CN106019881A - Image forming device and device, apparatus, system and program for managing consumables in image forming device - Google Patents
Image forming device and device, apparatus, system and program for managing consumables in image forming device Download PDFInfo
- Publication number
- CN106019881A CN106019881A CN201610177637.7A CN201610177637A CN106019881A CN 106019881 A CN106019881 A CN 106019881A CN 201610177637 A CN201610177637 A CN 201610177637A CN 106019881 A CN106019881 A CN 106019881A
- Authority
- CN
- China
- Prior art keywords
- image processing
- processing system
- units
- period
- multiple stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/00127—Connection or combination of a still picture apparatus with another apparatus, e.g. for storage, processing or transmission of still picture signals or of information associated with a still picture
- H04N1/00344—Connection or combination of a still picture apparatus with another apparatus, e.g. for storage, processing or transmission of still picture signals or of information associated with a still picture with a management, maintenance, service or repair apparatus
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/50—Machine control of apparatus for electrographic processes using a charge pattern, e.g. regulating differents parts of the machine, multimode copiers, microprocessor control
- G03G15/5075—Remote control machines, e.g. by a host
- G03G15/5079—Remote control machines, e.g. by a host for maintenance
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/55—Self-diagnostics; Malfunction or lifetime display
- G03G15/553—Monitoring or warning means for exhaustion or lifetime end of consumables, e.g. indication of insufficient copy sheet quantity for a job
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03G—ELECTROGRAPHY; ELECTROPHOTOGRAPHY; MAGNETOGRAPHY
- G03G15/00—Apparatus for electrographic processes using a charge pattern
- G03G15/55—Self-diagnostics; Malfunction or lifetime display
- G03G15/553—Monitoring or warning means for exhaustion or lifetime end of consumables, e.g. indication of insufficient copy sheet quantity for a job
- G03G15/556—Monitoring or warning means for exhaustion or lifetime end of consumables, e.g. indication of insufficient copy sheet quantity for a job for toner consumption, e.g. pixel counting, toner coverage detection or toner density measurement
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/00002—Diagnosis, testing or measuring; Detecting, analysing or monitoring not otherwise provided for
- H04N1/00026—Methods therefor
- H04N1/00042—Monitoring, i.e. observation
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/00002—Diagnosis, testing or measuring; Detecting, analysing or monitoring not otherwise provided for
- H04N1/00026—Methods therefor
- H04N1/00058—Methods therefor using a separate apparatus
- H04N1/00061—Methods therefor using a separate apparatus using a remote apparatus
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/00002—Diagnosis, testing or measuring; Detecting, analysing or monitoring not otherwise provided for
- H04N1/00026—Methods therefor
- H04N1/00068—Calculating or estimating
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/00127—Connection or combination of a still picture apparatus with another apparatus, e.g. for storage, processing or transmission of still picture signals or of information associated with a still picture
- H04N1/00323—Connection or combination of a still picture apparatus with another apparatus, e.g. for storage, processing or transmission of still picture signals or of information associated with a still picture with a measuring, monitoring or signaling apparatus, e.g. for transmitting measured information to a central location
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1202—Dedicated interfaces to print systems specifically adapted to achieve a particular effect
- G06F3/121—Facilitating exception or error detection and recovery, e.g. fault, media or consumables depleted
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1202—Dedicated interfaces to print systems specifically adapted to achieve a particular effect
- G06F3/1218—Reducing or saving of used resources, e.g. avoiding waste of consumables or improving usage of hardware resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1202—Dedicated interfaces to print systems specifically adapted to achieve a particular effect
- G06F3/1218—Reducing or saving of used resources, e.g. avoiding waste of consumables or improving usage of hardware resources
- G06F3/1219—Reducing or saving of used resources, e.g. avoiding waste of consumables or improving usage of hardware resources with regard to consumables, e.g. ink, toner, paper
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1229—Printer resources management or printer maintenance, e.g. device status, power levels
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1229—Printer resources management or printer maintenance, e.g. device status, power levels
- G06F3/1232—Transmitting printer device capabilities, e.g. upon request or periodically
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1229—Printer resources management or printer maintenance, e.g. device status, power levels
- G06F3/1234—Errors handling and recovery, e.g. reprinting
- G06F3/1235—Errors handling and recovery, e.g. reprinting caused by end of consumables, e.g. paper, ink, toner
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F3/00—Input arrangements for transferring data to be processed into a form capable of being handled by the computer; Output arrangements for transferring data from processing unit to output unit, e.g. interface arrangements
- G06F3/12—Digital output to print unit, e.g. line printer, chain printer
- G06F3/1201—Dedicated interfaces to print systems
- G06F3/1223—Dedicated interfaces to print systems specifically adapted to use a particular technique
- G06F3/1237—Print job management
- G06F3/1239—Restricting the usage of resources, e.g. usage or user levels, credit limit, consumables, special fonts
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N1/00—Scanning, transmission or reproduction of documents or the like, e.g. facsimile transmission; Details thereof
- H04N1/32—Circuits or arrangements for control or supervision between transmitter and receiver or between image input and image output device, e.g. between a still-image camera and its memory or between a still-image camera and a printer device
- H04N1/32502—Circuits or arrangements for control or supervision between transmitter and receiver or between image input and image output device, e.g. between a still-image camera and its memory or between a still-image camera and a printer device in systems having a plurality of input or output devices
- H04N1/32523—Circuits or arrangements for control or supervision between transmitter and receiver or between image input and image output device, e.g. between a still-image camera and its memory or between a still-image camera and a printer device in systems having a plurality of input or output devices a plurality of output devices
- H04N1/32539—Detecting or indicating the status of the output devices
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04N—PICTORIAL COMMUNICATION, e.g. TELEVISION
- H04N2201/00—Indexing scheme relating to scanning, transmission or reproduction of documents or the like, and to details thereof
- H04N2201/0077—Types of the still picture apparatus
- H04N2201/0094—Multifunctional device, i.e. a device capable of all of reading, reproducing, copying, facsimile transception, file transception
Landscapes
- Engineering & Computer Science (AREA)
- Multimedia (AREA)
- Signal Processing (AREA)
- Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- General Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Control Or Security For Electrophotography (AREA)
- Microelectronics & Electronic Packaging (AREA)
- Accessory Devices And Overall Control Thereof (AREA)
Abstract
The invention relates to: an image forming device and device, an apparatus, a system and a program for managing consumables in image forming device. The storage unit stores therein registered data about image forming devices connected to each other via a network. An acquisition unit refers to the registered data to acquire the number of the image forming devices. A consumption ratio monitor unit monitors a consumption ratio of consumables in at least one of the image forming devices. A prediction unit predicts a predicted time for replenishment or replacement of consumables for each image forming device monitored by the consumption rate monitor, based on the consumption ratio of consumables thereof, and corrects the predicted time based on comparison between a number that the acquisition unit has acquired and another number that the acquisition unit previously acquired. A requisition unit issues a request for replenishment or replacement of consumables at the predicted time.
Description
Technical field
The present invention relates to image processing system, particularly to the technology managing the consumable goods that this device utilizes.
Background technology
Image processing system utilizes various consumable goods.Such as, image processing system will have been put aside in advance in paper feeding cassette
Sheet is used as the object of printing.In it prints, if the device of electro photography, then utilize toner, if ink jet type
Device, then utilize the inks such as pigment.In the device of electro photography, and then, photoconductor drum, intermediate transfer belt, transfer roll
Deng movable member due to contacting of miscellaneous part and wear and tear, and due to vibration etc. and tired.Therefore, at image processing system
Maintenance in, it is desirable to reliable period supplement or change these consumable goodss.
In image processing system, generally as the function of the management for assisting consumable goods, it is equipped with according to consumable goods
Consumption degree notify its function in period supplemented/change.Specifically, image processing system first monitor printing number,
The consumption of toner, the quantity of having processed of task or movement time etc. represent the ginseng of the duty of the machine quantitatively
Number, according to these values, evaluates the consumption degree of consumable goods.Its evaluation of estimate equal to paper use up, the longevity of toner exhaustion, movable member
When lives etc. represent the value of necessity supplemented/change of consumable goodss, image processing system in the display of operation screen to user
Notify that it supplements/change or makes requests on to outside management server and (see, for example Japanese Unexamined Patent Publication 2002-300308
Publication).
And then, in such as Japanese Unexamined Patent Publication 2014-092729 publication, Japanese Unexamined Patent Publication 2014-091293 publication, Japan
In JP 2014-052697 publication and Japanese Unexamined Patent Publication 2012-128237 publication, disclose according to image processing system
The passage of duty carry out the system supplementing/change period of forecast consumption product.Specifically, this system is first against every 1
Hour, for every 1 day etc., obtain the duty of image processing system termly.Next this system forms dress according to image
The history of the duty put, thus it is speculated that the speed (hereinafter referred to as " consumption rate ") that consumable goods consumes, utilizes its guess value to predict
Consumable goods supplement/change period.If new consumable goods was carried out in the way of delivery before the period that this prediction represents
Order, then can cut down and then remove the exhaustion due to consumable goods and image processing system is absorbed in the non-serviceable time.
Summary of the invention
Popularizing of adjoint network technology, the system managing multiple stage image processing system via network one-dimensionally increases.Especially
Being that in recent years, the scale of this system is not limited to office's unit and extends to company's unit, the image as management object is formed
The situation that the number of units of device increases to tens~hundreds of is the rarest.
So in large-scale system, the benefit of the consumable goods of the history of duty based on each image processing system
The prediction filling/change period is the most chaotic.It practice, in the network that such system utilizes, typically, image processing system
The variation of number of units is violent.Particularly, the frequent real estate of situation that image processing system is removed from this network temporarily or enduringly
Raw.In this case, by being processed, by other device replacements of surrounding, the task dispatching that the device being avoided is responsible for before this, at this
In a little devices, work ratio typically increases.With it concomitantly, the consumption rate of consumable goods rises and is well over based on duty
The guess value of history, so the easily ratio in period that supplements/change of consumable goods is predicted earlier.
As the chaotic method preventing such prediction, it is considered to such as improve and make each image processing system obtain the machine
The frequency of duty.If this frequency is high, then seem to make the number of units of the image processing system in prediction tracking network
Variation.But, if the frequency obtaining duty is too high, then the evaluation of duty is easily subject to the impact of each task,
So the precision of easy damage prediction on the contrary.Therefore, the way obtaining frequency of duty is improved as preventing the mixed of prediction
Random method is the most preferred.
It is an object of the invention to solve above-mentioned problem, the image that a kind of with identical network is connected to is provided especially
Form how the number of units of device changes and can supplement/replacing period for each image processing system forecast consumption product exactly
Consumable item management system.
The consumable item management system of 1 viewpoint of the present invention is to possess the multiple stage image being connected with each other via network to be formed
Device, for the request at least one supplementary consumable goods in these multiple stage image processing systems or change consumable goods be
System, including storage part, obtaining section, consumption degree monitoring unit, prediction section and request unit.Storage part storage and these multiple stage image shapes
Become the register information that device is relevant.Obtaining section obtains the number of units of multiple stage image processing system with reference to this register information.Consumption degree
Monitoring unit monitors the consumption degree of at least one consumable goods consumed in multiple stage image processing system.Prediction section is according to this consumption
The consumption degree of product, it was predicted that the supplementary period of this consumable goods or the period of replacing, according to the multiple stage image shape of obtaining section acquirement last time
Becoming the number of units of device and the comparison of the new number of units obtained, correction supplements period or the predictive value in the period of replacing.Request unit is in advance
When the period that survey portion dopes has arrived, ask supplementing or changing of this consumable goods.
The information processor of 1 viewpoint of the present invention is to be connected with multiple stage image processing system via network, for asking
Seek at least one supplementary consumable goods in these multiple stage image processing systems or change the device of consumable goods, including obtaining
Portion, consumption degree monitoring unit, prediction section and request unit.Obtaining section is with reference to the registered letter relevant with these multiple stage image processing systems
Breath obtains the number of units of these multiple stage image processing systems.Consumption degree monitoring unit monitor by multiple stage image processing system at least
The consumption degree of one consumable goods consumed.Prediction section is according to the consumption degree of this consumable goods, it was predicted that supplementary period of this consumable goods or
Person changes period, according to the comparison of the number of units of the multiple stage image processing system obtained obtaining section last time with the new number of units obtained, school
Just supplementing period or the predictive value in the period of replacing.Request unit, when having arrived the period that prediction section dopes, asks this consumption
Supplementing or replacing of product.
The consumable item management method of 1 viewpoint of the present invention is asked to the multiple stage image processing system being connected to via network
In at least one supplementary consumable goods or change consumable goods.This consumable item management method has: reference and described multiple stage image
Form the register information that device is relevant, obtain the step of the number of units of described multiple stage image processing system;Monitor by described multiple stage figure
As forming the step of the consumption degree of the consumable goods of at least one consumption in device;Consumption degree according to described consumable goods, it was predicted that
The supplementary period of described consumable goods or the step in the period of replacing;Platform according to the described multiple stage image processing system that last time obtains
Number and the comparison of the new number of units obtained, correct the step of the predictive value in the period of supplementing or the period of replacing;And doping
When period has arrived, ask the step supplemented or change of described consumable goods.
In the consumable item management system of the present invention, as it has been described above, prediction section is according to multiple stage image connected to the network
The consumption degree of the consumable goods at least in formation device, it was predicted that the supplementary period of this consumable goods or the period of replacing.Enter
And, it was predicted that portion when obtaining section obtains their number of units from the register information relevant with these multiple stage image processing systems, root
According to the comparison of this number of units Yu the number of units of last time, correction supplements period or the predictive value in the period of replacing.Thus, this system with
How the number of units of the image processing system that identical network is connected to changes, can be for each image processing system, exactly
Forecast consumption product supplement/change period.
Accompanying drawing explanation
Fig. 1 is the network of the consumable item management system of embodiments of the present invention 1.
In fig. 2, showing of the data exchange that (a) is carried out when being and be shown in system request consumable goods that Fig. 1 represents supplementary
Being intended to, (b) is the schematic diagram being shown in and registering the data exchange carried out when network removes image processing system.
Fig. 3 is the block diagram of the hardware configuration of the managing device illustrating that Fig. 1 represents.
Fig. 4 is the table being shown in the storage part that Fig. 3 represents the register information relevant with device cluster preserved.
Fig. 5 is the front view of the structure schematically illustrating the image processing system that Fig. 1 represents.
In figure 6, (a) is the profile of the image-forming block that Fig. 5 represents, (b) and (c) is built-in in these parts respectively
The top view of development section and profile.
Fig. 7 is the block diagram of the structure of the electronic control system of the image processing system illustrating that Fig. 5 represents.
Fig. 8 is image processing system its supplementary period of historical forecast according to the consumption of toner of explanatory diagram 7 expression
The schematic diagram of process.
Fig. 9 is the image processing system that represents of explanatory diagram 7 platform according to other connected to the network image processing systems
Number correction supplements the schematic diagram of the process of the predictive value in period.
Figure 10 is the flow process that the image processing system that Fig. 7 represents speculates the process of the consumption of toner according to view data
Figure.
Figure 11 is that the image processing system that Fig. 7 represents judges whether to require supplementation with tune according to the history of the consumption of toner
The flow chart of the process of toner.
Figure 12 is the image processing system that represents of Fig. 7 number of units school according to the image processing system being notified of from managing device
Just for the flow chart of process of threshold value of consumption of toner.
Figure 13 is that the managing device of embodiments of the present invention 2 is obtained the number of units of the image processing system that can work and notifies
Flow chart to the process of each image processing system.
Figure 14 is the flow chart of the subroutine of step S133 that Figure 13 represents.
In fig .15, (a) is to be shown in the consumable item management system of embodiments of the present invention 3 in managing device from respectively
The schematic diagram of the data exchange that image processing system is carried out when obtaining the information relevant with duty, (b) is to be shown in this to be
The schematic diagram of the data exchange that system is carried out when the image processing system that cannot work being detected.
Figure 16 is usage frequency image processing system that Figure 15 represents being described according to the image processing system that cannot work
The schematic diagram of the process of the predictive value in the period of supplementing is corrected with the number of units of other image processing systems that can work.
Figure 17 is that the managing device that Figure 15 represents is obtained the number of units of the image processing system that can work and usage frequency and leads to
Know the flow chart of process to each image processing system.
Figure 18 is the flow chart of the subroutine of step S173 that Figure 17 represents.
Figure 19 is that the image processing system that Figure 15 represents forms dress according to the image worked being notified of from managing device
The number of units put and the usage frequency adjusting pin flow chart to the process of the threshold value of the consumption of toner.
Figure 20 is the flow chart of the subroutine of step S197 that Figure 19 represents.
Figure 21 is the image processing system that embodiments of the present invention 4 the are described platform according to the image processing system that can work
The schematic diagram of the process of the predictive value in the supplementary period of number and usage frequency correction toner.
Figure 22 is that the image processing system that Figure 21 represents forms dress according to the image worked being notified of from managing device
The number of units put and the usage frequency adjusting pin flow chart to the process of the threshold value of the consumption of toner.
Figure 23 is the flow chart of the subroutine of step S223 that Figure 22 represents.
Figure 24 is the flow chart of the subroutine of step S227 that Figure 22 represents.
Figure 25 is the hardware configuration of the personal computer (PC) of the electronic equipment being shown as embodiments of the present invention 5
Block diagram.
Figure 26 is to be shown in the PC represented with removing image processing system from network from Figure 25 to have unloaded setting of correspondence
The schematic diagram of the data exchange that during standby driver, the consumable item management system of embodiments of the present invention 5 is carried out.
Figure 27 is that the number of units of the image processing system that each image processing system is notified of according to the PC represented from Figure 26 comes school
Just for the flow chart of process of threshold value of consumption of toner.
Detailed description of the invention
Hereinafter, referring to the drawings, embodiments of the present invention are described.
" embodiment 1 "
The consumable item management system of embodiments of the present invention 1 is embedded in by multiple stage image processing system and more than 1
The existing system that managing device is constituted via network, assist the toner that each image processing system consumes with phase in period
Be suitable for supplements.In the system that this is existing, it may for example comprise with the distribution/distribution of task implemented by printing server etc. and
The detection utilizing the obstacles such as the charge of correspondence, paperboard of each image processing system and the system for the purpose of gerentocratic circular.
[structure of consumable item management system]
Fig. 1 is the network of the consumable item management system of embodiments of the present invention 1.With reference to Fig. 1, this system 100 includes
Device cluster 110 and managing device 120.These devices group 110,120 is connected with each other via network N TW, and then and personal computer
(PC) group 140 connects.This network N TW is such as TCP/IP network, is the LAN set up in 1 office, 1 mansion etc.
(LAN) the Internet that, 1 enterprise is proprietary or utilize the VPN (virtual private network) (VPN) of the Internet.This network N TW so via
Router 150 is connected with wide area network WWW such as the Internets.Thus, managing device 120 can be with the Cloud Server on wide area network WWW
130 communicate.Cloud Server 130 is to have leased the enterprise of the image processing system included by device cluster 110 or on commission
PC, server special machine or the main frame that the enterprise maintaining them is had.
Device cluster 110 includes plurality of printers, photocopier, scanner, facsimile machine (FAX), all-in-one multifunctional machine
Image processing systems (hereinafter referred to as " equipment ") such as (multi-function peripheral:MFP).Each equipment 110 warp
It is connected with personal computer (PC) group 140 by network N TW, receives view data from PC group 140 and print or obtain from original copy
And it is sent to PC group 140.
Managing device 120 is to perform specific software by the information processor that PC or server special machine etc. are general
And the device of function or embedded in the special information processing apparatus of the hardware such as the special circuit turning to specific function
Put, management makes the task of at least one of facility load of device cluster 110 as main function.Specifically, at pipe
In reason device 120, such as printing server, accept the request of task from PC group 140, by these tasks to device cluster 110
In as management object equipment distribution or distribution.It addition, in managing device 120, as storage device server, protect
The view data that should process of equipment as management object in tube apparatus group 110 or the view data processed or
Download from Cloud Server 130 or upload to it.
