- CN106048185A CN106048185A CN201610601579.6A CN201610601579A CN106048185A CN 106048185 A CN106048185 A CN 106048185A CN 201610601579 A CN201610601579 A CN 201610601579A CN 106048185 A CN106048185 A CN 106048185A
- Authority
- CN
- China
- Prior art keywords
- flange
- guide shell
- inner ring
- chain
- arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D9/00—Heat treatment, e.g. annealing, hardening, quenching or tempering, adapted for particular articles; Furnaces therefor
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D1/00—General methods or devices for heat treatment, e.g. annealing, hardening, quenching or tempering
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Crystallography & Structural Chemistry (AREA)
- Mechanical Engineering (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Tunnel Furnaces (AREA)
Abstract
The invention discloses draft tubes and a lifting structure on a well type tempering furnace. The well type tempering furnace comprises a furnace body and a furnace hearth, wherein a bearing base is welded in a fixed mount; a roller bearing is mounted in the bearing base; a rotary shaft is assembled in the roller bearing; a lifting arm is arranged in the rotary shaft in a penetration manner, and is fixed through a lifting arm seat plate; an electric pushing rod motor on an electric pushing rod is fixed to a bracket; chain wheels are arranged in the lifting arm; the chain wheels are connected through chains; a furnace lid is lifted under one end of each chain; the other end of each chain is connected to the electric pushing rod; the tail end of the electric pushing rod is provided with a pulling plate; a handle is connected to the front end of the lifting arm; a switch arranged on the handle is electrically connected to a control wire on the electric pushing rod; the draft tubes are arranged in the furnace hearth; the draft tubes are suspended on a flange; the inner ring of the flange is welded with inner supports; the inner supports are sunken towards the inner ring of the flange; the positions, which correspond to the inner ring of the flange, of the upper-end openings of the draft tubes are provided with lug bosses. According to the draft tubes and the lifting structure, labor power is saved and labor intensity is relieved, so that quality of processed workpieces improved.
Description
Technical field
The present invention relates to a kind of well formula tempering furnace, be particularly suited for lifting and the structure of body of heater inner draft tube of bell.
Background technology
Existing well formula tempering furnace is made up of body of heater, bell, furnace cover lifting mechanism, body of heater inner draft tube etc., and bell passes through chain sling
Being connected with crane, crane is connected with lifting shaft, and lifting shaft is connected with screw lift.When bell needs to open, start silk
Bar elevator, screw lift drives lifting shaft and crane to hoist, and crane drives bell to hoist by chain sling again, and bell rises
Being raised to specified altitude, then drive bell to open to direction, side by the handle on crane, this manual mode opens bell,
Need at least two people to operate just can complete.Shortcoming: one is waste of manpower, two is that manipulation strength is bigger.
Body of heater is built with guide shell, and blower fan is to be bolted on bell, during blower fan work, and the hot blast in body of heater
It is circulated by guide shell, owing between guide shell and body of heater, air channel is less, affects hot air circulation, cause temperature uniformity to reach
Less than design requirement, thus affect the quality of product.Additionally easily touch guide shell during workpiece turnover burner hearth, cause guide shell to be sent out
Raw displacement, affects the size in surrounding air channel, thus affects hot air circulation.
Summary of the invention
The task of the present invention is to propose a kind of furnace cover lifting to complete with opening a people;It is less that guide shell rocks gap.Improve and produce
Guide shell on the well formula tempering furnace of quality and lift structure.
The task of the present invention is done in such a way that it includes body of heater, burner hearth, it is characterised in that: it is welded with axle in fixed mount
Bearing, is provided with roller bearing in bearing block, be equipped with rotating shaft in described roller bearing, is installed with arm by hanging in described rotating shaft
Arm seat plate is fixed, and the electric pushrod motor on electric pushrod is fixed on support, described arm built with sprocket wheel, each sprocket wheel it
Between connected by chain, be lifted with bell below one end of chain, the other end of chain is connected with electric pushrod, electric pushrod
End is connected with the head end of arm equipped with arm-tie, handle, and the switch that handle is arranged electrically connects with the control line on electric pushrod
Connecing, equipped with guide shell in described burner hearth, described guide shell is suspended on flange, and the inner ring of flange is welded with inner support, inner support
Caving in towards flange inner ring, at the upper end open of described guide shell, companion flange inner ring is provided with boss.Described fixed mount is fixed
In a side of body of heater, described inner support is generally evenly distributed on the inner ring of flange.The boss arranged on guide shell is suspended on
The recess of flange inner ring, the bottom of guide shell is welded with the i-beam frame of ventilation, and shape is M shape.
The present invention has the effect that the bell that the present invention relates to, by bearing manual unlocking, is saved manpower, reduced work
Intensity;The guide shell installed in body of heater is difficult to rock, and body of heater increases with guide shell assemblage gap, increases thermal cycle, thus improves
Process workpiece quality.
Accompanying drawing explanation
Fig. 1 is the furnace cover structure schematic diagram on well formula tempering furnace;Fig. 2 is the guide shell structural representation on well formula tempering furnace
Figure;Fig. 3 is the top view of Fig. 2;Fig. 4 is flange arrangement schematic diagram;Fig. 5 is the top view of Fig. 4.
Drawing illustrates: 1, fixed mount, 2, bearing block, 3, arm-tie, 4, rotating shaft, 5, roller bearing, 6, arm, 7, electronic push away
Bar, 8, electric pushrod motor, 9, support, 10, sprocket wheel, 11, chain, 12, handle, 13, flange, 14, guide shell, 15, burner hearth,
16, paraphysis code, 17, inner support, 18, boss.
Detailed description of the invention
Describe embodiment in detail in conjunction with the figures above, as it is shown in figure 1, be welded with bearing block 2 in fixed mount 1, install in bearing block
Having roller bearing 5, be equipped with rotating shaft 4 in described roller bearing 5, described fixed mount is fixed on a side of body of heater, described turn
It is installed with arm 6 in axle to be fixed by arm seat board.Electric pushrod motor 8 on electric pushrod 7 is fixed on support 9, described in hang
Arm, built with sprocket wheel 10, is connected by chain between each sprocket wheel, is lifted with bell below one end of chain 11, another of chain
End is connected with electric pushrod, and the end of electric pushrod is connected with the head end of arm equipped with arm-tie 3, handle 12, and handle is arranged
Switch is electrically connected with the control line on electric pushrod.
During work, by the switch activated electric pushrod on handle, electric pushrod drives chain downward, and chain is sliding in sprocket wheel
Dynamic drive carries on bell, is raised to certain altitude when bell rises, and bell opened by light rotation handle.
In the burner hearth 15 of described well formula tempering furnace equipped with guide shell 14(as shown in Figure 2), described burner hearth is peripherally equipped with paraphysis
Brick 16, described guide shell is suspended on flange, and described flange as shown in Figure 4, the inner ring of flange 13 is welded with inner support 17, described
Inner support is generally evenly distributed on the inner ring of flange, and inner support caves in towards flange inner ring, at the upper end open of described guide shell
Companion flange inner ring is provided with boss, and furtherly, the boss 18 that guide shell is arranged is suspended on the recess of flange inner ring, leads
The bottom of flow cartridge is welded with the i-beam frame of ventilation, and shape is M shape, accelerates the hot air circulation in guide shell.
Claims (3)
1. the guide shell on well formula tempering furnace and lift structure, it includes body of heater, burner hearth, it is characterised in that: weld in fixed mount
There is bearing block, roller bearing is installed in bearing block, in described roller bearing, be equipped with rotating shaft, be installed with arm in described rotating shaft and lead to
Crossing arm seat board to fix, the electric pushrod motor on electric pushrod is fixed on support, and described arm is built with sprocket wheel, Mei Gelian
Being connected by chain between wheel, be lifted with bell below one end of chain, the other end of chain is connected with electric pushrod, electronic pushes away
The end of bar is connected with the head end of arm equipped with arm-tie, handle, the switch that handle is arranged and the control line electricity on electric pushrod
Property connect, equipped with guide shell in described burner hearth, described guide shell is suspended on flange, and the inner ring of flange is welded with inner support, interior
Supporting and cave in towards flange inner ring, at the upper end open of described guide shell, companion flange inner ring is provided with boss.
2. the guide shell on well formula tempering furnace as claimed in claim 1 and lift structure, it is characterised in that: described fixed mount is solid
Being scheduled on a side of body of heater, described inner support is generally evenly distributed on the inner ring of flange.
3. the guide shell on well formula tempering furnace as claimed in claim 1 or 2 and lift structure, it is characterised in that: on guide shell
The boss arranged is suspended on the recess of flange inner ring, and the bottom of guide shell is welded with the i-beam frame of ventilation, and shape is M shape.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610601579.6A CN106048185A (en) | 2016-07-28 | 2016-07-28 | Draft tubes and lifting structure on well type tempering furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610601579.6A CN106048185A (en) | 2016-07-28 | 2016-07-28 | Draft tubes and lifting structure on well type tempering furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN106048185A true CN106048185A (en) | 2016-10-26 |
Family
ID=57418699
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610601579.6A Pending CN106048185A (en) | 2016-07-28 | 2016-07-28 | Draft tubes and lifting structure on well type tempering furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106048185A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111717821A (en) * | 2020-07-24 | 2020-09-29 | 上海宏挺紧固件制造有限公司 | Furnace cover hoisting device of annealing furnace |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201276581Y (en) * | 2008-10-30 | 2009-07-22 | 杭州鼎盛炉业有限公司 | Strong convection well type spheroidizing furnace |
CN201381294Y (en) * | 2009-04-27 | 2010-01-13 | 王建中 | Lifting-type airflow carbonization furnace |
CN201917203U (en) * | 2010-12-23 | 2011-08-03 | 哈尔滨松江电炉厂有限责任公司 | Furnace cover device for pit furnace with lifting and moving functions |
CN102297583A (en) * | 2011-07-26 | 2011-12-28 | 浙江省长兴精工电炉制造有限公司 | Steam oxidation well furnace |
CN202849486U (en) * | 2012-09-27 | 2013-04-03 | 铜陵钱谊化工设备有限责任公司 | Vertical pit furnace cover |
CN203629276U (en) * | 2013-11-19 | 2014-06-04 | 重庆傲典工业炉有限公司 | Large furnace lid lifting mechanism |
CN104651568A (en) * | 2015-02-12 | 2015-05-27 | 浙江省长兴精工电炉制造有限公司 | High-precision atmosphere protection programmed tempering furnace |
CN205821406U (en) * | 2016-07-28 | 2016-12-21 | 河南省天利工业炉有限公司 | A kind of well formula tempering furnace device |
-
2016
- 2016-07-28 CN CN201610601579.6A patent/CN106048185A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201276581Y (en) * | 2008-10-30 | 2009-07-22 | 杭州鼎盛炉业有限公司 | Strong convection well type spheroidizing furnace |
CN201381294Y (en) * | 2009-04-27 | 2010-01-13 | 王建中 | Lifting-type airflow carbonization furnace |
CN201917203U (en) * | 2010-12-23 | 2011-08-03 | 哈尔滨松江电炉厂有限责任公司 | Furnace cover device for pit furnace with lifting and moving functions |
CN102297583A (en) * | 2011-07-26 | 2011-12-28 | 浙江省长兴精工电炉制造有限公司 | Steam oxidation well furnace |
CN202849486U (en) * | 2012-09-27 | 2013-04-03 | 铜陵钱谊化工设备有限责任公司 | Vertical pit furnace cover |
CN203629276U (en) * | 2013-11-19 | 2014-06-04 | 重庆傲典工业炉有限公司 | Large furnace lid lifting mechanism |
CN104651568A (en) * | 2015-02-12 | 2015-05-27 | 浙江省长兴精工电炉制造有限公司 | High-precision atmosphere protection programmed tempering furnace |
CN205821406U (en) * | 2016-07-28 | 2016-12-21 | 河南省天利工业炉有限公司 | A kind of well formula tempering furnace device |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111717821A (en) * | 2020-07-24 | 2020-09-29 | 上海宏挺紧固件制造有限公司 | Furnace cover hoisting device of annealing furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN208159100U (en) | A kind of industrial production control cabinet | |
CN205821406U (en) | A kind of well formula tempering furnace device | |
CN106048185A (en) | Draft tubes and lifting structure on well type tempering furnace | |
CN102692120A (en) | Multi-station drying room capable of feeding and discharging working piece at top part | |
CN215160671U (en) | Heat shield dismounting device | |
CN209443076U (en) | Gas fired aluminium alloy quenching furnace is used in a kind of production of precision casting | |
CN204981954U (en) | End portable medium temperature pit furnace of feeding | |
CN103352094B (en) | Rotary cover-uncovering machine and rotary cover-uncovering method for blast furnace iron runner | |
CN202945275U (en) | Mesh belt type hot air circulation tempering furnace | |
CN213977812U (en) | Furnace door opening and closing device of heat treatment furnace | |
CN105597627A (en) | Electric lifting assembly and high-temperature and high-pressure reaction kettle comprising same | |
CN209214355U (en) | One kind being used for Compaction of Heating Furnace Door emergency power hoisting mechanism | |
CN212764032U (en) | Glaze firing device for ceramic product processing | |
CN110541175B (en) | Heating device for electrolytic aluminum anode production | |
CN210916151U (en) | Liftable well type tempering furnace | |
CN209623344U (en) | Smelting furnace is used in a kind of production of fused magnesite | |
CN214572161U (en) | Automatic feeding device of semi-closed submerged arc furnace | |
CN202705563U (en) | Kyropoulos method sapphire crystal growth furnace and lifting mechanism thereof | |
CN202141331U (en) | Movable bell-shield full-fiber resistance furnace | |
CN220245935U (en) | Tempering furnace with automatic blanking function | |
CN205821382U (en) | A kind of lift structure on well formula tempering furnace | |
CN213593427U (en) | Curing oven circulation heating device | |
CN205874475U (en) | Safety of iron and steel electric stove discharging device that overturns | |
CN205045286U (en) | Smelt magnesium automatic feeding system's hopper that opens and shuts certainly | |
CN105441627A (en) | Safety overturning discharging device for steel electric furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20161026 |
|
WD01 | Invention patent application deemed withdrawn after publication |