CN106013211A - Foundation bolt group fixing structure and construction method thereof - Google Patents

Foundation bolt group fixing structure and construction method thereof Download PDF

Info

Publication number
CN106013211A
CN106013211A CN201610572597.6A CN201610572597A CN106013211A CN 106013211 A CN106013211 A CN 106013211A CN 201610572597 A CN201610572597 A CN 201610572597A CN 106013211 A CN106013211 A CN 106013211A
Authority
CN
China
Prior art keywords
bolt
foundation
steel plate
foundation bolt
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610572597.6A
Other languages
Chinese (zh)
Inventor
李宪
张云发
刘振安
李香薇
张远军
杨秋梅
霍庆春
张璐
陈建飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Science And Engineering Construction Engineering Group Co Ltd
Original Assignee
Hebei Science And Engineering Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Science And Engineering Construction Engineering Group Co Ltd filed Critical Hebei Science And Engineering Construction Engineering Group Co Ltd
Priority to CN201610572597.6A priority Critical patent/CN106013211A/en
Publication of CN106013211A publication Critical patent/CN106013211A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The invention relates to a foundation bolt group fixing structure and a construction method thereof. The construction method comprises the steps of cutting a steel plate with similar size as a column foot plate; snapping bolt hole position lines on the steel plate, then drilling holes; penetrating bolts into the steel plate holes, temporarily fixing the upper parts of the bolts and the steel plate through nuts, and inserting the lower parts of the bolts into foundation reinforcement; after adjusting the position and the elevation of the steel plate according to a steel column axis position, tightening the nuts, and welding the lower parts of the bolts and the foundation reinforcement; casting independent foundation concrete; after concrete casting and before initial setting, retesting and adjusting bolt positions, bolt rod spacing, elevation, steel plate position and elevation; after the strength of the independent foundation concrete achieves 1.2mps, taking the steel plate and the nuts down, and reusing; enabling the steel column bolt holes to penetrate through reserved bolt rods, and fixing through the nuts. The foundation bolt group fixing structure and the construction method thereof provided by the invention overcome the defect that group foundation bolt positions are reserved inaccurately in steel structure construction, the convenience in construction is realized, the working efficiency is high, the installation cost is low, and the steel plate and the nuts can be recycled.

Description

Foundation bolt fixed structure in groups and construction method thereof
Technical field
The present invention relates to the construction method of installation of foundation bolt, specifically a kind of foundation bolt fixed structure in groups and construction method thereof.
Background technology
In conventional steel structure construction, foundation bolt installation method is usually single bolt and isolated footing reinforcing bar binding or welds together, and this is it is difficult to ensure that the absolute position of bolt and absolute altitude, the bolt quality more Customers ' Legal Right of group.
Summary of the invention
Present invention seek to address that the problems referred to above that existing foundation bolt installation method exists, and a kind of foundation bolt fixed structure in groups and construction method thereof are provided.
The present invention solves its technical problem and the technical scheme is that
A kind of foundation bolt fixed structure in groups, including punched steel plate, foundation bolt, bolt hole it is provided with on punched steel plate, number and the position of bolt hole are determined by embedding anchor bolts position, foundation bolt upper end through bolt hole and is fixed with punched steel plate by nut, and foundation bolt lower end is to insert the connection end welded in reinforcement foundation and with reinforcement foundation.
Further, diameter of bolt hole is more than foundation bolt diameter 1mm.
The construction method of above-mentioned foundation bolt fixed structure in groups, is carried out in the steps below:
(1) one block of steel plate similar to heel slab size of cutting, ejects the position line of bolt hole according to drawing above;
(2) hole according to snap the line position with radial drill;
(3) being penetrated by foundation bolt in punched steel plate hole, foundation bolt is fixed by foundation bolt top nut with punched steel plate temporarily, and foundation bolt bottom is inserted in reinforcement foundation;
(4) the steel shaft line position theodolite first put well according to examination and level gauge adjust position and the absolute altitude of punched steel plate, after adjusting, by nut screwing clamping, are welded with reinforcement foundation foundation bolt bottom;
(5) isolated footing concrete is poured;
(6) concreting completes and before initial set, with theodolite and the position of level gauge repetition measurement foundation bolt, shank of bolt spacing, absolute altitude, the position of repetition measurement punched steel plate and absolute altitude, as being subjected to displacement, is adjusted;
(7), after independent concrete foundation intensity reaches 1.2mpa, punched steel plate is taken off with nut and reuses;
(8) when installing steel column, being penetrated by the bolt hole of steel column in reserved shank of bolt, nut is fixed.
Using the present invention of technique scheme, compared with prior art, it provides the benefit that:
Solving in Construction of Steel Structure foot bolt position in groups and reserve inaccurate shortcoming, and easy construction, working performance is high, and mounting cost is low, and steel plate and nut can be recycled, economical, last a long time.
Further, the preferred version of the present invention is:
In step (4), when shank of bolt has spacing with reinforcement foundation, choose two short reinforcing bar auxiliary bars and shank of bolt is welded together with reinforcement foundation.
In step (6), adjustment of displacement uses the hand hammer mode of rapping to carry out.
Accompanying drawing explanation
Fig. 1 is the punched steel plate floor map of the embodiment of the present invention;
Fig. 2 is that punched steel plate schematic perspective view worn by foundation bolt;
In figure: 1-punched steel plate;2-bolt hole;3-foundation bolt;
A, b represent the length and width of punched steel plate respectively;c1、c2Represent the spacing of vertical, horizontal bolt hole.
Detailed description of the invention
Below in conjunction with drawings and Examples in detail the present invention is described in detail, but the present embodiment does not constitute any restriction to the present invention.
See Fig. 1, Fig. 2, a kind of foundation bolt fixed structure in groups, it is made up of punched steel plate 1, foundation bolt 2 and nut, bolt hole 2 it is provided with on punched steel plate 1, number and the position of bolt hole 2 are determined by the pre-buried position of foundation bolt 3, foundation bolt 3 upper end is fixed through bolt hole 2 and by nut with punched steel plate 1, and foundation bolt 3 lower end is to insert the connection end welded in reinforcement foundation and with reinforcement foundation.
The construction method of above-mentioned foundation bolt fixed structure in groups, is carried out in the steps below:
(1) the rectangle steel plate of a piece of length and width respectively a, b of cutting is punched steel plate 1, and punched steel plate 1 is similar to heel slab size, ejects the position line (diameter of bolt hole 2 is than the foundation bolt 3 big 1mm of diameter) of bolt hole 2 on punched steel plate 1 according to drawing.
(2) 6 bolts hole 2 are got out with radial drill according to snap the line position.
(3) being penetrated by 6 bolts 3 in 6 bolts hole 2 of correspondence, foundation bolt 3 is fixed by foundation bolt 3 top nut with punched steel plate 1 temporarily, and foundation bolt 3 bottom is inserted in reinforcement foundation.
(4) the steel shaft line position theodolite first put well according to examination and level gauge adjust position and the absolute altitude of punched steel plate 1, after adjusting, by nut screwing clamping, foundation bolt 3 bottom and reinforcement foundation are welded (if shank of bolt and reinforcement foundation have spacing, can choose two short reinforcing bar auxiliary bars and shank of bolt and reinforcement foundation be welded together).
(5) pouring isolated footing concrete, during casting concrete, special messenger to be set keeps an eye on.
(6) concrete placings completes and before initial set, and with theodolite and the position of level gauge repetition measurement foundation bolt 3, shank of bolt spacing, absolute altitude, the position of repetition measurement steel plate 1 and absolute altitude, if it occur that displacement, available hand hammer is adjusted gently.
(7), after independent concrete foundation intensity reaches 1.2mpa, punched steel plate 1 can be taken off with nut and reuse.
(8) when installing steel column, being penetrated by the bolt hole of steel column in reserved shank of bolt, nut is fixed.
According to said method, i.e. realize foundation bolt of the present invention fixed structure in groups.
The foregoing is only the embodiment that the present invention is the most feasible, not thereby limit to the interest field of the present invention, the equivalent structure change that all utilization description of the invention and accompanying drawing content are made, within being both contained in the interest field of the present invention.

Claims (5)

1. a foundation bolt fixed structure in groups, it is characterized in that: include punched steel plate, foundation bolt, bolt hole it is provided with on punched steel plate, number and the position of bolt hole are determined by embedding anchor bolts position, foundation bolt upper end through bolt hole and is fixed with punched steel plate by nut, and foundation bolt lower end is to insert the connection end welded in reinforcement foundation and with reinforcement foundation.
Foundation bolt the most according to claim 1 fixed structure in groups, it is characterised in that: diameter of bolt hole is more than foundation bolt diameter 1mm.
3. the construction method of the fixed structure in groups of the foundation bolt as described in any one of claim 1-2, it is characterised in that carry out in the steps below:
(1) one block of steel plate similar to heel slab size of cutting, ejects the position line of bolt hole according to drawing above;
(2) hole according to snap the line position with radial drill;
(3) being penetrated by foundation bolt in punched steel plate hole, foundation bolt is fixed by foundation bolt top nut with punched steel plate temporarily, and foundation bolt bottom is inserted in reinforcement foundation;
(4) the steel shaft line position theodolite first put well according to examination and level gauge adjust position and the absolute altitude of punched steel plate, after adjusting, by nut screwing clamping, are welded with reinforcement foundation foundation bolt bottom;
(5) isolated footing concrete is poured;
(6) concreting completes and before initial set, with theodolite and the position of level gauge repetition measurement foundation bolt, shank of bolt spacing, absolute altitude, the position of repetition measurement punched steel plate and absolute altitude, as being subjected to displacement, is adjusted;
(7), after independent concrete foundation intensity reaches 1.2mpa, punched steel plate is taken off with nut and reuses;
(8) when installing steel column, being penetrated by the bolt hole of steel column in reserved shank of bolt, nut is fixed.
The construction method of foundation bolt the most according to claim 3 fixed structure in groups, it is characterised in that: in step (4), when shank of bolt has spacing with reinforcement foundation, choose two short reinforcing bar auxiliary bars and shank of bolt is welded together with reinforcement foundation.
The construction method of foundation bolt the most according to claim 3 fixed structure in groups, it is characterised in that: in step (6), adjustment of displacement uses the hand hammer mode of rapping to carry out.
CN201610572597.6A 2016-07-20 2016-07-20 Foundation bolt group fixing structure and construction method thereof Pending CN106013211A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610572597.6A CN106013211A (en) 2016-07-20 2016-07-20 Foundation bolt group fixing structure and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610572597.6A CN106013211A (en) 2016-07-20 2016-07-20 Foundation bolt group fixing structure and construction method thereof

Publications (1)

Publication Number Publication Date
CN106013211A true CN106013211A (en) 2016-10-12

Family

ID=57116532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610572597.6A Pending CN106013211A (en) 2016-07-20 2016-07-20 Foundation bolt group fixing structure and construction method thereof

Country Status (1)

Country Link
CN (1) CN106013211A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759943A (en) * 2017-03-21 2017-05-31 中国五冶集团有限公司 A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN107023028A (en) * 2017-04-06 2017-08-08 濮阳市盛源能源科技股份有限公司 A kind of positioning construction method of chemical tower foundation built-in bolt
CN108104488A (en) * 2017-11-22 2018-06-01 中国二十冶集团有限公司 The installation method of pre-embedded anchoring bolts
CN109853610A (en) * 2019-01-30 2019-06-07 山西三建集团有限公司 Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN111980153A (en) * 2020-08-18 2020-11-24 杭州江南建筑设计院有限公司 Construction method for embedded column base in ground beam
CN114809673A (en) * 2022-05-08 2022-07-29 山西三建集团有限公司 Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring
CN115506397A (en) * 2022-09-23 2022-12-23 中国化学工程第六建设有限公司 Construction method for accurately positioning foundation bolt box

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2748244B2 (en) * 1995-06-16 1998-05-06 龍二 関谷 Fixing method of steel pedestal column
CN202081427U (en) * 2011-05-26 2011-12-21 中国建筑第七工程局有限公司 Embedded bolt positioning device for tower crane foundation
CN202787307U (en) * 2012-09-25 2013-03-13 山东济炼石化工程有限公司 Foundation bolt positioning template
CN202913420U (en) * 2012-11-20 2013-05-01 中国十七冶集团有限公司 Reusable positioning device for installing foundation bolts
CN103088840A (en) * 2013-02-05 2013-05-08 成都市工业设备安装公司 Axis type foundation bolt high-precision fast locator and locating method thereof
CN203174622U (en) * 2013-05-02 2013-09-04 中建新疆建工集团第五建筑工程有限公司 Pre-embedded mounting and fixing device of steel structure column foundation bolts

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2748244B2 (en) * 1995-06-16 1998-05-06 龍二 関谷 Fixing method of steel pedestal column
CN202081427U (en) * 2011-05-26 2011-12-21 中国建筑第七工程局有限公司 Embedded bolt positioning device for tower crane foundation
CN202787307U (en) * 2012-09-25 2013-03-13 山东济炼石化工程有限公司 Foundation bolt positioning template
CN202913420U (en) * 2012-11-20 2013-05-01 中国十七冶集团有限公司 Reusable positioning device for installing foundation bolts
CN103088840A (en) * 2013-02-05 2013-05-08 成都市工业设备安装公司 Axis type foundation bolt high-precision fast locator and locating method thereof
CN203174622U (en) * 2013-05-02 2013-09-04 中建新疆建工集团第五建筑工程有限公司 Pre-embedded mounting and fixing device of steel structure column foundation bolts

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106759943A (en) * 2017-03-21 2017-05-31 中国五冶集团有限公司 A kind of pre-assembled Anchor Bolts in Steel Column Bases structure
CN107023028A (en) * 2017-04-06 2017-08-08 濮阳市盛源能源科技股份有限公司 A kind of positioning construction method of chemical tower foundation built-in bolt
CN107023028B (en) * 2017-04-06 2019-02-15 濮阳市盛源能源科技股份有限公司 A kind of positioning construction method of chemical tower foundation built-in bolt
CN108104488A (en) * 2017-11-22 2018-06-01 中国二十冶集团有限公司 The installation method of pre-embedded anchoring bolts
CN109853610A (en) * 2019-01-30 2019-06-07 山西三建集团有限公司 Steel pipe column concrete foundation pre-embedded anchoring bolts precise positioning mechanism and localization method
CN111980153A (en) * 2020-08-18 2020-11-24 杭州江南建筑设计院有限公司 Construction method for embedded column base in ground beam
CN114809673A (en) * 2022-05-08 2022-07-29 山西三建集团有限公司 Rear-buried foundation bolt suspension positioning method in street lamp concrete foundation pouring
CN115506397A (en) * 2022-09-23 2022-12-23 中国化学工程第六建设有限公司 Construction method for accurately positioning foundation bolt box
CN115506397B (en) * 2022-09-23 2023-06-27 中国化学工程第六建设有限公司 Accurate positioning construction method for foundation anchor bolt box

Similar Documents

Publication Publication Date Title
CN106013211A (en) Foundation bolt group fixing structure and construction method thereof
CN106193141B (en) A kind of impaired pier footing method for reinforcing of earthquake
CN107989029B (en) Pile-to-pile connection system and construction method thereof
CN108005401A (en) A kind of support and change method of the column of existing frame structure base isolation reinforcement
CN104264984A (en) Formwork for concrete structure pouring and pouring construction method
CN103161313B (en) Connection method of main reinforcement of constructional column of infilled wall and framed girder
CN106049563B (en) Earthquake is damaged pier footing reinforcing system
CN215594016U (en) Mounting structure of shock insulation support
JP5209278B2 (en) Construction method of steel column and pile connection structure of steel building
CN108487080A (en) Super-span T-type rigid structure beam side earnestly supports pinner reversed construction method
CN111764299A (en) Pile-column integrated assembling type bridge cap beam elevation control equipment and control method
CN107724384B (en) Pile-to-pile connection construction method
CN106968268B (en) Installation method of foundation bolt
CN217869777U (en) Town road based on prestressed concrete sheet pile is built
JP5794539B2 (en) How to remove floor slab
JP2005240426A (en) Erection structure for steel-pipe column
KR101273375B1 (en) PHC pile head cutting work and reinforced concrete structure for jointing scaffolding structural steel and construction method therof
CN212641233U (en) Pile and column integrated assembling type bridge cap beam elevation control equipment
CN112095487A (en) Deepwater bridge pile foundation and construction method thereof
CN110965575A (en) Foundation bolt mounting and fixing tool and method for equipment foundation
CN211286579U (en) I-steel fixed knot that encorbelments constructs
CN104032894B (en) Frame column root structure and the method for generation thereof
CN209636842U (en) Tower-crane foundation structure in the engineering of group hole
CN219364694U (en) Detachable concrete rag bolt positioner
CN214613392U (en) Concrete pavement structure of municipal construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161012