With it independently, managing device 120 can also be by the maintenance of at least one of equipment for device cluster 110
Auxiliary is as main function.Specifically, managing device 120 can also monitor the work in device cluster 110 via network N TW
For the duty of the equipment of maintenance object, collect printing from each equipment termly and number, movement time etc. represent work quantitatively
Make the value of the parameter of state, and be sent to Cloud Server 130.Managing device 120 can also so that from as maintenance the setting of object
The obstacles such as standby detection paperboard also notify to Cloud Server 130.In this case, Cloud Server 130 is according to fixed from managing device 120
The value of the parameter that phase ground receives, carries out the charge for the utilization as the equipment maintaining object, according to from managing device 120
The notice of obstacle, the auxiliary to the repair of this obstacle such as arrangement carrying out operator.
[summary of the function of consumable item management system]
Managing device 120 is in addition to above-mentioned main function, as a key element of consumable item management system 100, also
There is following function.(1) equipment as management object from device cluster 110 accepts the augmentation requests of toner.(2) about
For add/the removing of equipment of device cluster 110, accept the registration request from PC group 140.(3) by constitution equipment group's 110
The number of units of equipment notifies termly to the equipment as management object in device cluster 110.
On the other hand, each equipment of the management object in device cluster 110 is wanted as one of consumable item management system 100
Element, has following function.(4) consumption of the toner in supervision the machine.(5) according to the consumption rate of the toner in the machine,
Pre-direction finding the machine supplements the supplementary period of toner.(6) when arriving the supplementary period doped, send to managing device 120
The augmentation requests of toner.(7) with the notice from managing device 120 correspondingly, according to the number of units of the equipment that this notice represents,
Correction supplements the predictive value in period.
-augmentation requests of toner-
(a) of Fig. 2 is the schematic diagram being shown in the data exchange that system 100 asks to carry out during toner supplementary.Reference
The consumption of toner is reached more than threshold value by each equipment as management object in (a) of Fig. 2, first device cluster 110
Time point is considered as the supplementary period of toner, and augmentation requests RQS of toner is sent to managing device 120.Managing device 120
This augmentation requests RQS is sent to Cloud Server 130 or belongs to the terminal 141 of PC group 140.Cloud Server 130 is according to this benefit
Fill request RQS, the adjunctive program of the toners such as the order of auxiliary toner bottle.Terminal 141, according to this augmentation requests RQS, is being drawn
Face shows such message etc. of such as " please supplementing toner ", urges user to supplement toner to each equipment 110.
Each equipment 110 sets the above-mentioned threshold value of the consumption for toner as described below.Each equipment 110 first against
Each task speculates the consumption of toner, the most such as, for each business day (working day of device cluster 110), add up to each
Estimated value in task.Each equipment 110 is next according to the history of this aggregate value, with the cycle more than cycle of this total, example
As for every 1 week=5 business days, thus it is speculated that the consumption rate (consumption on each business day) of toner.Each equipment 110 is following
It is estimated as this guess value is multiplied by from sending augmentation requests RQS of toner to the business actually supplemented needed for toner
Natural law (hereinafter referred to as " date of delivery of toner ") and the value that obtains are estimated as " should remaining toning when the order of toner bottle
The amount of agent " (hereinafter referred to as " lower limit of residual quantity of toners ").Each equipment 110 and then by from the toner can filled in the machine
Heap(ed) capacity remove the lower limit of residual quantity of toners and the value that obtains is set as above-mentioned threshold value.
By this setting, threshold value represent the time exhausted from toner light pushed away forward toner date of delivery time
Between point be predicted to be the value that consumption altogether reaches.Hereinafter, under this meaning, threshold value is considered as " the supplementary period of toner
Predictive value ".If it practice, the consumption of toner altogether in each equipment 110 reaches the time point of this threshold value, this sets
Standby 110 send augmentation requests RQS, then the probability supplementing toner in this equipment 110 before toner exhaustion is the highest.
It addition, in above-mentioned setting, the most such as, for every 1 week=5 business days, update the i.e. toner of this threshold value
The predictive value in the period of supplementing.By so with the interval renewal predictive value of appropriateness, it is possible to make this predictive value not because of abnormal the hugest
The variation of consumption of the burst such as the process of the task of number and affected by big, when following the trail of the end of month, end of year accurately
Medium, big on the impact of the consumption rate of the toner equipment of the task-set of customary behaviour in service long period in change
Dynamic.
-correction of the prediction in supplementary period-
Whenever the number of units variation of the equipment of constitution equipment group 110, whether the equipment no matter system 100 is added/remove
For management object, all according to the comparison of the number of units before and after variation, correct as described below for each equipment as management object
The prediction in the supplementary period of toner.
(b) of Fig. 2 is the schematic diagram being shown in the registration data that system 100 is carried out when network N TW removes equipment exchange.
With reference to (b) of Fig. 2, in the case of removing 1 DV1 in device cluster 110 from network N TW, no matter whether this 1 DV1 is pipe
The management object of reason device 120, user makes 1 station terminal 142 in PC group 140 will remove relevant registration request RST with this
It is sent to managing device 120.This registration request RST includes the identification information as the equipment DV1 removing object.Managing device
120 accept this registration request RST, the identification information represented according to it, determine as the equipment DV1 removing object, and no matter this sets
Whether standby DV1 is the management object of managing device 120, all rewrites the information for this equipment DV1 registration.When at device cluster 110
In add new equipment in the case of, similarly, managing device 120 adds relevant registration request RST according to this no matter
Whether this new equipment is added to manage in object, all makes the register information with this device-dependent.
Managing device 120 is termly with reference to the register information relevant with device cluster 110, and whether tube apparatus is not management object
All confirm their number of units, would indicate that information NTC of its number of units notifies to each equipment 110.The cycle of this notice is set to pre-
Survey the cycle in supplementary period of toner, such as 1 week=5 business day value below, such as 1 business day.
Whenever this information NTC notified, each equipment 110, from the number of units of this information NTC readout equipment, is obtained and from last time
The ratio of number of units that read of information NTC.If this ratio is not " 1 ", then it represents that the number of units variation of equipment.Therefore, each equipment 110
According to this ratio, the predictive value in the supplementary period of correction toner, i.e. for the threshold value of consumption of toner.Such as, if should
Than more than " 1 ", then it represents that equipment increases, so increase threshold value and supplementary period is postponed backward, on the contrary if less than " 1 ",
Then represent the minimizing of equipment, so reducing threshold value and being shifted to an earlier date supplementary period.So, according to the variation of the number of units of equipment, correction
The predictive value in the supplementary period of toner.
Particularly, the cycle of the number of units of notice equipment is set to predict the cycle in the supplementary period of toner below, institute
Even if the amount of the task should process along with the equipment removing 1 equipment DV1 and its periphery is increased dramatically, it is also possible to the most late
Each equipment is made to shift to an earlier date the supplementary period of toner in this situation.
[hardware configuration of managing device]
Fig. 3 is the block diagram of the hardware configuration illustrating managing device 120.With reference to Fig. 3, managing device 120 include CPU310,
RAM320, ROM330, storage part 350 and network interface (I/F) 370.These key elements 310-370 can be mutual via bus 380
Connect communicatedly.
CPU310, RAM320 and ROM330 are the electricity being assembled with on 1 substrate that the inside of managing device 120 is arranged
Road.CPU310 controls other key elements 320-370 being connected to bus 380 according to firmware.By this control, CPU310 is special
Realize the accepting of augmentation requests as above-mentioned 3 kinds of functions of a key element of consumable item management system, i.e. (1) toner, (2)
About the accepting of the registration request add/removed of equipment, the regularly notice of the number of units of (3) equipment.RAM320 is to CPU310
Operating area during CPU310 execution firmware is provided.ROM330 includes semiconductor memory system and the EEPROM etc. that can not write
Rewritable semiconductor memory system.The former stores firmware, and the latter provides the preservation region of environmental variable etc. to CPU310.
Storage part 350 is non-volatile mass storage device built-in in managing device 120, and e.g. hard disk drives
Dynamic device (HDD) or solid-state drive (SSD).In this storage part 350, preserve the registered letter relevant with device cluster 110 especially
Breath 351.
Network I/F370 is connected with network N TW by wired or wireless mode, via this network N TW, with device cluster
110, PC group 140 and Cloud Server 130 communicate.Network I/F370 receives supplementing of toner from device cluster 110 especially
Request RQS also notifies to CPU311, from PC group 140 receive with equipment add/remove relevant registration request RST notice to
CPU311, sends augmentation requests RQS of toner to Cloud Server 130.
-project of the register information relevant with device cluster-
Fig. 4 is the table being shown in storage part 350 register information relevant with device cluster preserved.With reference to Fig. 4, step at this
In the project of note information, including the identification information of each equipment, the kind of task that can process and the genus of sheet that can process
Property.Identify information table example such as implementor name and IP address.The type table example of task is if any the disposal ability under netrual colour and has
Without printer, photocopier, each function of scanner.Attribute list example each size such as such as A3, A4, B4 etc. of sheet and could be corresponding to general
Each paper types such as logical paper, art paper, good quality paper.It addition, in the project of register information, in addition, it is also possible to including can
No two-face printing, with or without auto document feeder (ADF), the kind (not shown in Fig. 4) of executable post processing.
[function part of managing device]
Referring again to Fig. 3, CPU310 by carrying out action according to firmware as 3 kinds of function part 311-313, it is achieved above-mentioned 3
Plant function (1)-(3).These function parts include monitoring unit 311, notification unit 312 and register 313.Monitoring unit 311 makes network
I/F370 detection augmentation requests RQS from device cluster 110 and registration request RST from PC group 140.Notification unit 312 is regular
Ground (such as each business day) access storage part 350 and with reference to the register information 351 relevant with device cluster 110, to such as
The IP address that identification information includes carries out counting and obtaining the number of units of equipment.Notification unit 312 and then generation represent the letter of this number of units
Breath NTC, notifies this information NTC to each equipment 110 via network I/F370.It addition, notification unit 312 detects at network I/F370
When arriving augmentation requests RQS from device cluster 110, this request RQS is sent to Cloud Server 130 via network I/F370.Step on
Note portion 313 resolves registration request RST from PC group 140 that network I/F370 detects, includes as additional object at it
In the case of the identification information of equipment, by the register information 351 in this identification information afterthought to storage part 350, including work
In the case of removing the identification information of the equipment of object, retrieval and stepping on that this identification information association is got up in storage part 350
The project of note information 351, adds the meaning of write " equipment is avoided " in this project, or should from storage part 350 deletion
Project.
[structure of image processing system]
Fig. 5 is the signal that an example as the image processing system belonging to device cluster 110 illustrates the structure of MFP111
Front view.In Figure 5, with the key element of the inside just as describing this MFP111 through the front surface view mode of framework.Should
MFP111 is equipped with the function of color printer especially.Operating portion 50, control portion 60 and image is possessed with reference to Fig. 5, MFP111
Forming portion.Operating portion 50 for the operation of guidance panel or the communication of the electronic equipment with outside, accepts printing via user
Etc. request and the view data of process object of task, transfer them to control portion 60.Control portion 60 is to fill on 1 substrate
The circuit joined, according to the information from operating portion 50, controls the action of other key elements of MFP111.Image forming part is basis
The view data that operating portion 50 has accepted forms the part of toner image on sheet, including delivery section 10, imaging section 20, fixing section
30 and paper discharge unit 40.
Delivery section 10 contains sheet heap SHT in being built in the paper feeding cassette 11 of bottom of MFP111.The material of sheet SHT is paper
Or resin, size is A3, A4, A5 or B4 etc., and paper type is common paper, art paper, good quality paper etc..Not shown in Fig. 5,
But paper feeding cassette 11 can also be multiple, in different boxes, house the sheet heap that attribute is different.Delivery section 10 utilizes carrying roller group
12,13,14 from this heap SHT, sheet is separated one by one and pass out to imaging section 20.
First imaging section 20 makes the intermediate transfer belt 23 set up on 2 rollers 23L, 23R rotate and pass through 4 image-forming blocks
Between 21Y, 21M, 21C, 21K and 41 transfer roll 22Y, 22M, 22C, 22K.Thus, identical at this intermediate transfer belt 23
Position, the toner image of overlapping yellow (Y), magenta (M), cyan (C) and black (K) this 4 color forms 1 and colored adjusts
Toner picture.Imaging section 20 next make the sheet SH2 that sent from delivery section 10 by intermediate transfer belt 23 and 2 transfer rolls 24 it
Between clamping part, transfer color toner picture from intermediate transfer belt 23 to this sheet SH2, and pass out to fixing section 30.
Fixing section 30 makes this sheet SH2 pass through the clamping part between fixing roller 31 and backer roll 32, by fixing roller 31
Put heater etc. this sheet SH2 is heated, and pressed towards fixing roller 31 by backer roll 32.By from fixing roller 31
Heat and from the pressure of backer roll 32, toner image is fixing on the surface of sheet SH2.Fixing roller 31 and backer roll 32 and then will
This sheet SH2 passes out to paper discharge unit 40.
Paper discharge unit 40 by distributing roller 43 by the sheet SH2 that moves along guide plate 41 from the top of fixing section 30 from outlet
42 pass out to discharge tray 44.So, on discharge tray 44, pile up the sheet SH3 being formed with toner image.
-structure of image-forming block-
(a) of Fig. 6 is the profile of image-forming block 21.4 image-forming block 21Y-21K illustrate with Fig. 6 (a)
The structure that image-forming block 21 is same, possess photoconductor drum 211, charged device 212, exposure mouth 213, development section 214, cleaner 215,
Electric eliminating lamp (not shown in Fig. 2), toner replenishing pipe 216 and toner Cartridge 217.
Photoconductor drum 211 is the cylinder part that its periphery is covered by photoreceptor.This photoreceptor can be charged, when illuminated outside
During light, its exposed portion is by except electricity.Photoconductor drum 211 can rotate around central shaft, by this rotation, makes each portion of outer peripheral face depend on
Secondary with charged device 212, exposure mouth 213, development section 214, intermediate transfer belt 23, cleaner 215 opposed.
Charged device 212 in the outer peripheral face of photoconductor drum 211, the vicinity of opposite part produce electric discharge, or to
This part is directly injected into electric charge.Thus, this part of photoconductor drum 211 is the most charged.
Laser from exposure portion 25 is imported to the inside of image-forming block by exposure mouth 213, is irradiated to photoconductor drum 211
In charging zone on outer peripheral face, opposite part.Now, this exposed portion, by except electricity, forms electrostatic in this part and dives
Picture.
Development section 214 obtains the toner stored in toner Cartridge 217 via toner replenishing pipe 216, at photoreceptor
Toner is carried in the outer peripheral face of drum 211, to be formed with electrostatic latent image part.Thus, toner be attached to this electrostatic dive
As and make this electrostatic latent image appear as toner image.
Cleaner 215 from the outer peripheral face of photoconductor drum 211, the part that just contacts with intermediate transfer belt 23 remove residual
The toner deposited.Electric eliminating lamp, to the opposite part in the outer peripheral face of photoconductor drum 211, is irradiated light equably and is removed electricity.
-structure of development section-
(b) and (c) of Fig. 6 is top view and the profile of development section 214 respectively.With reference to (b), (c) of Fig. 6, development section
214 include framework 240, shaft 241, supply axle 242 and developer roll 243.
The inside of framework 240 is separated into agitator tank TK1 and supplying layer TK2 by next door PRT.Agitator tank TK1 and supply
A part of layer TK2 is dipped in developing agent DVL.This developing agent DVL comprises toner and these 2 compositions of carrier.Toner is
There is the fine powder of the nonmagnetic material of electric conductivity, be painted to some in this 4 color of Y, M, C, K.Carrier is that tool is magnetic
The powder of insulator, its particle diameter is more than the particle diameter of toner, at the powder of a large amount of toner of surface adsorption.
Shaft 241 is built in agitator tank TK1, can rotate around central shaft.At the outer peripheral face of shaft 241, define spiral shell
Rotation portion SC1, stirs developing agent DVL with the rotation of shaft 241, simultaneously to a direction (in (b) of Fig. 6 arrow AR1
Direction) mobile.The part being immersed in developing agent DVL that supply axle 242 is built in feed trough TK2, can rotate around central shaft.
At the outer peripheral face of supply axle 242, define spire SC2, stir developing agent DVL with the supply rotation of axle 242, simultaneously to
The direction (among (bs) of Fig. 6 the direction of arrow AR2) contrary with the spire SC1 of shaft 241 is mobile.Next door PRT is arranged
Peristome OP1, OP2, (represent with reference to (b) of Fig. 6 so developing agent DVL circulates between agitator tank TK1 and feed trough TK2
Arrow AR3,4).So, in the period of developing agent DVL circulation, toner is charged by the friction with carrier.
What developer roll 243 was arranged in feed trough TK2 is immersed in the top of the part of developing agent DVL, can revolve around central shaft
Turn.The built-in Magnet of developer roll 243, by its magnetic force by the carrier adsorption in developing agent DVL to outer peripheral face.This outer peripheral face is with photosensitive
The outer peripheral face of body drum 211 is separated out predetermined distance and opposed.Bias voltage is applied between developer roll 243 and photoconductor drum 211,
So by the electrostatic force caused by this voltage, toner from the surface of the carrier of the outer peripheral face being adsorbed onto developer roll 243 to sense
The outer peripheral face of body of light drum 211 moves and adheres to.
And then with reference to (b) of Fig. 6, in the bottom of agitator tank TK1, arrange permeability (toner-carrier ratio:
TCR) sensor 245.TCR sensor 245 measures the permeability of the developing agent DVL moved in the inside of agitator tank TK1.With carrier
Difference, toner does not have magnetic, so the permeability of developing agent DVL is the highest, then toner is the lowest relative to the ratio of carrier.
Utilizing this point, control portion 60 is according to the measured value of TCR sensor 245, and the toner in detection developing agent DVL is mixed with carrier
Composition and division in a proportion, according to its detected value, determines the amount of the toner of reply development section 214 supply.
It addition, (b) of Fig. 6 illustrates toner replenishing mouth 244.Toner replenishing mouth 244 is by toner replenishing pipe 216 even
Knot is to the part of agitator tank TK1, including the motor of toner replenishing.This motor is according to the driving signal from control portion 60
Drive, supply the toner of desired amount via toner replenishing pipe 216 from toner Cartridge 217 to the inside of agitator tank TK1.
[electronic control system of image processing system]
Fig. 7 is the block diagram of the structure of the electronic control system illustrating MFP111.With reference to Fig. 7, within the system, operating portion
50, control portion 60 and image forming part 10-40 can connect via bus 90 with being in communication with each other.
Operating portion 50 includes guidance panel 51, scanner 52, memory interface (I/F) 53 and LANI/F54.Operating surface
Plate 51 includes button, touch panel and display.Guidance panel 51, according to the driving signal from control portion 60, will operate picture
The GUI pictures such as the input picture of face and various parameter are shown in display.It addition, guidance panel 51 identifies user operation
Button or the position of touch panel, be sent to control portion 60 using the information relevant with this identification as operation information.Scanner
52 utilize built-in optical device that the surface of original copy is irradiated light, according to the intensity distributions of its reflection light, reading characters, pattern or
Person's photo is also transformed to view data and delivers to control portion 60.Memory I/F53 is defeated via the image such as USB port, memory card slot
Enter terminal, obtain view data immediately from the storage device of the peripheral hardware such as USB storage, HDD.LANI/F54 is by wired or nothing
Line mode is connected with outside network N TW, with and other electronic equipments of being connected to of this network N TW communicate.LANI/F54
Receive from the instruction of user, particularly task and the view data of printing object from these electronic equipments.
Control portion 60 includes CPU61, RAM62 and ROM63.CPU61 according to firmware, control and bus 90 is connected to its
His key element 10 ..., 50.The operating area performed by CPU61 during firmware is supplied to CPU61 by RAM62, and preserves by operating portion
The view data of 50 printing object accepted.ROM63 includes that the semiconductor memory system that can not write and EEPROM etc. can
The semiconductor memory system rewritten.The former stores firmware, and the latter provides the preservation region of environmental variable etc. to CPU61.
[function in control portion]
Control portion 60 is according to the operation information from operating portion 50, and other key elements in MFP111 send and drive signal.
Thus, control portion 60, for action patterns such as these other key elements, instruction mode of operation, standby mode, sleep patterns, makes respectively to want
Element performs the process corresponding with this action pattern.
Control portion 60 makes operating portion 50 show operation screen, the operation implemented by reason user.At operating portion 50 from user
When having accepted task, control portion 60 makes operating portion 50 that the view data of printing object is sent to RAM62.Control portion 60 and then depend on
According to the printing condition of this task presentation, specify kind and the timing of its conveying of the sheet that should carry for delivery section 10, for one-tenth
Picture portion 20, it is provided that represent the view data of the toner image that should be formed.Control portion 60 makes exposure portion 25 according to this picture number especially
Change according to the exit pattern making laser.
Control portion 60 is when providing view data to imaging section 20, for this view data, carries out color correction process, ash
Image procossing (hereinafter referred to as RIP (the raster-such as degree correction process, screening (screening) process and difference expansion process
Image processor, raster image processor) process), the raster data obtained as its result is delivered to imaging section 20.
Particularly, being processed by screening, view data is for each pixel, (following by " point " described with the toner of each color
Density referred to as " tracing point ") represents the gray value of 4 colors.
And then with reference to Fig. 7, control portion 60 includes monitoring unit 611, prediction section 612 and request unit 613.These function parts lead to
Cross CPU61 to carry out action according to firmware and realize, particularly as described below, play above-mentioned 4 kinds of functions, i.e. (4) toner and disappear
The supervision of consumption, the prediction in supplementary period of (5) toner, (6) send augmentation requests RQS of toner to managing device 120
And the correction in the supplementary period of (7) number of units based on equipment.
-monitoring unit-
Monitoring unit 611 monitors the consumption of the toner in the machine.Such as, for each task, from the figure processing object
As the gray value of each pixel of data read-out, speculate according to these gray values and form toner in imaging section 20 according to this view data
The toner amount consumed during picture.Specifically, first monitoring unit 611 according to the view data i.e. raster data after RIP process, presses
Pixel is counted by gray value according to each color respectively.Next the pixel count of each gray value is multiplied by this ash by monitoring unit 611
The estimated value of the consumption of the toner in each pixel of angle value, according to each color, for all gray values by obtained
Long-pending summation.Herein, by between the gray value and the consumption of toner of each color speculate corresponding relation, i.e. at 1 picture
In element describe tracing point quantity with in the description of these tracing points consume toner amount estimated value between corresponding
Relation is saved in ROM63 as form or function in advance.Monitoring unit 611 and then the conjunction (such as each business day) termly
The estimated value that obtains for each task of meter is also saved in ROM63, and monitors and supplemented what time of toner lighted from last time
Consumption of toner altogether.If its statistical value reaches the threshold value for it, then this meaning is notified to request by monitoring unit 611
Portion 613.
The estimated value of the consumption of toner that monitoring unit 611 has added up to is used for mending to development section 214 the most as described below
To toner.Control portion 60, first via the measured value of TCR sensor 245, monitors the toner in developing agent DVL and carrier
Mixing ratio, on the other hand, is accumulated at the toner consumption added up to after development section 214 feeds the time point of toner last time
The estimated value of amount.When in the consumption with toner, toner drops to allow lower limit relative to the ratio of carrier, or
When the aggregate-value of consumption of toner reaches the predetermined upper limit, control portion 60 feeds toner to development section 214.Specifically,
Control portion 60 determines the increment of toner according to the aggregate-value of consumption of toner, calculates toner replenishing according to this increment
The drive volume of the motor of mouth 244, and by driving signal to be delivered to the drive circuit of this motor.By corresponding with this driving signal
The driving of this motor, the toner of this increment is supplied to from toner replenishing mouth 244 the agitator tank TK1 of development section 214.
-prediction section-
Prediction section 612 is according to the consumption rate of the toner in the machine, it was predicted that supplement the supplementary period of toner to the machine.Tool
For body, it was predicted that going through of the consumption of the portion 612 first toner that basis has added up to (such as each business day) termly
History, speculates the consumption rate (=consumption/business day) of toner termly (such as every 1 week).As this guess value, example
Average such as, the aggregate value after selecting last time when speculating.Prediction section 612 is next according to this guess value, and estimation toner remains
The lower limit (date of delivery of the consumption rate × toner of=toner) of surplus, and then will remove under this from the heap(ed) capacity of toner
The value limited and obtain is set as the threshold value of the consumption for toner.The guess value of the consumption rate of toner is by the most more
Newly, so the predictive value in the supplementary period of the i.e. toner of threshold value is also updated with the identical cycle (such as every 1 week).
In addition to this function, it was predicted that portion 612 whenever from managing device 120 by termly (such as each business day)
When notifying information NTC of number of units of expression equipment, according to its number of units corrected threshold.Specifically, it was predicted that portion 612 is first from this letter
The number of units of breath NTC readout equipment, obtains the ratio relative to the number of units read from information NTC of last time.At this than the feelings equal to " 1 "
Under condition, it was predicted that portion 612 does not corrects predictive value and is maintained original value.On the other hand, in the case of this is not than being " 1 ", in advance
The lower limit RMA of residual quantity of toners divided by this ratio, is carried out more new lower bound RMA with its business by survey portion 612.Thus, if number of units is than big
In " 1 ", then the lower limit RMA of residual quantity of toners reduces and threshold value for consumption increases, so the period of supplementing postpones, on the contrary
Ground is if less than " 1 ", then lower limit RMA increases and threshold value minimizing, so the period of supplementing is in advance.
-request unit-
Request unit 613, when arriving the supplementary period of the toner that prediction section 612 dopes, sends to managing device 120
Augmentation requests RQS of toner.Specifically, request unit 613 will reach from the notified consumption of toner altogether of monitoring unit 611
Time point to threshold value is considered as the supplementary period of toner, according to this notice, generates augmentation requests RQS, and via LANI/F54
It is sent to managing device 120.
Afterwards, even if request unit 613 makes prediction section 612 from the letter of the number of units of managing device 120 notified expression equipment
Breath NTC also skips the correction process of the predictive value in the supplementary period of toner, till actually supplementing toner.Concrete and
Speech, such as, request unit 613, when have sent augmentation requests RQS, arranges predetermined mark, when supplementing toner, makes this mark
Will makes zero.Prediction section 612, whenever from managing device 120 notified information NTC, checks this mark, if being provided with this mark,
Then it is predicted the correction of value, if zero, then skips this correction.
[prediction in the supplementary period of toner]
Fig. 8 is the signal of the process illustrating to predict its supplementary period according to the history of the consumption of toner in control portion 60
Figure.With reference to Fig. 8, monitoring unit 611 for each business day, with the percentage rate of the heap(ed) capacity relative to toner show for
Consumption of toner that each business day has added up to and supplemented the toner consumption altogether that the time of toner lights from last time
Amount.Such as, in the case of the heap(ed) capacity of toner is 1 toner bottle amount " 500g ", consumption " 0.5% " is equal to toning
Dosage 500g × 0.5%=2.5g.And then, Fig. 8 illustrates that prediction section 612 sets for every 1 week=5 business days according to these values
The threshold value of consumption for toner.
The 5th business day, it was predicted that first portion 612 obtains the average of the consumption of the toner in the 1-5 business day
Value " 0.44%/sky ", the consumption rate of the toner being considered as in this week.Prediction section 612 is next to this consumption rate " 0.44%/sky "
It is multiplied by the date of delivery " 6 days " of toner, by these long-pending lower limit RMA:RMA=0.44%/sky × 6 day being set as residual quantity of toners
≈ 3%.Herein, date of delivery " 6 days " is that the time " 4 days " ordered goods needed for delivery from toner bottle is added " 2 days " conduct
The value having more than needed and obtain.Prediction section 612 and then obtain removing this lower limit RMA=3% from the heap(ed) capacity " 100% " of toner
To value " 97% " be set as threshold value.Thus, monitoring unit 611 after the 5th business day, repeat this threshold value " 97% " and
The comparison of consumption of toner altogether, until again predicting supplementary period on the 10th business day.As shown in Figure 8, at 5-9
In business day, compared to threshold value " 97% ", consumption of toner altogether is less.
On the 10th business day, it was predicted that portion 612 carries out supplementing the revaluation of the predicting again of period, i.e. threshold value.Specifically, it was predicted that
First portion 612 obtains the meansigma methods " 0.60%/sky " of the consumption of the toner in 6-10 business day, is considered as in this week
The consumption rate of toner.This consumption rate " 0.60%/sky " is next multiplied by the date of delivery " 6 days " of toner by prediction section 612, uses
This long-pending lower limit RMA:RMA=0.60%/sky × 6 day ≈ 4% updating residual quantity of toners.Prediction section 612 and then with from toning
The value " 96% " removing this lower limit RMA=4% in the heap(ed) capacity " 100% " of agent and obtain updates threshold value.Toning altogether
Agent consumption " 97.3% " exceedes the threshold value " 96% " after renewal, so this meaning is notified to request unit 613 by monitoring unit 611,
According to this notice, augmentation requests RQS of toner is sent to managing device 120 by request unit 613.
[supplementing the correction of the prediction in period]
Fig. 9 is to illustrate that prediction section 612 supplements the predictive value in period according to the number of units correction of the equipment being connected to network N TW
The schematic diagram of process.With reference to Fig. 9, for each business day, it is shown that information NTC being notified of from managing device 120 represents
The number of units of equipment, the ratio of number of units that read with information NTC from last time of this number of units and from last time supplement toner time
Between the consumption of toner altogether lighted.Fig. 9 and then illustrate the threshold of the consumption for toner that prediction section 612 sets
Value.
Until 1-6 business day, the number of units of the equipment that information NTC being notified of from managing device 120 represents remains perseverance
Definite value " 4 ", so number of units ratio is maintained " 1 ".Therefore, in the same manner as Fig. 8, the 5th business day, it was predicted that portion 612 sets and adjusts
The lower limit RMA=3% of toner surplus and threshold value " 97% ", the 5th, 6 business days, monitoring unit 611 confirms toner altogether
Consumption is less than this threshold value " 97% ".
On the 7th business day, information NTC being notified of from managing device 120 represents the number of units " 3 " of equipment, so number of units ratio
" 3/4 " is less than " 1 ".Correspondingly, it was predicted that portion 612 corrected threshold.I.e., it was predicted that portion 612 is by the lower limit RMA of residual quantity of toners
Divided by this number of units ratio " 3/4 ", carry out more new lower bound RMA:RMA=(100%-97%)/(3/4)=4% with its business.Prediction section 612
And then the value " 96% " obtained with removing this lower limit RMA=4% from the heap(ed) capacity " 100% " of toner updates threshold
Value.
Now, consumption of toner " 96% " altogether has reached the threshold value " 96% " after updating, so monitoring unit 611
This meaning being notified to request unit 613, according to this notice, augmentation requests RQS of toner is sent to management dress by request unit 613
Put 120.
[flow process that the reckoning of consumption of toner processes]
Figure 10 is the flow chart that monitoring unit 611 speculates the process of the consumption of toner according to view data.In control portion
60 start this process when operating portion 50 is informed about the request of task.
In step S101, processing the RIP of view data concurrently with by control portion 60, monitoring unit 611 is first from this
View data i.e. raster data after RIP process selects 1 page.Next monitoring unit 611 is whenever extracting 1 group out from this page
During pixel data, from this pixel data, read the gray value of 4 colors, make the counting of the pixel of each gray value of expression gradually increase by 1.
So, the pixel included this page respectively according to the gray value of each color counts.Afterwards, process enters into step
S102。
In step s 102, monitoring unit 611 is to the consumption of the toner for each gray value (quantity of tracing point)
Estimated value is multiplied by the pixel count of this gray value, and long-pending by them adds up under all gray values according to each color, should
Aggregate result is added to estimated value CSM of the consumption of toner of each color.Afterwards, process enters into step S103.
In step s 103, whether monitoring unit 611 remains untreated page in confirming the view data after RIP processes
Face.If the untreated page remains, then repeating process from step S101, if do not remained, then process terminates.
[the need of supplementary toner judgement process flow process]
Figure 11 is that control portion 60 judges whether to require supplementation with the process of toner according to the history of the consumption of toner
Flow chart.When have passed through the cycle of prediction, such as 1 week=5 business days from the time point supplementing toner, start at this
Reason.
In step S111, it was predicted that portion 612 is after supplementing the time point of toner, according to the most such as often
The history of the consumption of the toner that individual business day has added up to, calculates meansigma methods CAV of aggregate value, is set as the consumption of toner
The guess value of rate (=consumption/business day).Afterwards, process enters into step S112.
In step S112, it was predicted that portion 612 is by guess value CAV of the consumption rate of toner and the date of delivery of toner long-pending
It is set as the lower limit RMA:RMA=CAV × date of delivery of residual quantity of toners.Afterwards, process enters into step S113.
In step S113, it was predicted that the difference of the lower limit RMA of residual quantity of toners and the heap(ed) capacity of toner is set by portion 612
It is set to the threshold value of the consumption for toner: threshold value=heap(ed) capacity-RMA.Afterwards, process enters into step S114.
In step S114, monitoring unit 611 be confirmed whether from prediction section 612 finish time of step S113 light through
The cycle of prediction, such as 1 week=5 business days.If through this cycle, then repeating process from step S111, as
Fruit without, then process enter into step S115.
In step sl 15, monitoring unit 611 is confirmed whether to add up to last time the pushing away of consumption of toner from monitoring unit 611
The time of calculation value lights the cycle of total that have passed through, such as 1 business day.If without this cycle, then process and repeat
Step S115, if process, then processes and enters into step S116.
In step S116, monitoring unit 611 confirms that supplementing, from last time, the toner altogether that time of toner lights disappears
Whether consumption is less than threshold value.If less than threshold value, then from step S114, repeat process, if reaching more than threshold value, then
Process enters into step S117.
In step S117, consumption of toner altogether reaches more than threshold value, so this meaning is notified by monitoring unit 611
To request unit 613, according to this notice, augmentation requests RQS of toner is sent to managing device 120 by request unit 613.Afterwards,
Process terminates.
[supplementing the flow process of the correction process of the prediction in period]
Figure 12 is the consumption to toner of the control portion 60 number of units adjusting pin according to the equipment being notified of from managing device 120
The flow chart of the process of the threshold value of amount.Control portion 60 is in information NTC of the number of units being informed about expression equipment from managing device 120
Time start this process.
In step S121, it was predicted that portion 612, from the number of units of this information NTC readout equipment, obtains relative to from the letter of last time
The ratio of the number of units that breath NTC has read.Afterwards, process enters into step S122.
In step S122, it was predicted that portion 612 confirms that whether the number of units of equipment is than equal to " 1 ".If equal to " 1 ", then process
Terminate, if not " 1 ", then process and enter into step S123.
In step S123, the number of units ratio of equipment is not " 1 ", so number of units variation.Prediction section 612 with this number of units than with tune
The business of the lower limit RMA of toner surplus carrys out more new lower bound RMA, by the difference of the lower limit RMA after renewal with the heap(ed) capacity of toner
Update the threshold value of the consumption for toner: threshold value=heap(ed) capacity-RMA.Afterwards, process enters into step S124.
In step S124, it was predicted that portion 612 confirm threshold value be whether its upper limit, such as " 98% " below.If standard
Equipment, even if then this upper limit is configured to the scheduled time example lighted in the time reaching this upper limit from the consumption of toner
The exhaustion of toner it also is able to avoid as remained able to the state of work in 4 days.If threshold value is below the upper limit, then process enters
To step S126, if it exceeds the upper limit, then process and enter into step S125.
In step s 125, threshold value exceedes the upper limit, so threshold restriction is the upper limit, such as " 98% " by prediction section 612.It
After, process and enter into step S126.
In step S126, monitoring unit 611 confirms that supplementing, from last time, the toner altogether that time of toner lights disappears
Whether consumption is less than threshold value.If less than threshold value, then process terminates, if reaching more than threshold value, then processes and enters into step
S127。
In step S127, consumption of toner altogether reaches more than threshold value, so this meaning is notified by monitoring unit 611
To request unit 613, according to this notice, augmentation requests RQS of toner is sent to managing device 120 by request unit 613.Afterwards,
Process terminates.
[advantage of embodiment 1]
In the consumable item management system 100 of embodiments of the present invention 1, as it has been described above, first, the prison of each equipment 110
The consumption of toner in the machine is monitored depending on portion 611.It follows that according to the history of its consumption, the prediction section of each equipment 110
The 612 prediction values that interim consumption altogether reaches when toner supplementary, are set as this value for consumption altogether
Threshold value.Within the system, and then, managing device 120 would indicate that information NTC of the number of units of equipment notifies termly to each equipment
110, whenever carrying out this notice, each equipment 110 compares number of units that this information NTC represents and the platform that information NTC of last time represents
Number.If the ratio of these number of units is not " 1 ", then prediction section 612 is come than the business with the lower limit RMA of residual quantity of toners by this number of units
More new lower bound RMA.Now, if number of units is than more than " 1 ", then lower limit RMA reduces and threshold value increase, so the period of supplementing postpones,
On the contrary if less than " 1 ", then lower limit RMA increases and threshold value minimizing, so the period of supplementing is in advance.So, according to the platform of equipment
The variation of number, correction supplements the predictive value in period.
So, in this system 100, how the number of units of the equipment being connected to network N TW changes, and can make each
Equipment 110 predicts the supplementary period of toner exactly.Particularly, even if with 1 removing of equipment and the equipment of its periphery
The amount of should processing of task is increased dramatically, it is also possible to make each equipment shift to an earlier date the supplementary period of toner in time.
[variation of embodiment 1]
(A) each image processing system that the consumable item management system 100 of embodiment 1 includes for device cluster 110, auxiliary
The matched with period of toner is supplemented.It is set to manage the consumable goods of object about this system 100, in addition to toner,
Can also be ink, the photoconductor drum of imaging section 20, intermediate transfer belt, transfer roll, the exposure such as pigment that utilize of sheet, ink-jet printer
The laser diode etc. in light portion 25.In this case, system 100 such as evaluates consumption degree for sheet according to printing number, for
Ink evaluates consumption degree according to usage amount, evaluates consumption degree for photoconductor drum etc. according to the use time, as it
Threshold value, set supplement/change period predictive value.
(B) in each equipment 110, monitoring unit 611 is according to view data, thus it is speculated that the consumption of toner, 60, control portion
According to this estimated value, determine to feed the increment of toner to development section 214.Alternatively, it is also possible to be that control portion 60 is according to developing agent
In toner in DVL and the mixing ratio of carrier are reduced to allow the development section 214 that the time of lower limit, light sensors go out
The volume etc. of developing agent DVL, determines the increment of toner, and monitoring unit 611 adds up this increment to calculate the consumption of toner
Amount.It addition, monitoring unit 611 can also according to sheet process number, the movement time etc. of equipment, calculate toner consumption or
Person uses them as the index of consumption.
(C) number of units of the equipment of constitution equipment group 110 is notified to each equipment 110 by managing device 120 termly.It addition,
In managing device 120, if according to having rewritten the time point of register information 351 from registration request RST of PC group 140
There is the change of number of units, the most immediately this meaning is notified to each equipment 110.
(D) managing device 120 is as it is shown in figure 1, be separated into the most independent with either one of device cluster 110 and PC group 140
Device.It addition, managing device can also be embedded into the arbitrary equipment in device cluster 110 or any terminal in PC group 140.
(E) in embodiment 1, the notification unit 312 of managing device 120 is with reference to the register information relevant with device cluster 110
The identification information of the equipment in 351 obtains the number of units of equipment.Alternatively, it is also possible to notification unit 312 is notifying to device cluster 110
The identification information of embedded equipment in information NTC, the prediction section 612 of each equipment 110, will be such as included by it with reference to this identification information
The number of units that quantity set is equipment of IP address.
(F) notification unit 312 is with reference to the identification information of the equipment in the register information 351 relevant with device cluster 110, to its institute
Including IP address carry out counting the number of units of the equipment of obtaining.Therefore, the information NTC table that notification unit 312 notifies to device cluster 110
The number of units shown is equal to the sum of the equipment of registration in storage part 350.
It addition, notification unit 312 can also be for the sundry item of the register information that Fig. 4 represents, the task of i.e. can processing
Each kind or each attribute of sheet, distinguish equipment number of units.Device cluster 110 both can be divided into such as by notification unit 312
Can carry out, with colour, the type that processes and be only capable of and carry out, with monochrome, the type that processes, it is also possible to be divided into printer, photocopier,
Each type of scanner.And then, it is also possible to it is divided into the type of the sheet that can process each size such as A3, A4, B4 or copes with
The type of each paper types such as common paper, art paper, good quality paper.
To device cluster 110, notification unit 312 notifies that so obtain represents the number of units distinguished by the kind of task or by sheet
Information NTC of number of units distinguished of attribute.Task in the number of units that each equipment 110 represents according to this information NTC, that can process
Kind or the number of units of the attribute of the sheet type identical with the machine, the predictive value in the supplementary period of correction toner.Example
As, color printer, for the toner of this 3 color of Y, M, C, can be carried out with colour according to color printer, color copy machine etc.
No matter the number of units corrected threshold of the type processed, for the toner of K color, be colored or monochromatic, all according to all devices
Number of units corrected threshold.
(G) as shown in figure 12, in the correction process of the threshold value of the consumption for toner, in step S122, as
Really the number of units ratio of equipment is not " 1 ", then, in step S123, come than the business with the lower limit RMA of residual quantity of toners by this number of units
More new lower bound RMA.
It addition, the number of units of equipment is not than in the case of being " 1 " in step S122, it was predicted that portion 612 so that obtain threshold value with
The difference of the consumption altogether under current point in time, if this difference be predetermined value more than needed, such as more than 10%, then skip thresholds
Correction: the consumption of threshold value-altogether is had more than needed value 10%.So, by consumption altogether close to the situation of this value
Under, the correction of threshold limit, it is possible to be more effectively carried out this correction.
" embodiment 2 "
The consumable item management system of embodiments of the present invention 2 is in the same manner as the system 100 of embodiment 1, to device cluster
Supplement matched with period of the toner of the 110 each image processing system consumption included assists.But, at management dress
The monitoring unit 311 putting 120 monitors the duty of device cluster 110 on this point, the system of embodiment 2 and embodiment 1
System 100 is different.
Hereinafter, about the system of embodiment 2, the part different from the system 100 of embodiment 1 is described.About two
Part common in the system of side, quotes the explanation about embodiment 1.
In the managing device 120 of embodiment 1, notification unit 312 in storage part 350 preserve with device cluster 110
The IP address in relevant register information 351, identification information includes carries out counting and being set as the number of units of equipment.Therefore, to
The number of units that information NTC of device cluster 110 notice represents is equal to the sum of the equipment registered.
In contrast, in the managing device 120 of embodiment 2, the IP address included for this identification information, monitoring unit
311 carry out utilizing the supervision of poll etc., according to its monitoring result, count the equipment worked in device cluster 110.Cause
This, the number of units that information NTC to device cluster 110 notice represents is equal to the platform of the equipment that only can work in the equipment registered
Number.Herein, the condition that " can work " for equipment is the most ensuing 3.(A) power on, (B) are at least 1 paper supply
The sheet and (C) that remain able to process in box are not absorbed in the error conditions such as paperboard.
Monitoring unit 311 makes network I/F370 carry out the poll for device cluster 110 termly.That is, have to device cluster 110
The IP address that the register information 351 closed represents sends polling signal successively, as its response from the work of each equipment loopback Yu the machine
Make the information that state is relevant.The duty represented according to these information, monitoring unit 311 is to the above-mentioned delimiter with " can work "
The equipment of the duty closed counts.
The cycle of poll is preferably set to 1 hour, would indicate that information NTC of the number of units of equipment notifies to device cluster 110
Cycle set be such as 1 business day below.In this case, notification unit 312 is newly notifying this information to device cluster 110
During NTC, in the number of units of the equipment worked obtained from the poll after the notice of last time, select such as maximum and embedding
Enter to this information NTC.
Figure 13 is that managing device 120 is obtained the number of units of the equipment that can work and notifies the flow process of process to each equipment 110
Figure.By accessing power supply to managing device 120, start this process.
In step S131, notification unit 312 confirms whether should arrive, such as to the period of device cluster 110 announcement information NTC
Whether from the notice of last time, have passed through 1 day.If this period arrives, then process and enter into step S136, if do not arrived, then
Process enters into step S132.
In step S132, because being not already answering the period of announcement information NTC, so monitoring unit 311 confirms that reply can work
Whether the period that the equipment made carries out counting arrives for example whether light from the time carrying out counting last time and have passed through 1 hour.As
Really arrive this period, then processing and enter into step S133, if do not arrived, then from step S131, repeating process.
In step S133, owing to being the equipment that can work of reply period of carrying out counting, so monitoring unit 311 carries out pin
Supervision to device cluster 110, according to its monitoring result, obtains number of units NDV of the equipment that can work.Detailed about this step S133
Details condition is described below.Afterwards, process enters into step S134.
In step S134, monitoring unit 311 confirms whether number of units NDV obtained in step S133 is more than stored platform
Number NPR.If the former NDV is more than the latter NPR, then processes and enter into step S135, if the former NDV is not more than the latter NPR, then
Process is repeated from step S131.
In step S135, number of units NDV obtained in step S133 is more than stored number of units NPR, so monitoring unit
311 update the latter NPR with the former NDV.Afterwards, from step S131, process is repeated.
In step S136, owing to being the period answering announcement information NTC, so what monitoring unit 311 was stored by notification unit 312
Number of units NPR is embedded in information NTC and notifies to device cluster 110.By repeating after the notice in the last time of information NTC
Step S134, S135, number of units NPR that monitoring unit 311 stores at this time point equal to after the most secondary notice in step
Maximum in the number of units of the equipment worked obtained in S133.Afterwards, process enters into step S137.
In step S137, number of units NPR of storage is initialized as " 0 " by monitoring unit 311.Afterwards, process enters into step
S138。
In step S138, monitoring unit 311 is confirmed whether that the supervision that should terminate device cluster 110 processes.If should terminate, then
Process terminates, and otherwise repeats process from step S131.
Figure 14 be Figure 13 represent step S133, i.e. according to obtaining setting of can working for the monitoring result of device cluster 110
The flow chart of the subroutine of standby number of units NDV.
In step s 141, monitoring unit 311 reads the register information 351 relevant with device cluster 110 from storage part 350
The IP address of equipment, for these IP addresses, is sent to network I/F370 successively by polling signal.Monitoring unit 311 so via
Network I/F370, accepts the loopback from device cluster 110 for this polling signal.Afterwards, process enters into step S142.
In step S142, number of units NDV of the equipment that can work is initialized as " 0 " by monitoring unit 311.Afterwards, process into
Enter to step S143.
In step S143, monitoring unit 311, from for selecting 1 the loopback of polling signal and resolving, confirms as it
Whether the duty of the equipment in loopback source meets whether the condition (A) of " can work ", the i.e. power supply of this equipment are connected.If connect
Logical, then process and enter into step S144, if off, then process and enter into step S147.
In step S144, monitoring unit 311 confirms whether the duty of the equipment as loopback source meets " can work "
Condition (B), i.e. this equipment whether at least 1 paper feeding cassette, maintain the sheet that can process.If kept, then process enters
To step S145, if do not kept, then process and enter into step S147.
In step S145, monitoring unit 311 confirms whether the duty of the equipment as loopback source meets " can work "
Condition (C), i.e. this equipment be not the most the error conditions such as paperboard.If not error condition, then process and enter into step
S146, if error condition, then processes and enters into step S147.
In step S146, as loopback source equipment duty meet " can work " full terms (A)-
(C), so monitoring unit 311 makes number of units NDV increase " 1 ".Afterwards, process enters into step S147.
In step S147, monitoring unit 311 confirms whether not have untreated loopback in for the loopback of polling signal,
The confirmation of duty the most whether is finished for all devices.Without untreated loopback, then process terminates, if
Have, then from step S143, repeat process.
[advantage of embodiment 2]
The consumable item management system of embodiments of the present invention 2 in the same manner as the system 100 of embodiment 1, each equipment 110
The consumption of the toner in supervision the machine, according to the history of this consumption, sets the lower limit RMA of residual quantity of toners, will be total
The time point of the threshold value of common consumption has reached fewer than the heap(ed) capacity of toner this lower limit RMA is predicted as supplementing of toner
Period.Within the system, and then, managing device 120 would indicate that information NTC of the number of units of equipment notifies termly to each equipment
110, whenever carrying out this notice, each equipment 110 obtains number of units that this information NTC represents and the platform that information NTC of last time represents
The ratio of number, if this ratio is not " 1 ", then carrys out more new lower bound RMA with this business than the lower limit RMA with residual quantity of toners.So,
The variation of the number of units according to equipment, correction supplements the predictive value in period, so the number of units of the equipment being connected to network N TW
How to change, the supplementary period of toner can be predicted for each equipment 110 exactly.
In embodiments of the present invention 2, different from embodiment 1, managing device 120 only in device cluster 110 can
The equipment of work counts.Thus, it is not only and removes equipment from network N TW and be reflected to the correction of predictive value in period of supplementing
In, and the equipment being connected to network N TW actually cannot work in the correction of the predictive value being also reflected to period of supplementing,
It is possible to improve the precision of its prediction further.
[variation of embodiment 2]
(A) monitoring unit 311 of managing device 120 utilizes poll to monitor device cluster 110.It addition, managing device can also
This equipment is monitored by the duty making each equipment utilization regularly interrupt notification the machine.
(B) duty about equipment is the condition (B) of " can work ", (C), if this equipment is paper to be used up, mistake
State, then the length of the time needed for repairing regardless of it how, and monitoring unit 311 is uniformly judged as being unsatisfactory for.It addition, monitoring unit
311 can also be according to repairing the scheduled time, it is judged that condition (B), the true and false of (C).Such as, owing to realizing paper with the comparatively short time
The reparation used up, so condition (B) can also be removed from the condition of " can work ".Alternatively, it is also possible to about single-shot paperboard,
Paper such as uses up at the error condition can repaired with the comparatively short time, it is judged that for meeting condition (C), about the taking place frequently of paperboard, zero
The replacings of part etc. send operator to spend the error condition of long time in reparation owing to needing, it is judged that for being unsatisfactory for
Condition (C).When this judgement, managing device 120 can also urge user to set the repairing of benchmark of the true and false of the condition of should be used as (C)
The multiple scheduled time.
" embodiment 3 "
The consumable item management system of embodiments of the present invention 3 is in the same manner as the system 100 of embodiment 1, to device cluster
Including each image processing system consumption toner matched with period supplement assist.But, about equipment
The supervision project of duty of group includes the usage frequency monitoring object, in the school of predictive value in the supplementary period of toner
Center, also utilizes their usage frequency, in this, the system of embodiment 3 and enforcement in addition to the number of units of equipment
The system 100 of mode 1 is different.
Hereinafter, about the system of embodiment 3, the part different from the system 100 of embodiment 1 is described.About two
Part common in the system of side, quotes the explanation about embodiment 1.
[function of consumable item management system]
Managing device except the accepting of augmentation requests of the function as embodiment 1, i.e. (1) toner, (2) about
Beyond the accepting of the registration request add/removed of equipment, also there is following function.(2A) monitor device cluster duty,
The number of the sheet particularly processed.(3A) number of units and the usage frequency of the equipment worked in device cluster are notified termly
To each equipment.
Each equipment is except the function as embodiment 1, the i.e. supervision of (4) consumption of toner, the benefit of (5) toner
Fill the prediction in period and beyond the transmission of augmentation requests that (6) supplement from toner to managing device, also there is following function.
(7A) according to from the notice of managing device, the number of units of the equipment worked represented according to this notice and usage frequency, correction
The predictive value in the period of supplementing.Particularly, in the case of the number of units at the equipment that can work decreases, it was predicted that portion is to setting after reducing
Standby and the machine is with the usage frequency that " equal ratio " distribution is only the equipment that can work before minimizing, according to the basis before and after distribution
The change of the usage frequency of machine, corrected threshold.
-supervision of the duty of equipment-
(a) of Figure 15 is to be shown in managing device 123 in the system 300 of embodiment 3 to obtain and work from each equipment 113
The schematic diagram of the data exchange carried out during the relevant information of state.With reference to (a) of Figure 15, the monitoring unit 311 of managing device 123 makes
Network I/F370 carries out the poll for device cluster 113 termly.That is, have with device cluster 113 to preserve in storage part 350
The IP address in the register information 351 closed, the identification information of equipment represents, sends polling signal POL successively, rings as it
Should, from information RPT that the loopback of each equipment 113 is relevant with the duty of the machine.The work shape represented according to these information RPT
State, the equipment that can work is counted by monitoring unit 311, register 313 using its number of units as a project of register information 351
It is saved in storage part 350.The cycle of poll, in the same manner as the cycle in embodiment 2, is preferably set to 1 hour, would indicate that
Information NTC of the number of units of equipment notifies to the cycle set of device cluster 113 as below such as 1 business day.
The condition that equipment " can work " is ensuing 3 in the same manner as the condition in such as embodiment 2.(A) power supply
Connect, (B) remain able at least 1 paper feeding cassette process sheet and (C) be not absorbed in the error conditions such as paperboard.Monitoring unit
311 pairs count with the equipment of the duty that this definition meets.Therefore, except register from network N TW remove set
Standby in addition, by the equipment of some (hereinafter referred to as " equipment that cannot work ") that is unsatisfactory in condition (A)-(C) from " can work
The number of units of equipment made " counting in remove.
Monitoring unit 311 is different from embodiment 2, whenever poll, makes each equipment 113 by the poll in last time with post processing
The number of sheet notify as project of information RPT relevant with duty, add up it for each equipment
Number.This aggregate-value is saved in storage part 350 as a project of register information 351 by register 313.
-correction of the prediction in supplementary period-
When the number of units of the equipment worked in device cluster 113 changes, system 300 makes each equipment 113 as described below
The prediction in the supplementary period of correction toner.
First, in managing device 123, notification unit 312 is the most such as each business day, reference and device cluster
113 relevant register informations 351, obtain number of units and the usage frequency of the equipment that can work, and would indicate that their information NTC notice
To each equipment 113.As " number of units of the equipment that can work ", notification unit 312 selects to be notified of time of number of units in such as last time
Maximum in the number of units obtained in poll after point.On the other hand, in " usage frequency of the equipment that can work ", notice
What portion 312 obtained after being set in the time point being notified of number of units such as last time in poll processes the aggregate-value of number, i.e. platform
The announcement period of number, the process number on the most each business day.
(b) of Figure 15 is the signal being shown in the data exchange that when the equipment DV1 that cannot work being detected, system 300 is carried out
Figure.With reference to (b) of Figure 15,1 DV1 in device cluster 113 cannot work.In this case, notification unit 312 by can work its
Number of units and the usage frequency of his equipment are embedded into information NTC and notify to device cluster 113.
Whenever accepting this information NTC, the prediction section 612 of each equipment 113 first reads out the platform of equipment from this information NTC
Number, obtains the ratio with the number of units read from information NTC of last time.In the case of this number of units is than equal to " 1 ", it was predicted that portion
The predictive value in the 612 supplementary periods not correcting toner, i.e. it is maintained original value for the threshold value of consumption of toner.
On the other hand, in the case of number of units is not than being " 1 ", the number of units variation of the equipment that can work, so prediction section 612 is according to number of units
Than carrying out corrected threshold.
Specifically, first in the case of number of units is than more than " 1 ", it was predicted that portion 612 remains than except toner by this number of units
Amount lower limit RMA, will such as " 98% " as the upper limit, by its business more new lower bound RMA.If the equipment of standard, then this upper limit
Even if being configured within the scheduled time, such as 4 days that the time reaching this upper limit from the consumption of toner lights keep energy
The state of enough work also is able to avoid the exhaustion of toner.Thus, in the case of number of units is than more than " 1 ", residual quantity of toners
Lower limit RMA reduce and for consumption threshold value increase, so supplement period postpone.
On the other hand, in the case of number of units is than less than " 1 ", it was predicted that portion 612 is notified of with reference first to from managing device 123
The usage frequency that includes of information NTC, include the equipment of usage frequency being searched at this from information NTC being notified of in last time
Secondary information NTC being notified of does not includes the equipment of usage frequency and is considered as working.Prediction section 612 is next for this nothing
The equipment of method work, is notified of from managing device 123 after calculating the time point in the supplementary period doping toner in last time
The overall meansigma methods of usage frequency.Prediction section 612 and then this average usage frequency is put down by the number of units of the equipment that can work
All distribute and be speculated as these shares of every 1, this share is appended to the usage frequency of the machine.As this " the machine
Usage frequency ", it was predicted that portion 612 is in the same manner as the usage frequency of the equipment that cannot work, and estimation doped toner in last time
The meansigma methods that the usage frequency of the machine being notified of from managing device 123 after the time point in the period of supplementing is overall.
Prediction section 612 next usage frequency to the machine add share obtain the usage frequency after adding relative to
The ratio of the usage frequency before Zhui Jiaing, with this than with the lower limit RMA of residual quantity of toners amass more new lower bound RMA.Thus, at platform
Number ratio is less than in the case of " 1 ", and the lower limit RMA of residual quantity of toners increases, so the threshold value for consumption reduces, when supplementing
Phase is in advance.
Figure 16 is the prediction section 612 that specific equipment DV0 is described according to the usage frequency of the equipment DV1 that cannot work and can
The number of units of other equipment DV2, DV3 of work corrects the schematic diagram of the process of the predictive value in the supplementary period of toner.Reference
Figure 16, for each business day, show the equipment worked that information NTC being notified of from managing device 123 represents number of units,
The usage frequency of each equipment DV0, DV1, DV2, DV3, supplemented time of toner from last time and light specific equipment DV0 and consume
Toner amount altogether and the threshold value of the consumption for toner that sets of the prediction section 612 of this equipment DV0.
Until the 1-5 business day, the platform of the equipment worked that information NTC being notified of from managing device 123 represents
Number remains steady state value " 4 ", so number of units ratio is maintained " 1 ".Therefore, it was predicted that threshold value is maintained the setting of last time by portion 612
Value " 97% ", until 1-4 business day.
5th business day is the period of new prediction, so prediction section 612 revaluation threshold value.I.e., it was predicted that institute of portion 612 such as Fig. 8
Show, the consumption of the toner from the 1-5 business day selects maximum " 0.5%/sky " and the toning that is considered as in this week
The consumption rate of agent, at the date of delivery " 6 days " that it is multiplied by toner, updates the lower limit of residual quantity of toners by thus obtained value
RMA:RMA=0.5%/sky × 6 day=3%.Prediction section 612 and then remove under this from the heap(ed) capacity " 100% " of toner
Limit RMA=3%, is set as threshold value by thus obtained value " 97% ".
Monitoring unit 611 confirms that whether consumption of toner altogether is less than the threshold value " 97% " so set.Such as Figure 16
Shown in, in the 5th business day, consumption of toner altogether is less than threshold value " 97% ".
In the 6th business day, the number of units of the equipment worked that information NTC being notified of from managing device 123 represents is also
Remain steady state value " 4 ", so number of units ratio is maintained " 1 ".Therefore, it was predicted that threshold value is maintained the setting value of last time by portion 612
" 97% ".On the other hand, monitoring unit 611 confirms that consumption of toner altogether is less than this threshold value " 97% ".
The number of units " 3 " of the equipment that can work is represented from information NTC that managing device 123 is notified of on the 7th business day, so
Number of units ratio " 3/4 " is less than " 1 ".Correspondingly, it was predicted that portion 612 corrected threshold.
Specifically, it was predicted that the portion 612 first usage frequency of the equipment that reference can work from information NTC, from the 6th battalion
Information NTC that industry day is notified of includes in the equipment DV0-DV3 of usage frequency, and search is in this information NTC being notified of
Including the equipment DV1 of usage frequency and be considered as working.Next prediction section 612 calculates the equipment DV1's that cannot work
The meansigma methods " 125/day " that usage frequency in 1-6 business day is overall, by the equipment worked in the 7th business day
Number of units " 3 " carries out decile and is speculated as every 1 share SHR:SHR=125/3 ≈ 42/day.Prediction section 612 is next by the
The overall meansigma methods " 108/day " of usage frequency in 1-6 business day is estimated as the usage frequency of the machine DV0, chases after this value
Add share SHR=42 and open/sky, obtain the usage frequency " 108+42=150 opens/sky " after adding relative to the use before adding
The ratio of frequency " 108/day ".Prediction section 612 so with this than the lower limit RMA=100%-97%=with residual quantity of toners
3% amass more new lower bound RMA:RMA=(100%-97%) × (150/108) ≈ 4%.Prediction section 612 is with from toner
Lower limit RMA=4% after removing this renewal in heap(ed) capacity " 100% " and the value " 96% " that obtains updates threshold value.
Now, consumption of toner " 96% " altogether has reached the threshold value " 96% " after updating, so monitoring unit 611
This meaning being notified to request unit 613, according to this notice, augmentation requests RQS of toner is sent to management dress by request unit 613
Put 123.
[supplementing the flow process of the correction process of the prediction in period]
-process of managing device-
Figure 17 is that managing device 123 is obtained the number of units of the equipment that can work and usage frequency and notified to each equipment 113
The flow chart processed.The process of the managing device 120 of the embodiment 2 that this process represents with Figure 13 is compared, and is only replacing step
S133, S136 and different on this point of including step S173, S176, other steps are same.The step identical to these, attached
Add the symbol " S131, S132 ... " identical with Figure 13.
In step S131, notification unit 312 confirms whether the period of reply device cluster 113 announcement information NTC arrives, such as
1 day whether is have passed through from the notice of last time.If this period arrives, then process and enter into step S176, if do not arrived, then
Process enters into step S132.
In step S132, it is not already answering the period of announcement information NTC, so monitoring unit 311 confirms what reply can work
The time whether arrive the period that equipment carries out counting, such as carried out counting from last time lights whether have passed through 1 hour.If should
Period arrives, then processing and enter into step S173, if do not arrived, then repeating process from step S131.
In step S173, owing to being the equipment that can work of reply period of carrying out counting, so monitoring unit 311 carries out pin
Supervision to device cluster 113, according to its monitoring result, counts number of units NDV of the equipment that can work, the process of accumulative sheet
Number NSH.Details about this step S173 is described below.Afterwards, process enters into step S134.
In step S134, monitoring unit 311 confirms that whether number of units NDV obtained in step S173 is more than register information
351 number of units NPR included.If the former NDV is more than the latter NPR, then processes and enter into step S135, then the former NDV is not more than
The latter NPR, then repeat process from step S131.
In step S135, number of units NPR that number of units NDV obtained in step S173 includes more than register information 351, institute
The latter NPR is updated with the former NDV with monitoring unit 311.Afterwards, from step S131, process is repeated.
In step S176, owing to being the period answering announcement information NTC, so notification unit 312 is read from register information 351
Go out number of units NPR of the equipment that can work and process the aggregate-value FRA of number NSH, embedding them into information NTC and notify to setting
Standby group 113.Due to repeated execution of steps S134, S135 after the notice in the last time of information NTC, thus this number of units NPR is equal to
Maximum in number of units NDV of the equipment worked obtained in step S173 after the notice of last time.Open it addition, process
The aggregate-value FRA of number NSH is the total at number with post processing of the notice of last time, so equal to this announcement period, such as
The process number on each business day, i.e. usage frequency.Afterwards, process enters into step S137.
In step S137, number of units NPR of the equipment worked that register information is included by monitoring unit 311 is initialized as
“0”.Afterwards, process enters into step S138.
In step S138, monitoring unit 311 is confirmed whether that the supervision that should terminate device cluster 113 processes.If should terminate, then
Process terminates, and otherwise repeats process from step S131.
Figure 18 be Figure 17 represent step S173, i.e. according to obtaining setting of can working for the monitoring result of device cluster 113
The flow chart of the subroutine of the aggregate-value FRA of standby number of units NDV and process number NSH.The embodiment party that this process and Figure 14 represent
The process of the managing device of formula 2 is compared, and only includes on this point of step S180 different after step S146, and other steps are same
Sample.With Figure 14 identical symbol " S141, S142 ... " additional to these identical steps.
In step s 141, monitoring unit 311 reads the register information 351 relevant with device cluster 113 from storage part 350
The IP address of equipment, for these IP addresses, is sent to network I/F370 by polling signal POL successively.Monitoring unit 311 and then warp
By network I/F370, accept the loopback RPT from device cluster 113 for this polling signal POL.Afterwards, process enters into step
Rapid S142.
In step S142, number of units NDV of the equipment that can work is initialized as " 0 " by monitoring unit 311.Afterwards, process into
Enter to step S143.
In step S143, monitoring unit 311, from for selecting 1 the loopback RPT of polling signal POL and resolving, confirms
Whether the duty as the equipment in its loopback source meets whether the condition (A) of " can work ", the i.e. power supply of this equipment are connected.
Step S144 is entered into if it is switched on, then process, if off, then process and enter into step S147.
In step S144, monitoring unit 311 confirms whether the duty of the equipment as loopback source meets " can work "
Condition (B), i.e. this equipment whether at least 1 paper feeding cassette, maintain the sheet that can process.If kept, then process enters
To step S145, if do not kept, then process and enter into step S147.
In step S145, monitoring unit 311 confirms whether the duty of the equipment as loopback source meets " can work "
Condition (C), i.e. this equipment be not the most the error conditions such as paperboard.If not error condition, then process and enter into step
S146, if error condition, then processes and enters into step S147.
In step S146, as loopback source equipment duty meet " can work " full terms (A)-
(C), so monitoring unit 311 makes number of units NDV increase " 1 ".Afterwards, process enters into step S180.
In step S180, monitoring unit 311 reads the poll in last time from the loopback RPT that have selected step S143
The number NSH of the sheet with post processing, is added to this number NSH in storage part 350 as a project of register information 351
The aggregate-value FRA preserved.Afterwards, process enters into step S147.
In step S147, monitoring unit 311 confirms in for the loopback RPT of polling signal POL the most untreated
Loopback, the most whether confirm to work for all devices.Without untreated loopback, then process terminates, if
Have, then from step S143, repeat process.
-process of equipment-
Figure 19 is that control portion 60 according to number of units NPR of the equipment worked being notified of from managing device 123 and uses frequency
The degree FRA adjusting pin flow chart to the process of the threshold value of the consumption of toner.It is notified of from managing device 123 in control portion 60
This process is started during information NTC.
In step S191, it was predicted that portion 612 reads number of units NPR of equipment that can work from this information NTC, obtain relative to
From the ratio of the number of units that information NTC of last time has read.Afterwards, process enters into step S192.
In step S192, it was predicted that portion 612 confirm the number of units of equipment that can work than be whether " 1 " below.If " 1 "
Hereinafter, then process and enter into step S196, if greater than " 1 ", then process and enter into step S193.
In step S193, the number of units of the equipment that can work is than more than " 1 ", so this number of units increases.Prediction section 612 is with being somebody's turn to do
Number of units carrys out more new lower bound RMA than the business with the lower limit RMA of residual quantity of toners, with the lower limit RMA after updating and toner
The difference of Large Copacity updates the threshold value of the consumption for toner: threshold value=heap(ed) capacity-RMA.Afterwards, process enters into
Step S194.
In step S194, it was predicted that portion 612 confirms that threshold value limits the most thereon, such as " 98% " below.If threshold value is
Below the upper limit, then process and enter into step S198, if it exceeds the upper limit, then process and enter into step S195.
In step S195, threshold value exceedes the upper limit, so threshold restriction is the upper limit, such as " 98% " by prediction section 612.It
After, process and enter into step S198.
In step S196, the number of units ratio of the equipment owing to working be " 1 " below, so prediction section 612 confirms that it is
No equal to " 1 ".If equal to " 1 ", then process terminates, and if less than " 1 ", then processes and enters into step S197.
In step S197, the number of units ratio of the equipment owing to working is less than " 1 ", so this number of units reduces.I.e., newly occur
The equipment that cannot work.Therefore, it was predicted that the usage frequency of this equipment that cannot work at equivalent ratios, is distributed by portion 612
Give the equipment that can work, according to the change of the usage frequency of the machine before and after distribution, corrected threshold.Detailed about this step S197
Details condition is described below.Afterwards, process enters into step S198.
In step S198, monitoring unit 611 confirms that supplementing, from last time, the toner altogether that time of toner lights disappears
Whether consumption is less than threshold value.If less than threshold value, then process terminates, if reaching more than threshold value, then processes and enters into step
S199。
In step S199, consumption of toner altogether reaches more than threshold value, so this meaning is notified by monitoring unit 611
To request unit 613, according to this notice, augmentation requests RQS of toner is sent to managing device 120 by request unit 613.Afterwards,
Process terminates.
Figure 20 be Figure 19 represent step S197, i.e. according to the sub-example of the usage frequency corrected threshold of equipment that cannot work
The flow chart of journey.
In step s 201, it was predicted that the usage frequency that portion 612 includes with reference to information NTC being notified of from managing device 123
FRA, includes in the equipment of usage frequency FRA from information NTC being notified of in last time, and search is in this information being notified of
NTC does not includes the equipment of usage frequency FRA and is defined as the equipment that cannot work.Afterwards, process enters into step S202.
In step S202, it was predicted that portion 612, for the equipment that cannot work determined in step s 201, calculates from upper
The usage frequency FRA that the time point in the secondary supplementary period doping toner is notified of to current point in time from managing device 123
Overall meansigma methods FAV.Afterwards, process enters into step S203.
In step S203, in prediction section 612, as the usage frequency MFR of the machine, estimation doped toning in last time
The overall meansigma methods of the usage frequency FRA of the machine being notified of from managing device 123 after the time point in the supplementary period of agent.
Afterwards, process enters into step S204.
In step S204, it was predicted that portion 612 first by the average usage frequency FAV that obtains in step S202 by can work
The number of units NPR mean allocation of the equipment made, and it is speculated as these every 1 shares SHR.Next this shared by prediction section 612
Amount SHR is appended to the usage frequency MFR of the machine, obtains the usage frequency MFR+SHR after adding relative to the machine before adding
The ratio of usage frequency MFR, with this than with the lower limit RMA of residual quantity of toners amass more new lower bound RMA:RMA=RMA × (MFR
+SHR)/MFR.The prediction section 612 and then difference of the lower limit RMA after this renewal and the heap(ed) capacity of toner is set as tune
The threshold value of the consumption of toner: threshold value=heap(ed) capacity-RMA.Afterwards, process and return to the flow process that Figure 19 represents, enter into step
Rapid S198.
[advantage of embodiment 3]
The consumable item management system 300 of embodiments of the present invention 3 in the same manner as the system 100 of embodiment 1, each equipment
113 consumptions monitoring the toner in the machine, according to the history of this consumption, set the lower limit RMA of residual quantity of toners, will
The time point of the threshold value of consumption altogether has reached fewer than the heap(ed) capacity of toner this lower limit RMA is predicted as the benefit of toner
Fill period.In this system 300, and then managing device 123 would indicate that information NTC of number of units of the equipment that can work is led to termly
Know to each equipment 113, whenever carrying out this notice, number of units that each equipment 113 represents according to this information NTC and the information of last time
The ratio of the number of units that NTC represents, corrected threshold.So, according to the variation of the number of units of the equipment that can work, correction supplements the pre-of period
Measured value, so how the number of units of the equipment being connected to network N TW changes, no matter how their duty changes,
The supplementary period of toner can be predicted exactly for each equipment 113.
In embodiments of the present invention 3, different from embodiment 1, in the case of the equipment that can work decreases, respectively
The prediction section 612 of equipment 113 first according to from information NTC that managing device 123 is notified of with or without usage frequency, determine nothing
The equipment of method work.This nothing that next prediction section 612 will be notified of until current point in time after the prediction of last time
The meansigma methods of the usage frequency of the equipment of method work is by the number of units mean allocation of the equipment that can work, thus it is speculated that for these every 1 point
Load amount.Prediction section 612 next this share is appended to the machine usage frequency and obtain the usage frequency before and after adding it
Ratio, with this than with the lower limit RMA of residual quantity of toners amass more new lower bound RMA.Thus, with the appearance of the equipment that cannot work
The increase of the usage frequency of other equipment worked together is reflected to the correction of the predictive value in period of supplementing, it is possible to
Improve the precision of its prediction further.
[variation of embodiment 3]
(A) in managing device 123, monitoring unit 311, whenever poll, makes each equipment 113 by after the poll of last time
The number of the sheet processed notifies as a project of information RPT relevant with duty.It addition, in managing device
123 it is printing server etc., grasped in the case of PC group 140 is to the content of the task that device cluster 113 is asked, it is possible to
With the content according to these tasks, process number for each equipment is accumulative.In this case, it is possible to so that in device cluster 113
Not as management object equipment the process number of the machine is notified termly to managing device 123.
(B) in managing device 123, monitoring unit 311 notifies the process of sheet whenever poll to each equipment of device cluster 113
Number, notification unit 312 adding up according to this process number, according to the process number of each announcement period about number of units, evaluate
The usage frequency of equipment.Alternatively, it is also possible to be monitoring unit 311 toning from poll to each equipment 113 that notify each task whenever
The consumption (scope (coverage)) of agent, notification unit 312 carrys out the usage frequency of valuator device according to this scope.
(C) the identification information that the notification unit 312 of managing device 123 can also include for the register information 351 that Fig. 4 represents
Project in addition, each kind of i.e. can processing of task or each attribute of sheet, obtain the number of units of the equipment that can work
And usage frequency.Notification unit 312 both can be divided into the process under such as colour especially and use frequency is obtained in the process under monochrome
Degree, it is also possible to for printer, photocopier, each function of scanner, for each size of the sheets such as A3, A4, B4 or pin
Each paper type to common paper, art paper, good quality paper etc., obtains usage frequency.
Notification unit 312 notifies that to device cluster 113 so obtain represents that the kind by task or the attribute by sheet are distinguished
Number of units and information NTC of usage frequency.In this case, the number of units that each equipment 113 represents according to this information NTC and use frequency
The number of units of the type that the attribute of in degree, the kind of task that is that can process or sheet is identical with the machine and usage frequency, correction
The predictive value in the supplementary period of toner.Such as, color printer, for the toner of this 3 color of Y, M, C, is beaten according to colour
Print machine, color copy machine etc. can carry out the number of units of type processed and the frequency using them in the process under colour with colour
Degree, corrected threshold.On the other hand, for the toner of K color, no matter it is colored or monochromatic, according to all equipment worked
Number of units and they are in colored and monochromatic usage frequency under both, corrected threshold.
(D) notification unit 312 of managing device 123 both the number of units of the equipment that can work and usage frequency are embedded into right
In identical information NTC of device cluster 113 notice, so about any one in number of units and usage frequency, to device cluster 113
Cycle of notice the most equal.It addition, notification unit 312 can also be changed by the number of units of equipment and the usage frequency that can work
The cycle of notice.Preferably the announcement period of number of units is set as below the announcement period of usage frequency.
(E) in each equipment 113, in prediction section 612, as the usage frequency of the machine, estimation doped tune in last time
The overall meansigma methods of the usage frequency of the machine being notified of from managing device 123 after the time point in the supplementary period of toner.
It addition, prediction section 612 can also be after the prediction of last time, the number of the sheet that accumulative the machine has processed, according to from managing device
Aggregate-value under 123 time points being notified of information NTC and the cycle of prediction, the usage frequency of estimation the machine.
" embodiment 4 "
The consumable item management system of embodiments of the present invention 4 is in the same manner as the system 100 of embodiment 1, to device cluster
Including each image processing system consumption toner matched with period supplement assist.This system also with embodiment party
Similarly, the supervision project in the duty about device cluster includes the usage frequency monitoring object to the system 300 of formula 3,
In addition to the number of units of other equipment, their usage frequency is also utilized in the correction of the predictive value in the supplementary period of toner.
But, not in equal ratio with the ratio of the increment of usage frequency distribute the usage frequency of the equipment that cannot work to
On this point of the equipment that can work, the system of embodiment 4 is the most different from the system 100,300 of embodiment 1,3.
Hereinafter, about the system of embodiment 4, the different part of system 100,300 from embodiment 1,3 is described.Close
Part common in the system 300 at the system of embodiment 4 and the system 100 of embodiment 1 or embodiment 3, helps
Draw about embodiment 1 or the explanation of embodiment 3.
[function of consumable item management system]
Managing device except the accepting of augmentation requests of the function as embodiment 1, i.e. (1) toner, (2) about
Beyond the accepting of the registration request add/removed of equipment, also there is the function as the system of embodiment 3, i.e. (2A)
The number of units of the equipment that the supervision of the duty of device cluster, (3A) can work and usage frequency regularly notify such merit
Energy.
Each equipment is except the function as embodiment 1, the i.e. supervision of (4) consumption of toner, the benefit of (5) toner
Fill the prediction in period and beyond the transmission of augmentation requests that (6) supplement from toner to managing device, also there is following function.
(7B) according to from the notice of managing device, the number of units of the equipment worked represented according to this notice and usage frequency, correction
The predictive value in the period of supplementing.Particularly, in the case of the number of units at the equipment that can work decreases, it was predicted that portion is to setting after reducing
Standby and the machine " in the ratio of the increment of usage frequency " distribution is only the usage frequency of the equipment that can work before minimizing, according to dividing
The change of the usage frequency of the machine before and after joining, corrected threshold.
-correction of the prediction in supplementary period-
Figure 21 is that the prediction section 612 that specific equipment DV0 is described is come according to number of units and the usage frequency of the equipment that can work
The schematic diagram of the process of the predictive value in the supplementary period of correction toner.With reference to Figure 21, for each business day, display is from management
The number of units of the equipment worked that information NTC that device 124 is notified of represents, the use frequency of each equipment DV0, DV1, DV2, DV3
The time spending, supplementing from last time toner lights toner amount altogether and this equipment DV0 that specific equipment DV0 consumes
The threshold value of the consumption for toner that sets of prediction section 612.
Until the 1-5 business day, the number of units of the equipment that information NTC being notified of from managing device 124 represents remains
Steady state value " 4 ", so number of units ratio is maintained " 1 ".Therefore, it was predicted that threshold value is maintained the setting value " 97% " of last time by portion 612,
Until 1-4 business day.It addition, prediction section 612 reads the usage frequency of each equipment from information NTC and stores.
5th business day is the period of new prediction, so prediction section 612 revaluation threshold value.I.e., it was predicted that institute of portion 612 such as Fig. 8
Show, the consumption of the toner from the 1-5 business day selects maximum " 0.44%/sky ", and the tune being considered as in this week
The consumption rate of toner, at the date of delivery " 6 days " that it is multiplied by toner, updates under residual quantity of toners by thus obtained value
Limit RMA:RMA=0.44%/sky × 6 day ≈ 3%.Prediction section 612 and then remove this from the heap(ed) capacity " 100% " of toner
Lower limit RMA=3%, is set as threshold value by thus obtained value " 97% ".
Monitoring unit 611 confirms that whether consumption of toner altogether is less than the threshold value " 97% " so set.Such as Figure 21
Shown in, in the 5th business day, consumption of toner altogether is less than threshold value " 97% ".
In the 6th business day, the number of units of the equipment that information NTC being notified of from managing device 124 represents also remains perseverance
Definite value " 4 ", so number of units ratio is maintained " 1 ".Therefore, it was predicted that threshold value is maintained the setting value " 97% " of last time by portion 612.With
This correspondingly, monitoring unit 611 confirms that consumption of toner altogether is less than this threshold value " 97% ".It addition, prediction section 612 is from information
NTC reads the usage frequency of each equipment and stores.
The number of units " 3 " of equipment is represented from information NTC that managing device 124 is notified of on the 7th business day, so number of units ratio
" 3/4 " is less than " 1 ".Correspondingly, it was predicted that portion 612 judges whether to answer corrected threshold.
Specifically, it was predicted that the portion 612 first usage frequency of the equipment that reference can work from information NTC, from the 6th battalion
Information NTC that industry day is notified of includes in the equipment DV0-DV3 of usage frequency, and search is in this information NTC being notified of
Including the equipment DV1 of usage frequency and be considered as working.Next prediction section 612 calculates the equipment DV1's that cannot work
The meansigma methods " 125/day " that usage frequency in 1-6 business day is overall.
Prediction section 612, for other equipment DV2, DV3, the DV0 that can work, calculates in 1-6 business day similarly
Overall meansigma methods FAV of usage frequency.In fig. 20, in 1-6 business day of each equipment DV2, DV3, the DV0 that can work
Average usage frequency FAV be " 17/day ", " 93/day ", " 108/day ".
Afterwards, it was predicted that portion 612 waits from notified ensuing information NTC of managing device 124.Thus, threshold value is maintained
For the setting value " 97% " of last time, so monitoring unit 611 confirms that consumption of toner altogether is less than this threshold value " 97% ".
In the 8th business day, it was predicted that portion 612 first confirms that what information NTC being newly notified of from managing device 124 represented sets
Standby number of units is still the value " 3 " of the day before yesterday.Prediction section 612 each equipment DV2 that next reading can work from this information NTC,
The usage frequency FRA of DV3, DV0, obtains the increment INC=relative to the average usage frequency FAV in 1-6 business day
FRA-FAV.In fig. 20, equipment DV2, DV3, DV0 of working that information NTC being notified of on the 8th business day represents makes
" 60/day ", " 90/day ", " 150/day " with frequency FRA, thus the increment INC of usage frequency according to equipment DV2,
The order of DV3, DV0 is "+43/days ", "-3/days ", "+42/days " successively.
Prediction section 612, from these increments INC, extracts more than lower limit, the increment INC of such as more than+10/days out.If
Representing that the equipment of increment INC extracted out does not includes the machine, then prediction section 612 not corrected threshold and be maintained original
Value, if included, then corrected threshold.In fig. 20, the increment INC of the usage frequency of equipment DV2, DV0 be "+10/days " with
On, so prediction section 612 corrected threshold of these equipment.
In equipment DV0, it was predicted that portion 612 carries out the correction of threshold value as described below.Prediction section 612 is first at lower limit "+10
/ sky " more than usage frequency increment INC between obtain ratio.In fig. 20, other equipment DV2 that can work and the machine DV0
Between the ratio of increment INC be " 43:42 ".Prediction section 612 is next for these equipment DV2, DV0, by the ratio of increment INC
The average usage frequency " 125/day " of the equipment DV1 that " 43:42 " distribution cannot work.That is, by following formula, the machine is calculated
Share SHR:SHR=125 × 42/ (43+42) ≈ 62/day of DV0.Prediction section 612 next by this share " 62/
My god " it is appended to the usage frequency " 108/day " of the machine DV0, obtain usage frequency " 108+62=170 opens/sky " phase after adding
For the ratio of usage frequency " 108/day " before adding, with this than the lower limit RMA=100%-97% with residual quantity of toners
=3% amass more new lower bound RMA:RMA=(100%-97%) × (170/108) ≈ 5%.Prediction section 612 and then from toning
The heap(ed) capacity " 100% " of agent removes the lower limit RMA=5% after this renewal, updates threshold by thus obtained value " 95% "
Value.
Now, consumption of toner " 97% " altogether has reached the threshold value " 95% " after updating, so monitoring unit 611
This meaning being notified to request unit 613, according to this notice, augmentation requests RQS of toner is sent to management dress by request unit 613
Put 124.
[supplementing the flow process of the correction process of the prediction in period]
-process of equipment-
Figure 22 is control portion 60 according to the number of units of the equipment worked being notified of from managing device 124 and usage frequency
FRA carrys out the adjusting pin flow chart to the process of the threshold value of the consumption of toner.The embodiment 3 that this process and Figure 19 represent
The process of managing device 123 is compared, only replace step S193-S195 and include step S223 and replace step S197 and
Including different on this point of step S227, other steps are same.With Figure 19 identical symbol additional to these identical steps
Number " S191, S192 ... ".
In step S191, it was predicted that portion 612 reads the number of units of the equipment that can work from this information NTC, obtain relative to
From the ratio of the number of units that information NTC of last time has read.Afterwards, process enters into step S192.
In step S192, it was predicted that portion 612 confirm the number of units of equipment that can work than be whether " 1 " below.If " 1 "
Hereinafter, then process and enter into step S196, if greater than " 1 ", then process and enter into step S223.
In step S223, the number of units of the equipment that can work is than more than " 1 ", so this number of units increases.That is, having added can work
The new equipment made.According to the decrement with its usage frequency together, it was predicted that portion 612 corrected threshold.About this step S223
Details described below.Afterwards, process enters into step S198.
In step S196, the number of units ratio of the equipment owing to working be " 1 " below, so prediction section 612 confirms that it is
No equal to " 1 ".If equal to " 1 ", then process terminates, and if less than " 1 ", then processes and enters into step S227.
In step S227, the number of units ratio of the equipment owing to working is less than " 1 ", so this number of units reduces.I.e., newly occur
The equipment that cannot work.Therefore, it was predicted that portion 612 is according to the usage frequency of this equipment that cannot work, corrected threshold.About this
The details of step S227 is described below.Afterwards, process enters into step S198.
In step S198, monitoring unit 611 confirms that supplementing, from last time, the toner altogether that time of toner lights disappears
Whether consumption is less than threshold value.If less than threshold value, then process terminates, if reaching more than threshold value, then processes and enters into step
S199。
In step S199, consumption of toner altogether reaches more than threshold value, so this meaning is notified by monitoring unit 611
To request unit 613, according to this notice, augmentation requests RQS of toner is sent to managing device 120 by request unit 613.Afterwards,
Process terminates.
Figure 23 be Figure 22 represent step S223, i.e. according to the new equipment that can work add usage frequency together
Decrement carry out the flow chart of subroutine of corrected threshold.
In step S231, it was predicted that the usage frequency that portion 612 includes with reference to information NTC being notified of from managing device 123
FRA, search for information NTC being notified of last time do not include usage frequency FRA, in this information NTC being notified of first
Including the equipment of usage frequency FRA, it is defined as new equipment.Afterwards, process enters into step S232.
In step S232, it was predicted that portion 612 is for working beyond the new equipment determined in step S231
Each equipment, calculating doped the time point in the supplementary period of toner and leads to from managing device 123 to current point in time from last time
Overall meansigma methods FAV of the usage frequency FRA of cicada.Afterwards, process enters into step S233.
In step S233, it was predicted that portion 612 is confirmed whether to receive ensuing information NTC from managing device 124.If
Receive ensuing information NTC, then processing and enter into step S234, if do not received, then processing repeated execution of steps
S233。
In step S234, receive ensuing information NTC from managing device 124, so prediction section 612 is from this information
NTC reads the number of units of equipment that can work, obtains the ratio of number of units with last time.And then, it was predicted that portion 612 confirms that this number of units ratio is
No equal to " 1 ".If equal to " 1 ", then process and enter into step S235, if not " 1 ", then process and return to what Figure 22 represented
Flow process, repeats from step S192.
In step S235, it was predicted that first portion 612 is reading the machine from information NTC that managing device 124 receives
Usage frequency MFR, calculates decrement DEC of meansigma methods FAV of the usage frequency relative to the machine obtained in step S232
=FAV-MFR.Afterwards, process enters into step S236.
In step S236, it was predicted that portion 612 confirms decrement DEC of the usage frequency of the machine obtained in step S232
Whether it is more than lower limit, such as 20/day.This lower limit is set to such as produce toner with the minimizing of usage frequency
Its decrement during the probability that supplementary period delays 1 day.If decrement DEC is more than lower limit, then processes and enter into step
S237, if less than lower limit, then processes the flow process returning to Figure 22, enters into step S198.
In step S237, decrement DEC of the usage frequency of the machine is more than lower limit, so there is supplementing of toner
The probability delayed period more than 1 day.Therefore, it was predicted that portion 612 obtains the minimizing relative to the machine of the usage frequency MFR after minimizing
Before the ratio of meansigma methods FAV i.e. obtained in step S232 of usage frequency, with this than with the lower limit RMA of residual quantity of toners it
Amass more new lower bound RMA:RMA=RMA × MFR/FAV.Prediction section 612 and then by the lower limit RMA after this renewal and toner
The difference of heap(ed) capacity is set as the threshold value of the consumption for toner: threshold value=heap(ed) capacity-RMA.Afterwards, return is processed
The flow process represented to Figure 22, enters into step S198.
Figure 24 is step S227 that Figure 22 represents, the son i.e. carrying out corrected threshold according to the usage frequency of the equipment that cannot work
The flow chart of routine.
In step S241, it was predicted that the usage frequency that portion 612 includes with reference to information NTC being notified of from managing device 124
FRA, includes in the equipment of usage frequency FRA from information NTC being notified of in last time, and search is in this information being notified of
NTC does not includes the equipment of usage frequency FRA, is defined as the equipment that cannot work.Afterwards, process enters into step S242.
In step S242, it was predicted that portion 612 is for each equipment, and calculating doped the supplementary period of toner from last time
Overall meansigma methods FAV of the usage frequency FRA that time point is notified of to current point in time from managing device 123.Afterwards, process
Enter into step S243.
In step S243, it was predicted that portion 612 is confirmed whether to receive ensuing information NTC from managing device 124.If
Receive ensuing information NTC, then processing and enter into step S244, if do not received, then processing repeated execution of steps
S243。
In step S244, receive ensuing information NTC from managing device 124, so prediction section 612 is from this information
NTC reads the number of units of equipment that can work, and obtains the ratio of number of units with last time.And then, it was predicted that whether portion 612 confirms this number of units ratio
Equal to " 1 ".If equal to " 1 ", then process and enter into step S245, if not " 1 ", then process and return to the stream that Figure 22 represents
Journey, enters into step S198.
In step S245, it was predicted that first portion 612 is reading from information NTC that managing device 124 receives and can work
The usage frequency FRA of equipment, calculate the increment INC of meansigma methods FAV compared to the usage frequency obtained in step S242
=FRA-FAV.Afterwards, process enters into step S246.
In step S246, from the equipment that can work, extract out the increment INC that obtains in step S245 be lower limit with
Upper, the equipment of such as more than+10/days.Afterwards, process enters into step S247.
In step S247, it was predicted that portion 612 confirms whether extracted the machine out in step S246.If having extracted the machine out,
Then process and enter into step S248, if do not extracted out, then process the flow process returning to Figure 22, enter into step S198.
In step S248, step S246 has been extracted the machine out, thus with the equipment that can work reduce basis together
The increment INC of the usage frequency of machine is more than lower limit.Therefore, it was predicted that portion 612 is for the equipment that can work, by the increasing of usage frequency
The ratio of amount INC, the usage frequency of the equipment that distribution cannot work, according to the change of the usage frequency of the machine before and after distribution,
Corrected threshold.
Specifically, it was predicted that first portion 612 obtains the increment INC of the machine can work relative to extracted out in step S246
The ratio of the summation of the increment INC of the usage frequency that the equipment made is overall, is multiplied by the usage frequency of the equipment that cannot work to this ratio,
Thus obtained value is set as share SHR of the machine.Next this share SHR is appended to the machine by prediction section 612
Usage frequency MFR, obtains the usage frequency MFR+SHR after adding relative to the ratio of usage frequency MFR before adding, with this than with
The lower limit RMA of residual quantity of toners amasss more new lower bound RMA:RMA=RMA × (MFR+SHR)/MFR.Prediction section 612 and then
The difference of the lower limit RMA after this renewal and the heap(ed) capacity of toner is set as the threshold value of the consumption for toner: threshold value
=heap(ed) capacity-RMA.Afterwards, process and return to the flow process that Figure 22 represents, enter into step S198.
[advantage of embodiment 4]
The consumable item management system of embodiments of the present invention 4 is as the consumable item management system 100 of embodiment 1
Ground, each equipment 114 monitors the consumption of the toner in the machine, according to the history of this consumption, sets residual quantity of toners
The time point of the threshold value of lower limit RMA, consumption altogether has been reached fewer than the heap(ed) capacity of toner this lower limit RMA is predicted as
The supplementary period of toner.Within the system, and then managing device 124 would indicate that information NTC of number of units of the equipment that can work
Notify termly to each equipment 114.Whenever carrying out this notice, number of units that each equipment 114 represents according to this information NTC and last time
The comparison of number of units that represents of information NTC, corrected threshold.So, according to the variation of the number of units of the equipment that can work, correction supplements
The predictive value in period, so how the number of units of the equipment being connected to network N TW changes, can for each equipment 114,
Predict the supplementary period of toner exactly.
In embodiments of the present invention 4, different from embodiment 1, in the case of the equipment that can work decreases, respectively
The prediction section 612 of equipment 114 first according to from information NTC that managing device 124 is notified of with or without usage frequency, determine nothing
The equipment of method work.Prediction section 612, next for each equipment, is obtained after the prediction of last time until the equipment that can work
Overall meansigma methods FAV of usage frequency that is notified of of the time point that decreases of number of units.Prediction section 612 is next for cannot
The equipment worked beyond the equipment of work, obtains the increment INC of usage frequency before and after the minimizing of number of units, sets for these
Standby, in the ratio of increment INC, the meansigma methods of the usage frequency of the equipment that distribution cannot work, speculate the share of the machine
SHR.Prediction section 612 so this share SHR is appended to meansigma methods FAV of usage frequency of the machine and before and after obtaining and adding
The ratio of usage frequency, with this than with the lower limit RMA of residual quantity of toners amass more new lower bound RMA.Thus, this system can make
The each equipment that can work is according to the increment with reality usage frequency together occur of the equipment that cannot work, when correction supplements
The predictive value of phase, it is possible to improve the precision of its prediction further.
[variation of embodiment 4]
(A) number of units and the usage frequency of the equipment that can work are led to by the notification unit 31 of managing device 124 with the identical cycle 2
Know to device cluster 114.It addition, the announcement period that notification unit 312 can also make usage frequency is longer than the announcement period of number of units.Example
As, in the case of notifying number of units for each business day, it is also possible to notified usage frequency for every 1 week.In this case,
Preferably after the time point that number of units has changed, notification unit 312, with the cycle identical with number of units, notifies usage frequency.
" embodiment 5 "
The consumable item management system of embodiments of the present invention 5 is as the consumable item management system 100 of embodiment 1
Ground, supplement matched with period of the toner of each image processing system consumption including device cluster 110 assists.But
It is to be carried a managing device 120 key element institute as consumable item management system replacing managing device 120 by specific PC
On this point of the function possessed, the system of embodiment 5 is different from the system 100 of embodiment 1.
Hereinafter, about the system of embodiment 5, the part different from the system 100 of embodiment 1 is described.About in reality
Execute the part that the system of mode 5 is common with in the system 100 of embodiment 1, quote the explanation about embodiment 1.
[hardware configuration of PC]
Figure 25 is the block diagram of the hardware configuration illustrating specific PC145.In the PC group 140 that Fig. 1 represents, including at least one
This PC145 of platform.CPU510, RAM520, ROM530, storage part 550, network I/F570 and use is included with reference to Figure 25, this PC145
Family I/F580.These key elements 510-580 can connect via bus 590 with being in communication with each other.
CPU510, RAM520 and ROM550 are the circuit of assembling on 1 substrate that the inside of PC145 is arranged.
CPU510, according to firmware, controls other key elements 520-570 being connected to bus 580.RAM520 provides CPU510 to CPU510
Perform operating area during firmware.ROM550 includes semiconductor memory system and the EEPROM etc. rewritable half that can not write
Conductor memory device.The former stores firmware, and the latter provides the preservation region of environmental variable etc. to CPU510.
Storage part 550 is non-volatile mass storage device built-in in PC145, is such as HDD or SSD.
In this storage part 550, preserve the device driver for each equipment 110 especially.
Network I/F570 is connected by wired or wireless mode with network N TW, via this network N TW, with device cluster
110, PC group 140 and maintenance device 150 communicate.Network I/F570 receives the benefit of toner especially from device cluster 110
Fill request RQS and notify to CPU511, receiving and add/the removing relevant registration request RST and notify of equipment from PC group 140
To CPU511, send augmentation requests RQS of toner to maintenance device 150.
User I/F580 to mouse, keyboard, display etc. between input/output unit and bus 590 data exchange carry out
Relaying.Via this user I/F580, the operation of CPU510 accepted user, and to user's information in picture shows etc..
[as the function of PC of a key element of consumable item management system]
The set information (characteristic) 551 of the corresponding equipment that the device driver that storage part 550 preserves includes can act as
The register information of this equipment.It practice, device driver 551 includes the project of register information that Fig. 4 represents, i.e. implementor name, IP
Disposal ability under the identification information of the equipment such as address, colour, printer, photocopier, each function etc. of scanner can process
The kind of task and the attribute of sheet that can process such as size, paper type.It addition, for the device driver of PC145
Installation/unloading can be considered as the connection/disconnection of network N TW relative to corresponding equipment.
And then with reference to Figure 25, CPU510 according to firmware, as 3 kinds of function parts i.e. monitoring unit 511, notification unit 512 and step on
Note portion 513 and carry out action.These function parts realize the expendable management system possessed as the managing device 120 of embodiment 1
The the accepting of augmentation requests of 3 kinds of functions of one key element of system, i.e. (1) toner, (2) about equipment add/remove step on
The the accepting of note request, the regularly notice of the number of units of (3) equipment.
Monitoring unit 511, according to the device driver being mounted with in the machine, makes network I/F570 detect from device cluster 110
In augmentation requests RQS of the equipment corresponding with this device driver.Notification unit 512 is termly (such as each business
Day), the device driver being mounted with in the machine is counted, obtains the available equipment of the machine in device cluster 110
Number of units.Notification unit 512 and then generation represent information NTC of this number of units, this information NTC are notified to respectively setting via network I/F570
Standby 110.It addition, notification unit 512 is when network I/F570 detects augmentation requests RQS from device cluster 110, by this request
RQS sends Cloud Server 130 to via network I/F570.Register 513 accepts network N TW from user via user I/F580
The request of the installation/unloading add/removing corresponding device driver together with equipment, perform this installation/unloading.By
This, in the case of installing, the characteristic 551 of corresponding equipment by afterthought to storage part 550, under unloaded conditions, in correspondence
Equipment characteristic 551 in add write " equipment not may utilize " meaning or from storage part 550 delete include this characteristic 551
The entirety of device driver.
[supplementing the correction of the prediction in period]
When the number of units of the equipment of constitution equipment group 110 varies by, the system of embodiment 5 makes each equipment as described below
The prediction in the supplementary period of correction toner.
Figure 26 is to be shown in be when PC145 has unloaded the device driver of correspondence with removing equipment from network N TW
The schematic diagram of the data exchange that system 500 is carried out.With reference to Figure 26, in the situation of 1 DV1 removed from network N TW in device cluster 110
Under, user is to the terminal 145,146 utilizing this equipment DV1 in PC group 140, the unloading of the device driver that request is corresponding.Respectively
The register 513 of terminal 145,146, according to this request, unloads the device driver of this equipment DV1, is rewritten as in storage part 550
The characteristic of this equipment DV1 of registration.In the case of adding new 1 in device cluster 110, according to corresponding device driver
The request installed, installs the device driver of this equipment DV1, the characteristic of this equipment DV1 is registered in storage part 550.
In each terminal 145,146 of PC group 140, notification unit 512 is termly from the device drives being mounted with the machine
The identification information of device retrieval facility, such as implementor name or IP address, using them as the identification of the available equipment of the machine
Information NTC that information represents notifies to each equipment 110.The cycle of this notice is set to the prediction in the supplementary period of toner
Cycle, such as 1 week=5 business day value below, such as 1 business day.
Whenever this information NTC notified, in each equipment 110, it was predicted that first portion 612 reads from each information NTC and set
Standby identification information, adds up to the number of units of equipment according to them.Now, common between different PC equipment is counted as 1
Platform.Thus, this aggregate value represents equipment total of the number of units of the available equipment of entirety of PC group 140, i.e. constitution equipment group 110
Number.Next prediction section 612 obtains the ratio of this aggregate value and the aggregate value obtained according to information NTC of last time.If this ratio is not
It it is " 1 ", then it represents that the variation of the number of units of equipment.Therefore, it was predicted that portion 612 is according to this ratio, in the same manner as embodiment 1, correction is adjusted
The predictive value in the supplementary period of toner, i.e. for the threshold value of consumption of toner.
Particularly, the cycle of the number of units of notice equipment is set to predict the cycle in the supplementary period of toner below, institute
Even if being increased dramatically with the amount of the task that the equipment of its periphery should process with removing of 1 equipment DV1, it is also possible in time
Make each equipment shift to an earlier date the supplementary period of toner.
-flow process of the correction process of prediction-
Figure 27 is that the control portion 60 of each equipment 110 carrys out adjusting pin pair according to the number of units from PC145,146 equipment being notified of
The flow chart of the process of the threshold value of the consumption of toner.Control portion 60 from PC145,146 be notified of expression and available set
During standby information NTC, start this process.The process in the control portion 60 of the embodiment 1 that this process represents with Figure 12 is compared, and only exists
Replacing step S121 to include on this point of step S271, S272 different, other steps are same.The step identical to these
Suddenly, the additional symbol " S122, S123 ... " identical with Figure 12.
In step S271, it was predicted that portion 612 is the identification information of readout equipment from each information NTC, and from PC group's 140
The identification information of the equipment that same information NTC that other-end has accepted has read compares.Thus, constitution equipment is added up to
The number of units of the equipment of group 110.Afterwards, process enters into step S272.
In step S272, it was predicted that the ratio of the aggregate value of the aggregate value obtained in step S271 and last time is asked by portion 612
Go out the number of units ratio for equipment.Afterwards, process enters into step S122.
In step S122, it was predicted that portion 612 confirms that whether the number of units of equipment is than equal to " 1 ".If equal to " 1 ", then process
Terminate, if not " 1 ", then process and enter into step S123.
In step S123, the number of units ratio of equipment is not " 1 ", so number of units variation.Prediction section 612 with this number of units than with tune
The business of the lower limit RMA of toner surplus carrys out more new lower bound RMA, by the lower limit RMA after renewal and the difference of the heap(ed) capacity of toner
Update the threshold value of the consumption for toner: threshold value=heap(ed) capacity-RMA.Afterwards, process enters into step S124.
In step S124, it was predicted that portion 612 confirms whether threshold value is below its upper limit.If threshold value is below the upper limit, then
Process enters into step S126, if it exceeds the upper limit, then processes and enters into step S125.
In step s 125, threshold value exceedes the upper limit, so threshold restriction is the upper limit by prediction section 612.Afterwards, process enters
To step S126.
In step S126, monitoring unit 611 confirms that supplementing, from last time, the toner altogether that time of toner lights disappears
Whether consumption is less than threshold value.If less than threshold value, then process terminates, if reaching more than threshold value, then processes and enters into step
S127。
In step S127, consumption of toner altogether reaches more than threshold value, so this meaning is notified by monitoring unit 611
To request unit 613, according to this notice, augmentation requests RQS of toner is sent to specific PC145, makes by request unit 613
The notification unit 512 of PC145 is sent to Cloud Server 130.Afterwards, process terminates.
[advantage of embodiment 5]
The consumable item management system 500 of embodiments of the present invention 5 is same with the consumable item management system 100 of embodiment 1
Sample ground, each equipment 110 monitors the consumption of the toner in the machine, according to the history of this consumption, sets residual quantity of toners
The time point prediction of threshold value of lower limit RMA, consumption altogether has been reached fewer than the heap(ed) capacity of toner this lower limit RMA
Supplementary period for toner.On the other hand, within the system, different from the system 100 of embodiment 1, replace managing device
At least one 145,146 information NTC that would indicate that the available equipment of the machine in 120, PC groups 140 notifies termly to respectively setting
Standby 110.Each equipment 110, from the identification information of these information NTC readout equipments, adds up to the number of units of the equipment of constitution equipment group 110.
Each equipment 110 and then obtain the ratio of aggregate value of this aggregate value and last time, if this ratio is not " 1 ", then with this than with toner
The business of the lower limit RMA of surplus carrys out more new lower bound RMA.So, according to the variation of the number of units of equipment, correction supplements the prediction in period
Value, so how the number of units of the equipment being connected to network N TW changes, can predict for each equipment 110 exactly
The supplementary period of toner.
[variation of embodiment 5]
(A) notification unit 512 of PC145 is with the identical cycle, repeats the counting of device driver and to device cluster 110
Notice equipment number of units.It addition, notification unit 512 can also make the announcement period of the number of units of the counting period ratio equipment of device driver
Shorter.For example, it is also possible to 1 hour Di device driver is counted for every, for the number of units of every 1 world notice equipment.
In this case, notification unit 512 can also by the quantity of device driver that obtains after the notice in the number of units of last time
The big representative value such as value, meansigma methods is set as the number of units of the available equipment of the machine.
[supplementing]
For those skilled in the art, according to above record, it is possible to independent assortment embodiment 1-5 and their change
Shape example.
Can also be according to above-mentioned embodiment, as described below to supplementary features of the present invention.
In the consumable item management system of the present invention, it is also possible to be prediction section predict termly supplementary period or change time
Phase, obtaining section, with the cycle below cycle of being predicted by prediction section, obtains the number of units of multiple stage image processing system termly.
Can also be the register information identification information that includes multiple stage image processing system, obtaining section be to these multiple stage image processing systems
Identification information counts, and the value obtained is set as the number of units of these multiple stage image processing systems.It can also be prediction section
Predictive value is represented by the threshold value of the consumption degree for consumable goods, and the consumption degree of this consumable goods is reached this threshold value by request unit
Time point is considered as period of supplementing or the arrival in the period of replacing, when obtaining section obtains the number of units of multiple stage image processing system,
Prediction section, according to the ratio of the number of units obtained this number of units and last time, corrects this threshold value.
Duty via network monitoring multiple stage image processing system can also be also equipped with by this consumable item management system
Duty monitoring unit, obtaining section according to the monitoring result of duty monitoring unit to working in multiple stage image processing system
Device count, the value obtained is set as the number of units of these multiple stage image processing systems.It can also be duty prison
The project carrying out monitoring for the duty of multiple stage image processing system depending on portion includes the usage frequency monitoring object, it was predicted that
Portion is in the feelings of the predictive value correspondingly correcting supplementary period or the period of replacing with the minimizing of the number of units of multiple stage image processing system
Under condition, the ratio of the increment at equivalent ratios or with usage frequency, will utilize when obtaining the number of units before reducing in obtaining section
Monitoring result in the usage frequency of image processing system that can work distribute to the image processing system of the number of units after reducing, root
According to the change of the usage frequency of the multiple stage image processing system before and after distribution, corrected threshold.
This consumable item management system can also be also equipped with the management dress being connected to via network and multiple stage image processing system
Putting, obtaining section is embedded in this managing device, and on the other hand, consumption degree monitoring unit, prediction section and request unit are embedded in multiple stage figure
As forming the specific image processing system in device.Managing device can also include relevant with the number of units that obtaining section obtains
Information notifies to the notification unit of specific image processing system.In this case, it was predicted that portion can also be according to from notification unit
Notice, comparison based on multiple stage image processing system the last time number of units obtained and the number of units newly obtained, supplementing of correction consumable goods
Period or the predictive value in the period of replacing.The information that specific image processing system is notified by notification unit can also represent multiple stage figure
As forming the number of units of other image processing systems beyond the specific image processing system in device.It can also be register information
Including the project of the kind representing sheet that other image processing systems can process or task, notification unit according to this project for
The sheet that can process or each kind of task obtain the number of units of other image processing systems, it was predicted that portion is according to for locating
The number of units of other image processing systems that the sheet of reason or each kind of task are obtained, for specific image processing system energy
Enough sheets processed or each kind of task, correction supplements period or the predictive value in the period of replacing.Can also be other figures
The kind of the task that picture formation device can process represents which in monochrome and colour the image of process object be.
Managing device can also be assemblied in the device for multiple stage image processing system distribution task.Managing device can also
The electronic equipment being assemblied in connected to the network, from be embedded in this electronic equipment operating system for these multiple stage image shapes
The device driver becoming device reads the information relevant with multiple stage image processing system.
The information processor of the present invention can also be formed with multiple stage image via network as expendable management device
Device connects.In this case, it is also possible to be the specific image processing system in obtaining section acquirement multiple stage image processing system
The number of units of other image processing systems in addition, consumption degree monitoring unit monitors the consumption consumed by this specific image processing system
The consumption degree of product, it was predicted that portion is according to the change of the number of units of other image processing systems, and correction is to this specific image processing system
Supplement the supplementary period of consumable goods or the predictive value changing period of consumable goods.
The information processor of the present invention can also be the specific image processing system in multiple stage image processing system.?
In the case of Gai, it is also possible to be the consumption degree monitoring unit consumption degree that monitors the consumable goods of this specific image processing system self, take
Obtain the register information of other image processing systems that portion's reference is connected to identical network and obtain this other image processing systems
Number of units, it was predicted that portion according to the change of the number of units of these other image processing systems, corrects and mends to this specific image processing system
Fill the supplementary period of consumable goods or the predictive value changing period of consumable goods.Obtaining section can also be from pipe connected to the network
Reason device, obtains register information.This information processor can also be also equipped with storing step on relevant with other image processing systems
The storage part of note information.
The consumable item management method of the present invention can also be predicted period of supplementing or the step in the period of replacing termly,
With the cycle below the cycle of the step being predicted, carry out obtaining the step of the number of units of multiple stage image processing system termly.
Can also be the register information identification information that includes multiple stage image processing system, obtain the number of units of these multiple stage image processing systems
Step include the identification information of these multiple stage image processing systems being counted and the value obtained being set as these multiple stage
The step of the number of units of image processing system.It can also be the prediction obtained in prediction supplements the step in period or the period of replacing
Value is represented by the threshold value of the consumption degree for consumable goods, and the step supplemented or change of request consumable goods includes consuming
The consumption degree of product reaches the step that the time point of threshold value is considered as the arrival in period of supplementing or the period of replacing, correction supplement period or
The step of the predictive value that person changes period included whenever obtaining the number of units of multiple stage image processing system based on its number of units and last time
The ratio of the number of units obtained carrys out the step of corrected threshold.Can also be obtain the step of number of units of multiple stage image processing system include through
By the step of the duty of these multiple stage image processing systems of network monitoring and according to its monitoring result to these multiple stage images
The device worked formed in device carries out counting and the value obtained being set as the number of units of these multiple stage image processing systems
Step.The predictive value obtained in prediction supplements the step in period or the period of replacing is by the consumption degree for consumable goods
Threshold value represents, the step supplemented or change of request consumable goods includes the time point that the consumption degree of consumable goods reaches threshold value
It is considered as period of supplementing or the step of arrival in the period of replacing, carries out monitoring for the duty of multiple stage image processing system
Project includes the usage frequency monitoring object, and the step of the predictive value that correction supplements period or the period of replacing includes: with many
In the case of the minimizing of the number of units of platform image processing system is correspondingly carried out, at equivalent ratios or with the increasing of usage frequency
The ratio of amount, the usage frequency of the image processing system that can work in the monitoring result that will utilize when obtaining the number of units before reducing
Distribute to the step of the image processing system of the number of units after reducing;And making according to the multiple stage image processing system before and after distribution
The step of corrected threshold is carried out with the change of frequency.
Can also be in monitoring the step of consumption degree of consumable goods, by by the specific image in multiple stage image processing system
The consumption degree of the consumable goods forming device consumption is set to monitor object, supplements the predictive value in period or the period of replacing in correction
In step, according to the platform of other image processing systems beyond the specific image processing system of this in multiple stage image processing system
The change of number, corrects the period of changing supplementing supplementary period of consumable goods or consumable goods to this specific image processing system
Predictive value, in the step supplemented or change of request consumable goods, it is also possible to ask to mend to this specific image processing system
Fill consumable goods or change consumable goods.Can also be register information include representing sheet that other image processing systems can process or
The project of the kind of person's task, in obtaining the step of number of units of multiple stage image processing system, according to this project, for locating
The sheet of reason or each kind of task obtain the number of units of other image processing systems, supplement period or the period of replacing in correction
Predictive value step in, other image processing systems obtained according to each kind for the sheet that can process or task
Number of units, the sheet that can process for specific image processing system or each kind of task, correct predictive value.Other figures
The kind of the task that picture formation device can process can also represent which in monochrome and colour the image of process object be.
Managing device can also be assemblied in the device for multiple stage image processing system distribution task.Managing device can also be assemblied in
The electronic equipment that network is connected to.In this case, consumable item management method can also also include from being embedded in this electronic equipment
The device driver for other image processing systems of operating system read the information relevant with other image processing systems
Step.
Claims (30)
1. a consumable item management system, possesses the multiple stage image processing system being connected with each other via network, for request to
At least one supplementary consumable goods in described multiple stage image processing system or replacing consumable goods, described consumable item management system
It is characterised by possessing:
Storage part, stores the register information relevant with described multiple stage image processing system;
Obtaining section, obtains the number of units of described multiple stage image processing system with reference to described register information;
Consumption degree monitoring unit, monitors the consumption degree of the consumable goods consumed by least in described multiple stage image processing system;
Prediction section, according to the consumption degree of described consumable goods, it was predicted that the supplementary period of described consumable goods or the period of replacing, according to institute
State number of units and the comparison of the new number of units obtained of the described multiple stage image processing system of obtaining section acquirement last time, correct supplementary period
Or the predictive value in the period of replacing;And
Request unit, when having arrived the period that described prediction section dopes, asks supplementing or changing of described consumable goods.
Consumable item management system the most according to claim 1, it is characterised in that
Described prediction section carries out period of supplementing or the prediction in the period of replacing termly,
Described obtaining section, by the cycle below the cycle of the prediction implemented by described prediction section, obtains described multiple stage image termly
Form the number of units of device.
3. according to the consumable item management system described in claims 1 or 2, it is characterised in that
Described register information includes the identification information of described multiple stage image processing system,
The identification information of described multiple stage image processing system is counted by described obtaining section, the value obtained is set as described many
The number of units of platform image processing system.
4. according to the consumable item management system described in any one in claims 1 to 3, it is characterised in that
The predictive value of described prediction section is represented by the threshold value of the consumption degree for described consumable goods,
The consumption degree of described consumable goods is reached the time point of described threshold value when being considered as period of supplementing or change by described request unit
The arrival of phase,
When described obtaining section obtains the number of units of described multiple stage image processing system, described prediction section was according to this number of units and last time
The ratio of the number of units obtained, corrects described threshold value.
5. according to the consumable item management system described in any one in Claims 1-4, it is characterised in that
It is also equipped with the duty monitoring unit of duty via multiple stage image processing system described in described network monitoring,
Described obtaining section according to the monitoring result of described duty monitoring unit, in described multiple stage image processing system can work
The device made counts, and the value obtained is set as the number of units of described multiple stage image processing system.
Consumable item management system the most according to claim 5, it is characterised in that
The predictive value of described prediction section is represented by the threshold value of the consumption degree for described consumable goods,
The consumption degree of described consumable goods is reached the time point of described threshold value when being considered as period of supplementing or change by described request unit
The arrival of phase,
The project that described duty monitoring unit carries out monitoring for the duty of described multiple stage image processing system includes
Monitor the usage frequency of object,
Described prediction section correspondingly corrects supplementary period or replacing in the minimizing with the number of units of described multiple stage image processing system
In the case of the predictive value in period, the ratio of the increment at equivalent ratios or with usage frequency, will take in described obtaining section
After the usage frequency of the image processing system that can work in the monitoring result utilized during number of units before must reducing is distributed to reduce
The image processing system of number of units, according to the change of the usage frequency of the described multiple stage image processing system before and after distribution, corrects institute
State threshold value.
7. according to the consumable item management system described in any one in claim 1 to 6, it is characterised in that
It is also equipped with the managing device being connected to via described network with described multiple stage image processing system,
Described obtaining section is embedded in described managing device, on the other hand, and described consumption degree monitoring unit, described prediction section and described
Request unit is embedded in the specific image processing system in described multiple stage image processing system,
Described managing device includes the information relevant with the number of units that described obtaining section obtains being notified to described specific image shape
Become the notification unit of device,
Described prediction section is according to the notice from described notification unit, the platform that last time based on described multiple stage image processing system obtains
Number and the comparison of the new number of units obtained, correct supplementary period or the predictive value in the period of replacing of described consumable goods.
Consumable item management system the most according to claim 7, it is characterised in that
The information that described specific image processing system notifies is represented in described multiple stage image processing system by described notification unit
The number of units of other image processing systems beyond described specific image processing system.
9. according to the consumable item management system described in claim 7 or 8, it is characterised in that
Described register information includes representing beyond the described specific image processing system in described multiple stage image processing system
Sheet that other image processing systems can process or the project of the kind of task,
Described notification unit is according to this project, for the sheet that can process or each kind of task, obtains other images described
Form the number of units of device,
Described prediction section obtain according to each kind for the sheet that can process or task described in other images formed
The number of units of device, the sheet that can process for described specific image processing system or each kind of task, correction supplements
Period or the predictive value in the period of replacing.
Consumable item management system the most according to claim 9, it is characterised in that
The kind of the task that other image processing systems described can process represents that the image processing object is monochromatic and in colour
Which.
11. according to the consumable item management system described in any one in claim 7 to 10, it is characterised in that
Described managing device is assemblied in the device for described multiple stage image processing system distribution task.
12. according to the consumable item management system described in any one in claim 7 to 10, it is characterised in that
Described managing device is assemblied in the electronic equipment being connected to described network, from the operation being embedded in described electronic equipment
The device driver for described multiple stage image processing system of system reads the letter relevant with described multiple stage image processing system
Breath.
13. 1 kinds of information processors, are connected with multiple stage image processing system via network, for request to described multiple stage image
Forming at least one supplementary consumable goods in device or change consumable goods, described information processor is characterised by possessing:
Obtaining section, with reference to the register information relevant with described multiple stage image processing system, obtains described multiple stage image processing system
Number of units;
Consumption degree monitoring unit, monitors the consumption degree of the consumable goods consumed by least in described multiple stage image processing system;
Prediction section, according to the consumption degree of described consumable goods, it was predicted that the supplementary period of described consumable goods or the period of replacing, according to institute
State number of units and the comparison of the new number of units obtained of the described multiple stage image processing system of obtaining section acquirement last time, correct supplementary period
Or the predictive value in the period of replacing;And
Request unit, when having arrived the period that described prediction section dopes, asks supplementing or changing of described consumable goods.
14. information processors according to claim 13, it is characterised in that
As expendable management device, it is connected with described multiple stage image processing system via described network.
15. information processors according to claim 14, it is characterised in that
Described obtaining section obtains other image shapes beyond the specific image processing system in described multiple stage image processing system
Become the number of units of device,
Described consumption degree monitoring unit monitors the consumption degree of the consumable goods consumed by described specific image processing system,
Described prediction section, according to the change of the number of units of other image processing systems described, corrects and forms dress to described specific image
Put the supplementary period of supplementary consumable goods or the predictive value changing period of consumable goods.
16. information processors according to claim 13, it is characterised in that
Described information processor is the specific image processing system in described multiple stage image processing system.
17. information processors according to claim 16, it is characterised in that
Described consumption degree monitoring unit monitors the consumption degree of the consumable goods of described specific image processing system self,
The register information of other image processing systems that the reference of described obtaining section is connected to identical network, obtains other figures described
As forming the number of units of device,
Described prediction section, according to the change of the number of units of other image processing systems described, corrects and forms dress to described specific image
Put the supplementary period of supplementary consumable goods or the predictive value changing period of consumable goods.
18. according to the information processor described in claim 16 or 17, it is characterised in that
Described obtaining section is from the managing device described register information of acquirement being connected to described network.
19. according to the information processor described in claim 16 or 17, it is characterised in that
It is also equipped with storing the storage part of the register information relevant with other image processing systems described.
20. 1 kinds of consumable item management methods, for request in the multiple stage image processing system being connected to via network at least
One supplementary consumable goods or replacing consumable goods, described consumable item management method is characterised by having:
With reference to the register information relevant with described multiple stage image processing system, obtain the number of units of described multiple stage image processing system
Step;
Monitor the step of the consumption degree of the consumable goods consumed by least in described multiple stage image processing system;
Consumption degree according to described consumable goods, it was predicted that the supplementary period of described consumable goods or the step in the period of replacing;
Number of units according to the described multiple stage image processing system obtained last time and the comparison of the new number of units obtained, correct the period of supplementing
Or the step of the predictive value in the period of replacing;And
When having arrived the period doped, ask the step supplemented or change of described consumable goods.
21. consumable item management methods according to claim 20, it is characterised in that
It is predicted described supplementary period or the step in the period of replacing termly,
By the cycle below the cycle of the step carrying out described prediction, carry out termly obtaining described multiple stage image processing system
The step of number of units.
22. according to the consumable item management method described in claim 20 or 21, it is characterised in that
Described register information includes the identification information of described multiple stage image processing system,
The step of the number of units obtaining described multiple stage image processing system includes the identification information to described multiple stage image processing system
Carry out counting and the value obtained being set as the step of the number of units of described multiple stage image processing system.
23. according to the consumable item management method described in any one in claim 20 to 22, it is characterised in that
The predictive value obtained in predicting the step in described supplementary period or the period of replacing is by disappearing for described consumable goods
The threshold value of consumption degree represents,
The step supplemented or change asking described consumable goods includes the consumption degree of described consumable goods is reached described threshold value
Time point is considered as the step of the arrival in period of supplementing or the period of replacing,
The step of the predictive value correcting described supplementary period or the period of replacing includes whenever obtaining described multiple stage image formation dress
The ratio of the number of units obtained according to this number of units and last time during the number of units put corrects the step of described threshold value.
24. according to the consumable item management method described in any one in claim 20 to 23, it is characterised in that
The step of the number of units obtaining described multiple stage image processing system includes:
Step via the duty of multiple stage image processing system described in described network monitoring;And
According to this monitoring result, the device worked in described multiple stage image processing system is counted, the value that will obtain
It is set as the step of the number of units of described multiple stage image processing system.
25. consumable item management methods according to claim 24, it is characterised in that
The predictive value obtained in predicting the step in described supplementary period or the period of replacing is by disappearing for described consumable goods
The threshold value of consumption degree represents,
The step supplemented or change asking described consumable goods includes the consumption degree of described consumable goods is reached described threshold value
Time point is considered as the step of the arrival in period of supplementing or the period of replacing,
The project carrying out monitoring for the duty of described multiple stage image processing system includes the usage frequency monitoring object,
The step of the predictive value correcting described supplementary period or the period of replacing includes:
In the case of the minimizing with the number of units of described multiple stage image processing system is correspondingly carried out, at equivalent ratios or
Person is with the ratio of the increment of usage frequency, the image shape that can work in the monitoring result that will utilize when obtaining the number of units before reducing
The usage frequency becoming device distributes to the step of the image processing system of the number of units after reducing;And
The change of the usage frequency according to the described multiple stage image processing system before and after distribution corrects the step of described threshold value.
26. according to the consumable item management method described in any one in claim 20 to 25, it is characterised in that
In monitoring the step of consumption degree of described consumable goods, by by the specific image shape in described multiple stage image processing system
Become device consume consumable goods consumption degree as monitor object,
In correcting the step of predictive value in described supplementary period or the period of replacing, according in described multiple stage image processing system
Described specific image processing system beyond the change of number of units of other image processing systems, correction is to described specific figure
The supplementary period of consumable goods or the predictive value changing period of consumable goods is supplemented as forming device,
In the step supplemented or change asking described consumable goods, ask to supplement to described specific image processing system to disappear
Consumption product or replacing consumable goods.
27. consumable item management methods according to claim 26, it is characterised in that
Described register information includes representing the project of the kind of sheet that other image processing systems described can process or task,
In obtaining the step of number of units of described multiple stage image processing system, according to this project, for the sheet that can process or
Each kind of task, obtains the number of units of other image processing systems described,
Correct described supplementary period or change period predictive value step in, according to for the sheet that can process or appoint
Each kind of business and the number of units of other image processing systems described obtained, can for described specific image processing system
The sheet processed or each kind of task, correct described predictive value.
28. consumable item management methods according to claim 27, it is characterised in that
The kind of the task that other image processing systems described can process represents that the image processing object is monochromatic and in colour
Which.
29. according to the consumable item management method described in any one in claim 26 to 28, it is characterised in that
Described managing device is assemblied in the device for described multiple stage image processing system distribution task.
30. according to the consumable item management method described in any one in claim 26 to 28, it is characterised in that
Described managing device is assemblied in the electronic equipment being connected to described network,
Described consumable item management method also include from the operating system being embedded in described electronic equipment for other images described
The device driver forming device reads the step of the information relevant with other image processing systems described.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015061857A JP6277988B2 (en) | 2015-03-25 | 2015-03-25 | Image forming apparatus, consumable management apparatus, system, and program |
JP2015-061857 | 2015-03-25 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106019881A true CN106019881A (en) | 2016-10-12 |
CN106019881B CN106019881B (en) | 2018-09-11 |
Family
ID=56976126
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610177637.7A Active CN106019881B (en) | 2015-03-25 | 2016-03-25 | Consumable item management system and consumable item management method, information processing unit |
Country Status (3)
Country | Link |
---|---|
US (1) | US10367955B2 (en) |
JP (1) | JP6277988B2 (en) |
CN (1) | CN106019881B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108668044A (en) * | 2017-03-27 | 2018-10-16 | 柯尼卡美能达株式会社 | Maintenance care device, the device and recording medium for maintaining object |
CN108828919A (en) * | 2018-07-20 | 2018-11-16 | 宜春小马快印科技有限公司 | Carbon dust surplus monitoring method, device, readable storage medium storing program for executing and printer |
CN110275401A (en) * | 2018-03-15 | 2019-09-24 | 柯尼卡美能达办公系统研发(无锡)有限公司 | It can screening device monitoring arrangement, image forming apparatus and monitoring method |
CN110920259A (en) * | 2018-09-20 | 2020-03-27 | 精工爱普生株式会社 | Consumable consumption device and consumable consumption system |
Families Citing this family (23)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US10453112B2 (en) | 2013-03-15 | 2019-10-22 | OrderGroove, Inc. | Methods, apparatus, and computer readable medium for converting one-time buyers of a product/service into subscribers |
JP6862704B2 (en) * | 2016-07-21 | 2021-04-21 | ブラザー工業株式会社 | Computer programs for control devices and control devices |
JP6540624B2 (en) * | 2016-07-26 | 2019-07-10 | 京セラドキュメントソリューションズ株式会社 | Image forming apparatus and image forming system |
US11640636B2 (en) | 2016-11-22 | 2023-05-02 | Ordergroove, Llc | Sensors and executable instructions to compute consumable usage to automate replenishment or service of consumables via an adaptive distribution platform |
US10769708B2 (en) | 2016-11-22 | 2020-09-08 | OrderGroove, Inc. | Consumable usage sensors and applications to facilitate automated replenishment of consumables via an adaptive distribution platform |
US11416810B2 (en) | 2017-04-04 | 2022-08-16 | OrderGroove, Inc. | Electronic messaging to distribute items based on adaptive scheduling |
US10586266B2 (en) | 2016-11-22 | 2020-03-10 | OrderGroove, Inc. | Dynamic processing of electronic messaging data and protocols to automatically generate location predictive retrieval using a networked, multi-stack computing environment |
US12014407B2 (en) | 2016-11-22 | 2024-06-18 | Ordergroove, Llc | Adaptive scheduling to facilitate optimized distribution of subscribed items |
US11537980B2 (en) * | 2017-04-04 | 2022-12-27 | OrderGroove, Inc. | Consumable usage sensors and applications to facilitate automated replenishment of consumables via an adaptive distribution platform |
US11900439B2 (en) | 2017-04-04 | 2024-02-13 | Ordergroove, Llc | Consumable usage sensors and applications to facilitate automated replenishment of consumables via an adaptive distribution platform |
US12014325B2 (en) * | 2017-04-04 | 2024-06-18 | Ordergroove, Llc | Consumable usage sensors and applications to facilitate automated replenishment of consumables via an adaptive distribution platform |
US10338861B2 (en) * | 2017-04-28 | 2019-07-02 | Kyocera Document Solutions Inc. | Formulation and implementation of rules associated with printing devices |
JP6977305B2 (en) * | 2017-04-28 | 2021-12-08 | コニカミノルタ株式会社 | Printing equipment, maintenance control program and maintenance control method |
CN107395665B (en) * | 2017-05-22 | 2020-04-24 | 创新先进技术有限公司 | Block chain service acceptance and service consensus method and device |
WO2019032111A1 (en) * | 2017-08-10 | 2019-02-14 | Hewlett-Packard Development Company, L.P. | Power consumption usage report |
JP7040012B2 (en) * | 2017-12-27 | 2022-03-23 | ブラザー工業株式会社 | Image forming device and program |
JP6864873B2 (en) * | 2018-02-01 | 2021-04-28 | ブラザー工業株式会社 | Consumables management program, management server, and label creation system |
JP2019148691A (en) * | 2018-02-27 | 2019-09-05 | キヤノン株式会社 | Consumable part management device, management method and program |
JP7118787B2 (en) | 2018-07-17 | 2022-08-16 | キヤノン株式会社 | Management system and management method |
JP2022071880A (en) * | 2019-02-28 | 2022-05-17 | 京セラドキュメントソリューションズ株式会社 | Consumables ordering system |
US11340847B2 (en) * | 2019-12-11 | 2022-05-24 | Canon Kabushiki Kaisha | Image forming system, image forming apparatus, and feeding apparatus |
US11995365B2 (en) * | 2020-09-30 | 2024-05-28 | Hewlett-Packard Development Company, L.P. | Printing device entry into reduced print material usage mode |
US20240070421A1 (en) * | 2021-01-15 | 2024-02-29 | Hewlett-Packard Development Company, L.P. | Printing device consumable item end of life prediction |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080201374A1 (en) * | 2007-02-19 | 2008-08-21 | Canon Kabushiki Kaisha | Information processing apparatus and information processing method |
CN102193465A (en) * | 2010-03-18 | 2011-09-21 | 柯尼卡美能达商用科技株式会社 | Image forming device, device and system for controlling an image forming device |
JP2011243000A (en) * | 2010-05-18 | 2011-12-01 | Ricoh Co Ltd | Printing control program, recording medium, information processor, printing system, and printer |
WO2013160488A1 (en) * | 2012-04-26 | 2013-10-31 | Nube Print Sl | Remote program control device for copiers and printers |
JP2014092729A (en) * | 2012-11-06 | 2014-05-19 | Fuji Xerox Co Ltd | Consumables management device and consumables management program |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002300308A (en) | 2001-03-30 | 2002-10-11 | Ricoh Co Ltd | Customer support system, office system, customer support center, supply center and customer support method |
JP2003263300A (en) * | 2001-12-05 | 2003-09-19 | Canon Inc | Program, apparatus, and method for predicting expendable supplies demand |
US20080030996A1 (en) * | 2006-08-07 | 2008-02-07 | Ming-Chih Chen | Reptile lamp having direction adjustable function |
US8218174B2 (en) * | 2007-06-15 | 2012-07-10 | Xerox Corporation | Interactive device capacity mimic and system override |
JP2010003028A (en) * | 2008-06-19 | 2010-01-07 | Konica Minolta Business Technologies Inc | Image forming system, image forming device, print server, image forming method, and image forming program |
JP5375396B2 (en) * | 2009-07-17 | 2013-12-25 | 富士ゼロックス株式会社 | Consumable management system and image forming apparatus |
JP5434425B2 (en) * | 2009-09-18 | 2014-03-05 | 富士ゼロックス株式会社 | Management system, management device, and program |
US20120076518A1 (en) * | 2010-09-27 | 2012-03-29 | Rapkin Alan E | Effectively using two consumables in single printer |
JP5177213B2 (en) | 2010-12-16 | 2013-04-03 | コニカミノルタビジネステクノロジーズ株式会社 | Inventory management device, inventory management system, inventory management method, inventory management program |
US8582986B2 (en) | 2010-12-10 | 2013-11-12 | Konica Minolta Business Technologies, Inc. | Inventory management device and inventory management method |
JP5177212B2 (en) * | 2010-12-10 | 2013-04-03 | コニカミノルタビジネステクノロジーズ株式会社 | Inventory management device, inventory management system, image processing device, inventory management method, inventory management program |
JP5949348B2 (en) | 2012-09-05 | 2016-07-06 | 富士ゼロックス株式会社 | Information processing apparatus and program |
JP2014091298A (en) | 2012-11-06 | 2014-05-19 | Fuji Xerox Co Ltd | Consumables management device, and consumables management program |
US8823990B2 (en) * | 2012-12-31 | 2014-09-02 | International Business Machines Corporation | Print job distribution within a printing system |
JP6242081B2 (en) * | 2013-05-30 | 2017-12-06 | キヤノン株式会社 | Printing system, and print job control method and program |
JP6065772B2 (en) * | 2013-07-08 | 2017-01-25 | 富士ゼロックス株式会社 | Consumables management device and consumables management program |
-
2015
- 2015-03-25 JP JP2015061857A patent/JP6277988B2/en active Active
-
2016
- 2016-03-17 US US15/073,393 patent/US10367955B2/en active Active
- 2016-03-25 CN CN201610177637.7A patent/CN106019881B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080201374A1 (en) * | 2007-02-19 | 2008-08-21 | Canon Kabushiki Kaisha | Information processing apparatus and information processing method |
CN102193465A (en) * | 2010-03-18 | 2011-09-21 | 柯尼卡美能达商用科技株式会社 | Image forming device, device and system for controlling an image forming device |
JP2011243000A (en) * | 2010-05-18 | 2011-12-01 | Ricoh Co Ltd | Printing control program, recording medium, information processor, printing system, and printer |
WO2013160488A1 (en) * | 2012-04-26 | 2013-10-31 | Nube Print Sl | Remote program control device for copiers and printers |
JP2014092729A (en) * | 2012-11-06 | 2014-05-19 | Fuji Xerox Co Ltd | Consumables management device and consumables management program |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108668044A (en) * | 2017-03-27 | 2018-10-16 | 柯尼卡美能达株式会社 | Maintenance care device, the device and recording medium for maintaining object |
CN110275401A (en) * | 2018-03-15 | 2019-09-24 | 柯尼卡美能达办公系统研发(无锡)有限公司 | It can screening device monitoring arrangement, image forming apparatus and monitoring method |
CN110275401B (en) * | 2018-03-15 | 2022-10-28 | 柯尼卡美能达办公系统研发(无锡)有限公司 | Optional device monitoring device, image forming apparatus, and monitoring method |
CN108828919A (en) * | 2018-07-20 | 2018-11-16 | 宜春小马快印科技有限公司 | Carbon dust surplus monitoring method, device, readable storage medium storing program for executing and printer |
CN110920259A (en) * | 2018-09-20 | 2020-03-27 | 精工爱普生株式会社 | Consumable consumption device and consumable consumption system |
CN110920259B (en) * | 2018-09-20 | 2022-08-23 | 精工爱普生株式会社 | Consumable consumption device and consumable consumption system |
Also Published As
Publication number | Publication date |
---|---|
JP6277988B2 (en) | 2018-02-14 |
JP2016181190A (en) | 2016-10-13 |
CN106019881B (en) | 2018-09-11 |
US20160286059A1 (en) | 2016-09-29 |
US10367955B2 (en) | 2019-07-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106019881A (en) | Image forming device and device, apparatus, system and program for managing consumables in image forming device | |
US6295423B1 (en) | Methods and systems for monitoring consumable item lifetimes for peripheral units | |
US6917437B1 (en) | Resource management for a printing system via job ticket | |
JP3747907B2 (en) | Device management system, printer management system, printer management terminal, network printer, terminal program, printer program, and device management method | |
US6744527B1 (en) | User interface for navigation and control of a printing system | |
JP5434425B2 (en) | Management system, management device, and program | |
JP4431415B2 (en) | Abnormality diagnosis method, state determination apparatus, and image forming apparatus | |
CN102572182B (en) | Image forming apparatus, authorization apparatus, image forming system | |
JP5177213B2 (en) | Inventory management device, inventory management system, inventory management method, inventory management program | |
CN102193465B (en) | Image forming device, device and system for managing an image forming device | |
CN101132468B (en) | Image forming apparatus, method for managing supplying product of image forming device and system supplying product | |
US20020143893A1 (en) | Information processing apparatus, information processing method, program, and storage medium product for distribution of image forming control software | |
CN1598706B (en) | Estimation of toner usage | |
JP4859218B2 (en) | Maintenance system and maintenance method for image forming apparatus | |
JPH07336512A (en) | Device for estimating range of pixel application | |
US7796900B2 (en) | Developer cartridge replacement scheme for electrostatographic printing | |
CN103376701A (en) | Image forming apparatus | |
CN102314119B (en) | Imaging device and the control method of this imaging device of control | |
US7983575B1 (en) | Apparatus and method for determining photoreceptor charge transport layer thickness of apparatus using a scorotron charge device | |
JP2018036672A (en) | Management method for consumable supply and its program in image forming apparatus | |
CN1356599A (en) | Colour image generator | |
US20220198231A1 (en) | Imaging documents | |
US20070059015A1 (en) | Monitoring device for image forming device, control method and control program of monitoring device, and computer-readable storage medium | |
JP2015148751A (en) | consumables management system | |
US20050058468A1 (en) | Monitoring of receiver type usage in a printing machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |