CN106049209B - A kind of interim rail support meanss changed for railway ballastless track supporting layer - Google Patents

A kind of interim rail support meanss changed for railway ballastless track supporting layer Download PDF

Info

Publication number
CN106049209B
CN106049209B CN201610605003.7A CN201610605003A CN106049209B CN 106049209 B CN106049209 B CN 106049209B CN 201610605003 A CN201610605003 A CN 201610605003A CN 106049209 B CN106049209 B CN 106049209B
Authority
CN
China
Prior art keywords
longeron
supporting layer
railway
track
changed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610605003.7A
Other languages
Chinese (zh)
Other versions
CN106049209A (en
Inventor
徐勇
蔡德强
文望青
张勇
康小英
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201610605003.7A priority Critical patent/CN106049209B/en
Publication of CN106049209A publication Critical patent/CN106049209A/en
Application granted granted Critical
Publication of CN106049209B publication Critical patent/CN106049209B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B29/00Laying, rebuilding, or taking-up tracks; Tools or machines therefor
    • E01B29/40Means or arrangements for temporarily supporting laid tracks, or rails or sleepers in the track

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Railway Tracks (AREA)

Abstract

The present invention relates to railway ballastless track disease technology for eliminating field, in particular to a kind of interim rail support meanss changed for railway ballastless track supporting layer.Including supporting the steel bearing beam of temporary traffic rail and the bearing on the supporting layer being fixed on below the operational railway at region longitudinal direction to be onstructed both ends;Described steel bearing beam includes two longerons being longitudinally arranged along track and the crossbeam between two longerons;On the supporting layer that the longeron both ends are respectively rested on the upper surface of bearing and are anchored at below the operational railway at region longitudinal direction to be onstructed both ends;For described crossbeam along track lateral arrangement, its both ends is separately fixed at two longeron sidepieces.By the present invention in that with steel bearing beam by construction area bulit on stilts pass through rail, Along Railway can normal operation, without stopping transport, it ensure that the normal operation of track, the other present invention can thoroughly eliminate the disease problem occurred in track underlying support layer and substructure, track hidden danger is thoroughly eliminated, there is great promotional value.

Description

A kind of interim rail support meanss changed for railway ballastless track supporting layer
Technical field
The present invention relates to railway ballastless track disease technology for eliminating field, is used for railway ballastless track branch in particular to one kind The interim rail support meanss that support layer changes.
Background technology
Non-fragment orbit is with good stability, maintenance workload is small, comfort level is high by bus, track service life is long, The advantages such as structure height is low are widely used in China Railway High-speed, and at the same time high-speed railway requires that track must possess high smooth-going Property is, it is necessary to which sub-rail foundation structure has very high stability.Although built or adopted in the Design of High-speed Railway founded a capital, construction etc. Measure is built with unprecedented high standard, but because China is vast in territory, railway construction condition is sufficiently complex, still has very The multifactor stability that may influence non-fragment orbit, such as construction quality, foundation settlement etc..
The supporting layer and substructure of ballastless track of high-speed railway are the passes for influenceing non-fragment orbit ride comfort and traffic safety Key factor, because of situations such as there may be concrete leakiness, the change of local geology situation in construction, non-fragment orbit is caused to support Layer and substructure do not meet design requirement, may cause fragment-free track slab and supporting layer ftractures, deformation causes track irregularity, Although can be by adjusting fastener, lifting track plates, the measure such as perfusion mortar, dead-end fracture improves ballastless track structure again Unfavoured state, but this simply method for curing the symptoms, not the disease, under the High-speed Train Loads of long term frequent, the bottom do not effected a radical cure Fault of construction is growing day by day, and disease can produce again in the course of time, or even influences traffic safety, therefore for non-fragment orbit disease Really produced, only non-fragment orbit can not be renovated by supporting layer and substructure defect if verified, and needed to support Layer and substructure remove reconstruction simultaneously.For high ferro visitor specially, once maintenance shut-downs, will directly affect the common people and normally go on a journey, make Into bad social influence, in the case where ensureing secured premise carrying out construction merely with Window time is necessary.At present to nothing Tiny fragments of stone, coal, etc. track do not cut off traffic in the case of regulation remain the supporting layer that in many technical barriers, is pointed to below non-fragment orbit and under Portion's structure changed under traffic-operating period it is even more difficult, therefore seek it is a kind of do not cut off traffic, securely and reliably, economical close Reason, easy for construction, adaptable ballastless track of high-speed railway supporting layer and substructure to change method imperative.
The content of the invention
Present invention aim to the prior art for solving to mention in above-mentioned background technology non-fragment orbit supporting layer The problem of can not being repaired when going wrong in the case where not influenceing railway operation to it, there is provided one kind is used for railway ballastless The interim rail support meanss that track supporting layer changes.
The technical scheme is that:A kind of interim rail support meanss changed for railway ballastless track supporting layer, It is characterized in that:Including supporting the steel bearing beam of temporary traffic rail and being fixed under the operational railway at region longitudinal direction to be onstructed both ends Bearing on first supporting layer of side;Described steel bearing beam include two need to remove along being suspended in of being longitudinally arranged of track the Longeron above two supporting layers and the crossbeam between two longerons;The longeron both ends are respectively rested on the upper end of bearing On face and the first supporting layer being anchored at below the operational railway at region longitudinal direction to be onstructed both ends;Described crossbeam is horizontal along track Arrangement, its both ends is separately fixed at two longeron sidepieces.
Further described longeron is the i-beam structure that web is arranged vertically.
The spaced apart stiffener of polylith is provided with further described longeron;Described stiffener is vertically Arrangement, the upper and lower ends and its sidepiece of stiffener are separately fixed at up and down on two blocks of flange plates and web of longeron.
Further described stiffener is fixed on the end of crossbeam by bolt arrangement, and crossbeam is fixed on by stiffener Between two blocks of flange plates of longeron.
Further described bearing includes being fixed on first below the operational railway at region longitudinal direction to be onstructed both ends Support the steel plate on layer and the rubber slab being fixed on steel plate;The both ends of described longeron are respectively rested on two blocks of relative rubber slabs On.
Further also include being used for the stopping means for limiting longeron transverse shifting ground;Described stopping means includes being located at Two blocks of angle steel of longeron end both lateral sides;Described angle steel includes being located at the riser of longeron sidepiece and is anchored at both by bolt There is the transverse slat on the first supporting layer below track;Described transverse slat is fixed on riser lower end, and longeron is between two pieces of risers.
Longitudinal both ends of longeron avoid the movement of longeron longitudinal direction also by the spacing fixation of angle steel.
Advantages of the present invention has:1st, non-fragment orbit supporting layer is changed in the case of not disrupted circuit operation, it is right Driving influences smaller.
2nd, the disease management occurred for the substructure of non-fragment orbit can use, applied widely, using steel bearing beam Section construction, the disease region of longer-range can be quickly renovated, supporting layer and substructure in construction are maked somebody a mere figurehead using steel bearing beam, By changeing substructure, the mass defect problems such as empty slag, Laminate construction thickness deficiency can thoroughly be administered, avoid occurring Secondary disease.
Every circuit is independently reinforced using a set of steel bearing beam system when the 3rd, constructing, therefore construction is not influenceed by line spacing, Due to every line can independent construction, therefore can according to circuit practical operation situation carry out construction organization, it is easy for construction flexibly, construction stream Aquation operation, no special construction requirement, difficulty of construction are low.
4th, set a set of steel bearing beam to change supporting layer under every circuit, the construction in multiple regions, steel can be carried out simultaneously Bearing beam can fall use, accelerate construction speed, construction area be divided into the circulation construction cell of multiple small sections, not only with track The segmentation of structure matches, while smaller to structural perturbation, securely and reliably.
5th, carry out changeing supporting layer and substructure paragraph by paragraph using small span steel bearing beam, defective substructure can obtain Thoroughly renovate, structure and track structure can recover to design point under rail.
By the present invention in that with steel bearing beam by construction area bulit on stilts pass through rail, Along Railway can normal operation, no With stoppage in transit, the normal operation of track is ensure that, the present invention can thoroughly eliminate track underlying support layer and substructure in addition The middle disease problem occurred, track hidden danger is thoroughly eliminated, there is great promotional value.
Brief description of the drawings
Fig. 1:The steel bearing beam mounting structure schematic top plan view of the present invention;
Fig. 2:The steel bearing beam mounting structure schematic longitudinal section of the present invention;
Fig. 3:The longeron of the present invention and the mounting structure schematic diagram of bearing;
Fig. 4:The steel bearing beam mounting structure schematic cross-sectional view of the present invention;
Fig. 5:The mounting structure schematic diagram of the interim rail of the present invention;
Wherein:1-longeron;2-crossbeam;3-stiffener;4-pass through rail;5-interim rail;6-the first supporting layer; 7-sleeper;8-rubber slab;9-steel plate;10-riser;11-transverse slat;12-the second supporting layer.
Embodiment
The present invention is described in further detail with specific embodiment below in conjunction with the accompanying drawings.
Such as Fig. 1~5, the method that the present embodiment changes supporting layer and substructure needs to remove to be set up in using steel bearing beam Supporting construction of the top of second supporting layer 12 (shown in the dotted line frame in such as Fig. 1) of construction as current rail 4, ensures rail The normal operation of road circuit.The structure of steel bearing beam is as shown in figure 1, including two longerons 1 being longitudinally arranged along track, longeron 1 is I-beam structure, the web of longeron 1 are arranged vertically.Connected and formed by the crossbeam 2 along track lateral arrangement between two longerons 1 Overall structure, crossbeam 2 generally use, two pieces of channel-section steel assembly are made, and the U mouths of two blocks of channel-section steels, which are supported or opposed, to be bolted to connection For overall structure, the both ends of crossbeam 2 are respectively protruding into the frame structure that stabilization is formed between two blocks of flange plates of two longerons 1, Ensure the spacing between longeron.
In order to further enhance the ability of the current rail 4 of the support of longeron 1, the present embodiment is also in two blocks of flange plates of longeron 1 Between be welded with the stiffener 3 arranged vertically, the upper and lower ends and sidepiece of stiffener 3 are separately fixed at two pieces of edges of a wing of longeron 1 On plate and web, the vertical enabling capabilities that whole longeron 1 is enhanced by stiffener 3 of longeron 11, avoid in train passage During longeron 1 is damaged by pressure.Crossbeam 2 is channel-section steel structure, and stiffener 3 is located at the transverse ends of crossbeam 2 respectively, and stiffener 3 gos deep into To the both ends that crossbeam 2 is bolted between two panels channel-section steel, crossbeam 2 is fixed on longeron 1 by bolt arrangement, such as Fig. 4 It is shown.Actually stiffener 3 can also be arranged on the other positions of longeron 1, but need to evade fastener, it is impossible to be produced with fastener Interference.
The both ends of longeron 1 are separately fixed at below the operational railway at longitudinal both ends of the second supporting layer 12 to be removed On one supporting layer 6, bearing is installed on first supporting layer 6 at both ends, as shown in figures 2-3, the present embodiment is indulged in region to be onstructed The deep mounting grooves of 15~20mm are cut on to the first supporting layer 6 below the operational railway at both ends, one is placed in mounting groove Block thickness is 10~20mm steel plate 9, then lays the rubber slab 8 that one piece of thickness is 30~40mm in the upper end of steel plate 9 and form branch Hold the seat structure of steel bearing beam.
Longeron 1 is provided at both ends with stopping means, and the stopping means of the present embodiment includes being located at the end cross both sides of longeron 1 Two blocks of angle steel, angle steel includes the riser 10 and be anchored at by bolt below operational railway first positioned at the sidepiece of longeron 1 The transverse slat 11 on layer 6 is supportted, transverse slat 11 is fixed on the steel angle structure of the lower end formation L-type of riser 10, and longeron 1 is located at two pieces of risers 10 Between horizontal rock avoided by the position-limiting action of riser 10.
The both ends of longeron 1 are respectively rested on the rubber slab 8 on first supporting layer 6 at longitudinal both ends in region to be onstructed, Set rubber slab 8 farthest to form cushioning effect, reduce the rigid collision between each part, avoid part Damage.Longitudinal both ends of longeron 1 are anchored at by angle steel and bolt on first supporting layer 6 at longitudinal both ends in region to be onstructed.
Because the track of high-speed railway is all long-play, the construction period of the present embodiment can only be in the day of every track Window point is constructed, and some construction procedures can not be fully finished in a skylight point, it is necessary to is carried out in several skylight points.Track Plate takes longer, it is necessary to which the time of a skylight point is carried out, therefore is completed removing cutting during cutting and removal Track plates after, it is necessary to install interim rail 5.As shown in figure 5, the installation method of interim rail 5 is:Directly in region to be onstructed The second supporting layer 12 on lay railway sleepers 7, sleeper 7 is laterally laid according to track, then temporary steel rail 5 is laid on sleeper 7, will be faced When rail 5 both ends connected respectively with operational railway, to ensure the normal pass of track.
Specifically construction method is:1st, the stratum of track both lateral sides to be reinforced, the reinforcement means of the present embodiment is, The inserting piling anchor pole directly on the soil layer of track both lateral sides, the soil layer of region both lateral sides to be onstructed is reinforced, avoid removing branch During supportting layer, there is the phenomenon to collapse in the soil layer of both sides, after the completion of soil layer is reinforced, by the vertical of the track plates in region to be onstructed Cut off to both ends, soil layer is reinforced and the cutting of track plates can all influence the normal operation of train, it is therefore desirable in the progress of skylight point;
2), first skylight point, the track plates of cut-out is removed using hanging device, set up on region to be onstructed interim Rail 5 connects operational railway, and the sleeper 7 of some direction across bridge is directly set up above the second supporting layer 12 for removing track plates, Temporary steel rail 5 is laid on sleeper 7 again, the both ends of rail are connected with the rail on operational railway respectively, so can not shadow The normal pass of train is rung, the circuit speed of service of interim rail 5 is no more than 45KM/h;
3), second skylight point, interim rail 5 and sleeper 7 are removed, is opened on the first supporting layer 6 below operational railway The deep mounting grooves of 15~20mm are dug, the steel plate 9 that one piece of thickness is 10~20mm is placed in mounting groove, then in the upper end of steel plate 9 One piece of thickness of laying is that 30~40mm rubber slab 8 forms the seat structure of support steel bearing beam, and longitudinal both ends of longeron 1 are distinguished It is anchored on the first supporting layer 6, welding beam 2 forms steel bearing beam between longeron 1, is spaced between two blocks of flange plates of longeron 1 Polylith stiffener 3 is welded, current rail 4 is then laid in longeron upper surface, current rail 4 is fixed on longeron 1 by fastener Upper surface, the both ends of current rail 4 is connected with the rail of operational railway respectively the normal pass for not influenceing train, on steel bearing beam There are many spaces to be easy to excavate, excavated using the space of the space on steel bearing beam and both sides and remove the second supporting layer 12 and the The structure of the bottom of two supporting layer 12, the depth of dismounting are judged according to actual conditions, remove need of work during skylight point Carry out;
4), pour to form the second new supporting layer 12 using early strength concrete in the lower section of current rail 4,
5), after concrete strength reaches requirement, translation steel bearing beam to next construction dot cycle construction, handling track plates To the second new supporting layer 12, and rail connection both ends track is reinstalled on track plates.
In fact, the present embodiment can carry out circulation construction according to the length of construction area, so can effectively accelerate Construction speed, efficiency of construction is improved, can be used manpower and material resources sparingly, reduce construction cost.
Specifically the method for circulation construction is:It is if the second supporting layer of track 12 that needs are removed is longitudinally split by track Dry isometric circulation construction area, each construction area that circulates longitudinally are in turn divided into isometric first circulation construction along track Unit, second circulation construction cell and the 3rd circulation construction cell, while the first circulation in each circulation construction area is applied Work order member carries out Demolition Construction, and carrying out second circulation after the completion of construction, above translation steel bearing beam to second circulation construction cell applies The construction of work order member, successively alternately, until all circulation construction area constructions are completed.
General principle, principal character and the advantages of the present invention of the present invention has been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the simply explanation described in above-described embodiment and specification is originally The principle of invention, various changes and modifications of the present invention are possible without departing from the spirit and scope of the present invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent defines.

Claims (6)

  1. A kind of 1. interim rail support meanss changed for railway ballastless track supporting layer, it is characterised in that:Face including support The steel bearing beam of Shi Tonghang rail (4) and the first supporting layer (6) being fixed on below the operational railway at region longitudinal direction to be onstructed both ends On bearing;Described steel bearing beam includes two and is suspended in along what track was longitudinally arranged on the second supporting layer (12) for needing to remove The longeron (1) and the crossbeam (2) between two longerons (1) of side;Longeron (1) both ends are respectively rested on the upper of bearing On end face and the first supporting layer (6) being anchored at below the operational railway at region longitudinal direction to be onstructed both ends;Described crossbeam (2) edge Track lateral arrangement, its both ends are separately fixed at two longeron (1) sidepieces.
  2. 2. a kind of interim rail support meanss changed for railway ballastless track supporting layer as claimed in claim 1, it is special Sign is:Described longeron (1) is the i-beam structure that web is arranged vertically.
  3. 3. a kind of interim rail support meanss changed for railway ballastless track supporting layer as claimed in claim 2, it is special Sign is:The spaced apart stiffener of polylith (3) is provided with described longeron (1);Described stiffener (3) is vertically Arrangement, the upper and lower ends and its sidepiece of stiffener (3) are separately fixed at up and down on two blocks of flange plates and web of longeron (1).
  4. 4. a kind of interim rail support meanss changed for railway ballastless track supporting layer as claimed in claim 3, it is special Sign is:Described stiffener (3) is fixed on the end of crossbeam (2) by bolt arrangement, and crossbeam (2) is solid by stiffener (3) It is scheduled between two blocks of flange plates of longeron (1).
  5. 5. a kind of interim rail support meanss changed for railway ballastless track supporting layer as claimed in claim 1, it is special Sign is:Described bearing includes being fixed on the first supporting layer (6) below the operational railway at region longitudinal direction to be onstructed both ends Steel plate (9) and the rubber slab (8) that is fixed on steel plate (9);The both ends of described longeron (1) are respectively rested on relative two pieces On rubber slab (8).
  6. 6. a kind of interim rail support meanss changed for railway ballastless track supporting layer as claimed in claim 1, it is special Sign is:Also include being used for the stopping means for limiting longeron (1) transverse shifting;Described stopping means includes being located at longeron (1) Two blocks of angle steel of end cross both sides;Described angle steel includes being located at the riser (10) of longeron (1) sidepiece and anchored by bolt Transverse slat (11) on the first supporting layer (6);Described transverse slat (11) is fixed on riser (10) lower end, and longeron (1) is located at two pieces Between riser (10).
CN201610605003.7A 2016-07-28 2016-07-28 A kind of interim rail support meanss changed for railway ballastless track supporting layer Active CN106049209B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610605003.7A CN106049209B (en) 2016-07-28 2016-07-28 A kind of interim rail support meanss changed for railway ballastless track supporting layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610605003.7A CN106049209B (en) 2016-07-28 2016-07-28 A kind of interim rail support meanss changed for railway ballastless track supporting layer

Publications (2)

Publication Number Publication Date
CN106049209A CN106049209A (en) 2016-10-26
CN106049209B true CN106049209B (en) 2017-11-21

Family

ID=57196428

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610605003.7A Active CN106049209B (en) 2016-07-28 2016-07-28 A kind of interim rail support meanss changed for railway ballastless track supporting layer

Country Status (1)

Country Link
CN (1) CN106049209B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106758590B (en) * 2016-12-20 2020-09-04 中国神华能源股份有限公司 Construction temporary beam for replacing railway track under non-stop condition and construction method
CN107268352A (en) * 2017-08-03 2017-10-20 中国铁道科学研究院铁道建筑研究所 Refoot the fixed track usage plan device of operation for tunnel
CN107974878B (en) * 2017-11-29 2019-07-05 中铁第四勘察设计院集团有限公司 A kind of rail yard track switch reinforcement means and structure
CN108611929A (en) * 2018-05-15 2018-10-02 中铁第四勘察设计院集团有限公司 A method of both causeway trouble was inserted in wired non-fragment orbit location
CN109183530B (en) * 2018-09-29 2024-03-12 中国铁道科学研究院集团有限公司铁道建筑研究所 Line temporary overhead device and method for ballastless track disease remediation
CN109267434A (en) * 2018-10-18 2019-01-25 中南大学 A kind of fragment-free track slab is Z-shaped to withhold stabilising arrangement
CN110029531B (en) * 2019-04-23 2020-10-27 中国铁道科学研究院集团有限公司铁道建筑研究所 Temporary high-speed rail ballastless track line overhead device and method suitable for high-speed traveling
CN111576106A (en) * 2020-05-18 2020-08-25 重庆交通大学 Construction method for rapidly pushing and replacing ballastless track structure of passenger special line
CN111827022A (en) * 2020-07-09 2020-10-27 武汉比邻工程技术有限公司 Quick maintenance method for double-block ballastless track

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009185512A (en) * 2008-02-06 2009-08-20 Keisei Kensetsu Kk Insulating block, transportation system, and jack-up system
CN202148493U (en) * 2011-07-05 2012-02-22 中铁十局集团有限公司 Existing line reinforcing device in inclined jacking construction of penetrating railway frame bridge from the lower part with small incline angle and large height
CN102926299A (en) * 2012-11-19 2013-02-13 房士杰 Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN203654111U (en) * 2014-01-04 2014-06-18 北京建筑大学 High-speed rail ballastless track supporting layer leveling and grooving device
CN203755099U (en) * 2014-03-19 2014-08-06 北京铁五院工程机械有限公司 Multifunctional track regulator for ballastless track construction
CN105421170A (en) * 2015-12-09 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Ballastless track construction method based on high-integration track panel frame
CN205893837U (en) * 2016-07-28 2017-01-18 中铁第四勘察设计院集团有限公司 A interim rail strutting arrangement that is used for railway ballastless track supporting layer to tear open trading

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009185512A (en) * 2008-02-06 2009-08-20 Keisei Kensetsu Kk Insulating block, transportation system, and jack-up system
CN202148493U (en) * 2011-07-05 2012-02-22 中铁十局集团有限公司 Existing line reinforcing device in inclined jacking construction of penetrating railway frame bridge from the lower part with small incline angle and large height
CN102926299A (en) * 2012-11-19 2013-02-13 房士杰 Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN203654111U (en) * 2014-01-04 2014-06-18 北京建筑大学 High-speed rail ballastless track supporting layer leveling and grooving device
CN203755099U (en) * 2014-03-19 2014-08-06 北京铁五院工程机械有限公司 Multifunctional track regulator for ballastless track construction
CN105421170A (en) * 2015-12-09 2016-03-23 中铁建大桥工程局集团第五工程有限公司 Ballastless track construction method based on high-integration track panel frame
CN205893837U (en) * 2016-07-28 2017-01-18 中铁第四勘察设计院集团有限公司 A interim rail strutting arrangement that is used for railway ballastless track supporting layer to tear open trading

Also Published As

Publication number Publication date
CN106049209A (en) 2016-10-26

Similar Documents

Publication Publication Date Title
CN106049209B (en) A kind of interim rail support meanss changed for railway ballastless track supporting layer
CN106192620B (en) A kind of railway ballastless track supporting layer and substructure change method
CN102926299B (en) Railway elevating and fixing device and railway bridge and culvert construction method adopting railway elevating and fixing device
CN102979041B (en) Soft overhead reinforcing jacking method for construction of span box bridge of jacking block of underpass turnout group of railway
CN105464008B (en) Large longitudinal beam system line reinforcement construction device and method
CN206538637U (en) A kind of track strengthening device for existing railway
CN203487475U (en) Line suspending and reinforcing structure for existing line jacking bridge and culvert construction
CN102758387B (en) Reinforcing construction method for H-shaped steel line
CN107620261B (en) Based on the horizontal existing railway track reinforcement means for holding formula just beam
CN103437254A (en) Reinforcing device for railway turnout area circuit during jacking for frame bridge
CN109183530A (en) A kind of interim overhead device of route for non-fragment orbit Disease Treatment and method
KR100891961B1 (en) The construction infrastructure the use road the martial art as a matter of bridge of the bridge which is old in the railroad or the railroad respects the induction event a method of construction which shifts the bridge and the system
CN203890866U (en) Construction auxiliary beam
CN105908583A (en) System for replacing tunnel ballast track bed with ballastless track under non-interruption traveling condition
CN205893837U (en) A interim rail strutting arrangement that is used for railway ballastless track supporting layer to tear open trading
CN113235639A (en) Existing line lower row pile enclosure structure and construction method thereof
CN217324965U (en) Face track laying base bridge that combines forever
CN105926381A (en) Method for changing ballast track bed of tunnel to ballastless track under condition of uninterrupted train working
CN110029531B (en) Temporary high-speed rail ballastless track line overhead device and method suitable for high-speed traveling
CN210341507U (en) Temporary overhead device for ballastless track line of high-speed rail suitable for high-speed traveling
CN202865708U (en) Railway aerial fixing device
CN107604823B (en) It is a kind of to cross the construction method for shipping beam by railway
CN111877060A (en) Ballastless track bed structure part replacement method
CN111321636A (en) Beam structure and method for rapidly and in-situ treating railway tunnel bottom plate diseases
CN205348012U (en) Big longeron system circuit reinforcing construction device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant