CN106016583B - Control method and control device, the air-conditioning system of air-conditioning system - Google Patents
Control method and control device, the air-conditioning system of air-conditioning system Download PDFInfo
- Publication number
- CN106016583B CN106016583B CN201610331607.7A CN201610331607A CN106016583B CN 106016583 B CN106016583 B CN 106016583B CN 201610331607 A CN201610331607 A CN 201610331607A CN 106016583 B CN106016583 B CN 106016583B
- Authority
- CN
- China
- Prior art keywords
- air
- fresh
- conditioning
- parameter
- ventilation equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/30—Control or safety arrangements for purposes related to the operation of the system, e.g. for safety or monitoring
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F2110/00—Control inputs relating to air properties
- F24F2110/50—Air quality properties
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F11/00—Control or safety arrangements
- F24F11/62—Control or safety arrangements characterised by the type of control or by internal processing, e.g. using fuzzy logic, adaptive control or estimation of values
- F24F11/63—Electronic processing
- F24F11/64—Electronic processing using pre-stored data
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B30/00—Energy efficient heating, ventilation or air conditioning [HVAC]
- Y02B30/70—Efficient control or regulation technologies, e.g. for control of refrigerant flow, motor or heating
Abstract
The invention discloses a kind of control method of air-conditioning system and control devices, air-conditioning system.Wherein, this method comprises: obtaining the first parameter that air-conditioning equipment is sent, wherein the first parameter is detected to obtain by the air quality detecting device on air-conditioning equipment, and the first parameter is for indicating indoor air quality;Judge whether the first parameter meets preset condition;If judging, the first parameter meets preset condition, sends the first control instruction to fresh-air ventilation equipment, wherein the first control instruction is for controlling fresh-air ventilation opening of device.The present invention solves the technical issues of can not automatically controlling the operation of fresh-air ventilation equipment in the prior art.
Description
Technical field
The present invention relates to air-conditioner field, control methods and control device in particular to a kind of air-conditioning system, sky
Adjusting system.
Background technique
Air-conditioned room does not open a window for a long time, airtightness is strong, these poor factors of air flow property are easy to cause air-conditioned room
Oxygen content reduces, carbon dioxide content increases, pathogenic microorganisms is grown, in order to improve the air quality of air-conditioned room, very much
Air-conditioning producer is proposed fresh-air ventilation equipment.
Existing fresh-air ventilation equipment is not in contact with central air conditioning equipments such as multi-connected machines, the state in autonomous working.
Due to general user to the principle of fresh-air ventilation equipment there is no enough understandings, the booting of user's control fresh-air ventilation equipment and
Shutdown is easy to cause start-stop unreasonable, that is, air quality is good indoors, and user's control fresh-air ventilation is set when not needing booting
Standby booting, user's control fresh-air ventilation equipment is shut down when should continue to use the ventilation of fresh-air ventilation equipment, this will lead to
The start-stop of fresh-air ventilation equipment is unreasonable, cannot reach ideal ventilation effect, and will cause energy waste.
For above-mentioned problem, currently no effective solution has been proposed.
Summary of the invention
The embodiment of the invention provides a kind of control method of air-conditioning system and control devices, air-conditioning system, at least to solve
The technical issues of operation of fresh-air ventilation equipment can not certainly be automatically controlled in the prior art.
According to an aspect of an embodiment of the present invention, a kind of control method of air-conditioning system is provided, comprising: described in acquisition
The first parameter that air-conditioning equipment is sent, wherein first parameter is examined by the air quality detecting device on the air-conditioning equipment
It measures, first parameter is for indicating indoor air quality;Judge whether first parameter meets preset condition;If sentencing
Disconnected first parameter out meets the preset condition, then sends the first control instruction to the fresh-air ventilation equipment, wherein institute
The first control instruction is stated for controlling the fresh-air ventilation opening of device.
Further, after judging whether first parameter meets preset condition, the method also includes: if judgement
First parameter is unsatisfactory for the preset condition out, whether in the open state detects the fresh-air ventilation equipment;If described
Fresh-air ventilation equipment is in the open state, then sends the second control instruction to the fresh-air ventilation equipment, wherein second control
System instruction is for controlling the fresh-air ventilation equipment shutdown.
Further, the air-conditioning system includes multiple fresh-air ventilation equipment, and the air-conditioning equipment includes one or more
Air-conditioning internal machine is sending the to the fresh-air ventilation equipment after judging that first parameter meets the preset condition
Before one control instruction, the method also includes: obtain the air-conditioning internal machine in operating status in the air-conditioning system
Target position;Using one or more fresh-air ventilation equipment in the preset range around the target position as the first fresh air
Air regenerating device, to send first control instruction to the first fresh-air ventilation equipment.
Further, the air-conditioning equipment includes one or more air-conditioning internal machines, is judging the first parameter satisfaction
After the preset condition, before sending the first control instruction to the fresh-air ventilation equipment, the method also includes: it obtains
The quantity of the air-conditioning internal machine in operating status in the air-conditioning system;Judge the air-conditioning internal machine in operating status
Quantity whether be greater than preset quantity;It is greater than the present count in the quantity for judging the air-conditioning internal machine in operating status
When amount, determine that first control refers to according to the quantity of first parameter and the air-conditioning internal machine in operating status
It enables.
