CN106013203A - Construction method for refined pre-embedded structure of steel structural foundation bolt shaping mould - Google Patents

Construction method for refined pre-embedded structure of steel structural foundation bolt shaping mould Download PDF

Info

Publication number
CN106013203A
CN106013203A CN201610361957.8A CN201610361957A CN106013203A CN 106013203 A CN106013203 A CN 106013203A CN 201610361957 A CN201610361957 A CN 201610361957A CN 106013203 A CN106013203 A CN 106013203A
Authority
CN
China
Prior art keywords
bolt
plate
foundation bolt
foundation
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610361957.8A
Other languages
Chinese (zh)
Other versions
CN106013203B (en
Inventor
王新泉
韩尚宇
朱凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CITIC Guoan Construction Group Co Ltd
Original Assignee
Hangzhou Jiangrun Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Jiangrun Technology Co Ltd filed Critical Hangzhou Jiangrun Technology Co Ltd
Priority to CN201610361957.8A priority Critical patent/CN106013203B/en
Publication of CN106013203A publication Critical patent/CN106013203A/en
Application granted granted Critical
Publication of CN106013203B publication Critical patent/CN106013203B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/41Connecting devices specially adapted for embedding in concrete or masonry

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Foundations (AREA)

Abstract

The invention relates to a construction method for a refined pre-embedded structure of a steel structural foundation bolt shaping mould. The construction method is characterized by comprising the steps of firstly, assembling an adjustable assembled mould frame on a prefabrication site or a construction site; after finishing location of structural members of the assembled mould frame, dismounting a formwork at the bottom, and enabling a foundation bolt to penetrate an assembly limiting bolt hole and a foundation bolt hole of the assembled mould frame; then, connecting an anchor bolt with a lower locating plate, and respectively adjusting the horizontality of the lower locating plate and the verticality of the foundation bolt through a levelling nut and a transverse connecting rib; next, filling a gap between an upper locating plate and the lower locating plate with a pre-locating grouting body by virtue of a pre-locating grouting pipe; and after the pre-locating grouting body is initially solidified, dismounting a formwork at the top, and carrying out foundation concrete pouring in other areas. By using the construction method, not only can the in-site installation and location time of the foundation bolt be shortened, but also the accuracy degree for locating the foundation bolt can be increased, and affects of foundation concrete pouring to the spatial position of the foundation bolt can be avoided.

Description

A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method
Technical field
The present invention relates to a kind of steel construction embedding anchor bolts construction method, become more meticulous pre-buried structure construction method particularly to the steel construction foundation bolt shaper that a kind of can effectively shorten on-site construction time, improve foundation bolt positioning precision, belong to building engineering field, it is adaptable to steel construction foundation bolt construction work.
Background technology
In recent years, along with the fast development of urban construction, steel building application is more and more universal.In Construction of Steel Structure, installation quality and the positional accuracy of steel construction foundation bolt are prominent on safety and the construction quality impact of steel construction.
Existing a kind of combined multifunctional foundation bolt locating template, the connected mode that the framework of template is nested within big steel part according to small steel piece by four telescoping rods is in turn connected to form;The U type groove of the U-shaped steel part in lower end of connector is stuck on telescoping rod, and is connected by bolt and telescoping rod are fixing;Foundation bolt fixed standard part is through two through holes of U shaped steel side, connector upper end, and is connected by bolt and connector are fixing.Though this structure from the position of adjustment foundation bolt horizontal, vertical, but can be difficult to the connection strengthening foundation bolt with foundation soil, and the installation of this structure is complicated, location workload is big.
One foot bolt Embedment Construction engineering method accurately, take making high-precision positioning fixture, the pre-embedded anchoring bolts often organizing equipment Foundations is carried out clustered control, and sprung jaws is set outside foundation bolt, and the leg on sprung jaws is embedded in the screens hole on positioning fixture, spring clamp is fastened on foundation bolt positioning fixture, reinforces foundation bolt further, prevents foundation bolt from loosening.Though this construction method can prevent foundation bolt from loosening problem, but is difficult to be adjusted foundation bolt locus, and Contraction in Site amount is big, be difficult to effectively promote foundation bolt positioning precision.
In sum, though the construction technology of existing steel construction foundation bolt, structure achieve preferable project benefit under suitable operating mode, but remain certain shortcoming, be mainly reflected in: the design of foundation bolt location structure owes rationally, foundation bolt positioning precision is low, structure integrated connection intensity not enough, structure site operation assembles the aspects such as difficulty is big.Given this, it is actually needed based on current position foot bolt is pinpoint, the most urgently invents and a kind of can effectively shorten on-the-spot foundation bolt and the time of location is installed, promotes the accuracy of foundation bolt location, reduce base concrete and pour the steel construction embedding anchor bolts construction method on the impact of foundation bolt locus.
Summary of the invention
It is an object of the invention to provide and a kind of can effectively shorten on-the-spot foundation bolt and the time of location is installed, promotes the accuracy of foundation bolt location, reduce base concrete and pour the steel construction foundation bolt shaper on the impact of foundation bolt locus and become more meticulous pre-buried structure construction method.
For realizing above-mentioned technical purpose, present invention employs techniques below scheme:
A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method, including following construction procedure:
1) foundation bolt locus test: according to the design requirement of steel structure column foundation bolt, the diameter of foot bolt definitely, and assemble the caging bolt aperture through hole;
2) assemble mould bases assemble: template top, bottom set gradually lower location-plate, vertical spacing base plate, vertical spacing top board, on location-plate and top template, vertical spacing base plate, vertical spacing top board control it by cross spacing arc plate and vertically spend, limit its horizontal level by upper limit plate, make the caging bolt that assembles of bottom template determine the assembling caging bolt of plate and upper location-plate through hole through lower simultaneously;Then by assembly and connection bolt through assembly and connection bolt through hole, and lower location-plate is connected firmly with upper location-plate, top template;
3) position, ground anchor bolt school: the ground anchor bolt that and lower location-plate pre-buried at steel construction foundation bolt installation position is connected, and guarantee ground anchor bolt be connected firmly with bottom foundation structure body, ground anchor bolt position corresponding through hole site with lower location-plate ground anchor bolt;
4) bottom, screed-coat is laid: uses screed-coat bottom discrete material laying in lower location-plate bottom, and carries out shaking densification process;
5) foundation bolt is installed: will assemble the bottom form removable of mould bases, and it is inserted into foundation bolt through hole and foundation bolt through hole assembling caging bolt, make the anchor plate bottom foundation bolt be in close contact with lower location-plate, lateral connection muscle is set between foundation bolt and vertical spacing base plate, vertical spacing top board;
6) ground anchor bolt is connected with lower location-plate: the assembling mould bases connected with foundation bolt is put into screed-coat top, bottom, and by the lower location-plate level of leveling nut regulation, and make ground anchor bolt fasten;
7) foundation bolt locus correction: carry out the test of foundation bolt locus, changes the vertical degree of foundation bolt by the tightness of regulation lateral connection muscle;
8) pre-determined bit injecting cement paste construction: be inserted into Grouting Pipe through hole to the pre-determined bit Grouting Pipe of top template, starts to synchronize to pour all Grouting Pipe symmetries pre-determined bit injecting cement paste material from lower location-plate end face, forms pre-determined bit injecting cement paste;
9) top form removable: after pre-determined bit injecting cement paste initial set before final set, symmetry unclamps assembly and connection bolt, by removed together to top template and assembly and connection bolt;
10) base concrete pours: carries out other position concretings of basis of steel structure column ground anchor bolt, and carries out maintenance construction.
Step 2) 3 or 4 assembly and connection bolts are circumferentially set on described lower location-plate and upper location-plate through hole, the assembly and connection bolt at lower location-plate arranges assembly and connection bolt fastening screw thread in hole, welds upper limit plate at upper location-plate lower surface.
Step 2) described vertical spacing base plate, vertical spacing plate link slot, cross spacing arc plate insertion groove and upper limit groove are set on vertical spacing top board;The most spacing base plate, the corresponding sliding link slot in vertically arranged multiple rows of and foundation bolt dowel position laterally outside of vertical spacing top board and connecting bolt.
Step 2) described cross spacing arc plate central angle is 90 °, arranges arc plate at cross spacing arc plate two ends and connects tenon, arc plate connects tenon and inserts cross spacing arc plate insertion groove.
Step 2) oblique assembly and connection bolt is set in the template of described top through groove and assembles caging bolt through groove, outer ledge is symmetrical arranged 3-4 pre-determined bit Grouting Pipe through hole, arranges assembling caging bolt and assemble caging bolt and pass groove in the template of bottom.
Described in step 7), lateral connection muscle one end is placed on foundation bolt outer surface;Lateral connection muscle is connected firmly with vertical spacing base plate or vertical spacing top board by the other end by sliding link slot and connecting bolt.
Pre-determined bit injecting cement paste described in step 8) uses self-compaction particulate formula concrete.
Described in step 3), ground anchor bolt is L-shaped, and one end is anchored in the foundation structure body of bottom, and the other end is through the ground anchor bolt of lower location-plate through hole, and is connected with leveling nut.
The present invention has following feature and beneficial effect
(1) in precasting yard or job site, bottom employing, lower location-plate, vertical spacing base plate, vertical spacing top board, upper location-plate are quickly positioned by template, top template, assembling caging bolt and assembly and connection bolt, not only can promote the installation effectiveness assembling mould bases, and can be with the positioning precision of lift structure.
(2) foundation bolt through hole or assembles caging bolt through behind hole through the foundation bolt of lower location-plate, upper location-plate, it is connected firmly with lower location-plate by anchor plate, controlled the vertical degree of foundation bolt by horizontal tension rib, thus realize the quick correction to foundation bolt locus.
(3) during the concreting of foundation bolt periphery, first pour pre-determined bit injecting cement paste and foundation bolt is carried out spacing, then carry out base concrete and pour, can prevent base concrete from pouring the position affecting foundation bolt.
Accompanying drawing explanation
Fig. 1 is that one steel construction foundation bolt shaper of the present invention becomes more meticulous structural profile schematic diagram after pre-buried structure foundation bolt installation;
Fig. 2 is that Fig. 1 base concrete has poured rear structural profile schematic diagram;
Fig. 3 is that Fig. 1 steel construction foundation bolt shaper is completed rear structural profile schematic diagram;
Fig. 4 is Fig. 1 vertical spacing base plate, vertical spacing top board and cross spacing arc board connecting structure schematic diagram;
Fig. 5 is Fig. 1 positive elevational schematic view of vertical spacing top board;
Fig. 6 is Fig. 1 positive elevational schematic view of vertical spacing base plate;
Fig. 7 is location-plate floor map under Fig. 1;
Fig. 8 is location-plate floor map on Fig. 1;
Fig. 9 is stencil plane schematic diagram bottom Fig. 3;
Figure 10 is Fig. 1 top die board plane schematic diagram;
Figure 11 is that one steel construction foundation bolt shaper of the present invention becomes more meticulous pre-buried structure construction process figure.
In figure: 1-foundation bolt;2-assembles caging bolt through hole;Template bottom 3-;Location-plate under 4-;5-vertical spacing base plate;6-vertical spacing top board;The upper location-plate of 7-;8-top template;9-cross spacing arc plate;10-upper limit plate;11-assembles caging bolt;12-ground anchor bolt;13-bottom foundation structure body;14-ground anchor bolt passes hole;Screed-coat bottom 15-;16-assembly and connection bolt passes hole;17-foundation bolt passes hole;18-anchor plate;19-lateral connection muscle;20-leveling nut;21-pre-determined bit Grouting Pipe passes hole;22-Grouting Pipe;23-pre-determined bit injecting cement paste;24-base concrete;25-vertical spacing plate link slot;26-cross spacing arc plate insertion groove;27-upper limit groove;28-sliding link slot;29-connecting bolt;30-arc plate connects tenon;31-assembly and connection bolt;32-assembly and connection bolt passes groove;33-assembles caging bolt through groove.
Specific embodiment
Illustrate embodiments of the invention are described in further detail below in conjunction with accompanying drawing, but the present embodiment is not limited to the present invention, the analog structure of every employing present invention and similar change thereof, all should list protection scope of the present invention in.
Foundation bolt design and manufacturing technology requirement, the requirement of pre-determined bit injecting cement paste construction technical requirement, base concrete pouring construction technology, upper location-plate and the requirement of lower location-plate design and construction technology, reinforcing bar binding or the requirement of welding procedure technology, ground anchor bolt design and construction technology requirement etc., repeating no more in present embodiment, emphasis illustrates the embodiment of the method that the present invention relates to.
Fig. 1 is that one steel construction foundation bolt shaper of the present invention becomes more meticulous structural profile schematic diagram after pre-buried structure foundation bolt installation, Fig. 2 is that Fig. 1 base concrete has poured rear structural profile schematic diagram, Fig. 3 is that Fig. 1 steel construction foundation bolt shaper is completed rear structural profile schematic diagram, Fig. 4 is Fig. 1 vertical spacing base plate, vertical spacing top board and cross spacing arc board connecting structure schematic diagram, Fig. 5 is Fig. 1 positive elevational schematic view of vertical spacing top board, Fig. 6 is Fig. 1 positive elevational schematic view of vertical spacing base plate, Fig. 7 is location-plate floor map under Fig. 1, Fig. 8 is location-plate floor map on Fig. 1, Fig. 9 is stencil plane schematic diagram bottom Fig. 1, Figure 10 is Fig. 1 top die board plane schematic diagram.
Become more meticulous pre-buried structure with reference to the steel construction foundation bolt shaper shown in Fig. 1 ~ Figure 10, lower location-plate 4 and upper location-plate 7 are set between top template 8 and bottom template 3, lower location-plate 4 and upper location-plate 7 are connected by vertical spacing top board 6 and vertical spacing base plate 5, arrange cross spacing arc plate 9 between vertical spacing top board 6 and vertical spacing base plate 5;Lower location-plate 4 is connected by ground anchor bolt 12 with bottom foundation structure body 13, and sets leveling nut 20 on lower location-plate 4;Pre-determined bit injecting cement paste 23 and base concrete 24 are set outside foundation bolt 1.
The anchor slab foundation bolt that foundation bolt 1 uses diameter 48mm, long 1000mm, strength grade to be Q235, same foundation bolt group contains 8 foundation bolts 1;Assembling caging bolt through hole 2 and foundation bolt through the aperture in hole 17 is 54mm;Assemble caging bolt and uniformly lay 4 through hole 2 along lower location-plate 4 and upper location-plate 7 hoop;It is middle through hole 2 that foundation bolt is positioned at adjacent assembling caging bolt through hole 17, sets 4 altogether.
Bottom template 3 and top template 8 use 1.0m × 1.0m, thick 10mm, strength grade to be the square plate of Q235;Arrange 4 in the template 3 of bottom assemble caging bolt 11 and assemble caging bolt through groove 33;Assemble the double thread bolt that caging bolt 11 uses diameter 48mm, long 600mm, strength grade to be Q235;Assembling caging bolt and pass groove 33 wide 60mm, long 120mm, axis is through the center of bottom template 3;Arranging oblique assembly and connection bolt in top template 8 and pass groove 33 through groove 32 and assembling caging bolt, outer ledge is symmetrical arranged 4 pre-determined bit Grouting Pipe through hole 21;Assembly and connection bolt is through groove 32 wide 30mm, long 60mm, and axis is through the center of top template 8;Pre-determined bit Grouting Pipe is 40mm through the aperture in hole 21.
Lower location-plate 4 uses 0.6m × 0.6m, thick 20mm, strength grade to be the square plate of Q235;Upper location-plate 7 all uses 0.8m × 0.8m, thick 20mm, strength grade to be the square plate of Q235;Circumferentially arranging 4 assembly and connection bolts on lower location-plate 4 and upper location-plate 7 and pass hole 16, arrange 4 ground anchor bolts and pass hole 14 on lower location-plate 4, ground anchor bolt passes a diameter of 30mm in hole 14;Assembly and connection bolt is 25mm through the internal diameter in hole 16;The long 500m of assembly and connection bolt 31 screw rod, the hexagonal flat head bolt using major diameter of thread to be 25mm;Being provided with upper limit plate 10 at upper location-plate 7 lower surface, upper limit plate 10 uses thick 10mm, length and width to be 250mm square plate;Ground anchor bolt 12 use use diameter 32mm, long 500mm spiral prefabricated L-shaped.
The rectangle steel plate that vertical spacing base plate 5 and vertical spacing top board 6 all use long 0.5m, high 0.45m, thick 20mm, strength grade to be Q235;Vertical spacing base plate 5 and vertical spacing top board 6 arrange vertical spacing plate link slot 25, cross spacing arc plate insertion groove 26, upper limit groove 27;The most spacing base plate 5, the vertically arranged two rows sliding link slot 28 that dowel 19 position is corresponding laterally outside with foundation bolt 1 of vertical spacing top board 6 and connecting bolt 29.The high 225mm of vertical spacing plate link slot 25;The cross spacing high 40mm of arc plate insertion groove 26, wide 40mm;Upper limit groove 27 wide 250mm, high 10mm;Lateral connection muscle 19 uses high 20mm, the steel disc of thick 5mm, and one end is placed on foundation bolt 1 outer surface, and lateral connection muscle 19 is connected firmly with vertical spacing base plate 5 or vertical spacing top board 6 by the other end by sliding link slot 28 and connecting bolt 29;The long 40mm of sliding link slot 28, wide 12mm;Connecting bolt 29 uses the hexagonal flat head bolt of external diameter 10mm.
Cross spacing arc plate 9 central angle is 90 °, and the steel plate cutting using thick 20mm, strength grade to be Q235 forms;Arranging arc plate at the two ends of cross spacing arc plate 9 and connect tenon 30, arc plate connects tenon 30 wide 40mm, long 20mm.
The concreting that bottom foundation structure body 13 uses strength grade to be C25 forms.The thick 40mm of bottom screed-coat 15, uses the medium sand material that grating is good.
Anchor plate 18 uses wide 150mm, long 150mm, thick 20mm, strength grade to be the square plate of Q235, and anchor plate 18 is welded to connect with foundation bolt 1.
Leveling nut 20 uses internal diameter 32mm nut.Grouting Pipe 22 uses the rubber hose of diameter 25mm.The self-compaction particulate formula concrete that pre-determined bit injecting cement paste 23 uses strength grade to be C35.The normal concrete that base concrete 24 uses strength grade to be C35.
Figure 11 is that steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction process figure.With reference to shown in Figure 11, the steel construction foundation bolt shaper pre-buried structure that becomes more meticulous includes following construction procedure:
1) foundation bolt 1 locus test: according to the design requirement of steel structure column foundation bolt 1, the diameter of foot bolt 1 definitely, and assemble the caging bolt aperture through hole 2;
2) assemble mould bases assemble: bottom template 3 top set gradually lower location-plate 4, vertical spacing base plate 5, vertical spacing top board 6, on location-plate 7 and top template 8, vertical spacing base plate 5, vertical spacing top board 6 control it by cross spacing arc plate 9 and vertically spend, limit its horizontal level by upper limit plate 10, make the caging bolt 11 that assembles of bottom template 3 determine the assembling caging bolt of plate 4 and upper location-plate 7 through hole 2 through lower simultaneously;Then by assembly and connection bolt 31 through assembly and connection bolt through hole 16, and lower location-plate 4 is connected firmly with upper location-plate 7, top template 8;
3) position, ground anchor bolt 12 school: the ground anchor bolt 12 that and lower location-plate 4 pre-buried at steel construction foundation bolt 1 installation position is connected, and guarantee ground anchor bolt 12 be connected firmly with bottom foundation structure body 13, ground anchor bolt 12 position corresponding through position, hole 14 with lower location-plate 4 ground anchor bolt;
4) bottom screed-coat 15 is laid: uses screed-coat 15 bottom discrete material laying in lower location-plate 4 bottom, and carries out shaking densification process;
5) foundation bolt 1 is installed: the bottom template 3 assembling mould bases removed, and it is inserted into foundation bolt 1 through hole 2 and foundation bolt through hole 17 assembling caging bolt, make the anchor plate 18 bottom steel construction foundation bolt 1 be in close contact with lower location-plate 4, lateral connection muscle 19 is set between foundation bolt 1 and vertical spacing base plate 5, vertical spacing top board 6;
6) ground anchor bolt 12 is connected with lower location-plate 4: the assembling mould bases connected with foundation bolt 1 is put into screed-coat 15 top, bottom, and by lower location-plate 4 level of leveling nut 20 regulation, and make ground anchor bolt 12 fasten;
7) foundation bolt locus correction: carry out the test of foundation bolt 1 locus, changes the vertical degree of foundation bolt 1 by the tightness of regulation lateral connection muscle 19;
8) pre-determined bit injecting cement paste 23 is constructed: be inserted into Grouting Pipe 22 to the pre-determined bit Grouting Pipe of top template 8 through hole 21, starts to synchronize to pour all Grouting Pipe 22 symmetries pre-determined bit injecting cement paste material from lower location-plate 4 end face, forms pre-determined bit injecting cement paste 23;
9) top template 8 is removed: after pre-determined bit injecting cement paste 23 initial set before final set, symmetry unclamps assembly and connection bolt 31, by removed together to top template 8 and assembly and connection bolt 31;
10) base concrete 24 pours: carries out other position concretings of basis of steel structure column ground anchor bolt, and carries out maintenance construction.

Claims (8)

1. a steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method, it is characterised in that: include following construction procedure:
1) foundation bolt (1) locus test: according to the design requirement of steel structure column foundation bolt (1), the diameter of foot bolt (1) definitely, and assemble the caging bolt aperture through hole (2);
2) assemble mould bases to assemble: set gradually lower location-plate (4), vertical spacing base plate (5), vertical spacing top board (6), upper location-plate (7) and top template (8) on bottom template (3) top, vertical spacing base plate (5), vertical spacing top board (6) control it by cross spacing arc plate (9) and vertically spend, limit its horizontal level by upper limit plate (10), make the assembling caging bolt (11) of bottom template (3) determine the assembling caging bolt of plate (4) and upper location-plate (7) through hole (2) through lower simultaneously;Then by assembly and connection bolt (31) through assembly and connection bolt through hole (16), and lower location-plate (4) is connected firmly with upper location-plate (7), top template (8);
3) ground anchor bolt (12) position, school: the ground anchor bolt (12) that and lower location-plate (4) pre-buried at steel construction foundation bolt (1) installation position is connected, and guarantee ground anchor bolt (12) be connected firmly with bottom foundation structure body (13), ground anchor bolt (12) position corresponding through hole (14) position with lower location-plate (4) ground anchor bolt;
4) bottom, screed-coat (15) is laid: uses screed-coat (15) bottom discrete material laying in lower location-plate (4) bottom, and carries out shaking densification process;
5) foundation bolt (1) is installed: the bottom template (3) assembling mould bases removed, and it is inserted into foundation bolt (1) through hole (2) and foundation bolt through hole (17) assembling caging bolt, the anchor plate (18) making foundation bolt (1) bottom is in close contact with lower location-plate (4), arranges lateral connection muscle (19) between foundation bolt (1) and vertical spacing base plate (5), vertical spacing top board (6);
6) ground anchor bolt (12) is connected with lower location-plate (4): the assembling mould bases connected with foundation bolt (1) is put into screed-coat (15) top, bottom, and by lower location-plate (4) level of leveling nut (20) regulation, and ground anchor bolt (12) is made to fasten;
7) foundation bolt locus correction: carry out the test of foundation bolt (1) locus, changes the vertical degree of foundation bolt (1) by the tightness of regulation lateral connection muscle (19);
8) pre-determined bit injecting cement paste (23) construction: be inserted into Grouting Pipe (22) through hole (21) to the pre-determined bit Grouting Pipe of top template (8), start to synchronize all Grouting Pipe (22) symmetry is poured pre-determined bit injecting cement paste material from lower location-plate (4) end face, form pre-determined bit injecting cement paste (23);
9) top template (8) is removed: after pre-determined bit injecting cement paste (23) initial set before final set, symmetry unclamps assembly and connection bolt (31), by removed together to top template (8) and assembly and connection bolt (31);
10) base concrete (24) pours: carries out other position concretings of basis of steel structure column ground anchor bolt, and carries out maintenance construction.
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterized in that: step 2) 3 or 4 assembly and connection bolts are circumferentially set on described lower location-plate (4) and upper location-plate (7) through hole (16), assembly and connection bolt at lower location-plate (4) arranges assembly and connection bolt fastening screw thread, at upper location-plate (7) lower surface welding upper limit plate (10) in hole (16).
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterised in that: step 2) described vertical spacing base plate (5), vertical spacing plate link slot (25), cross spacing arc plate insertion groove (26) and upper limit groove (27) are set on vertical spacing top board (6);The most spacing base plate (5), vertically arranged multiple rows of corresponding with foundation bolt (1) dowel laterally outside (19) the position sliding link slot (28) of vertical spacing top board (6) and connecting bolt (29).
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterized in that: step 2) described cross spacing arc plate (9) central angle is 90 °, arranging arc plate at cross spacing arc plate (9) two ends and connect tenon (30), arc plate connects tenon (30) and inserts cross spacing arc plate insertion groove (26).
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterized in that: step 2) oblique assembly and connection bolt is set on described top template (8) through groove (32) and assembles caging bolt and pass groove (33), outer ledge is symmetrical arranged 3-4 pre-determined bit Grouting Pipe and passes hole (21), arranges assembling caging bolt (11) and assemble caging bolt through groove (33) in bottom template (3).
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterised in that: described in step 7), lateral connection muscle (19) one end is placed on foundation bolt (1) outer surface;Lateral connection muscle (19) is connected firmly with vertical spacing base plate (5) or vertical spacing top board (6) by the other end by sliding link slot (28) and connecting bolt (29).
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterised in that: pre-determined bit injecting cement paste (23) described in step 8) uses self-compaction particulate formula concrete.
Steel construction foundation bolt shaper the most according to claim 1 becomes more meticulous pre-buried structure construction method, it is characterized in that: ground anchor bolt described in step 3) (12) is L-shaped, one end is anchored in bottom foundation structure body (13), the other end is through the ground anchor bolt of lower location-plate (4) through hole (14), and is connected with leveling nut (20).
CN201610361957.8A 2016-05-26 2016-05-26 A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method Active CN106013203B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610361957.8A CN106013203B (en) 2016-05-26 2016-05-26 A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610361957.8A CN106013203B (en) 2016-05-26 2016-05-26 A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method

Publications (2)

Publication Number Publication Date
CN106013203A true CN106013203A (en) 2016-10-12
CN106013203B CN106013203B (en) 2018-01-16

Family

ID=57094141

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610361957.8A Active CN106013203B (en) 2016-05-26 2016-05-26 A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure construction method

Country Status (1)

Country Link
CN (1) CN106013203B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003184102A (en) * 2001-12-25 2003-07-03 Ncn:Kk Anchor bolt fixture
CN101787739A (en) * 2010-04-08 2010-07-28 赵正义 Positioning structure for chassis of tower mast-type mechanical equipment
CN102108714A (en) * 2011-01-04 2011-06-29 赵正义 Vertical locating and connecting structure of tower-type mechanical equipment underframe
CN103924674A (en) * 2014-04-29 2014-07-16 东南大学 High-strength bolt shear key structure and constructing method thereof
CN206110356U (en) * 2016-10-21 2017-04-19 郑州市卧龙游乐设备有限公司 But height -adjusting's multipurpose stand

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003184102A (en) * 2001-12-25 2003-07-03 Ncn:Kk Anchor bolt fixture
CN101787739A (en) * 2010-04-08 2010-07-28 赵正义 Positioning structure for chassis of tower mast-type mechanical equipment
CN102108714A (en) * 2011-01-04 2011-06-29 赵正义 Vertical locating and connecting structure of tower-type mechanical equipment underframe
CN103924674A (en) * 2014-04-29 2014-07-16 东南大学 High-strength bolt shear key structure and constructing method thereof
CN206110356U (en) * 2016-10-21 2017-04-19 郑州市卧龙游乐设备有限公司 But height -adjusting's multipurpose stand

Also Published As

Publication number Publication date
CN106013203B (en) 2018-01-16

Similar Documents

Publication Publication Date Title
CN209636847U (en) A kind of adjustable tower crane built-in fitting accurate positioning tool
CN204040056U (en) A kind of location and installation support of pre-embedded anchoring bolts
CN102061746B (en) Steel structure assembled embedded part and construction method thereof
CN104695557B (en) Steel structure building construction method for one-step pre-burying of foundation bolts
CN102127968B (en) Method for grouting floor slab bushing hole reservation preembedding die and grouting die
KR101274481B1 (en) Pre-embedded anchor frame equipped with coupler and anchoring method of steel column thereof
CN108894116A (en) Prefabricated stand column assembling and construction method
CN113202222A (en) Construction method for assembled type superposed beam slab
CN108239990A (en) A kind of construction method using second pouring streetlamp foundation
CN110670734A (en) Fixing device for pre-buried steel plate under shock insulation support and construction method thereof
CN111364356A (en) Assembled reinforced concrete side anti-collision guardrail for connecting bridge
CN109112903A (en) Solid concrete roabed trackless construction technology is cheated in a kind of phase library inner column formula inspection
CN110820794B (en) Integrated construction method for equipment base and foundation embedded part
CN103132494B (en) Embedded anchor cone accurate positioning method
CN204825945U (en) A fixture for fixing buried bolt in advance
CN109129849B (en) Prefabricated beam wedge block and embedded bolt mounting die and construction method thereof
CN115075146B (en) Method for connecting prefabricated bent cap through prestressed tendons and steel bars
CN205776309U (en) A kind of steel construction foundation bolt shaper becomes more meticulous pre-buried structure
CN106013203A (en) Construction method for refined pre-embedded structure of steel structural foundation bolt shaping mould
CN214883824U (en) Pre-leveling tower foundation
CN210529741U (en) Independent foundation embedded bolt mounting structure
CN106930406A (en) A kind of preparation method of Anchor Bolts in Steel Column Bases positioning structure
CN107059913A (en) A kind of reactor built-in fitting supporting construction and method for embedding
CN106988293B (en) A kind of ship lift main equipment room steel lattice column construction method and installation accuracy control method
CN102943484B (en) Tapered-iron pulp-bedding rapid leveling method for large-size and middle-size equipment installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Xuehua

Inventor after: Liu Yang

Inventor after: Zhou Xiaojun

Inventor after: Liu Haiyan

Inventor before: Wang Xinquan

Inventor before: Han Shangyu

Inventor before: Zhu Kai

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180402

Address after: 610046 Sichuan city of Chengdu province Wuhou District grass Golden Road No. 9

Patentee after: CITIC Guoan Construction Group Co., Ltd.

Address before: 310015 Hangzhou, Gongshu District Wanda Commercial Center, building 3, room 3, unit 1901, room

Patentee before: Hangzhou Jiang Run Science and Technology Ltd.