaped section of opening upwards Face, such as channel steel, T-slot steel, wherein by taking T-slot steel as an example, support base 6 is perpendicular to the land side of positioning guide rail 1, support base 6 Center line and water blocking wallboard 2 center line it is mutually coplanar, i.e., the vertical edge of T-slot steel is perpendicular to the land side of positioning guide rail 1, T-slot steel Center line be aligned with the center line of water blocking wallboard 2, one end of support base 6 is equipped with dismountable second clamping plate 9, second clamping plate 9 and branch Relative distance between support seat 6 is adjusted by bolt, clamping and positioning guide rail 1 between second clamping plate 9 and support base 6, i.e. T-slot steel Upper and positioning guide rail 1 contact surface is equipped with second clamping plate 9, and second clamping plate 9 is bolted T-steel slot, passes through bolt tune Relative distance between section second clamping plate 9 and T-steel slot, the interior side elevation of second clamping plate 9 and T-steel slot clamping and positioning guide rail 1, This connection structure realizes that support base 6 may be mounted to any position on positioning guide rail 1, can expire support base 6 according to water blocking wallboard 2 It corresponds, reduces installation requirement, improve installation effectiveness, reduce the processing request of support base 6 and positioning guide rail 1.
After water blocking 2 fittable slackening device of wallboard, by rotating the body of rod 7, to adjust the length of supporting rod 5, to adjust The gradient for saving water blocking wallboard 2 makes water blocking wallboard 2 adjust to optimum position, eliminates because installation is unfavorable, caused by water blocking wallboard Pressure in being generated between 2, improve water blocking wallboard 2 works as water effect.
Further include several backwater gates for prolonging waterwall distribution, waterwall is divided into several sections, as shown in figure 4, water blocking Gate includes being located at the symmetrically arranged gate column 10 in both sides, and the inside of gate column 10, which is equipped with, prolongs inserting for the distribution of gate column 10 Slot 11, slot 11 is interior to be inserted into multiple door-plates 12 for prolonging the stacking of slot 11, and door-plate 12 is horizontally disposed, and the both ends of its narrow side is made to insert respectively Enter in the slot 11 of both sides, 12 vertical stacking of multiple door-plates, form backwater gate, the inner wall of slot 11 is equipped with sealing strip, lock The outside of door pillar 10 is equipped with the lock 3 being connected with water blocking wallboard 2, and door-plate 12 is very light, can be by manually installed, if thinking Water level conditions are observed, then remove door-plate 12 successively from top to bottom, the degree of door-plate 12 is removed and is determined with water level, cannot be below water level Line makes backwater gate become the lowest order of waterwall, after whole door-plates 12 is removed, detachable entire waterwall, if often There is flood, such as the Cheng Wuhan in thousand lakes in year, usually can only remove door-plate 12, passed through for people, vehicle, retain waterwall, When rainfall to appear is exceeded, it is only necessary to transverse slat be installed, block the lowest order of waterwall, it can be achieved that quickly increasing the effect of dykes and dams Fruit, installation effectiveness is high, avoids unnecessary loss.
A kind of hard ground waterwall construction method, including it is laid with positioning guide rail 1, the initial water blocking wallboard 2 of installation, peace Fill support base 6, installation supporting rod 5, installation waterwall:
It is laid with positioning guide rail 1:Prolong on hard ground and be laid with positioning guide rail 1 along flood control, positioning guide rail 1 passes through expanding screw Bolt is fixed on hard ground, is bolted between adjacent positioning guide rail 1.
Initial water blocking wallboard 2 is installed:By 2 vertical display of water blocking wallboard in the end face water side of positioning guide rail 1, in waterwall The land side of plate 2 installs first clamping plate 4, and the relative distance between first clamping plate 4 and water blocking wallboard 2 is adjusted by bolt, and first It is clamped between clamping plate 4 and water blocking wallboard 2 on the outer side elevation of positioning guide rail 1.
Support base 6 is installed:One end of support base 6 is resisted into positioning guide rail 1, makes the center line and water blocking wallboard 2 of support base 6 Center line is conllinear, and support base 6 is fixed on hard ground finally by expansion bolt.
Supporting rod 5 is installed:One end of supporting rod 5 is installed to the land side of water blocking wallboard 2, rotates the body of rod 7, adjusts support The length of bar 5, then the other end of supporting rod 5 is installed on support base 6, the body of rod 7 is finally rotated again, adjusts supporting rod 5 Water blocking wallboard 2 is adjusted and arrives optimum tilt position by length.
Waterwall is installed:A side lock 3 on water blocking wallboard 2 is carried out being engaged spelling with the lock 3 on initial water blocking wallboard 2 Then dress carries out step installation support base 6, installation supporting rod 5,
Installation waterwall, installation support base 6, installation supporting rod 5 are repeated, the waterwall for prolonging the distribution of positioning guide rail 1 is obtained.
In preferred embodiments, installation water blocking node is additionally provided with before being laid with positioning guide rail 1, including installation node is stood Column, installation transverse slat, installation water blocking wallboard 2.
Gate column 10 is installed:Prolong on along flood control and choose several gate installation positions, and in the both sides of gate installation position It is symmetrical arranged gate column 10, the bottom end of gate column 10 is fixed on by expansion bolt on hard ground.
Door-plate 12 is installed:Door-plate 12 is horizontally arranged, manually the both ends of door-plate 12 are inserted in place from top to bottom respectively in In the slot 11 of two side gate columns 10, several door-plates 12 vertical stacking between gate column 10 forms backwater gate.
Initial water blocking wallboard 2 is installed:Initial water blocking wallboard 2 is inserted vertically into from top to bottom, is made on initial water blocking wallboard 2 Lock 3 is engaged with 3 phase of lock on gate column 10, realizes the connection of gate column 10 and water blocking wallboard 2.
Finally it should be noted that:Above each embodiment is only used to illustrate the technical scheme of the present invention, rather than its limitations; Although the present invention is described in detail referring to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:Its according to Can so modify to the technical solution recorded in previous embodiment, or which part or all technical features are carried out etc. With replacement;And these modifications or substitutions, various embodiments of the present invention technical solution that it does not separate the essence of the corresponding technical solution Range.

Claims (10)

1. a kind of hard ground water blocking wall construction, it is characterised in that:Include the positioning guide rail and waterwall being arranged along the line along flood control, The cross section of the positioning guide rail is the U-shaped section of opening upwards, and the positioning guide rail is laid on hard ground, the water blocking By several water blocking wallboards, longitudinally occlusion splicing forms wall, and the lock being mutually twisted is respectively equipped in the both sides long side of the water blocking wallboard The ground terminal of button, the water blocking wallboard is arranged in the face water side of the positioning guide rail, and the land side of the water blocking wallboard is equipped with branch Support arrangement;
The support device includes supporting rod and support base, and one end of the supporting rod is rotatable to connect the water blocking wallboard, The rotatable connection support base of the other end of the supporting rod, the support base are fixed on the hard ground;
The supporting rod includes the connector positioned at the intermediate body of rod and positioned at both ends, and the both ends of the body of rod are respectively equipped with positive silk The body of rod, the rotatable connection gear of the other end of the connector are connected with the threaded one end of anti-silk, the connector Waterwall plate or support base.
2. hard ground water blocking wall construction according to claim 1, it is characterised in that:The bottom backwater of the water blocking wallboard Side is equipped with dismountable first clamping plate, and the relative distance between the first clamping plate and water blocking wallboard is adjusted by bolt, described The positioning guide rail is clamped between first clamping plate and water blocking wallboard.
3. hard ground water blocking wall construction according to claim 1, it is characterised in that:The cross section of the support base is to open Mouthful upward U-shaped section, the support base is perpendicular to the land side of the positioning guide rail, the center line of the support base and the gear The center line of waterwall plate is mutually coplanar.
4. hard ground water blocking wall construction according to claim 3, it is characterised in that:One end of the support base is equipped with can The second clamping plate of dismounting, the relative distance between the second clamping plate and support base are adjusted by bolt, the second clamping plate with The positioning guide rail is clamped between support base.
5. hard ground water blocking wall construction according to claim 1, it is characterised in that:If further including being distributed along waterwall The waterwall is divided into several sections by dry backwater gate, and the backwater gate includes being located at the symmetrically arranged gate in both sides to stand Column, the inside of the gate column are equipped with the slot being distributed along the gate column, are inserted into the slot multiple along slot heap The both ends of folded door-plate, the door-plate are inserted into the slot of both sides respectively, and the outside of the gate column is equipped with and water blocking wallboard The lock being connected.
6. the hard ground water blocking wall construction according to any one of claim 1-5, it is characterised in that:The waterwall The ground terminal of plate is equipped with sealing strip and/or waterproof roll for preventing water leakage.
7. the hard ground water blocking wall construction according to any one of claim 1-5, it is characterised in that:The waterwall The lock junction of plate is equipped with sealing strip and/or waterproof roll for preventing water leakage.
8. the hard ground water blocking wall construction according to any one of claim 1-5, it is characterised in that:The waterwall Plate is Larsen steel sheet pile.
9. a kind of construction method of hard ground water blocking wall construction applied to any one of claim 1-5, feature exist In, including it is laid with positioning guide rail, the initial water blocking wallboard of installation, installation support base, installation supporting rod, installation waterwall:
It is laid with positioning guide rail:It is laid with positioning guide rail along the flood control of hard ground upper edge, the positioning guide rail passes through expansion bolt It is fixed on the hard ground, is bolted between adjacent positioning guide rail;
Initial water blocking wallboard is installed:By water blocking wallboard vertical display positioning guide rail initial end, in the back of the body of the water blocking wallboard First clamping plate is installed in water side, and the relative distance between the first clamping plate and water blocking wallboard, first folder are adjusted by bolt The positioning guide rail is clamped between plate and water blocking wallboard;
Support base is installed:The center line of the support base is conllinear with the center line of water blocking wallboard, and the support base passes through expanding screw Bolt is fixed on hard base face;
Supporting rod is installed:One end of supporting rod is installed to the land side of the water blocking wallboard, the other end peace of the supporting rod It is attached on the support base, rotates the body of rod, adjust the length of supporting rod;
Waterwall is installed:A side lock on water blocking wallboard is carried out being engaged assembly with the lock on the initial water blocking wallboard, Then it carries out step installation support base and installation supporting rod, the water blocking wallboard is vertically placed in hard base face along positioning guide rail On;
Step installation waterwall, installation support base and installation supporting rod are repeated, waterwall is obtained.
10. the construction method of hard ground water blocking wall construction according to claim 9, it is characterised in that:Described be laid with is determined Installation gate column and installation door-plate are additionally provided with before the guide rail of position;
Gate column is installed:Several gate installation positions are chosen on along flood control, and in the both sides pair of the gate installation position Claim setting gate column, the bottom end of the gate column is fixed on by expansion bolt on the hard ground;
Door-plate is installed:Door-plate is horizontally arranged, and is inserted into from top to bottom in the slot of the gate column, several described doors Plate vertical stacking between gate column forms backwater gate, initial water blocking wallboard is inserted vertically into from top to bottom, makes described first Lock on beginning water blocking wallboard is mutually engaged with the lock on gate column.
CN201610644592.XA 2016-08-08 2016-08-08 Hard ground water blocking wall construction and construction method Active CN106049355B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610644592.XA CN106049355B (en) 2016-08-08 2016-08-08 Hard ground water blocking wall construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610644592.XA CN106049355B (en) 2016-08-08 2016-08-08 Hard ground water blocking wall construction and construction method

Publications (2)

Publication Number Publication Date
CN106049355A CN106049355A (en) 2016-10-26
CN106049355B true CN106049355B (en) 2018-08-07

Family

ID=57481005

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610644592.XA Active CN106049355B (en) 2016-08-08 2016-08-08 Hard ground water blocking wall construction and construction method

Country Status (1)

Country Link
CN (1) CN106049355B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106400739B (en) * 2016-11-30 2018-04-13 中水北方勘测设计研究有限责任公司 Quick flood control structure for City Bank, sill may
CN107100133B (en) * 2017-07-06 2022-08-23 北京北排装备产业有限公司 Clamping mechanism for quickly assembling flood prevention retaining wall and using method thereof
CN107574790B (en) * 2017-09-13 2020-11-27 徐州天骋智能科技有限公司 Portable manger plate dam convenient to dismantle
CN112982375A (en) * 2021-04-15 2021-06-18 中国建筑第四工程局有限公司 H-shaped steel supporting and waterproof device
CN113429067B (en) * 2021-06-28 2022-11-22 江苏冬春水利建设工程有限公司 River channel ecological restoration system with intelligent scientific and technological wetland unit combination

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3245739C2 (en) * 1982-12-10 1985-02-14 Fried. Krupp Gmbh, 4300 Essen Stop bar emergency lock
CN2556340Y (en) * 2002-08-19 2003-06-18 陈学伟 Water retaining structure
CN201665852U (en) * 2010-04-22 2010-12-08 金志刚 Detachable inserting plate water barrier
CN201962648U (en) * 2011-03-22 2011-09-07 贾长江 Dike flood fighting and emergency rescue water retaining steel sheet wall capable of being quickly combined
CN204418107U (en) * 2015-01-27 2015-06-24 海盐亚威工业物资有限公司 A kind of assembled moving flood protection wall
CN204919475U (en) * 2015-09-17 2015-12-30 徐建 Novel flood prevention wall body that hydraulic engineering used
CN105545190A (en) * 2015-10-31 2016-05-04 南京军理科技股份有限公司 Modular automatic water stop device
CN205954570U (en) * 2016-08-08 2017-02-15 贺立军 Stereoplasm ground waterwall structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3245739C2 (en) * 1982-12-10 1985-02-14 Fried. Krupp Gmbh, 4300 Essen Stop bar emergency lock
CN2556340Y (en) * 2002-08-19 2003-06-18 陈学伟 Water retaining structure
CN201665852U (en) * 2010-04-22 2010-12-08 金志刚 Detachable inserting plate water barrier
CN201962648U (en) * 2011-03-22 2011-09-07 贾长江 Dike flood fighting and emergency rescue water retaining steel sheet wall capable of being quickly combined
CN204418107U (en) * 2015-01-27 2015-06-24 海盐亚威工业物资有限公司 A kind of assembled moving flood protection wall
CN204919475U (en) * 2015-09-17 2015-12-30 徐建 Novel flood prevention wall body that hydraulic engineering used
CN105545190A (en) * 2015-10-31 2016-05-04 南京军理科技股份有限公司 Modular automatic water stop device
CN205954570U (en) * 2016-08-08 2017-02-15 贺立军 Stereoplasm ground waterwall structure

Also Published As

Publication number Publication date
CN106049355A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106049355B (en) Hard ground water blocking wall construction and construction method
CN209011138U (en) A kind of slope retaining device for excavation of foundation pit
US11066801B2 (en) Cofferdam system and method of installing the same
JPH11509283A (en) Seawall cutoff device
CN205954570U (en) Stereoplasm ground waterwall structure
CA2940801A1 (en) Foundation for the support of a structure and method of installation
CN112663623A (en) Steel formwork for supporting steel sheet piles in building foundation pit construction
CN211171809U (en) Concrete precast pile and plastic steel sheet pile combined type revetment structure
CN214363515U (en) Supporting construction of drainage pipe foundation ditch
CN207727593U (en) A kind of slope reinforcement structure
CN106088145B (en) Soft foundation water blocking wall construction and construction method
DE102007040744A1 (en) Temporary flood protection system, has partition provided between base side and base-fixed partition edges in support-free manner, where partition is textile inductile partition or double-walled partition
JP4174359B2 (en) Water stop connection structure between members
CN216360660U (en) Flashboard connecting structure for river surface trestle approach hole
CN212801680U (en) Underground continuous wall connects seepage prevention structure
CN205035780U (en) Wet tailing of piling accelerates drainage consolidation device and tailing storehouse drainage system step by step
CN205954677U (en) Soft ground waterwall structure
CN210658224U (en) Water blocking device that hydraulic engineering used
DE102005048304A1 (en) High water level protection unit has steel support built into ground and protective wall bands of aluminum that can be drawn out and fixed in position and lowered when the waters recede
CN105002870A (en) Stage-by-stage wet stacking tailing drainage acceleration and consolidation device
DE102011108222B3 (en) channel seal
CN114016467B (en) Dyke bank protection parting rubber waterstop positioner
CN107587477B (en) Corrugated surface base detachable flood control wall
CN215329442U (en) Drainage box culvert
CN214836440U (en) Supporting device for preventing tunnel settlement deformation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant