CN105993696B - Greenhouse plastic-steel section bar and application method - Google Patents

Greenhouse plastic-steel section bar and application method Download PDF

Info

Publication number
CN105993696B
CN105993696B CN201610317735.6A CN201610317735A CN105993696B CN 105993696 B CN105993696 B CN 105993696B CN 201610317735 A CN201610317735 A CN 201610317735A CN 105993696 B CN105993696 B CN 105993696B
Authority
CN
China
Prior art keywords
film
skeleton
glass
clamping groove
cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610317735.6A
Other languages
Chinese (zh)
Other versions
CN105993696A (en
Inventor
李世峰
安国民
安璐菲
闫苧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING JUNENG GREENHOUSE SCIENCE & TECHNOLOGY Co Ltd
Original Assignee
BEIJING JUNENG GREENHOUSE SCIENCE & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING JUNENG GREENHOUSE SCIENCE & TECHNOLOGY Co Ltd filed Critical BEIJING JUNENG GREENHOUSE SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201610317735.6A priority Critical patent/CN105993696B/en
Publication of CN105993696A publication Critical patent/CN105993696A/en
Application granted granted Critical
Publication of CN105993696B publication Critical patent/CN105993696B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01GHORTICULTURE; CULTIVATION OF VEGETABLES, FLOWERS, RICE, FRUIT, VINES, HOPS OR SEAWEED; FORESTRY; WATERING
    • A01G9/00Cultivation in receptacles, forcing-frames or greenhouses; Edging for beds, lawn or the like
    • A01G9/14Greenhouses
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/10Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
    • Y02A40/25Greenhouse technology, e.g. cooling systems therefor

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Environmental Sciences (AREA)
  • Greenhouses (AREA)

Abstract

Novel greenhouse plastic-steel section bar and practical approach are a kind of greenhouse profiles, it overcomes the shortcomings that current other technologies, the present invention is formed by connecting by skeleton one, skeleton two and skeleton three and matching component, and skeleton one, skeleton two and skeleton three and matching component are made of plastic-steel section bar.

Description

Greenhouse plastic-steel section bar and application method
Technical field
The present invention relates to a kind of greenhouse profiles, especially greenhouse plastic-steel section bar and application method.
Background technique
The structural material on existing top of greenhouse and periphery is mostly the metal components such as aluminium alloy or steel pipe, and structure is single, close Seal poor, thermally conductive fast, day and night temperature is big, is not suitable for planting;Top steelframe and gutter are the largest heat radiation point.
Summary of the invention
The object of the present invention is to provide a kind of easy for installation, quick;Heat preservation, good seal performance greenhouse plastic-steel section bar and make With method, the shortcomings that it overcomes current other technologies, the object of the present invention is achieved like this, and greenhouse is by skeleton one, bone Frame two and skeleton three and matching component are formed by connecting, and skeleton one, skeleton two and skeleton three and matching component are by plastic-steel type Material composition, the skeleton one are mounted on the outside of the lower pole of double heat preservation gutters, and skeleton one is vertical and horizontal latticed, component and structure Part, component by corner brace and are bolted with column and double heat preservation gutters, and glass is equipped with outside side in prolonging for skeleton one, glass seam Place is equipped with press strip, and press strip top is all made of structure with the position that glass contact position, top glass are contacted with double heat preservation gutters Glue sealing;Film is installed on one inside film-clamping groove of skeleton, forms the first cavity between film and glass;Under double heat preservation gutters While there is column;Electric curl-up film device is installed, when work opens or closes on the inside of column;Two cavitys are formed when closing, pass through sky The thermal loss of cavity configuration reduction side.
One layer of heat preservation film is pasted below double heat preservation gutters, double heat preservation gutters and the skeleton one of herringbone top lower part pass through corner brace Be bolted, in prolonging for skeleton one glass is installed outside side, glass and prolongs and have adhesive tape between side, pressure is installed at glass seam Item, press strip and glass contact position are sealed using structure glue;Film is installed on one inside film-clamping groove of skeleton, film is protected by double Warm gutter lower part extends to the film-clamping groove for the skeleton one installed on the outside of column, is connected with circlip, the lower part card of film and skeleton two The connection of film slot, forms the first cavity between this layer film and glass;The slot that uncovers is installed in one lower part of herringbone parietal bone frame, uncover slot Film-clamping groove above is connect with the film-clamping groove below two lower section mounting framework three of skeleton by lower film;Under lower film and glass The second cavity is formed between the film in face.
On skeleton two, skeleton one is separately mounted to the two sides of skeleton two, by corner brace and is bolted, two components prolong Edge position is concordant, prolongs and installs glass above side, glass and prolongs and has adhesive tape between side, and press strip, press strip and glass are equipped at glass seam Glass contact position is sealed using structure glue;Film is installed on the film-clamping groove of two lower part film-clamping groove of skeleton and skeleton one, film and The first cavity is formed between glass;After film is installed, drilling tail silk mounting framework three is used below film-clamping groove, under then installing Layer film, directly stretches lower film to both sides flat, is mounted in the film-clamping groove on the slot top that uncovers, is fixed with press mold spring, lower layer The second cavity is formed between film below film and glass.
On skeleton three, the lower part supporting piece two sides of ditch are equipped with skeleton one in double heat preservations, install outside side in prolonging for skeleton one There is glass;Insulation film is installed on one inside film-clamping groove of skeleton, forms the first cavity between insulation film and glass.
The face paste thin film under ditch in double heat preservations, ditch and the skeleton one of herringbone top lower part pass through corner brace and spiral shell in double heat preservations It tethers and connects, in prolonging for skeleton one glass is installed outside side, glass and prolong and have adhesive tape between side, press strip is installed at glass seam, is pressed Item and glass contact position are sealed using structure glue;Film is installed on one inside film-clamping groove of skeleton, film passes through in double heat preservations Ditch lower part extends to the film-clamping groove for the skeleton one installed on the outside of supporting piece, is connected with circlip, the lower part film-clamping groove of film and skeleton two Connection, forms the second cavity between film and glass;The slot that uncovers is installed in one lower part of skeleton, the film-clamping groove above the slot that uncovers with The film-clamping groove below skeleton three installed below skeleton two is connected by lower film;Between film below lower film and glass Form the second cavity;The dewdrop formed on lower film is flowed to along film in the slot that uncovers, and centralized collection is got up, and prevents from revealing Pearl falls, and influences to plant.
In the slope on greenhouse herringbone top, skeleton one is mounted between the first cavity and skeleton two, and two components prolong edge Position is concordant, prolongs and installs glass above side, glass and prolongs and has adhesive tape between side, press strip is equipped at glass seam, press strip connects with glass Position is touched to seal using structure glue;Film, film are separately installed on the film-clamping groove of two lower part film-clamping groove of skeleton and skeleton one The second cavity is formed between glass.
The present invention production when, first produce skeleton one, skeleton two, skeleton three, press strip, the groove shape that uncovers mold, adjust After making plastic formula, skeleton one, skeleton two are produced by extruding machine, skeleton one, skeleton two inner hole in penetrate hot galvanizing Square tube, when convex portion stress in hole, contact with square tube, reduce the conduction surface between profile and square tube, this gap is Thermal insulation layer.
Application method of the invention, is equipped with electric curl-up film device on the inside of column, when work, opens or closes electronic wound membrane Device;Two cavitys of profile are closed, the thermal loss of side is reduced by cavity;The dewdrop formed on lower film, along thin Film flows in the slot that uncovers, and centralized collection is got up, and prevents dewdrop from falling, and influences to plant.
Meaning of the present invention: first is that it is combined into the composite construction of two chambers together using three layers of translucent material and plastic-steel section bar, The many drawbacks for overcoming current other glass or sunlight board single structure, reduce top and peripheral part and extraneous heat is handed over Throw-over degree improves the thermal insulation property in greenhouse;Second is that having easy for installation, quick;Heat preservation, good seal performance;Intensity is big, the service life Long feature;Third is that solving the sealing thermal insulation and profile Rigidity of attached-greenhouse top and peripheral structure;Fourth is that using more Layer cavity structure design, in conjunction with the performance characteristics of unlike material material, maximizes favourable factors and minimizes unfavourable ones, the attached-greenhouse that plastic-steel section bar is built, tool There is good appearance, the characteristics of sound construction, energy consumption is extremely low, and heat waste is few, and good heat insulation is at low cost, high efficiency, is China's Greenhouse Construction The upgrading of technology.
Detailed description of the invention
Fig. 1 is Keelof green house sectional view, 1, skeleton 1, skeleton 23, skeleton 34, film-coiling device in figure
Fig. 2 is the structural schematic diagram of skeleton one, 1, skeleton 1, column 6, double heat preservation gutters 7, the first cavity in figure 8, glass 9, film 10, press strip 11, uncover slot 12, lower film
Fig. 3 is the structural schematic diagram of skeleton two, 1, skeleton 1 in figure, skeleton 23, skeleton 37, the first cavity 8, Glass 9, press strip 12, lower film 13, the second cavity 14, prolongs side 15, adhesive tape at film 10
Fig. 4 is the structural schematic diagram of skeleton three, 1 in figure, skeleton 1, the first cavity 8, glass 9, film 11, is uncovered Slot 12, lower film 16, supporting piece 17, ditch 18, insulation film in double heat preservations
Fig. 5 is the ramp structure schematic diagram on greenhouse herringbone top, 1, skeleton 1, skeleton 27, the first cavity 8, glass 9, film 10, press strip 12, lower film 13, the second cavity 14, prolong side 15, adhesive tape 16, supporting piece.
Specific embodiment
Embodiment 1, greenhouse are formed by connecting by skeleton 1, skeleton 22 and skeleton 33 and matching component, skeleton 1, Skeleton 22 and skeleton 33 and matching component are made of plastic-steel section bar, and the skeleton 1 is mounted under double heat preservation gutters 6 5 outside of portion's column, skeleton 1 are that vertical and horizontal latticed, component and component, component and column 5 and double heat preservation gutters 6 pass through corner brace Be bolted, in prolonging for skeleton 1 glass 8 is installed outside side, press strip 10,10 top of press strip and glass is installed at 8 seam of glass The position that 8 contact position of glass, top glass 8 are contacted with double heat preservation gutters 6 is all made of structure glue sealing;In one 1 inside card of skeleton Film 9 is installed on film slot, forms the first cavity 7 between film 9 and glass 8;Double heat preservation gutters 6 have column 5 below;Column 5 Inside is equipped with electric curl-up film device 4, and when work opens or closes;Two cavitys are formed when closing, and side is reduced by cavity structure The thermal loss in face.
Embodiment 2 pastes one layer of heat preservation film, the bone of double heat preservation gutters 6 and herringbone top lower part below double heat preservation gutters 6 Frame 1 is equipped with glass 8 in prolonging for skeleton 1 by corner brace and being bolted outside side, glass 8 and prolong and have adhesive tape between side, glass Press strip 10, press strip 10 and 8 contact position of glass are installed to seal using structure glue at 8 seam of glass;On one 1 inside film-clamping groove of skeleton Film 9 is installed, film 9 extends to the film-clamping groove for the skeleton 1 installed on the outside of column 5 by double heat preservation 6 lower parts of gutter, with card Spring connection, film 9 are connect with the lower part film-clamping groove of skeleton 22, and the first cavity is formed between this layer film and glass;On herringbone top One 1 lower part of skeleton is equipped with the slot 11 that uncovers, below the film-clamping groove above the slot 11 that uncovers and 22 lower section mounting framework 33 of skeleton Film-clamping groove is connected by lower film 12;The second cavity is formed between film below lower film 12 and glass.
Embodiment 3, on skeleton 22, skeleton 1 is separately mounted to the two sides of skeleton 22, passes through corner brace and bolt and connects Connect, two components to prolong 14 position of side concordant, prolong side 14 and glass 8 be installed above, glass 8 and prolong and have adhesive tape 15 between side 14, glass 8 Press strip 10, press strip 10 and glass contact position are installed to seal using structure glue at seam;In 22 lower part film-clamping groove of skeleton and skeleton Film 9 is installed on one 1 film-clamping groove, forms the first cavity 7 between film 9 and glass 8;After film 9 is installed, in card film Drilling tail silk mounting framework 33 is used below slot, then lower film 12 is installed, and lower film 12 is directly stretched to flat, installation to both sides It in the film-clamping groove for uncovering slot top, is fixed with press mold spring, it is empty to form second between the film below lower film 12 and glass Chamber.
Embodiment 4, on skeleton 33,16 two sides of lower part supporting piece of ditch 17 are equipped with skeleton 1 in double heat preservations, in skeleton One 1 prolong is equipped with glass 8 outside side;Insulation film 18 is installed on one 1 inside film-clamping groove of skeleton, insulation film 18 and glass 8 it Between form the first cavity 7.
Embodiment 5, the face paste thin film 9 under ditch 17 in double heat preservations, the skeleton of ditch 17 and herringbone top lower part in double heat preservations One 1 by corner brace and being bolted, and glass 8 is equipped with outside side in prolonging for skeleton 1, glass 8 and prolongs and has adhesive tape between side, glass Press strip, press strip and glass contact position are installed to seal using structure glue at seam;It is installed on one 1 inside film-clamping groove of skeleton thin Film, film are extended to the film-clamping groove for the skeleton 1 installed on the outside of supporting piece 16 by 17 lower part of ditch in double heat preservations, are connected with circlip, Film is connect with the lower part film-clamping groove of skeleton 22, and the second cavity is formed between film and glass;It is equipped in one 1 lower part of skeleton Uncover slot 11, and the film-clamping groove below the skeleton three of 22 lower section installation of the film-clamping groove above the slot 11 that uncovers and skeleton is by lower film 12 connections;The second cavity is formed between film below lower film 12 and glass;The dewdrop formed on lower film, along Film flows in the slot that uncovers, and centralized collection is got up, and prevents dewdrop from falling, and influences to plant.
Embodiment 6, in the slope on greenhouse herringbone top, skeleton 1 is mounted between the first cavity 7 and skeleton 22, two Component to prolong 14 position of side concordant, prolong side 14 and glass 8 be installed above, glass 8 and prolong and have adhesive tape 15 between side 14, at 8 seam of glass Press strip 10, press strip 10 and 8 contact position of glass are installed to seal using structure glue;In 22 lower part film-clamping groove of skeleton and skeleton 1 Film-clamping groove on be separately installed with film 9, the second cavity 13 is formed between film 9 and glass.
Embodiment 7, the present invention first make that skeleton 1, skeleton 22, skeleton 33, press strip 10, uncover slot in production The mold of 11 shapes after modulating plastic formula, produces skeleton 1, skeleton 22, skeleton 1, skeleton 22 by extruding machine Inner hole in penetrate hot galvanizing square tube, when convex portion stress in hole, contacts with square tube, reduces the biography between profile and square tube Guide face product, this gap is thermal insulation layer.
Embodiment 8, application method of the invention, are equipped with electric curl-up film device 4 on the inside of column 5, when work, open or close Electric curl-up film device 4;Two cavitys of profile are closed, the thermal loss of side is reduced by cavity;It is formed on lower film 12 Dewdrop is flowed to along film in the slot 11 that uncovers, and centralized collection is got up, and prevents dewdrop from falling, and influences to plant.

Claims (8)

1. greenhouse plastic-steel section bar, greenhouse be connected by skeleton one (1), skeleton two (2) and skeleton three (3) and matching component and At skeleton one (1), skeleton two (2) and skeleton three (3) and matching component are made of plastic-steel section bar, it is characterized in that: the bone Frame one (1) is mounted on the outside of the lower pole (5) of double heat preservations gutter (6), and skeleton one (1) is vertical and horizontal latticed, component and component It by corner brace and is bolted, component and column (5), column (5) and double heat preservations gutter (6) are connected by corner brace and bolt respectively Connect, be equipped with outside side glass (8) in prolonging for skeleton one (1), be equipped with press strip (10) at glass (8) seam, press strip (10) top with The position that glass (8) contact position, top glass (8) are contacted with double heat preservations gutter (6) is all made of structure glue sealing;In skeleton one (1) film (9) are installed on the film-clamping groove of inside, form the first cavity (7) between film (9) and glass (8);Double heat preservation gutters (6) Below have column (5);It is equipped with electric curl-up film device (4) on the inside of column (5), when work, opens or closes;Two are formed when closing A cavity reduces the thermal loss of side by cavity.
2. greenhouse plastic-steel section bar according to claim 1, it is characterized in that: pasting one layer of guarantor below double heat preservation gutters (6) Warm film, double heat preservations gutter (6) and the skeleton one (1) of herringbone top lower part by corner brace and are bolted, and prolong side in skeleton one (1) Be equipped with glass (8) outside, glass (8) and prolong and have adhesive tape between side, be equipped with press strip (10) at glass (8) seam, press strip (10) with Glass (8) contact position is sealed using structure glue;Film (9) are installed on the film-clamping groove of skeleton one (1) inside, film (9) passes through Double heat preservation gutter (6) lower parts extend to the film-clamping groove for the skeleton one (1) installed on the outside of column (5), are connected with circlip, film (9) It is connect with the lower part film-clamping groove of skeleton two (2), forms the first cavity between this layer film and glass;In herringbone parietal bone frame one (1) Lower part is equipped with the slot that uncovers (11), and the skeleton three (3) installed below the film-clamping groove of the slot that uncovers (11) above and skeleton two (2) is below Film-clamping groove by lower film (12) connect;The second cavity is formed between film below lower film (12) and glass.
3. greenhouse plastic-steel section bar according to claim 1, it is characterized in that: skeleton one (1) is pacified respectively on skeleton two (2) Mounted in the two sides of skeleton two (2), by corner brace and be bolted, two components to prolong side (14) position concordant, prolong side (14) above It installs glass (8), glass (8) and prolonging has adhesive tape (15) between side (14), is equipped with press strip (10), press strip at glass (8) seam (10) it is sealed with glass contact position using structure glue;On the film-clamping groove of skeleton two (2) lower part film-clamping groove and skeleton one (1) It installs film (9), forms the first cavity (7) between film (9) and glass (8);After film (9) is installed, under film-clamping groove Face drilling tail silk mounting framework three (3) then installs lower film (12), and lower film (12) is directly stretched to flat, peace to both sides It in the film-clamping groove for uncovering slot top, is fixed with press mold spring, forms between the film below lower film (12) and glass Two cavitys.
4. greenhouse plastic-steel section bar according to claim 1, it is characterized in that: on skeleton three (3), ditch (17) in double heat preservations Lower part supporting piece (16) two sides are equipped with skeleton one (1), and glass (8) are equipped with outside side in prolonging for skeleton one (1);In skeleton one (1) It is equipped on the film-clamping groove of inside insulation film (18), forms the first cavity (7) between insulation film (18) and glass (8).
5. greenhouse plastic-steel section bar according to claim 1 or 4, it is characterized in that: in double heat preservations one layer of face paste under ditch (17) Film (9), ditch (17) and the skeleton one (1) of herringbone top lower part by corner brace and are bolted in double heat preservations, in skeleton one (1) Prolong and be equipped with outside side glass (8), glass (8) and prolong and have adhesive tape between side, press strip, press strip and glass contact are installed at glass seam Position is sealed using structure glue;Film is installed on the film-clamping groove of skeleton one (1) inside, film passes through ditch (17) lower part in double heat preservations The film-clamping groove for extending to the skeleton one (1) installed on the outside of supporting piece (16), is connected, the lower part card of film and skeleton two (2) with circlip The connection of film slot, forms the second cavity between film and glass;The slot that uncovers (11) are installed in skeleton one (1) lower part, uncover slot (11) film-clamping groove above is connect with the film-clamping groove below the skeleton three installed below skeleton two (2) by lower film (12);Under The second cavity is formed between film below layer film (12) and glass;The dewdrop formed on lower film (12), along thin Film flows in the slot that uncovers (11), and centralized collection is got up, and prevents dewdrop from falling, and influences to plant.
6. greenhouse plastic-steel section bar according to claim 1, it is characterized in that: in the slope on greenhouse herringbone top, skeleton one (1) Be mounted between the first cavity (7) and skeleton two (2), two components to prolong side (14) position concordant, prolong side (14) and glass be installed above Glass (8), glass (8) and prolonging have adhesive tape (15) between side (14), are equipped with press strip (10) at glass (8) seam, press strip (10) and glass Glass (8) contact position is sealed using structure glue;Pacify respectively on the film-clamping groove of skeleton two (2) lower part film-clamping groove and skeleton one (1) Equipped with film (9), the second cavity (13) are formed between film (9) and glass.
7. the production method of greenhouse plastic-steel section bar described in claim 1, it is characterized in that: producing skeleton one first in production (1), skeleton two (2), skeleton three (3), press strip (10), the slot that uncovers (11) shape mold, after modulating plastic formula, by squeeze Molding machine produces skeleton one (1), skeleton two (2), skeleton one (1), skeleton two (2) inner hole in penetrate hot galvanizing square tube, in hole Convex portion stress when contacted with square tube, reduce the conduction surface between profile and square tube, this gap is thermal insulation layer.
8. the application method of greenhouse plastic-steel section bar described in claim 1, it is characterized in that: being equipped with electronic wound membrane on the inside of column (5) Device (4) when work, opens or closes electric curl-up film device (4);Two cavitys of greenhouse plastic-steel section bar are closed, side is reduced by cavity The thermal loss in face;The dewdrop formed on lower film (12) is flowed to along film in the slot that uncovers (11), and centralized collection rises Come, prevents dewdrop from falling, influence to plant.
CN201610317735.6A 2016-05-16 2016-05-16 Greenhouse plastic-steel section bar and application method Expired - Fee Related CN105993696B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610317735.6A CN105993696B (en) 2016-05-16 2016-05-16 Greenhouse plastic-steel section bar and application method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610317735.6A CN105993696B (en) 2016-05-16 2016-05-16 Greenhouse plastic-steel section bar and application method

Publications (2)

Publication Number Publication Date
CN105993696A CN105993696A (en) 2016-10-12
CN105993696B true CN105993696B (en) 2019-03-22

Family

ID=57100754

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610317735.6A Expired - Fee Related CN105993696B (en) 2016-05-16 2016-05-16 Greenhouse plastic-steel section bar and application method

Country Status (1)

Country Link
CN (1) CN105993696B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109618760A (en) * 2019-01-31 2019-04-16 深圳春沐源控股有限公司 Liquid collector and greenhouse

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7401820A (en) * 1973-02-12 1974-08-14
CN2371790Y (en) * 1999-01-22 2000-04-05 钟连喜 Support for double-layer thermal insulating greenhouse
JP2002335776A (en) * 2001-05-22 2002-11-26 Michio Suzuki Opening and closing device of vertical film in greenhouse
CN2731960Y (en) * 2004-07-28 2005-10-12 王景立 Combined plastic-steel double film booth framework
JP2010161966A (en) * 2009-01-15 2010-07-29 Green System:Kk Agricultural greenhouse
CN202059809U (en) * 2011-05-12 2011-12-07 宋进亮 Dual-layer greenhouse
CN104160895A (en) * 2014-07-28 2014-11-26 北京聚能温室科技有限公司 Novel heat-preservation greenhouse top structure and application method
CN203985244U (en) * 2013-12-31 2014-12-10 电白县绿缘绿色食品有限公司 A kind of scaffolding structure of green house
CN204031948U (en) * 2014-08-20 2014-12-24 徐社德 One can be rolled up and be covered the double-deck three disjunctor greenhouses of formula
CN204518673U (en) * 2015-03-31 2015-08-05 北京中农美景温室工程技术有限公司 Taiyangnengguangfuwen Room
CN104813869A (en) * 2015-05-19 2015-08-05 新疆阳光电通科技股份有限公司 Agricultural greenhouse

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL7401820A (en) * 1973-02-12 1974-08-14
CN2371790Y (en) * 1999-01-22 2000-04-05 钟连喜 Support for double-layer thermal insulating greenhouse
JP2002335776A (en) * 2001-05-22 2002-11-26 Michio Suzuki Opening and closing device of vertical film in greenhouse
CN2731960Y (en) * 2004-07-28 2005-10-12 王景立 Combined plastic-steel double film booth framework
JP2010161966A (en) * 2009-01-15 2010-07-29 Green System:Kk Agricultural greenhouse
CN202059809U (en) * 2011-05-12 2011-12-07 宋进亮 Dual-layer greenhouse
CN203985244U (en) * 2013-12-31 2014-12-10 电白县绿缘绿色食品有限公司 A kind of scaffolding structure of green house
CN104160895A (en) * 2014-07-28 2014-11-26 北京聚能温室科技有限公司 Novel heat-preservation greenhouse top structure and application method
CN204031948U (en) * 2014-08-20 2014-12-24 徐社德 One can be rolled up and be covered the double-deck three disjunctor greenhouses of formula
CN204518673U (en) * 2015-03-31 2015-08-05 北京中农美景温室工程技术有限公司 Taiyangnengguangfuwen Room
CN104813869A (en) * 2015-05-19 2015-08-05 新疆阳光电通科技股份有限公司 Agricultural greenhouse

Also Published As

Publication number Publication date
CN105993696A (en) 2016-10-12

Similar Documents

Publication Publication Date Title
CN105599696B (en) The mounting structure of automobile sash ornamental strip
CN105993696B (en) Greenhouse plastic-steel section bar and application method
CN203201418U (en) Hollow glass door
CN203129457U (en) Building photovoltaic element module
CN206389320U (en) A kind of rotatable aluminum alloy frame
CN101822179B (en) Sealing structure of roof ridge of greenhouse
CN203837305U (en) Flat-plate solar collector
CN203499459U (en) Thermal insulation structure of aluminium alloy sliding door and window
CN202485260U (en) Flat plate type solar thermal collector frame module
CN203188805U (en) Section bar with aluminum liner separated by expanded plastic and totally covered by expanded plastic
CN206023678U (en) A kind of photovoltaic module waterproof frame and the photovoltaic module containing waterproof frame
CN102953632A (en) Injected bridge-cutoff aluminum profile used for inswinging casement window
CN205783868U (en) A kind of solar energy heating and building roof integral structure
CN207021954U (en) A kind of photovoltaic component frame structure and the mounting structure of component and component
CN203684929U (en) PVC60 casement window with surface covered by metal films
CN204119136U (en) Concentrating photovoltaic module
CN205577741U (en) Sunshine room glass mounting structure
CN203891209U (en) 90-degree external-corner connecting structure of aluminum-clad-wood sunlight room
CN203248036U (en) Hollow umbrella type waterproof sealing bar
CN203488017U (en) Edge sealing profile of heat insulation gel injection energy-saving environmental protection high airtight sliding window
CN202074730U (en) Combined panel solar energy collector
CN205102437U (en) Solar collector and thermal -arrest board thereof
CN208089134U (en) A kind of leakage-proof water aluminum alloy doors and windows
CN202810525U (en) Perfusion broken bridge aluminum profile for inswinging casement window
CN202391291U (en) Aluminum-wood combined door and window structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190322