CN106012876B - A kind of U-shaped culvert structure of shaped form shop fixtures - Google Patents
A kind of U-shaped culvert structure of shaped form shop fixtures Download PDFInfo
- Publication number
- CN106012876B CN106012876B CN201610404405.0A CN201610404405A CN106012876B CN 106012876 B CN106012876 B CN 106012876B CN 201610404405 A CN201610404405 A CN 201610404405A CN 106012876 B CN106012876 B CN 106012876B
- Authority
- CN
- China
- Prior art keywords
- culvert
- shaped
- side wall
- shaped form
- trapezoidal side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F5/00—Draining the sub-base, i.e. subgrade or ground-work, e.g. embankment of roads or of the ballastway of railways or draining-off road surface or ballastway drainage by trenches, culverts, or conduits or other specially adapted means
- E01F5/005—Culverts ; Head-structures for culverts, or for drainage-conduit outlets in slopes
Abstract
West area mud-rock flow region is more, and mud-rock flow directly impact and undercutting are that bridges and culverts damages important function power type.The structure type for how reasonably selecting debris flow region culvert flow section meets under limited topography situation Buried culvert under roadbed with preferable resistant abrasion ability and best discharge capacity, the major issue that must be solved when being the novel culvert design in debris flow region.The present invention provides a kind of U-shaped culvert structure of shaped form shop fixtures, including culvert contains body, shaped form staking sequence, buffer layer, culvert import;The culvert contains body:Thicken cover board, the trapezoidal side wall of culvert and foundation;It is both provided with foundation and the trapezoidal side wall of culvert in the both sides of U-shaped culvert, bottom is provided with shaped form staking sequence between the trapezoidal side wall of both sides culvert, and top is provided with thickening cover board, and the culvert import includes:Import truncated cone banking, import collecting tray and shaped form staking sequence.
Description
Technical field
The present invention relates to a kind of culvert structures of the small-sized debris flow gully of highway span centre, and in particular to a kind of shaped form shop fixtures U
Type culvert structure.
Background technology
Gradual with 21 century country's the Belt and Road development strategy is implemented and the deep propulsion of strategy to develop western regions,
West area will show the newcoming advantage of opening, and west area Investment in Basic Facilities for Traffic construction will become China and improve
The emphasis of the people's livelihood.West area mud-rock flow region is more, mud-rock flow area crushing rock formation, and earthquake intensity is big, it is wide to destroy, vegetation compared with
Less, there is heavy rain when summer, the frequent generation of mud-stone flow disaster is bred in the expansion in addition human activity degree deepens continuously.
Mud-rock flow directly impact and undercutting are that bridges and culverts damages important function power type.Especially highway culvert is as friendship
Lead to drainage system important in transport and ensures roadbed continuously not by one of the important structure of flood erosion or invasion, and in west
Portion's local highway is higher with ratio in using;The mud-rock flow that western mountainous areas is formed have outburst suddenly, last that of short duration, the oncoming force is fierce
Violent and the features such as quickly cause disaster, when outburst, can go out gradually to accumulate material resource and huge energy a large amount of early periods in abrupt release, generate pole
Big destructive power, and culvert import is nearby mud-rock flow collection region, debris flow velocity and flow are all bigger, so when outburst
When mud-rock flow, often since culvert design is unreasonable or culvert headroom is insufficient or culvert is imported and exported and shop fixtures is not taken and effectively arranged
It applies, causes seriously wash away or deposit blocking or deeper sapping trace, the overall stability for jeopardizing culvert even blocks for a long time
The normal operation of traffic causes large area roadbed to be destroyed by rush of water.Therefore, debris flow region culvert flow section how is reasonably selected
Structure type to meet the Buried culvert under roadbed under limited topography situation be mud with preferable resistant abrasion ability and best discharge capacity
The major issue that must be solved when the novel culvert design in rock glacier area.
Invention content
In order to improve the resistant abrasion ability and discharge capacity of debris flow region culvert, the present invention provides a kind of shaped form shop fixtures
U-shaped culvert structure.
The present invention is achieved by the following technical solution:
A kind of U-shaped culvert structure of shaped form shop fixtures, including culvert contain body, shaped form staking sequence, buffer layer, culvert into
Mouthful;
The culvert contains body:The trapezoidal side wall of cover board, culvert and foundation;It is both provided in the both sides of U-shaped culvert
Foundation and the trapezoidal side wall of culvert, the trapezoidal side wall of culvert are centrally positioned in foundation top, and foundation width is wide
In the trapezoidal side wall of culvert, wherein unilateral width goes out 0.05m~0.20m, the foundation is mortar flag stone or block stone, thickness are
0.50m~0.60m;
The trapezoidal side wall of culvert is up-narrow and down-wide along the section in gully bed neighboring to culvert direction, and the wall face of the trapezoidal side wall of culvert hangs down
Directly, inner wall surface tilts, wherein the inclination slope of the trapezoidal side wall inner wall surface of culvert is 1:0.1~1:1;
Bottom is provided with shaped form staking sequence between the trapezoidal side wall of both sides culvert, and the shaped form staking sequence is
Concrete or reinforced concrete structure;Top is provided with cover board between the trapezoidal side wall of both sides culvert, and the cover board is pre-
Concrete or reinforced concrete structure processed;
The culvert import includes:Import truncated cone banking, import collecting tray and shaped form staking sequence, the import taper
Bank protection is in the left and right entrance for being symmetricly set on culvert of bell mouth shape, and one end is connected with the trapezoidal side wall of culvert, the other end and import
Collecting tray be connected, shaped form staking sequence be arranged import truncated cone banking bottom and with the shaped form shop fixtures knot of U-shaped culvert bottom
Structure is connected.
Further, the shaped form staking sequence is half elliptic, semicircle or parabola shaped, the mark of U-shaped culvert
Quasi- across footpath meets《Highway bridge and culvert designs general specification》The requirement of (JTG D60-2015);Wherein, the length of the half elliptic half
Axis is the half of culvert standard span, and the ratio of the major semiaxis a and semi-minor axis b are 1~5.0;The radius curve type shop fixtures
The radius of structure is the half of culvert standard span;The distance of the parabola shaped focus to the trapezoidal side wall inner wall surface of culvert is to contain
The half of hole standard span, and parabola shaped focus is to distance and the focus of the trapezoidal side wall inner wall surface of culvert to shop fixtures minimum point
The ratio of distance is 1: 1~1: 2.5.
Further, the cover board is overlapped with the trapezoidal side wall of both sides culvert, is 0.10m~0.30m per the side lap of splice;Institute
It is 0.40m~0.60m to state cover sheet thickness, and overall length is 1.50m~5.00m;
Further, the ultimate tensile strength of the shaped form staking sequence meets《Code for design of concrete structures》
(GB50010-2010) requirement, thickness of the shaped form staking sequence between the trapezoidal side wall in both sides are 0.50m~1.00m,
Thickness within the scope of culvert import 0m~1.50m is 0.60m~1.50m.
Further, buffer layer, the thickness of the buffer layer is provided below in the bottom of the shaped form staking sequence
Degree is 0.50m~1.00m.
Further, build-in stake together with being respectively arranged with culvert exit in culvert import, build-in stake insertion ground
The depth of base is 1.00m~1.50m, and the build-in stake height is 1.20m~2.00m.
Further, if the culvert bed direction in the U-shaped culvert structure of shaped form shop fixtures is evenly arranged with arterial highway rib sill, the rib
The height of sill is 0.20m~0.40m;The length of rib sill and the width of shaped form staking sequence match.
Further, the groove gradient of the U-shaped culvert is 2.0%~10.0%.
Further, kind is implanted with trees between collecting tray and roadbed, if the collecting tray section is according to landform condition setting
The shape of dry row steel tube concrete stake, steel tube concrete pile is fixed according to confluence section landform, root in highway area upstream debris flow gully
According to landform, several check dam engineerings are set.
The present invention has the advantages that:
1, using import truncated cone banking, the roadbed that on the one hand can adequately protect can allow mud-rock flow not by the direct erosion of mud-rock flow
It is discharged after taking advantage of a situation into culvert after hole is collected;It is prior, the thicker shaped form of setting of taking advantage of a situation between import truncated cone banking
Shop fixtures can play the role of resistant abrasion, anti-sapping, extend the service life of culvert;
2, the trapezoidal side wall of culvert is set, headroom from bottom to up gradually increases, and reduces the impact of lateral throwing journey and the mill of tap
Damage ability is taken advantage of a situation with culvert shaped form staking sequence and is connected, and stress concentration during mud-rock flow erosion culvert is substantially reduced
Phenomenon reduces the damage degree of culvert;
3, the headroom for increasing 10%~30% than common culvert using shaped form shop fixtures culvert structure, increases mud-rock flow
Regional culvert is to mud-rock flow discharge capacity.
Description of the drawings
Fig. 1 is a kind of U-shaped culvert structure schematic top plan view of shaped form shop fixtures of the present invention.
Fig. 2 is a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention along A-A schematic cross-sectional views.
Fig. 3 is a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention along B-B schematic cross-sectional views.
Fig. 4 is that a kind of shaped form shop fixtures U-shaped culvert structure of the present invention shows when using half elliptic staking sequence along C-C section views
It is intended to.
Fig. 5 is that a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention is illustrated using when semicircle staking sequence along C-C section views
Figure.
Fig. 6 is that a kind of shaped form shop fixtures U-shaped culvert structure of the present invention shows when using parabola shaped staking sequence along C-C section views
It is intended to.
Fig. 7 is a kind of U-shaped culvert structure close-up schematic view of shaped form shop fixtures of the present invention.
In figure:(1) cover board, the trapezoidal side wall of (2) culvert, the trapezoidal side wall inner wall surface of (21) culvert, the trapezoidal side wall of (22) culvert
Wall face, (3) shaped form staking sequence, (31) half elliptic staking sequence, (32) semicircle staking sequence, (33) are parabola shaped
Staking sequence, (4) import truncated cone banking, (5) build-in stake, (6) roadbed, (7) foundation, (8) buffer layer, (9) import confluence
Slot, (10) rib sill, (11) ground.
Specific implementation mode
Embodiment shown with reference to the accompanying drawings is described in detail below:
Embodiment one:The shaped form staking sequence uses half elliptic staking sequence, is described in detail below:
Fig. 1 is a kind of U-shaped culvert structure schematic top plan view of shaped form shop fixtures of the present invention, and Fig. 2 is a kind of shaped form of the present invention
For the U-shaped culvert structure of shop fixtures along A-A schematic cross-sectional views, Fig. 3 is a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention along B-B section views
Schematic diagram, Fig. 4 are that a kind of shaped form shop fixtures U-shaped culvert structure of the present invention shows when using half elliptic staking sequence along C-C section views
It is intended to, Fig. 7 is a kind of U-shaped culvert structure close-up schematic view of shaped form shop fixtures of the present invention.As seen from the figure:A kind of shaped form paving
The U-shaped culvert structure in bottom, including culvert contain body, half elliptic staking sequence 31, buffer layer 8, culvert import;
The culvert contains body:The trapezoidal side wall 2 of cover board 1, culvert and foundation 7;It is respectively provided in the both sides of U-shaped culvert
There are a foundation 7 and the trapezoidal side wall 2 of culvert, the trapezoidal side wall of the culvert 2 is centrally positioned in 7 top of foundation, foundation 7
Width is wider than the trapezoidal side wall 2 of culvert, wherein unilateral width goes out 0.1m, the foundation 7 is mortar flag stone or block stone, thickness are
0.55m;
The trapezoidal side wall 2 of culvert is up-narrow and down-wide along the section in gully bed neighboring to culvert direction, and the trapezoidal side wall wall face 22 of culvert hangs down
Directly, inner wall surface tilts, wherein the inclination slope of the trapezoidal side wall inner wall surface of culvert 21 is 1:0.2;
Bottom is provided with half elliptic staking sequence 31, the half elliptic paving between the trapezoidal side wall 2 of both sides culvert
Bottom structure 31 is concrete or reinforced concrete structure;Top is provided with cover board 1 between the trapezoidal side wall 2 of both sides culvert, is
The bearing capacity of cover board is improved, the cover board 1 is precast concrete or reinforced concrete structure, and cover board and both sides culvert be trapezoidal
Side wall overlaps, and is in the present embodiment 0.20m per the side lap of splice;The cover sheet thickness is 0.45m, overall length 2.0m;
In order to improve mud-rock flow junction impact-resisting wear-resisting effect, the culvert entrance sapping that is hit is avoided to jeopardize highway road
Base, the culvert import include:Import truncated cone banking 4, import collecting tray 9 and half elliptic staking sequence 31, the cone
Shape bank protection 4 is in the left and right entrance for being symmetricly set on culvert of bell mouth shape, and the trapezoidal side wall of one end and culvert 2 is connected, the other end and
Import collecting tray 9 is connected, and half elliptic staking sequence 31 is arranged in 4 bottom of import truncated cone banking and with the half of U-shaped culvert bottom
Oval staking sequence linking.
Further, in order to improve the headroom of culvert, increase culvert to the discharge capacity of mud-rock flow, in the present embodiment institute
The standard span of the half elliptic staking sequence 31 stated, U-shaped culvert meets《Highway bridge and culvert designs general specification》(JTG D60-
2015) requirement;Wherein, the major semiaxis of the half elliptic is the half of culvert standard span, the major semiaxis a and semi-minor axis
The ratio of b is 1.5.
Further, the ultimate tensile strength of the half elliptic staking sequence 31 meets《Code for design of concrete structures》
The requirement of GB50010-2010 extends the service life of culvert for better resistant abrasion, in the present embodiment half elliptic shop fixtures knot
Thickness of the structure 31 between the trapezoidal side wall of both sides culvert 2 is 0.60m, and the thickness within the scope of culvert import 0m~1.50m is
0.80m。
Further, in order to which culvert can preferably adapt to mud-rock flow area ditch bed, in the half elliptic staking sequence 31
Buffer layer 8 is provided below in bottom, and the thickness of the buffer layer 8 is 0.70m in the present embodiment.
Further, in order to reinforce the stability of half elliptic staking sequence 31, distinguish at the import and export of U-shaped culvert
It is provided with one of build-in stake 5, the depth that the build-in stake 5 in the present embodiment is embedded in ground is 1.25m, and the build-in stake 5 is high
Degree is 2.00m.
Further, in order to consume the energy of mud-rock-flow-impact, the half elliptic staking sequence 31 in the present embodiment
Culvert bed direction be evenly arranged with 3 rib sill 10, the height of the rib sill 10 is 0.30m, and length and the half elliptic of rib sill are spread
The width of bottom structure matches.
Further, in order to further increase and improve overall stability and the safety of culvert, in the present embodiment, institute
The groove gradient for stating U-shaped culvert is 6.0%.Further, in order to improve the service life of culvert, the maintenance expense of culvert is reduced
With kind is implanted with trees between collecting tray and roadbed in the present embodiment, and the collecting tray section is according to several rows of landform condition setting
The shape of steel tube concrete pile, steel tube concrete pile is fixed according to confluence section landform, base area in highway area upstream debris flow gully
5 check dam engineerings are arranged in shape.
Embodiment two:The semicircle staking sequence is described in detail below using semicircle staking sequence:
Fig. 1 is a kind of U-shaped culvert structure schematic top plan view of shaped form shop fixtures of the present invention, and Fig. 2 is a kind of shaped form of the present invention
For the U-shaped culvert structure of shop fixtures along A-A schematic cross-sectional views, Fig. 3 is a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention along B-B section views
Schematic diagram, Fig. 5 are that a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention is illustrated using when semicircle staking sequence along C-C section views
Figure, Fig. 7 are a kind of U-shaped culvert structure close-up schematic view of shaped form shop fixtures of the present invention.As seen from the figure:A kind of shaped form shop fixtures
U-shaped culvert structure, including culvert contain body, semicircle staking sequence 32, buffer layer 8, culvert import;
The culvert contains body:The trapezoidal side wall 2 of cover board 1, culvert and foundation 7;It is respectively provided in the both sides of U-shaped culvert
There are a foundation 7 and the trapezoidal side wall 2 of culvert, the trapezoidal side wall of the culvert 2 is centrally positioned in 7 top of foundation, foundation 7
Width is wider than the trapezoidal side wall 2 of culvert, wherein unilateral width goes out 0.07m, the foundation 7 is mortar flag stone or block stone, thickness
For 0.52m;
The trapezoidal side wall 2 of culvert is up-narrow and down-wide along the section in gully bed neighboring to culvert direction, and the trapezoidal side wall wall face 22 of culvert hangs down
Directly, inner wall surface tilts, wherein the inclination slope of the trapezoidal side wall inner wall surface of culvert 21 is 1:0.25;
Bottom is provided with semicircle staking sequence 32, the semicircle shop fixtures knot between the trapezoidal side wall 2 of both sides culvert
Structure 32 is concrete or reinforced concrete structure;Top is provided with cover board 1 between the trapezoidal side wall 2 of both sides culvert, in order to carry
The bearing capacity of high cover board, the cover board 1 are precast concrete or reinforced concrete structure, cover board and the trapezoidal side wall of both sides culvert
Overlap joint is in the present embodiment 0.25m per the side lap of splice;The cover sheet thickness is 0.55m, overall length 2.50m;
In order to improve mud-rock flow junction impact-resisting wear-resisting effect, the culvert entrance sapping that is hit is avoided to jeopardize highway road
Base, the culvert import include:Import truncated cone banking 4, import collecting tray 9 and semicircle staking sequence 32, the import taper
Bank protection 4 is in the left and right entrance for being symmetricly set on culvert of bell mouth shape, and the trapezoidal side wall of one end and culvert 2 is connected, the other end and into
Mouthful collecting tray 9 is connected, semicircle staking sequence 32 be arranged 4 bottom of import truncated cone banking and with the semicircle of U-shaped culvert bottom
Staking sequence 32 is connected.
Further, in order to improve the headroom of culvert, increase culvert to the discharge capacity of mud-rock flow, in the present embodiment institute
The standard span of the semicircle staking sequence 32 stated, U-shaped culvert meets《Highway bridge and culvert designs general specification》(JTG D60-
2015) requirement;Wherein, the radius of the semicircle staking sequence 32 is the half of culvert standard span.
Further, the ultimate tensile strength of the semicircle staking sequence 32 meets《Code for design of concrete structures》
The requirement of GB50010-2010 extends the service life of culvert for better resistant abrasion, in the present embodiment semicircle staking sequence
32 thickness between the trapezoidal side wall of both sides culvert 2 is 0.70m, culvert into the thickness within the scope of 0m~1.50m be 0.80m.
Further, in order to which culvert can preferably adapt to mud-rock flow area ditch bed, at the bottom of the semicircle staking sequence 32
Buffer layer 8 is provided below in portion, and the thickness of the buffer layer 8 is 0.80m in the present embodiment.
Further, it in order to reinforce the stability of semicircle staking sequence 32, is set respectively at the import and export of U-shaped culvert
It is equipped with one of build-in stake 5, the depth that the build-in stake 5 in the present embodiment is embedded in ground is 1.50m, 5 height of the build-in stake
For 2.00m.
Further, in order to consume the energy of mud-rock-flow-impact, the semicircle staking sequence described in the present embodiment 32
Contain bed direction and be evenly arranged with 3 rib sill 10, the height of the rib sill 10 is 0.40m, length and the half elliptic shop fixtures of rib sill
The width of structure matches.
Further, in order to further increase and improve overall stability and the safety of culvert, in the present embodiment, institute
The groove gradient for stating U-shaped culvert is 6.0%.Further, in order to improve the service life of culvert, the maintenance expense of culvert is reduced
With kind is implanted with trees between collecting tray and roadbed in the present embodiment, and the collecting tray section is according to several rows of landform condition setting
The shape of steel tube concrete pile, steel tube concrete pile is fixed according to confluence section landform, base area in highway area upstream debris flow gully
5 check dam engineerings are arranged in shape.
Embodiment three:The shaped form staking sequence uses parabola shaped staking sequence, is described in detail below:
Fig. 1 is a kind of U-shaped culvert structure schematic top plan view of shaped form shop fixtures of the present invention, and Fig. 2 is a kind of shaped form of the present invention
For the U-shaped culvert structure of shop fixtures along A-A schematic cross-sectional views, Fig. 3 is a kind of U-shaped culvert structure of shaped form shop fixtures of the present invention along B-B section views
Schematic diagram, Fig. 6 are that a kind of shaped form shop fixtures U-shaped culvert structure of the present invention shows when using parabola shaped staking sequence along C-C section views
It is intended to, Fig. 7 is a kind of U-shaped culvert structure close-up schematic view of shaped form shop fixtures of the present invention.As seen from the figure:A kind of shaped form paving
The U-shaped culvert structure in bottom, including culvert contain body, parabola shaped staking sequence 33, buffer layer 8, culvert import;
The culvert contains body:The trapezoidal side wall 2 of cover board 1, culvert and foundation 7;It is respectively provided in the both sides of U-shaped culvert
There are a foundation 7 and the trapezoidal side wall 2 of culvert, the trapezoidal side wall of the culvert 2 is centrally positioned in 7 top of foundation, foundation 7
Width is wider than the trapezoidal side wall 2 of culvert, wherein unilateral width goes out 0.08m, the foundation 7 is mortar flag stone or block stone, thickness
For 0.52m;
The trapezoidal side wall 2 of culvert is up-narrow and down-wide along the section in gully bed neighboring to culvert direction, and the trapezoidal side wall wall face 22 of culvert hangs down
Directly, inner wall surface tilts, wherein the inclination slope of the trapezoidal side wall inner wall surface of culvert 21 is 1:0 5;
Bottom is provided with parabola shaped staking sequence 33, the parabola shaped paving between the trapezoidal side wall 2 of both sides culvert
Bottom structure 33 is concrete or reinforced concrete structure;Top is provided with cover board 1 between the trapezoidal side wall 2 of both sides culvert, is
The bearing capacity of cover board is improved, the cover board 1 is precast concrete or reinforced concrete structure, and cover board and both sides culvert be trapezoidal
Side wall overlaps, and is in the present embodiment 0.25m per the side lap of splice;The cover sheet thickness is 0.55m, overall length 2.50m;
In order to improve mud-rock flow junction impact-resisting wear-resisting effect, the culvert entrance sapping that is hit is avoided to jeopardize highway road
Base, the culvert import include:Import truncated cone banking 4, import collecting tray 9 and parabola shaped staking sequence 33, the cone
Shape bank protection 4 is in the left and right entrance for being symmetricly set on culvert of bell mouth shape, and the trapezoidal side wall of one end and culvert 2 is connected, the other end and
Import collecting tray 9 be connected, parabola shaped staking sequence 33 be arranged 4 bottom of import truncated cone banking and with the throwing of U-shaped culvert bottom
The linear staking sequence 33 of object is connected.
Further, in order to improve the headroom of culvert, increase culvert to the discharge capacity of mud-rock flow, in the present embodiment institute
The standard span of the parabola shaped staking sequence 33 stated, U-shaped culvert meets《Highway bridge and culvert designs general specification》(JTG D60-
2015) requirement;Wherein, the distance of the parabola shaped focus to the trapezoidal side wall inner wall surface of culvert is the one of culvert standard span
Half, and ratio of the distance with focus to shop fixtures minimum point at a distance from of parabola shaped focus to the trapezoidal side wall inner wall surface of culvert is 1:
1~1: 2.5, its ratio is 1 in the present embodiment:1.2.
Further, the ultimate tensile strength of the parabola shaped staking sequence 33 meets《Code for design of concrete structures》
The requirement of GB50010-2010 extends the service life of culvert for better resistant abrasion, in the present embodiment parabola shaped shop fixtures knot
Thickness of the structure 33 between the trapezoidal side wall of both sides culvert 2 is 0.80m, is into the thickness within the scope of 0m~1.50m in culvert
1.20m。
Further, in order to which culvert can preferably adapt to mud-rock flow area ditch bed, in the parabola shaped staking sequence 33
Buffer layer 8 is provided below in bottom, and the thickness of the buffer layer 8 is 0.80m in the present embodiment.
Further, in order to reinforce the stability of parabola shaped staking sequence 33, distinguish at the import and export of U-shaped culvert
It is provided with one of build-in stake 5, the depth that the build-in stake 5 in the present embodiment is embedded in ground is 1.25m, and the build-in stake 5 is high
Degree is 2.20m.
Further, in order to consume the energy of mud-rock-flow-impact, the parabola shaped staking sequence described in the present embodiment 33
Culvert bed direction be evenly arranged with 3 rib sill 10, the height of the rib sill 10 is 0.50m, and length and the half elliptic of rib sill are spread
The width of bottom structure matches.
Further, in order to further increase and improve overall stability and the safety of culvert, in the present embodiment, institute
The groove gradient for stating U-shaped culvert is 6.0%.Further, in order to improve the service life of culvert, the maintenance expense of culvert is reduced
With kind is implanted with trees between collecting tray and roadbed in the present embodiment, and the collecting tray section is according to several rows of landform condition setting
The shape of steel tube concrete pile, steel tube concrete pile is fixed according to confluence section landform, base area in highway area upstream debris flow gully
6 check dam engineerings are arranged in shape.
It should be understood that above-described embodiment is only illustrative of the invention and is not intended to limit the scope of the invention.In addition, it should also be understood that,
After reading the content taught by the present invention, those skilled in the art can make the present invention any various changes and modification,
Such equivalent forms equally fall within the application the appended claims and are limited.
Claims (9)
1. a kind of U-shaped culvert structure of shaped form shop fixtures, it is characterised in that:Contain body, shaped form staking sequence, buffering including culvert
Layer, culvert import;
The culvert contains body:The trapezoidal side wall of cover board, culvert and foundation;The cover sheet thickness is 0.40m~0.60m,
It is both provided with foundation and the trapezoidal side wall of culvert in the both sides of U-shaped culvert, the trapezoidal side wall of culvert is centrally positioned in culvert
Basic top, foundation width are wider than the trapezoidal side wall of culvert, wherein unilateral width goes out 0.05m~0.20m, the foundation
For mortar flag stone or block stone, thickness is 0.50m~0.60m;
The trapezoidal side wall of culvert is up-narrow and down-wide along the section in gully bed neighboring to culvert direction, and the wall face of the trapezoidal side wall of culvert is vertical, interior
Metope tilts, wherein the inclination slope of the trapezoidal side wall inner wall surface of culvert is 1:0.1~1:1;
Bottom is provided with shaped form staking sequence between the trapezoidal side wall of both sides culvert, and the shaped form staking sequence is coagulation
Soil or reinforced concrete structure;Top is provided with cover board between the trapezoidal side wall of both sides culvert, and the cover board is prefabricated mixed
Solidifying soil or reinforced concrete structure;
The culvert import includes:Import truncated cone banking, import collecting tray and shaped form staking sequence, the import truncated cone banking
In the left and right entrance for being symmetricly set on culvert of bell mouth shape, one end is connected with the trapezoidal side wall of culvert, and the other end converges with import
Slot is connected, and shaped form staking sequence is arranged in import truncated cone banking bottom and is held in the mouth with the shaped form staking sequence of U-shaped culvert bottom
It connects.
2. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:The shaped form paving
Bottom structure is half elliptic, semicircle or parabola shaped, and the standard span of U-shaped culvert meets《Highway bridge and culvert designs general specification》
The requirement of (JTG D60-2015);Wherein, the major semiaxis of the half elliptic is the half of culvert standard span, the major semiaxis
The ratio of a and semi-minor axis b is 1~5.0;The radius of the radius curve type staking sequence is the half of culvert standard span;Institute
The distance for stating parabola shaped focus to the trapezoidal side wall inner wall surface of culvert is the half of culvert standard span, and parabola shaped focus is extremely
Ratio of the distance of the trapezoidal side wall inner wall surface of culvert at a distance from focus to shop fixtures minimum point is 1: 1~1: 2.5.
3. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:The cover board and both sides
The trapezoidal side wall overlap joint of culvert, is 0.10m~0.30m per the side lap of splice;The cover board overall length is 1.50m~5.00m.
4. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:The shaped form shop fixtures
The ultimate tensile strength of structure meets《Code for design of concrete structures》(GB50010-2010) requirement, shaped form staking sequence
Thickness between the trapezoidal side wall in both sides is 0.50m~1.00m, and the thickness within the scope of culvert import 0m~1.50m is 0.60m
~1.50m.
5. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1 or 2, it is characterised in that:In the curve
Buffer layer is provided below in the bottom of type staking sequence, and the thickness of the buffer layer is 0.50m~1.00m.
6. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:In culvert import and culvert
One of build-in stake is respectively arranged at hole outlet, the depth of the build-in stake insertion ground is 1.00m~1.50m, the build-in
Stake height is 1.20m~2.00m.
7. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1 or 2, it is characterised in that:In shaped form shop fixtures
If the culvert bed direction of U-shaped culvert structure is evenly arranged with arterial highway rib sill, the height of the rib sill is 0.20m~0.40m;Rib sill
Length and the width of shaped form staking sequence match.
8. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:The ditch of the U-shaped culvert
Bed ratio is reduced to 2.0%~10.0%.
9. a kind of U-shaped culvert structure of shaped form shop fixtures according to claim 1, it is characterised in that:In collecting tray and roadbed
Between kind be implanted with trees, the collecting tray section according to several row steel tube concrete stakes of landform condition setting, steel tube concrete pile
Shape is fixed according to confluence section landform, and several check dam engineerings are arranged according to landform in highway area upstream debris flow gully.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610404405.0A CN106012876B (en) | 2016-06-03 | 2016-06-03 | A kind of U-shaped culvert structure of shaped form shop fixtures |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610404405.0A CN106012876B (en) | 2016-06-03 | 2016-06-03 | A kind of U-shaped culvert structure of shaped form shop fixtures |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106012876A CN106012876A (en) | 2016-10-12 |
CN106012876B true CN106012876B (en) | 2018-09-21 |
Family
ID=57090052
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610404405.0A Expired - Fee Related CN106012876B (en) | 2016-06-03 | 2016-06-03 | A kind of U-shaped culvert structure of shaped form shop fixtures |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106012876B (en) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH1077625A (en) * | 1996-09-03 | 1998-03-24 | Fujita Corp | Embedment structure of culvert |
US5836717A (en) * | 1997-02-25 | 1998-11-17 | Bebo Of America | Multi-segment spandrel wall for overfilled arch structures |
CN2734820Y (en) * | 2004-10-27 | 2005-10-19 | 陈洪凯 | Mud-rock flow blocking, gathering and discharging comprehensive control structure |
CN102182151A (en) * | 2011-04-09 | 2011-09-14 | 刘山健 | Reinforced concrete culvert |
CN202440766U (en) * | 2012-01-05 | 2012-09-19 | 中铁第一勘察设计院集团有限公司 | Water-drainage open cut tunnel aqueduct of road cut section |
CN103952986B (en) * | 2014-05-19 | 2016-04-13 | 中国地质大学(武汉) | A kind of off-load formula rigid culvert structure |
-
2016
- 2016-06-03 CN CN201610404405.0A patent/CN106012876B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN106012876A (en) | 2016-10-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106801403B (en) | A method of preventing mud-stone flow disaster and mudstone apoblema recycles | |
US20130078037A1 (en) | Debris flow drainage canal based on cascade antiscour notched sill group and application thereof | |
CN207003450U (en) | A kind of hydrophobic bank protection of express highway roadbed greening | |
CN110984193A (en) | Severe cold mountain area highway cutting side slope ecological protection system | |
CN204690698U (en) | A kind of debris flow dam | |
CN207904879U (en) | A kind of Debris Flow on Slope Surface improvement integration engineering structure | |
CN204825931U (en) | Protective structure is administered to side slope | |
CN207405576U (en) | For the galvanized wire cage debris dam of mountain area RBS in channel direction | |
CN207633300U (en) | A kind of Gullied Rolling Loess Region mud-stone flow disaster recycling control structure | |
CN106012876B (en) | A kind of U-shaped culvert structure of shaped form shop fixtures | |
CN210177294U (en) | Mountain area highway subgrade | |
CN106759778A (en) | For the scattered collection mating type waterproof and water drainage system of highway median strip | |
CN208309527U (en) | A kind of guard system that curved shape mud-rock flow is blocked | |
US20120269573A1 (en) | Systems and Methods for Diverting Sub-surface Water | |
CN109235184A (en) | A kind of highway Loess cutting border slope combined drainage system | |
CN206503213U (en) | Scattered collection mating type waterproof and water drainage system for highway median strip | |
CN206070493U (en) | A kind of guard system blocked for mud-rock flow | |
CN110172884A (en) | A kind of Subgrade in Mountain Area and construction method | |
CN213233325U (en) | Cutting and guiding structure applied to debris flow prevention and control | |
CN205224121U (en) | Karst depression sinkhole protection device | |
CN204475172U (en) | Bridge floor greenbelt waterproof and water drainage system | |
CN207597544U (en) | A kind of high resiliency water conservancy chute | |
CN209010891U (en) | A kind of multi-functional lobby drainage facility | |
CN107090759A (en) | Two-stage road slope ditch component and two-stage road slope ditch structure | |
CN207109997U (en) | Tunneled central gutter nondestructive inspection (NDI) construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 Termination date: 20200603 |
|
CF01 | Termination of patent right due to non-payment of annual fee |