Further, first control instruction includes the first sub-instructions and the second sub-instructions, according to first parameter
Determine that first control instruction includes: according to first ginseng with the quantity of the air-conditioning internal machine in operating status
The quantity of the air-conditioning internal machine several, in operating status and the incidence relation between the time, generate first sub-instructions and
Second sub-instructions, wherein first sub-instructions are opened for controlling the fresh-air ventilation equipment every the first preset time
It opens, second sub-instructions are shut down after opening the second preset time for controlling the fresh-air ventilation equipment, wherein described the
One preset time is greater than second preset time.
According to another aspect of an embodiment of the present invention, a kind of control device of air-conditioning system is additionally provided, comprising: first obtains
Unit is taken, the first parameter sent for obtaining the air-conditioning equipment, wherein first parameter is by the air-conditioning equipment
Air quality detecting device detects to obtain, and first parameter is for indicating indoor air quality;First judging unit, for sentencing
Whether first parameter of breaking meets preset condition;First transmission unit, if for judging described in the first parameter satisfaction
Preset condition then sends the first control instruction to the fresh-air ventilation equipment, wherein first control instruction is for controlling institute
State fresh-air ventilation opening of device.
Further, described device further include: detection unit, for judging described first in first judging unit
Parameter is unsatisfactory for after the preset condition, whether in the open state detects the fresh-air ventilation equipment;Second transmission unit,
For being sent out to the fresh-air ventilation equipment after detection unit detects that the fresh-air ventilation equipment is in the open state
Send the second control instruction, wherein second control instruction is for controlling the fresh-air ventilation equipment shutdown.
Further, the air-conditioning system includes multiple fresh-air ventilation equipment, and the air-conditioning equipment includes one or more
Air-conditioning internal machine, described device further include: second acquisition unit, for judging first parameter in first judging unit
After meeting the preset condition, first transmission unit to the fresh-air ventilation equipment send the first control instruction it
Before, obtain the target position of the air-conditioning internal machine in operating status in the air-conditioning system;First determination unit, being used for will
One or more fresh-air ventilation equipment in preset range around the target position as the first fresh-air ventilation equipment, with
First control instruction is sent to the first fresh-air ventilation equipment.
Further, the air-conditioning equipment includes one or more air-conditioning internal machines, described device further include: third obtains single
Member, for being sent out described first after first judging unit judges that first parameter meets the preset condition
Before sending unit to send the first control instruction to the fresh-air ventilation equipment, obtain in operating status in the air-conditioning system
The quantity of the air-conditioning internal machine;Second judgment unit, for judge the air-conditioning internal machine in operating status quantity whether
Greater than preset quantity;Second determination unit, for judging the air-conditioning in operating status in the second judgment unit
When the quantity of interior machine is greater than the preset quantity, according to the number of first parameter and the air-conditioning internal machine in operating status
Amount determines first control instruction.
Further, first control instruction includes the first sub-instructions and the second sub-instructions, second determination unit
Include: generation subelement, for according to first parameter, the quantity of the air-conditioning internal machine in operating status and time it
Between incidence relation, generate first sub-instructions and second sub-instructions, wherein first sub-instructions are for controlling institute
It states fresh-air ventilation equipment to open every the first preset time, second sub-instructions are being opened for controlling the fresh-air ventilation equipment
It shuts down after opening the second preset time, wherein first preset time is greater than second preset time.
According to another aspect of an embodiment of the present invention, a kind of air-conditioning system is additionally provided, comprising: above-described air-conditioning system
The control device of system.
In embodiments of the present invention, the first parameter that air-conditioning equipment is sent is obtained, wherein the first parameter is by air-conditioning equipment
Air quality detecting device detect to obtain, the first parameter is for indicating indoor air quality;Judge whether the first parameter meets
Preset condition;If judging, the first parameter meets preset condition, sends the first control instruction to fresh-air ventilation equipment, wherein
First control instruction is for controlling fresh-air ventilation opening of device.In embodiments of the present invention, by judging that indoor air quality is
It is no to meet pre-set condition, when indoor air quality meets pre-set condition, illustrate that indoor air quality is bad,
It takes a breath, mentions to room air to control fresh-air ventilation opening of device at this point, sending control instruction to fresh-air ventilation equipment
The quality for rising room air, does not need the unlatching and shutdown of manual control fresh-air ventilation equipment, realizes automatic control fresh air and changes
Gas equipment operation technical effect, and then solve can not automatically control in the prior art fresh-air ventilation equipment operation technology ask
Topic.
Detailed description of the invention
The drawings described herein are used to provide a further understanding of the present invention, constitutes a part of the invention, this hair
Bright illustrative embodiments and their description are used to explain the present invention, and are not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of the control method of air-conditioning system according to an embodiment of the present invention;
Fig. 2 is the position view of multi-connected central air conditioning system according to an embodiment of the present invention in the room;
Fig. 3 is the schematic diagram of the control device of air-conditioning system according to an embodiment of the present invention;
Fig. 4 is the schematic diagram of air-conditioning system according to an embodiment of the present invention.
Specific embodiment
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work
It encloses.
It should be noted that description and claims of this specification and term " first " in above-mentioned attached drawing, "
Two " etc. be to be used to distinguish similar objects, without being used to describe a particular order or precedence order.It should be understood that using in this way
Data be interchangeable under appropriate circumstances, so as to the embodiment of the present invention described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " includes " and " having " and their any deformation, it is intended that cover
Cover it is non-exclusive include, for example, the process, method, system, product or equipment for containing a series of steps or units are not necessarily limited to
Step or unit those of is clearly listed, but may include be not clearly listed or for these process, methods, product
Or other step or units that equipment is intrinsic.
Description below is made to technical term involved in the embodiment of the present invention first:
Multi-connected machine central air-conditioning: multi-connected machine central air-conditioning is a type of family central air-conditioning, is commonly called as " one drag more ", refers to
To be an outdoor unit (outdoor machine of air-conditioner) connect two or more indoor units (air-conditioning internal machine) by piping, outdoor unit uses
Air-cooled heat transfer form, indoor unit use the primary coolant air-conditioning system of direct evaporation and heat-exchange form.
According to embodiments of the present invention, a kind of embodiment of the control method of air-conditioning system is provided, it should be noted that
The step of process of attached drawing illustrates can execute in a computer system such as a set of computer executable instructions, also,
It, in some cases, can be to be different from shown in sequence execution herein although logical order is shown in flow charts
The step of out or describing.
Fig. 1 is the flow chart of the control method of air-conditioning system according to an embodiment of the present invention, as shown in Figure 1, this method packet
Include following steps:
Step S102 obtains the first parameter that air-conditioning equipment is sent, wherein the first parameter is by the air matter on air-conditioning equipment
Amount detecting device detects to obtain, and the first parameter is for indicating indoor air quality.
Step S104, judges whether the first parameter meets preset condition.
Step S106, if judging, the first parameter meets preset condition, sends the first control to fresh-air ventilation equipment and refers to
It enables, wherein the first control instruction is for controlling fresh-air ventilation opening of device.
The control method of air-conditioning system provided by the embodiment of the present invention can be used in controlling central air conditioner system, such as control
Multi-connected central air conditioning system processed.
First parameter can be it is following any one or it is a variety of: the gas concentration lwevel of room air, room air
Oxygen concentration, the PM2.5 concentration of room air, the bacterial concentration of room air, the temperature of room air, room air it is wet
Degree, etc..
First parameter can indicate indoor air quality, when the first parameter meets preset condition, illustrate the matter of room air
Measure it is poor, at this point, to fresh-air ventilation equipment send control instruction (i.e. above-mentioned first control instruction), when fresh-air ventilation equipment connects
After receiving the first control instruction, fresh-air ventilation opening of device, so that outdoor fresh air is introduced interior, so that Interior Space
The increased quality of gas.
For example, it is assumed that the first parameter is the oxygen concentration of room air, preset condition is the first parameter less than 18%.Assuming that
The oxygen concentration for the room air that air-conditioning equipment detects is 15% (i.e. the first parameter is 15%), since the first parameter 15% is small
In 18%, therefore, the first parameter meets preset condition, at this point, the first control instruction is sent to fresh-air ventilation equipment, it is new to control
Wind air regenerating device is opened.It is indoor by introducing outdoor fresh air after fresh-air ventilation opening of device, it can be improved Interior Space
The oxygen concentration of gas improves the comfort level of indoor environment.
In embodiments of the present invention, by judging whether indoor air quality meets pre-set condition, work as Interior Space
When makings amount meets pre-set condition, illustrate that indoor air quality is bad, refers at this point, sending control to fresh-air ventilation equipment
It enables, to control fresh-air ventilation opening of device, takes a breath to room air, promote the quality of room air, do not need manually to control
The unlatching and shutdown of fresh-air ventilation equipment processed solve the technology that can not automatically control the operation of fresh-air ventilation equipment in the prior art
Problem realizes the technical effect for automatically controlling the operation of fresh-air ventilation equipment.
For example, carbon dioxide concentration value and fortune is stored in advance using the gas concentration lwevel of room air as the first parameter
It is corresponding to search N when sensor detects that indoor carbon dioxide concentration is greater than N from incidence relation for the incidence relation of row time
Running time T 1, open fresh-air ventilation equipment, and fresh-air ventilation equipment run the T1 time after shut down.
For another example using the PM2.5 concentration of room air as the first parameter, when PM2.5 concentration value and operation is stored in advance
Between incidence relation, when sensor detects that indoor PM2.5 concentration is greater than M, when searching the corresponding operation of M from incidence relation
Between T2, open fresh-air ventilation equipment, and fresh-air ventilation equipment run the T2 time after shut down.
Optionally, after judging whether the first parameter meets preset condition, method further include: if judging the first parameter
It is unsatisfactory for preset condition, whether detection fresh-air ventilation equipment is in the open state;If fresh-air ventilation equipment is in the open state,
The second control instruction is sent to fresh-air ventilation equipment, wherein the second control instruction is for controlling the shutdown of fresh-air ventilation equipment.
Real-time detection often detects the first parameter at regular intervals, when the first parameter is unsatisfactory for preset condition, says
Bright indoor air quality is good, at this point, not needing to take a breath to room air, if fresh-air ventilation equipment is in unlatching at this time
When state, control instruction (i.e. above-mentioned second control instruction) is sent to fresh-air ventilation equipment, to control the shutdown of fresh-air ventilation equipment,
The shutdown of fresh-air ventilation equipment is controlled when good by air quality indoors, can be energy saving, avoid energy waste.
For example, it is assumed that the first parameter is the gas concentration lwevel of room air, preset condition is that the first parameter is greater than
0.06%.Assuming that the gas concentration lwevel for the room air that air-conditioning equipment is sent is 0.04% (i.e. the first parameter is 0.04%),
Since the first parameter 0.04% is less than 0.06%, the first parameter is unsatisfactory for preset condition, at this point, detection fresh-air ventilation is set
It is standby whether in the open state, it is assumed that testing result shows that fresh-air ventilation equipment is in the open state, then to fresh-air ventilation equipment
Send the second control instruction.After fresh-air ventilation equipment receives the second control instruction, the shutdown of fresh-air ventilation equipment.
Optionally, air-conditioning system includes multiple fresh-air ventilation equipment, and air-conditioning equipment includes one or more air-conditioning internal machines,
After judging that the first parameter meets preset condition, before sending the first control instruction to fresh-air ventilation equipment, method is also wrapped
It includes: obtaining the target position of air-conditioning internal machine in operating status in air-conditioning system;It will be in the preset range around target position
One or more fresh-air ventilation equipment as the first fresh-air ventilation equipment, to send the first control to the first fresh-air ventilation equipment
System instruction.
When air-conditioning system includes multiple fresh-air ventilation equipment and multiple air-conditioning internal machines, according to air-conditioning in operating status
The position of interior machine determines that opening which or which fresh-air ventilation equipment can open as a kind of optional embodiment
Fresh-air ventilation equipment near the air-conditioning internal machine being currently running.Specifically, the preset range around target position can be opened
One or more interior fresh-air ventilation equipment.
For example, a multi-connected central air conditioning system is mounted in room, as shown in Fig. 2, the multi-connected machine central air-conditioning system
8 air-conditioning internal machines and 2 fresh-air ventilation equipment are uniformly shared, 8 air-conditioning internal machines are respectively air-conditioning internal machine 1, air-conditioning internal machine 2
Number, air-conditioning internal machine 3 ..., air-conditioning internal machine 8,2 fresh-air ventilation equipment are respectively fresh-air ventilation equipment A and fresh-air ventilation
Equipment B.Wherein, air-conditioning internal machine in operating status has 2, is air-conditioning internal machine No. 5 and air-conditioning internal machine 6 respectively.Work as judgement
After the first parameter meets preset condition out, obtain air-conditioning internal machine 5 position (i.e. above-mentioned target position) and air-conditioning internal machine 6
Position (i.e. above-mentioned target position), since fresh-air ventilation equipment A and air-conditioning internal machine 5, air-conditioning internal machine 6 are closer,
Therefore, selection opens fresh-air ventilation equipment A and takes a breath to the air in room.
The quantity for the fresh-air ventilation equipment that air-conditioning system includes may be very big, if judging the first parameter satisfaction
All fresh-air ventilation equipment that air-conditioning system is opened after preset condition, will consume many electric energy, and due to not being
There is user in each region in room, therefore, thus causes the waste of the energy.In the air-conditioning being currently running due to distance
The closer region of machine has been more likely to user, it should the fresh-air ventilation equipment in these regions is opened, so that the air matter in these regions
Amount gets a promotion, and has both improved the comfort level of user, in turn avoids energy waste, very intelligent.
Optionally, air-conditioning equipment includes one or more air-conditioning internal machines, judge the first parameter meet preset condition it
Afterwards, before sending the first control instruction to fresh-air ventilation equipment, method further include: obtain in operating status in air-conditioning system
Air-conditioning internal machine quantity;Judge whether the quantity of air-conditioning internal machine in operating status is greater than preset quantity;Judging source
When the quantity of the air-conditioning internal machine of operating status is greater than preset quantity, according to the first parameter and air-conditioning internal machine in operating status
Quantity determine the first control instruction.
When the quantity of air-conditioning internal machine in operating status in room is more, indoor air quality is more likely caused
Difference, therefore more likely need ventilation.
After judging that the first parameter meets preset condition, air-conditioning internal machine in operating status in air-conditioning system is obtained
Quantity control fresh-air ventilation opening of device if the negligible amounts of air-conditioning internal machine in operating status in air-conditioning system,
It shuts down after the one shorter time of operation;If the quantity of air-conditioning internal machine in operating status is more in air-conditioning system, control
Fresh-air ventilation opening of device processed shuts down after running a longer time.By according to air-conditioning internal machine in operating status
Quantity controls fresh-air ventilation equipment, can accurate, flexibly, intelligently control the operation of fresh-air ventilation equipment, and save
The about energy.
Optionally, the first control instruction includes the first sub-instructions and the second sub-instructions, according to the first parameter and in operation
The quantity of the air-conditioning internal machine of state determines that the first control instruction includes: according in the first parameter, air-conditioning in operating status
The quantity of machine and the incidence relation between the time generate the first sub-instructions and the second sub-instructions, wherein the first sub-instructions are for controlling
Fresh-air ventilation equipment processed is opened every the first preset time, and the second sub-instructions are opening second in advance for controlling fresh-air ventilation equipment
If shutting down after the time, wherein the first preset time is greater than the second preset time.
First preset time can indicate the height of the booting frequency of fresh-air ventilation equipment, and the second preset time indicates fresh air
Air regenerating device is switched on each time to the runing time between shutdown.In general, when indoor air quality is poor, fresh air is needed
The air regenerating device time in the open state is long, constantly takes a breath to indoor air ventilating, to promote the matter of room air
Amount.
Specifically, the first preset time and the second preset time are by the first parameter and air-conditioning in operating status
What both quantity of machine codetermined, the number of first parameter, air-conditioning internal machine in operating status can be preset
Mapping table between amount and two preset times, when the first parameter, the quantity of air-conditioning internal machine in operating status determine
Later, the first preset time and the second preset time are read from the mapping table.For example, table 1 is the first parameter, in fortune
Mapping table between the quantity of the air-conditioning internal machine of row state and two preset times uses room air as shown in table 1
Gas concentration lwevel indicates the first parameter.
When value >=0.08% of the first parameter and when the quantity of air-conditioning internal machine in operating status is between [5,10],
First preset time is 10 minutes, and the second preset time is 8 minutes.
When the first parameter value [0.06%, 0.08%) between and the quantity of air-conditioning internal machine in operating status exist
When between [5,10], the first preset time is 12 minutes, and the second preset time is 6 minutes.
When the first parameter value [0.03%, 0.04%) between and the quantity of air-conditioning internal machine in operating status exist
When between [1,5], the first preset time is 30 minutes, and the second preset time is 5 minutes.
As the value < 0.03% of the first parameter and when the quantity of air-conditioning internal machine in operating status is between [1,5],
First preset time is 60 minutes, and the second preset time is 3 minutes.
Table 1
In above embodiments, give according to first parameter and the quantity of air-conditioning internal machine in operating status this two
A parameter determines that the embodiment of the first preset time and the second preset time, the present invention are not limited to using the above parameter jointly
Determine that the first preset time and the second preset time, the present invention can also use other parameters to determine the first preset time and second
Preset time.For example, following manner one, mode two, mode three, etc..
Mode one: the present invention can also use multiple first parameters jointly determine the first preset time and second it is default when
Between, for example, determined jointly according to the PM2.5 concentration and gas concentration lwevel of room air the two parameters the first preset time and
Second preset time.
Mode two: the present invention can also use multiple first parameters, the quantity of air-conditioning internal machine in operating status common
The first preset time and the second preset time are determined, for example, according to the PM2.5 concentration of room air, gas concentration lwevel, oxygen
Concentration, the quantity of air-conditioning internal machine in operating status this four parameters determine jointly the first preset time and second it is default when
Between.
Mode three: the present invention can also use the first parameter, the mass parameter of outdoor air, the operating parameter of air-conditioning common
Determine the first preset time and the second preset time.
The first preset time and the second preset time are determined jointly by using multiple parameters, and Multiple factors are taken into account
It is controlled with the runing time after the booting frequency and booting to fresh-air ventilation equipment, realizes air-conditioning system and fresh-air ventilation
The intelligent linkage of equipment controls, and accurate, flexibly control fresh-air ventilation equipment operation reaches excellent ventilation effect, promotes room
The quality of interior air, and it is energy saving.
According to embodiments of the present invention, a kind of control device of air-conditioning system is additionally provided.The control device of the air-conditioning system
The control method of above-mentioned air-conditioning system can be executed, the control method of above-mentioned air-conditioning system can also pass through the control of the air-conditioning system
Device processed is implemented.
Fig. 3 is the schematic diagram of the control device of air-conditioning system according to an embodiment of the present invention.As shown in figure 3, the device packet
It includes: first acquisition unit 10, the first judging unit 20 and the first transmission unit 30.
First acquisition unit 10, for obtaining the first parameter of air-conditioning equipment transmission, wherein the first parameter is by air-conditioning equipment
On air quality detecting device detect to obtain, the first parameter is for indicating indoor air quality.
First judging unit 20, for judging whether the first parameter meets preset condition.
First transmission unit 30, if being sent for judging that the first parameter meets preset condition to fresh-air ventilation equipment
First control instruction, wherein the first control instruction is for controlling fresh-air ventilation opening of device.
Optionally, device further include: detection unit, for judging that the first parameter is unsatisfactory for presetting in the first judging unit
After condition, whether detection fresh-air ventilation equipment is in the open state;Second transmission unit, for being detected newly when detection unit
After wind air regenerating device is in the open state, the second control instruction is sent to fresh-air ventilation equipment, wherein the second control instruction is used
In control fresh-air ventilation equipment shutdown.
Optionally, air-conditioning system includes multiple fresh-air ventilation equipment, and air-conditioning equipment includes one or more air-conditioning internal machines, dress
It sets further include: second acquisition unit, for after the first judging unit judges that the first parameter meets preset condition, first
Before transmission unit sends the first control instruction to fresh-air ventilation equipment, obtain in air-conditioning in operating status in air-conditioning system
The target position of machine;First determination unit, for changing one or more fresh air in the preset range around target position
Gas equipment is as the first fresh-air ventilation equipment, to send the first control instruction to the first fresh-air ventilation equipment.
Optionally, air-conditioning equipment includes one or more air-conditioning internal machines, device further include: third acquiring unit is used for
After first judging unit judges that the first parameter meets preset condition, the is sent to fresh-air ventilation equipment in the first transmission unit
Before one control instruction, the quantity of air-conditioning internal machine in operating status in air-conditioning system is obtained;Second judgment unit, for sentencing
Whether the quantity of air-conditioning internal machine in operating status of breaking is greater than preset quantity;Second determination unit, for single in the second judgement
When member judges that the quantity of air-conditioning internal machine in operating status is greater than preset quantity, according to the first parameter and in operating status
The quantity of air-conditioning internal machine determine the first control instruction.
Optionally, the first control instruction includes the first sub-instructions and the second sub-instructions, and the second determination unit includes: to generate son
Unit, for according to the first parameter, the quantity of air-conditioning internal machine in operating status and the incidence relation between the time, generating the
One sub-instructions and the second sub-instructions, wherein the first sub-instructions are opened for controlling fresh-air ventilation equipment every the first preset time,
Second sub-instructions shut down after opening the second preset time for controlling fresh-air ventilation equipment, wherein the first preset time is greater than
Second preset time.
According to embodiments of the present invention, a kind of air-conditioning system is additionally provided, comprising: the control of above-described air-conditioning system fills
It sets.As shown in figure 4, air-conditioning system includes detection module 50, computing module 60, control module 70 and display module 80.
Wherein, the effect of detection module 50 is detection the first parameter, the quantity of air-conditioning internal machine in operating status, outdoor
Mass parameter, the operating parameter of air-conditioning of air, etc..
The effect of computing module 60 is to detect obtained one or more parameter calculating fresh air according to detection module 50 to change
The control parameter of gas equipment, wherein control parameter can be at least one of: frequency, the fresh air of fresh-air ventilation device power-up
The runing time that air regenerating device is switched on every time, etc..
The effect of control module 70 is according to the calculated control parameter of computing module 60 to air-conditioning and fresh-air ventilation equipment
It is controlled.
The effect of display module 80 is that display environment temperature, the mass parameter of room air, air conditioner operation parameters, fresh air are changed
The operating parameter of gas equipment, etc..
The serial number of the above embodiments of the invention is only for description, does not represent the advantages or disadvantages of the embodiments.
In the above embodiment of the invention, it all emphasizes particularly on different fields to the description of each embodiment, does not have in some embodiment
The part of detailed description, reference can be made to the related descriptions of other embodiments.
In several embodiments provided by the present invention, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, such as the division of the unit, Ke Yiwei
A kind of logical function partition, there may be another division manner in actual implementation, for example, multiple units or components can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be through some interfaces, the INDIRECT COUPLING or communication link of unit or module
It connects, can be electrical or other forms.
The unit as illustrated by the separation member may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, it can and it is in one place, or may be distributed over multiple
On unit.It can some or all of the units may be selected to achieve the purpose of the solution of this embodiment according to the actual needs.
It, can also be in addition, the functional units in various embodiments of the present invention may be integrated into one processing unit
It is that each unit physically exists alone, can also be integrated in one unit with two or more units.Above-mentioned integrated list
Member both can take the form of hardware realization, can also realize in the form of software functional units.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can store in a computer readable storage medium.Based on this understanding, technical solution of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can for personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes: that USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic or disk etc. be various to can store program code
Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (9)
1. a kind of control method of air-conditioning system, which is characterized in that the air-conditioning system includes that air-conditioning equipment and fresh-air ventilation are set
It is standby, which comprises
Obtain the first parameter that the air-conditioning equipment is sent, wherein first parameter is by the air matter on the air-conditioning equipment
Amount detecting device detects to obtain, and first parameter is for indicating indoor air quality;
Judge whether first parameter meets preset condition;
If judging, first parameter meets the preset condition, sends the first control to the fresh-air ventilation equipment and refers to
It enables, wherein first control instruction is for controlling the fresh-air ventilation opening of device;
Wherein, the air-conditioning system includes multiple fresh-air ventilation equipment, and the air-conditioning equipment includes one or more air-conditioning internal machines,
After judging that first parameter meets the preset condition, the first control instruction is being sent to the fresh-air ventilation equipment
Before, the method also includes:
Obtain the target position of the air-conditioning internal machine in operating status in the air-conditioning system;
Using one or more fresh-air ventilation equipment in the preset range around the target position as the first fresh-air ventilation
Equipment, to send first control instruction to the first fresh-air ventilation equipment.
2. the method according to claim 1, wherein judge first parameter whether meet preset condition it
Afterwards, the method also includes:
If judging, first parameter is unsatisfactory for the preset condition, detects whether the fresh-air ventilation equipment is in opening state
State;
If the fresh-air ventilation equipment is in the open state, the second control instruction is sent to the fresh-air ventilation equipment, wherein
Second control instruction is for controlling the fresh-air ventilation equipment shutdown.
3. the method according to claim 1, wherein the air-conditioning equipment includes one or more air-conditioning internal machines,
After judging that first parameter meets the preset condition, the first control instruction is being sent to the fresh-air ventilation equipment
Before, the method also includes:
Obtain the quantity of the air-conditioning internal machine in operating status in the air-conditioning system;
Judge whether the quantity of the air-conditioning internal machine in operating status is greater than preset quantity;
When the quantity for judging the air-conditioning internal machine in operating status is greater than the preset quantity, according to first ginseng
The quantity of several and in operating status air-conditioning internal machines determines first control instruction.
4. according to the method described in claim 3, it is characterized in that, first control instruction includes the first sub-instructions and second
Sub-instructions determine that first control refers to according to the quantity of first parameter and the air-conditioning internal machine in operating status
Order includes:
It is raw according to first parameter, the quantity of the air-conditioning internal machine in operating status and the incidence relation between the time
At first sub-instructions and second sub-instructions, wherein
First sub-instructions are opened for controlling the fresh-air ventilation equipment every the first preset time, second sub-instructions
It shuts down after opening the second preset time for controlling the fresh-air ventilation equipment, wherein first preset time is greater than institute
State the second preset time.
5. a kind of control device of air-conditioning system, which is characterized in that the air-conditioning system includes that air-conditioning equipment and fresh-air ventilation are set
Standby, described device includes:
First acquisition unit, the first parameter sent for obtaining the air-conditioning equipment, wherein first parameter is by the sky
The air quality detecting device in equipment is adjusted to detect to obtain, first parameter is for indicating indoor air quality;
First judging unit, for judging whether first parameter meets preset condition;
First transmission unit, if being set for judging that first parameter meets the preset condition to the fresh-air ventilation
Preparation send the first control instruction, wherein first control instruction is for controlling the fresh-air ventilation opening of device;
Wherein, the air-conditioning system includes multiple fresh-air ventilation equipment, and the air-conditioning equipment includes one or more air-conditioning internal machines,
Described device further include:
Second acquisition unit, for first judging unit judge first parameter meet the preset condition it
Afterwards, before first transmission unit sends the first control instruction to the fresh-air ventilation equipment, the air-conditioning system is obtained
In the air-conditioning internal machine in operating status target position;
First determination unit, for by one or more fresh-air ventilation equipment in the preset range around the target position
As the first fresh-air ventilation equipment, to send first control instruction to the first fresh-air ventilation equipment.
6. device according to claim 5, which is characterized in that described device further include:
Detection unit, for after first judging unit judges that first parameter is unsatisfactory for the preset condition,
Whether in the open state detect the fresh-air ventilation equipment;
Second transmission unit, for after the detection unit detects that the fresh-air ventilation equipment is in the open state, to
The fresh-air ventilation equipment sends the second control instruction, wherein second control instruction is set for controlling the fresh-air ventilation
Standby shutdown.
7. device according to claim 5, which is characterized in that the air-conditioning equipment includes one or more air-conditioning internal machines,
Described device further include:
Third acquiring unit, for first judging unit judge first parameter meet the preset condition it
Afterwards, before first transmission unit sends the first control instruction to the fresh-air ventilation equipment, the air-conditioning system is obtained
In the air-conditioning internal machine in operating status quantity;
Second judgment unit, for judging whether the quantity of the air-conditioning internal machine in operating status is greater than preset quantity;
Second determination unit, for judging the quantity of the air-conditioning internal machine in operating status in the second judgment unit
When greater than the preset quantity, institute is determined according to the quantity of first parameter and the air-conditioning internal machine in operating status
State the first control instruction.
8. device according to claim 7, which is characterized in that first control instruction includes the first sub-instructions and second
Sub-instructions,
Second determination unit includes:
Generate subelement, for according to first parameter, the quantity of the air-conditioning internal machine in operating status and time it
Between incidence relation, generate first sub-instructions and second sub-instructions, wherein first sub-instructions are for controlling institute
It states fresh-air ventilation equipment to open every the first preset time, second sub-instructions are being opened for controlling the fresh-air ventilation equipment
It shuts down after opening the second preset time, wherein first preset time is greater than second preset time.
9. a kind of air-conditioning system, which is characterized in that the air-conditioning system includes air-conditioning described in any one of claim 5 to 8
The control device of system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610331607.7A CN106016583B (en) | 2016-05-17 | 2016-05-17 | Control method and control device, the air-conditioning system of air-conditioning system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610331607.7A CN106016583B (en) | 2016-05-17 | 2016-05-17 | Control method and control device, the air-conditioning system of air-conditioning system |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106016583A CN106016583A (en) | 2016-10-12 |
CN106016583B true CN106016583B (en) | 2018-12-07 |
Family
ID=57097836
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610331607.7A Active CN106016583B (en) | 2016-05-17 | 2016-05-17 | Control method and control device, the air-conditioning system of air-conditioning system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106016583B (en) |
Families Citing this family (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107990507A (en) * | 2017-10-11 | 2018-05-04 | 珠海格力电器股份有限公司 | Air conditioning control method, device, storage medium and air-conditioning |
CN108731217A (en) * | 2018-05-31 | 2018-11-02 | 珠海格力电器股份有限公司 | A kind of air-conditioning inner-outer circulation control method, air-conditioner controller and air-conditioning |
CN108759012B (en) * | 2018-06-26 | 2023-06-16 | 安徽应力环保科技有限公司 | Control system and control method of fresh air conditioner |
CN108954489B (en) * | 2018-07-25 | 2021-12-28 | 杭州研泰机电设备有限公司 | Energy-saving heating system and method for carrying out heat tracing by using driving system |
CN108954490B (en) * | 2018-07-25 | 2021-09-14 | 杭州研泰机电设备有限公司 | Energy-saving heating system with data self-learning function and method |
CN109163420B (en) * | 2018-07-25 | 2021-04-13 | 浙江工业大学 | Automatic tracking heating system and method based on contact measurement |
CN108954485B (en) * | 2018-07-25 | 2021-08-31 | 浙江工业大学 | Energy-saving heating system and method using rotary heating head |
CN108758790B (en) * | 2018-07-25 | 2021-09-14 | 杭州研泰机电设备有限公司 | Tracking energy-saving heating system and method |
CN109114663B (en) * | 2018-07-25 | 2021-06-15 | 浙江工业大学 | Energy-saving heating system and method using infrared temperature measurement |
CN111174318B (en) * | 2018-10-24 | 2021-09-21 | 青岛海尔空调器有限总公司 | Control method and device for movable air conditioner |
CN111174319B (en) * | 2018-10-24 | 2022-06-14 | 青岛海尔空调器有限总公司 | Movable air conditioner and purification control method thereof |
CN111174300B (en) * | 2018-10-24 | 2021-10-29 | 青岛海尔空调器有限总公司 | Control method and device for movable air conditioner |
TWI690681B (en) * | 2019-01-02 | 2020-04-11 | 逢甲大學 | Control system of air quality and the operating method thereof |
CN110779147B (en) * | 2019-11-13 | 2021-01-29 | 珠海格力电器股份有限公司 | Air conditioner control method and device and air conditioner |
JP2021081160A (en) * | 2019-11-22 | 2021-05-27 | ダイキン工業株式会社 | Air conditioning system |
CN117063192A (en) * | 2021-03-31 | 2023-11-14 | 大金工业株式会社 | Visualization system and program |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1645006A (en) * | 2004-10-28 | 2005-07-27 | 广州松下空调器有限公司 | Air conditioner linked with ventilator |
CN1808006A (en) * | 2005-01-20 | 2006-07-26 | 松下电器产业株式会社 | Air conditioner system with ventilation linkage function and control method thereof |
CN103968471A (en) * | 2014-05-21 | 2014-08-06 | 重庆大学 | Annual multi-working-condition central air conditioning fresh air regulating and controlling system |
CN104654458A (en) * | 2014-08-13 | 2015-05-27 | 戴若夫 | Fresh air conditioner control method and fresh air conditioner |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2009074788A (en) * | 2007-08-28 | 2009-04-09 | Toshiba Carrier Corp | Air conditioner |
-
2016
- 2016-05-17 CN CN201610331607.7A patent/CN106016583B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1645006A (en) * | 2004-10-28 | 2005-07-27 | 广州松下空调器有限公司 | Air conditioner linked with ventilator |
CN1808006A (en) * | 2005-01-20 | 2006-07-26 | 松下电器产业株式会社 | Air conditioner system with ventilation linkage function and control method thereof |
CN103968471A (en) * | 2014-05-21 | 2014-08-06 | 重庆大学 | Annual multi-working-condition central air conditioning fresh air regulating and controlling system |
CN104654458A (en) * | 2014-08-13 | 2015-05-27 | 戴若夫 | Fresh air conditioner control method and fresh air conditioner |
Also Published As
Publication number | Publication date |
---|---|
CN106016583A (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106016583B (en) | Control method and control device, the air-conditioning system of air-conditioning system | |
CN105324614B (en) | Air-conditioning system control device and air conditioner system control method | |
CN105387563B (en) | Air-conditioning and its control method, device and system and remote server | |
CN103941666B (en) | Judgement control instruction for home appliance sends the method and system of result | |
CN109974237A (en) | Air conditioner, the method for adjustment of air conditioner operation reserve and device | |
CN106052040B (en) | Air-conditioning and its control method and device | |
CN108224698B (en) | Air conditioning control method, device, storage medium and air-conditioning | |
CN107270649A (en) | Control method, control system and refrigerator, the computer installation of refrigerator | |
CN106094754A (en) | Apparatus control system, method and device | |
CN105650811A (en) | Method and device for controlling indoor unit of air conditioner | |
CN108317677A (en) | Air conditioning control method, system and air-conditioning | |
CN105546756A (en) | Air conditioner control method and device | |
CN110094843A (en) | The method and apparatus of control air-conditioning based on scarce refrigerant grade | |
CN106839313B (en) | The communication means and device of multi-online air-conditioning system | |
CN106247572A (en) | The control method of air-conditioning, device, system and air-conditioning | |
CN110531633A (en) | Cooperative control method and device, storage medium based on smart home operating system | |
CN109269036A (en) | The cloud control method and multi-online air-conditioning system of multi-gang air-conditioner | |
CN109764493A (en) | Air conditioner and its control method and computer readable storage medium | |
CN106403147A (en) | Control method, control system and control device for air-conditioner | |
CN110094844A (en) | The control method and device of air conditioner, air-conditioning equipment | |
CN108917088B (en) | A kind of body-sensing air quantity adjusting method, device and air conditioner | |
CN107726567A (en) | The control method and system of new blower fan, new blower fan and multi-online air-conditioning system | |
CN108253603A (en) | Method, apparatus, system and the air-conditioning of airconditioning control | |
CN109990434A (en) | Control the method, apparatus and household electrical appliance of household electrical appliance | |
CN113864991B (en) | Method and device for correcting ambient temperature in air conditioner and air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |