CN106002092A - Multi-cavity steel column shear wall structure and preparation method thereof - Google Patents

Multi-cavity steel column shear wall structure and preparation method thereof Download PDF

Info

Publication number
CN106002092A
CN106002092A CN201610396868.7A CN201610396868A CN106002092A CN 106002092 A CN106002092 A CN 106002092A CN 201610396868 A CN201610396868 A CN 201610396868A CN 106002092 A CN106002092 A CN 106002092A
Authority
CN
China
Prior art keywords
steel
inspection
check
welding
weld
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610396868.7A
Other languages
Chinese (zh)
Inventor
赵志海
顾拥军
王君木
李龙波
鲍丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Original Assignee
CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHAO FENG STEEL STRUCTURE GROUP Co Ltd filed Critical CHAO FENG STEEL STRUCTURE GROUP Co Ltd
Priority to CN201610396868.7A priority Critical patent/CN106002092A/en
Publication of CN106002092A publication Critical patent/CN106002092A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/58Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal
    • E04B2/60Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of metal characterised by special cross-section of the elongated members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/56Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members
    • E04B2/64Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete
    • E04B2/68Load-bearing walls of framework or pillarwork; Walls incorporating load-bearing elongated members with elongated members of concrete made by filling-up wall cavities

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The invention relates to a shear wall, in particular to a multi-cavity steel column shear wall structure and a preparation method thereof. The multi-cavity steel column shear wall structure comprises a plurality of steel plates, wherein the steel plates are assembled into a multi-cavity steel column shear wall; the width of the multi-cavity steel column shear wall is not greater than 150 mm; and concrete is arranged in the multi-cavity steel column shear wall. According to the multi-cavity steel column shear wall structure and the preparation method thereof, the structure is compact, using area is increased, and quality is guaranteed.

Description

Multi-cavity steel column shear wall structure and preparation method thereof
Technical field
The present invention relates to a kind of shear wall, particularly relate to a kind of multi-cavity steel column shear wall structure and preparation method thereof.
Background technology
Many high residential buildings of the prior art are the most unreasonable, and many employing H profile steel posts or box column, structural system is steel framework Frame-core wall structure or steel frame-brace structure system, steel frame-concrete wall structure, owing to Core Walls Structure is mixed earth knot Structure, construction condition is similar with traditional mixed clay structure, in addition it is also necessary to formwork structure, and speed of application is restricted; Steel frame-brace structure system, supporting construction manufacture is installed trouble, is arranged unreasonable.And the room of both structural system There is dew post phenomenon in corner, and room is arranged unsightly, it is difficult to the satisfaction of the client that obtains selling house
Chinese patent 201310358035.8, steel column and the company of steel bar girder shear wall in a kind of building plane are disclosed Access node structure, belongs to building member field.Shear wall uses precast reinforced truss xoncrete structure, and shear wall periphery is provided with steel limit Frame, steel frame is together with steel bar truss welding, and shear wall side is provided with pre-embedded steel slab, and the welding of steel frame, pre-embedded steel slab is weighed anchor Gu the anchor pole of effect, the upper end of shear wall is provided with pit, and the steel frame of lower end is welded with short steel fastener;At shear wall end Face welding short steel fastener, steel column boxes out mouth by the wing plate of shear wall end face side, and short steel fastener inserts in aperture, hole Mouth both sides steel plate and the steel frame welded closure of shear wall end face, in steel column, rear concrete perfusion forms tube shear wall.This knot Structure is relative complex, and serviceability is outstanding.
Summary of the invention
The present invention mainly solves the deficiencies in the prior art, it is provided that a kind of compact conformation, is hidden in inside body of wall, Do not have the phenomenon of corner, room dew post, limit the width of beam, decrease the possible multi-cavity steel column shearing of room head beam Wall construction and preparation method thereof.
The above-mentioned technical problem of the present invention is mainly addressed by following technical proposals:
A kind of multi-cavity steel column shear wall structure, including several steel plates, described steel plate is assembled into multi-cavity steel column shear wall, The width of described multi-cavity steel column shear wall is not more than 150mm, is provided with concrete in described multi-cavity steel column shear wall;
Described multi-cavity steel column shear wall is fixedly connected with girder steel assembly;
Described girder steel assembly includes fixing beam and extension beam, and described fixing beam is solid with the outer wall of multi-cavity steel column shear wall Fixed, the two side of described fixing beam is positioned with multi-cavity steel column shear wall by fixed plate respectively, the outer end of described fixing beam Being provided with extension beam, described extension beam is fixedly connected with fixing beam;
Or,
Described girder steel assembly includes being spaced fixing beam, and described interval is fixed beam and fixed with multi-cavity steel column shear wall;
The width of described girder steel assembly is not more than 150mm.
As preferably, between described fixing beam and extension beam, it is spaced to fix and passes through respectively between beam and multi-cavity steel column shear wall Connecting plate fixes, and the thickness of described connecting plate is not more than 10mm;
Described fixed plate is distributed in the top and bottom of fixing beam.
The preparation method of multi-cavity steel column shear wall structure, sequentially includes the following steps:
(1), the selection of steel plate:
1, steel plate and the thickness of steel band and tolerance should meet its product standard requirement;
Check quantity: every batch of same kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 5;
The method of inspection: measure with vernier calliper dipstick metering or sonigauge;
2, after uncoiling, width and the tolerance of steel band should meet:
Nominal width: B, width of steel band deviation ± 0.5mm;
Check quantity: each kind, the steel plate of specification detect at 5;
The method of inspection: steel ruler measures;
3, the unevenness of steel plate should meet the requirement of its product standard;
Check quantity: each kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 3.Inspection party Method: slide gauge and steel ruler measure;
4, the appearance quality of steel is in addition to should meeting the regulation of existing relative national standards, still should meet following rule Fixed:
When there is the defect of corrosion, pit or cut on the surface of steel, its degree of depth cannot be greater than this thickness of steel product
The 1/2 of negative tolerance value;
Steel surface rusting grade should meet existing national standards " steel surface rusting grade and derusting grade before application " More than the C level of GB/T 8923 regulation and C level;
Steel end edge or incision position should not have the defect of layering, slag inclusion;
Inspection quantity: exhaustive test;
The method of inspection: observe and check;
Steel plate uses to be determined the banding machine of bar and carries out machining, forbids flame cutting;
(2), the assembly of steel plate and welding:
Employing group founds machine, and to carry out group vertical;Use long-armed welding machine to weld, because web thickness is less, use single-sided welding;
1, mating of welding material and mother metal, should meet the requirement of design document and existing national standards " welding for steel structure is advised Model " regulation of GB 50661;Welding material before use, should be dried by the regulation of its product description and welding documents Roast and deposit;
Inspection quantity: exhaustive test;
The method of inspection: check on the quality testimonial and baking record;
2, welder through passing the examination and must obtain the certificate of competency, and accredited welder must be in its project and recognizing of passing the examination Can welding in scope;
Inspection quantity: exhaustive test;
The method of inspection: check welder qualification and accreditation scope, effect duration thereof;
3, unit in charge of construction should be according to design requirement, with reference to the relevant rule of national standard " welding for steel structure specification " GB 50661 Fixed, before steel pipe bundle makes and installs, carry out qualification of welding procedure, determine welding procedure according to evaluation report, write welding procedure Code also should be acted in accordance with it;
Inspection quantity: exhaustive test;
The method of inspection: check PQR, welding procedure specification (WPS) and weld job record;
4, design requires that the I and II weld seam of complete penetraction and fusion in welding should be according to " code for acceptance of construction quality of steel structures " GB The requirement of 50205 carries out Non-Destructive Testing, and its result should meet existing national standards and design requirement;
Inspection quantity: exhaustive test;
The method of inspection: check ultrasound wave or radiographic inspection record;
5, the docking of the requirement through welding of T junction, geneva cross, corner joint and corner connection composite welds, it adds fierce Foot size should meet the requirement of " structural steelwork construction quality specification " GB 50205;
Inspection quantity: data exhaustive test;Similar weld seam selective examination 10%, and should be less than 3;
The method of inspection: observe and check, measures with weld gauge selective examination;
6, face of weld must not have the defect such as crackle, overlap, one-level, second-order weld must not have surface pores, slag inclusion, arc crater Crackle, the defect of arc scratch;And first-order weld must not have undercut, incompletely filling, the defect of root contraction;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;Spot-check in component, each type welding seam 5% is spot-check by bar number, and should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: observing and check or use magnifier, weld gauge and steel ruler inspection, when there is doubt, employing is oozed Thoroughly or magnetic particle testing;
7, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet existing relative national standards Specify or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
8, weld appearance quality should meet the regulation of table 1.
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;Spot-check in component, each type welding seam 5% is spot-check by bar number, and should be less than 1;At every selective examination 1, total selective examination number should not be less than at 10;
The method of inspection: observe and check or use magnifier, weld gauge and steel ruler inspection;
Table 1 weld appearance quality standard (mm)
9, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet the existing relevant standard of country Specify or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
10, multi-cavity steel column longitudinal seam permissible variation in dimension should meet the regulation of table 2.
Table 2 multi-cavity steel column longitudinal seam permissible variation in dimension
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, every kind of weld seam presses bar The each selective examination 5% of number, but should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: check with weld gauge;
11, weld dished angle welding, between weld metal and mother metal, answer gentle transition;Process dished angle welding, no Cut channel must be left on its surface;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;
The method of inspection: observe and check;
12, weld seam sense organ should reach: profile is uniform, molding is preferable, and between welding bead and welding bead, welding bead and base metal, transition is relatively Smooth, welding slag and splash are removed totally substantially;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, every kind of weld seam is by number Measuring each selective examination 5%, total selective examination number should not be less than at 5;
The method of inspection: observe and check;
(3), the assembly of girder steel assembly:
According to drawing requirement, girder steel assembly is carried out assembly;
(4), girder steel assembly and the assembling of multi-cavity steel column shear wall:
With bolt, girder steel assembly and multi-cavity steel column shear wall are carried out assembly by connecting plate;
1, the Weld quality level used when the splicing of the steel part such as multi-cavity steel column or docking should meet design requirement.When setting Meter when not requiring, should use the full penetration weld that credit rating is not less than two grades, when weld seam be in tensile region and have etc. the most right Connect when requiring, one-level full penetration weld should be used;
Inspection quantity: exhaustive test;
The method of inspection: inspection awake ultrasonic examination report;
2, multi-cavity steel column assembling tolerance should meet the regulation of table 3;
Check quantity: exhaustive test;
The method of inspection: with steel ruler, angle square, the inspection of clearance gauge;
Table 3 multi-cavity steel column assembles tolerance (mm)
3, multi-cavity steel column postwelding tolerance should meet the regulation of table 4;
Inspection quantity: exhaustive test;
Inspection method: with steel ruler, angle square, the inspection of clearance gauge;
Tolerance (mm) after table 4 multi-cavity steel column assembly welding
4, the tolerance of steel beam column overall dimensions general data should meet existing national standards " structural steelwork construction matter Amount acceptance specification " regulation of GB 50205;
Check quantity: spot-check 10% by the number of components, and should be less than 3;
The method of inspection: see " code for acceptance of construction quality of steel structures " GB 50205;
The connected mode of multi-cavity steel column and H profile steel beam is shown in accompanying drawing, is divided into steel to connect in succession and is articulated and connected.
Using standardized designs, structural module is unified, it is simple to standard batch produces.This beam-to-column joint, because not having There is the obstruction of internal partition, pour post concrete the most smooth and easy.Because pillar does not has internal partition and diaphragm plate, the processing cost of pillar Significantly decline.
Advantage: 1, use steel construction, recyclable construction material.2, batch production makes, and meets housing industrialization requirement.3, pre- System assembling, reduces labor strength.4, weight significantly declines, and drastically reduce the area Road Transportation Volume, decreases environment dirty Dye.5, standardized designs, structural module is unified, it is simple to standard batch, mechanization production.6, multi-cavity steel column all uses special Equipment is processed manufacturing, the quality assurance, and percent of automatization is high.7, Multi-cavity steel cylindricality formula is similar with mixed earth shear wall, Yong Hurong Amount accepts.8, Multi-cavity steel rod structure steel using amount is smaller, and is suitable for producing in enormous quantities, acts the cost controlling steel house To certain effect, 9, width due to multi-cavity steel column, beam be 150mm, beam, post are all in body of wall.
Therefore, multi-cavity steel column shear wall structure of the present invention and preparation method thereof, compact conformation, increase usable floor area, protect Barrier quality.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the sectional structure schematic diagram of Fig. 1;
Fig. 3 is another structural representation in the present invention;
Fig. 4 is the sectional structure schematic diagram of Fig. 3;
Fig. 5 is another one structural representation in the present invention;
Fig. 6 is the sectional structure schematic diagram of Fig. 5;
Fig. 7 is the structural representation of " one " shape multi-cavity steel column shear wall in the present invention;
Fig. 8 is the structural representation of " T " shape multi-cavity steel column shear wall in the present invention;
Fig. 9 is the structural representation of legend in table 2 of the present invention;
Figure 10 is the structural representation of legend 1 in table 3 of the present invention;
Figure 11 is the structural representation of legend 2 in table 3 of the present invention;
Figure 12 is the structural representation of legend 3 in table 3 of the present invention;
Figure 13 is the structural representation of legend 4 in table 3 of the present invention;
Figure 14 is the structural representation of legend 5 in table 3 of the present invention;
Figure 15 is the structural representation of legend 6 in table 3 of the present invention;
Figure 16 is the structural representation of legend 7 in table 3 of the present invention;
Figure 17 is the structural representation of legend 1 in table 4 of the present invention;
Figure 18 is the structural representation of legend 2 in table 4 of the present invention;
Figure 19 is the structural representation of legend 3 in table 4 of the present invention;
Figure 20 is the structural representation of legend 4 in table 4 of the present invention;
Figure 21 is the structural representation of legend 5 in table 4 of the present invention;
Figure 22 is the structural representation of legend 6 in table 4 of the present invention;
Figure 23 is the structural representation of legend 7 in table 4 of the present invention;
Figure 24 is the structural representation of legend 8 in table 4 of the present invention;
Figure 25 is the structural representation of legend 9 in table 4 of the present invention;
Figure 26 is the structural representation of legend 10 in table 4 of the present invention.
Detailed description of the invention
Below by embodiment, and combine accompanying drawing, technical scheme is described in further detail.
Embodiment 1: as shown in Figure 1, Figure 2, shown in Fig. 3, Fig. 4, Fig. 5, Fig. 6, Fig. 7 and Fig. 8, a kind of multi-cavity steel column shear wall knot Structure, including several steel plates, described steel plate is assembled into multi-cavity steel column shear wall 1, the width of described multi-cavity steel column shear wall 1 It is not more than 150mm, described multi-cavity steel column shear wall 1 is provided with concrete 2;
Described multi-cavity steel column shear wall 1 is fixedly connected with girder steel assembly;
Described girder steel assembly includes fixing beam 3 and extension beam 4, outside described fixing beam 3 is with multi-cavity steel column shear wall 1 Wall is fixed, and the two side of described fixing beam 3 is positioned with multi-cavity steel column shear wall 1 by fixed plate 5 respectively, described fixing beam The outer end of 3 is provided with extension beam 4, and described extension beam 4 is fixedly connected with fixing beam 3;
Or,
Described girder steel assembly includes being spaced fixing beam 6, and it is solid with multi-cavity steel column shear wall 1 phase that beam 6 is fixed at described interval Fixed;
The width of described girder steel assembly is not more than 150mm.
Between described fixing beam 3 and extension beam 4, it is spaced to fix and passes through connecting plate respectively between beam 6 and multi-cavity steel column shear wall 1 7 fix, and the thickness of described connecting plate 7 is not more than 10mm;
Described fixed plate 5 is distributed in the top and bottom of fixing beam 3.
Described multi-cavity steel column shear wall 1 is in " one " shape, or the one in " L " shape, " T " shape, " ten " shape.
Described fixing beam 3, extension beam 4, the fixing beam in interval 6 are respectively H profile steel or box steel.
The preparation method of multi-cavity steel column shear wall structure, sequentially includes the following steps:
(1), the selection of steel plate:
1, steel plate and the thickness of steel band and tolerance should meet its product standard requirement;
Check quantity: every batch of same kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 5;
The method of inspection: measure with vernier calliper dipstick metering or sonigauge;
2, after uncoiling, width and the tolerance of steel band should meet:
Nominal width: B, width of steel band deviation ± 0.5mm;
Check quantity: each kind, the steel plate of specification detect at 5;
The method of inspection: steel ruler measures;
3, the unevenness of steel plate should meet the requirement of its product standard;
Check quantity: each kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 3.Inspection party Method: slide gauge and steel ruler measure;
4, the appearance quality of steel is in addition to should meeting the regulation of existing relative national standards, still should meet following rule Fixed:
When there is the defect of corrosion, pit or cut on the surface of steel, its degree of depth cannot be greater than this thickness of steel product
The 1/2 of negative tolerance value;
Steel surface rusting grade should meet existing national standards " steel surface rusting grade and derusting grade before application " More than the C level of GB/T 8923 regulation and C level;
Steel end edge or incision position should not have the defect of layering, slag inclusion;
Inspection quantity: exhaustive test;
The method of inspection: observe and check;
Steel plate uses to be determined the banding machine of bar and carries out machining, forbids flame cutting;
(2), the assembly of steel plate and welding:
Employing group founds machine, and to carry out group vertical;Use long-armed welding machine to weld, because web thickness is less, use single-sided welding;
1, mating of welding material and mother metal, should meet the requirement of design document and existing national standards " welding for steel structure is advised Model " regulation of GB 50661;Welding material before use, should be dried by the regulation of its product description and welding documents Roast and deposit;
Inspection quantity: exhaustive test;
The method of inspection: check on the quality testimonial and baking record;
2, welder through passing the examination and must obtain the certificate of competency, and accredited welder must be in its project and recognizing of passing the examination Can welding in scope;
Inspection quantity: exhaustive test;
The method of inspection: check welder qualification and accreditation scope, effect duration thereof;
3, unit in charge of construction should be according to design requirement, with reference to the relevant rule of national standard " welding for steel structure specification " GB 50661 Fixed, before steel pipe bundle makes and installs, carry out qualification of welding procedure, determine welding procedure according to evaluation report, write welding procedure Code also should be acted in accordance with it;
Inspection quantity: exhaustive test;
The method of inspection: check PQR, welding procedure specification (WPS) and weld job record;
4, design requires that the I and II weld seam of complete penetraction and fusion in welding should be according to " code for acceptance of construction quality of steel structures " GB The requirement of 50205 carries out Non-Destructive Testing, and its result should meet existing national standards and design requirement;
Inspection quantity: exhaustive test;
The method of inspection: check ultrasound wave or radiographic inspection record;
5, the docking of the requirement through welding of T junction, geneva cross, corner joint and corner connection composite welds, it adds fierce Foot size should meet the requirement of " structural steelwork construction quality specification " GB 50205;
Inspection quantity: data exhaustive test;Similar weld seam selective examination 10%, and should be less than 3;
The method of inspection: observe and check, measures with weld gauge selective examination;
6, face of weld must not have the defect such as crackle, overlap, one-level, second-order weld must not have surface pores, slag inclusion, arc crater Crackle, the defect of arc scratch;And first-order weld must not have undercut, incompletely filling, the defect of root contraction;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;Spot-check in component, each type welding seam 5% is spot-check by bar number, and should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: observing and check or use magnifier, weld gauge and steel ruler inspection, when there is doubt, employing is oozed Thoroughly or magnetic particle testing;
7, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet existing relative national standards Specify or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
8, weld appearance quality should meet the regulation of table 1.
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;Spot-check in component, each type welding seam 5% is spot-check by bar number, and should be less than 1;At every selective examination 1, total selective examination number should not be less than at 10;
The method of inspection: observe and check or use magnifier, weld gauge and steel ruler inspection;
Table 1 weld appearance quality standard (mm)
9, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet the existing relevant standard of country Specify or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
10, multi-cavity steel column longitudinal seam permissible variation in dimension should meet the regulation of table 2.
Table 2 multi-cavity steel column longitudinal seam permissible variation in dimension: as shown in Figure 9
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, every kind of weld seam presses bar The each selective examination 5% of number, but should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: check with weld gauge;
11, weld dished angle welding, between weld metal and mother metal, answer gentle transition;Process dished angle welding, no Cut channel must be left on its surface;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;
The method of inspection: observe and check;
12, weld seam sense organ should reach: profile is uniform, molding is preferable, and between welding bead and welding bead, welding bead and base metal, transition is relatively Smooth, welding slag and splash are removed totally substantially;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, every kind of weld seam is by number Measuring each selective examination 5%, total selective examination number should not be less than at 5;
The method of inspection: observe and check;
(3), the assembly of girder steel assembly:
According to drawing requirement, girder steel assembly is carried out assembly;
(4), girder steel assembly and the assembling of multi-cavity steel column shear wall:
With bolt, girder steel assembly and multi-cavity steel column shear wall are carried out assembly by connecting plate;
1, the Weld quality level used when the splicing of the steel part such as multi-cavity steel column or docking should meet design requirement.When setting Meter when not requiring, should use the full penetration weld that credit rating is not less than two grades, when weld seam be in tensile region and have etc. the most right Connect when requiring, one-level full penetration weld should be used;
Inspection quantity: exhaustive test;
The method of inspection: inspection awake ultrasonic examination report;
3, multi-cavity steel column assembling tolerance should meet the regulation of table 3;
Check quantity: exhaustive test;
The method of inspection: with steel ruler, angle square, the inspection of clearance gauge;
Table 3 multi-cavity steel column assembles tolerance (mm) as shown in Figure 10-16
3, multi-cavity steel column postwelding tolerance should meet the regulation of table 4;
Inspection quantity: exhaustive test;
Inspection method: with steel ruler, angle square, the inspection of clearance gauge;
After table 4 multi-cavity steel column assembly welding, tolerance (mm) is as shown in Figure 17-26
4, the tolerance of steel beam column overall dimensions general data should meet existing national standards " structural steelwork construction matter Amount acceptance specification " regulation of GB 50205;
Check quantity: spot-check 10% by the number of components, and should be less than 3;
The method of inspection: see " code for acceptance of construction quality of steel structures " GB 50205;
The connected mode of multi-cavity steel column and H profile steel beam is shown in accompanying drawing, is divided into steel to connect in succession and is articulated and connected.

Claims (5)

1. a multi-cavity steel column shear wall structure, it is characterised in that: include that several steel plates, described steel plate are assembled into Multi-cavity steel Post shear wall (1), the width of described multi-cavity steel column shear wall (1) is not more than 150mm, described multi-cavity steel column shear wall (1) In be provided with concrete (2);
Described multi-cavity steel column shear wall (1) is fixedly connected with girder steel assembly;
Described girder steel assembly includes fixing beam (3) and extension beam (4), described fixing beam (3) and multi-cavity steel column shear wall (1) Outer wall fix, the two side of described fixing beam (3) is positioned by fixed plate (5) and multi-cavity steel column shear wall (1) respectively, institute The outer end of the fixing beam (3) stated is provided with extension beam (4), and described extension beam (4) is fixedly connected with fixing beam (3);
Or,
Described girder steel assembly includes being spaced fixing beam (6), and beam (6) and multi-cavity steel column shear wall (1) phase are fixed in described interval Fixing;
The width of described girder steel assembly is not more than 150mm.
Multi-cavity steel column shear wall structure the most according to claim 1, it is characterised in that: described fixing beam (3) and extension Between beam (4), the fixing connecting plate (7) that passes through respectively between beam (6) and multi-cavity steel column shear wall (1) in interval fix, described connection The thickness of plate (7) is not more than 10mm;
Described fixed plate (5) is distributed in the top and bottom of fixing beam (3).
Multi-cavity steel column shear wall structure the most according to claim 1, it is characterised in that: described multi-cavity steel column shear wall (1) in " one " shape, or the one in " L " shape, " T " shape, " ten " shape.
4. according to the multi-cavity steel column shear wall structure described in claim 1 or 2 or 3, it is characterised in that: described fixing beam (3), Extension beam (4), the fixing beam (6) in interval are respectively H profile steel or box steel.
5. according to the preparation method of the multi-cavity steel column shear wall structure described in claim 1 or 2 or 3, it is characterised in that by following Step is carried out:
(1), the selection of steel plate:
1, steel plate and the thickness of steel band and tolerance should meet its product standard requirement;
Check quantity: every batch of same kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 5;
The method of inspection: measure with vernier calliper dipstick metering or sonigauge;
2, after uncoiling, width and the tolerance of steel band should meet:
Nominal width: B, width of steel band deviation ± 0.5mm;
Check quantity: each kind, the steel plate of specification detect at 5;
The method of inspection: steel ruler measures;
3, the unevenness of steel plate should meet the requirement of its product standard;
Check quantity: each kind, the steel plate of specification inspect 10% by random samples, and no less than 3, at every detection 3.The method of inspection: trip Mark slide calliper rule and steel ruler measure;
4, the appearance quality of steel is in addition to should meeting the regulation of existing relative national standards, still should meet the following requirements:
When there is the defect of corrosion, pit or cut on the surface of steel, its degree of depth cannot be greater than this thickness of steel product and bears tolerance The 1/2 of value;
Steel surface rusting grade should meet existing national standards " steel surface rusting grade and derusting grade before application " GB/T More than the C level of 8923 regulations and C level;
Steel end edge or incision position should not have the defect of layering, slag inclusion;
Inspection quantity: exhaustive test;
The method of inspection: observe and check;
Steel plate uses to be determined the banding machine of bar and carries out machining, forbids flame cutting;
(2), the assembly of steel plate and welding:
Employing group founds machine, and to carry out group vertical;Use long-armed welding machine to weld, because web thickness is less, use single-sided welding;
1, welding material and mother metal mate requirement and the existing national standards " welding for steel structure specification " that should meet design document The regulation of GB 50661;Welding material before use, should be bakeed by the regulation of its product description and welding documents With deposit;
Inspection quantity: exhaustive test;
The method of inspection: check on the quality testimonial and baking record;
2, welder through passing the examination and must obtain the certificate of competency, and accredited welder must be at its pass the examination project and accreditation model thereof Enclose interior welding;
Inspection quantity: exhaustive test;
The method of inspection: check welder qualification and accreditation scope, effect duration thereof;
3, unit in charge of construction should be according to design requirement, with reference to the pertinent regulations of national standard " welding for steel structure specification " GB 50661, Before steel pipe bundle makes and installs, carry out qualification of welding procedure, determine welding procedure according to evaluation report, write welding procedure rule Cheng Bingying acts in accordance with it;
Inspection quantity: exhaustive test;
The method of inspection: check PQR, welding procedure specification (WPS) and weld job record;
4, design requires that the I and II weld seam of complete penetraction and fusion in welding should be according to " code for acceptance of construction quality of steel structures " GB's 50205 Requirement carries out Non-Destructive Testing, and its result should meet existing national standards and design requirement;
Inspection quantity: exhaustive test;
The method of inspection: check ultrasound wave or radiographic inspection record;
5, the docking of the requirement through welding of T junction, geneva cross, corner joint and corner connection composite welds, it strengthens leg chi The very little requirement that should meet " structural steelwork construction quality specification " GB 50205;
Inspection quantity: data exhaustive test;Similar weld seam selective examination 10%, and should be less than 3;
The method of inspection: observe and check, measures with weld gauge selective examination;
6, face of weld must not have the defect such as crackle, overlap, one-level, second-order weld that surface pores, slag inclusion, arc crater must not be had to split Stricture of vagina, the defect of arc scratch;And first-order weld must not have undercut, incompletely filling, the defect of root contraction;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, each type welding seam presses bar Number selective examination 5%, and should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: observe and check or use magnifier, weld gauge and steel ruler inspection, when there is doubt, use infiltration or Magnetic particle testing;
7, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet the regulation of existing relative national standards Or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
8, weld appearance quality should meet the regulation of table 1.
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, each type welding seam presses bar Number selective examination 5%, and should be less than 1;At every selective examination 1, total selective examination number should not be less than at 10;
The method of inspection: observe and check or use magnifier, weld gauge and steel ruler inspection;
Table 1 weld appearance quality standard (mm)
9, to needing to preheat or the weld seam of after heat, its preheating or postheat temperature should meet the existing regulation about standard of country Or determined by qualification of welding procedure;
Inspection quantity: exhaustive test;
The method of inspection: check pre-, after heat construction note and PQR;
10, multi-cavity steel column longitudinal seam permissible variation in dimension should meet the regulation of table 2.
Table 2 multi-cavity steel column longitudinal seam permissible variation in dimension
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, it is each that every kind of weld seam presses bar number Selective examination 5%, but should be less than 1;Every checks at 1, and total selective examination number should not be less than at 10;
The method of inspection: check with weld gauge;
11, weld dished angle welding, between weld metal and mother metal, answer gentle transition;Process dished angle welding, must not be Its surface leaves cut channel;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;
The method of inspection: observe and check;
12, weld seam sense organ should reach: profile is uniform, molding is preferable, and between welding bead and welding bead, welding bead and base metal, transition is more flat Sliding, welding slag and splash are removed totally substantially;
Check quantity: spot-check 10% with class A of geometric unitA for every batch, and should be less than 3;By in selective examination component, every kind of weld seam is each by quantity Selective examination 5%, total selective examination number should not be less than at 5;
The method of inspection: observe and check;
(3), the assembly of girder steel assembly:
According to drawing requirement, girder steel assembly is carried out assembly;
(4), girder steel assembly and the assembling of multi-cavity steel column shear wall:
With bolt, girder steel assembly and multi-cavity steel column shear wall are carried out assembly by connecting plate;
1, the Weld quality level used when the splicing of the steel part such as multi-cavity steel column or docking should meet design requirement.When design does not has When requiring, the full penetration weld that credit rating is not less than two grades should be used, when weld seam is in tensile region and the strong docking such as has to want When asking, one-level full penetration weld should be used;
Inspection quantity: exhaustive test;
The method of inspection: inspection awake ultrasonic examination report;
2, multi-cavity steel column assembling tolerance should meet the regulation of table 3;
Check quantity: exhaustive test;
The method of inspection: with steel ruler, angle square, the inspection of clearance gauge;
Table 3 multi-cavity steel column assembles tolerance (mm)
3, multi-cavity steel column postwelding tolerance should meet the regulation of table 4;
Inspection quantity: exhaustive test;
Inspection method: with steel ruler, angle square, the inspection of clearance gauge;
Tolerance (mm) after table 4 multi-cavity steel column assembly welding
4, the tolerance of steel beam column overall dimensions general data should meet existing national standards " structural steelwork construction quality is tested Receive specification " regulation of GB 50205;
Check quantity: spot-check 10% by the number of components, and should be less than 3;
The method of inspection: see " code for acceptance of construction quality of steel structures " GB 50205;
The connected mode of multi-cavity steel column and H profile steel beam is shown in accompanying drawing, is divided into steel to connect in succession and is articulated and connected.
CN201610396868.7A 2016-06-07 2016-06-07 Multi-cavity steel column shear wall structure and preparation method thereof Pending CN106002092A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610396868.7A CN106002092A (en) 2016-06-07 2016-06-07 Multi-cavity steel column shear wall structure and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610396868.7A CN106002092A (en) 2016-06-07 2016-06-07 Multi-cavity steel column shear wall structure and preparation method thereof

Publications (1)

Publication Number Publication Date
CN106002092A true CN106002092A (en) 2016-10-12

Family

ID=57089821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610396868.7A Pending CN106002092A (en) 2016-06-07 2016-06-07 Multi-cavity steel column shear wall structure and preparation method thereof

Country Status (1)

Country Link
CN (1) CN106002092A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127352A (en) * 2018-01-13 2018-06-08 石柏林 A kind of double steel plate shearing wall member automatic production method and production equipment
CN113914508A (en) * 2021-11-26 2022-01-11 上海宝冶集团有限公司 Machining process of steel plate shear wall

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291531A (en) * 2005-04-08 2006-10-26 Kajima Corp Column/beam connection structure
CN104047363A (en) * 2014-05-05 2014-09-17 浙江杭萧钢构股份有限公司 Steel beam and steel tube bundle combined structure shear wall connected node
CN204645315U (en) * 2015-04-27 2015-09-16 中国建筑股份有限公司 Multicarity L shape encased steel plate shear wall
CN105178441A (en) * 2015-09-18 2015-12-23 杭萧钢构股份有限公司 Side plate type connection joint for steel beam and steel tube beam concrete shear wall
CN205976089U (en) * 2016-06-07 2017-02-22 潮峰钢构集团有限公司 Multicavity steel column shear wall structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006291531A (en) * 2005-04-08 2006-10-26 Kajima Corp Column/beam connection structure
CN104047363A (en) * 2014-05-05 2014-09-17 浙江杭萧钢构股份有限公司 Steel beam and steel tube bundle combined structure shear wall connected node
CN204645315U (en) * 2015-04-27 2015-09-16 中国建筑股份有限公司 Multicarity L shape encased steel plate shear wall
CN105178441A (en) * 2015-09-18 2015-12-23 杭萧钢构股份有限公司 Side plate type connection joint for steel beam and steel tube beam concrete shear wall
CN205976089U (en) * 2016-06-07 2017-02-22 潮峰钢构集团有限公司 Multicavity steel column shear wall structure

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周浪: "《钢结构工程计算速查手册》", 30 May 2008, 华中科技大学出版社 *
姜学成等: "《图解钢结构焊接》", 31 January 2013, 江苏科学出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108127352A (en) * 2018-01-13 2018-06-08 石柏林 A kind of double steel plate shearing wall member automatic production method and production equipment
CN113914508A (en) * 2021-11-26 2022-01-11 上海宝冶集团有限公司 Machining process of steel plate shear wall

Similar Documents

Publication Publication Date Title
CN105421211B (en) The preparation method of large span list arch rib steel case arch
van Wingerde et al. Criteria for the fatigue assessment of hollow structural section connections
CN110952661B (en) Method for determining connection node of frame beam and integrated house frame beam
Baldassino et al. Design by testing of industrial racks
CN112525091B (en) Construction method integrating installation, positioning and monitoring of steel box truss arch bridge
CN109457965B (en) High-efficiency installation method and device of precast concrete wall panel
CN106002092A (en) Multi-cavity steel column shear wall structure and preparation method thereof
CN115324359A (en) BIM-based design and construction method for arc-shaped multi-curved-surface special-shaped curtain wall
CN109736204A (en) A kind of precast of segmental beam by short line method construction technology
CN114396162A (en) On-site assembling method for steel structure pipe truss
CN114411945A (en) Bin jump construction method based on BIM technology
CN206873673U (en) A kind of assembling type steel structure out-hung panel node
CN111496996A (en) Construction process of large-span assembly type steel-concrete combined simply-supported box girder
CN106088399A (en) A kind of installation method of multi-cavity steel column shear wall combined structure building system
CN113323359A (en) Novel flower basket pull rod tool type overhanging frame construction method
CN206034275U (en) Steel anchor case
CN112962418A (en) Construction process of large-span assembly type steel-concrete combined simply-supported box girder
Kuhlmann et al. Welded circular hollow section (CHS) joints in bridges
CN219825754U (en) Rear anchoring integral connecting piece
Wei Experimental study of laterally offset RHS X-connections in branch axial compression
CN217438712U (en) Special-shaped curve structure steel-concrete combined tower segment
JPS6370736A (en) Connection of long square steel pipe pillar and beam
Schaumann et al. Automatically Welded Tubular X‐Joints for Jacket Substructures: Prediction of the Technical Fatigue Crack Location
TWI311601B (en)
Piscini Passing-through tubular column joints for steel and composite constructions made by laser cutting technology

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20161012