CN105990901A - Power supply and distribution method for important loads in first-level loads of control room - Google Patents

Power supply and distribution method for important loads in first-level loads of control room Download PDF

Info

Publication number
CN105990901A
CN105990901A CN201510087547.4A CN201510087547A CN105990901A CN 105990901 A CN105990901 A CN 105990901A CN 201510087547 A CN201510087547 A CN 201510087547A CN 105990901 A CN105990901 A CN 105990901A
Authority
CN
China
Prior art keywords
ups
power supply
load
power
important loads
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510087547.4A
Other languages
Chinese (zh)
Inventor
马力
王太祥
王宇
吴长丹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201510087547.4A priority Critical patent/CN105990901A/en
Publication of CN105990901A publication Critical patent/CN105990901A/en
Pending legal-status Critical Current

Links

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The invention provides a method for supplying and distributing important loads in a first-stage load of a control room.A basic load rate of a UPS (uninterrupted power supply) design capacity is selected to be below 40% in an online uninterrupted power supply system, the UPS adopts double mains supply power supply, an automatic conversion function is arranged in the UPS, non-important loads are separated from important loads, the power supply of the non-important loads is removed from the UPS, and the non-important loads are changed into I-section or II-section power supplies for direct power supply. The invention is easy to implement and expand, can greatly improve the reliability of a power supply system, ensures the normal supply of UPS commercial power, has the internal automatic conversion of the UPS obviously superior to a spare power automatic switching device between external bus sections, can avoid severe accidents of equipment serious damage caused by power failure superior to a control system, powerfully ensures the power supply of important loads, effectively reduces the accident rate and reduces the purchase cost of spare parts.

Description

The power supply and distribution method of important load in a kind of control room first order load
Technical field
The invention belongs to energy power supply-distribution system field, belong to particularly to the control system in a kind of control room The power supply and distribution method of important load in first order load.
Background technology
At present, the control system in each main production unit control room of domestic metallurgical works on-site belongs to Important load in first order load, its power supply mode many employings UPS (on-Line UPS electric power system) Power supply mode.But, find through long-term production practices, owing to UPS original design capacity exists mostly Irrational phenomenon, the violation of power supply supply mode and the reason of load adjustment, had a strong impact on for distribution in addition Stability, cause UPS electric power system Frequent Troubles, control system dead electricity, and UPS once damage, will Directly result in the visual plant power-off such as DCS (electric station dcs), unit chaser, cause a lot of Equipment badly damaged serious accident, UPS restores electricity to unit and recovers properly functioning needs more than 8 hours.
Summary of the invention
It is desirable to provide a kind of easy to implement and extension, reliable, it is avoided that control system dead electricity, Ensure that important load is powered, reduce the power supply and distribution method of important load in the control room first order load of accident rate.
To this end, the technical solution that the present invention is taked is:
The power supply and distribution method of important load in a kind of control room first order load, it is characterised in that:
1, on-Line UPS electric power system i.e. UPS is used for important load in control room first order load Power supply mode, the base load rate of UPS design capacity selects below 40%, to avoid impact load to UPS Impact, prevent UPS and be switched to bypass or the risk of directly tripping operation.
2, UPS takes double mains supply to power, the internal band auto-conversion function of UPS, when I section of power supply due to When fault is stopped power supply, II section of power supply realizes conversion automatically inside UPS.
3, carry out load classification, insignificant load is separated with important load, and by the power supply of insignificant load Reject from UPS, change other service poweies into and power.
The invention have the benefit that
The present invention easy to implement and extension, the reliability of electric power system can be greatly improved, when I section of power supply due to When fault is stopped power supply, II section of power supply realizes conversion automatically inside UPS, it is ensured that the normal confession of UPS civil power Giving, the internal conversion automatically of UPS is substantially better than the backup auto-activating device between external bus section, can avoid being better than controlling The equipment badly damaged serious accident that system dead electricity causes, strong guarantee important load is powered, and effectively reduces Accident rate, reduces spare parts purchasing expense.
Detailed description of the invention
As a example by certain integrated iron and steel works' dry coke quenching electric station ups system, the UPS that this enterprise is used at present Capacity is 3kVA, and single mains-supplied, its on-load is 3 operator stations, 1 engineer station, 2 electricity Gas shielded backstage, 2 station servers, and rear 1 office computer increased, totally 9 equipment.
Being mainly industrial computer computer in 9 equipment, every equipment is pressed 0.4kW and is calculated, general power time at full capacity 3.6kW, alreadys more than the capacity of online UPS, does not has capacity of short circuit to spend in advance.This rate of load condensate all reaches 80% at ordinary times Above, once over loading or short-circuit impact will cause electric power system fault, have a strong impact on the stable operation of system.
To this end, the power supply and distribution method that the present invention is taked is:
1, the base load rate of UPS design capacity selects below 40%, and i.e. selecting rated capacity is 10kVA UPS, to meet the needs of capacity of short circuit, stability that ups system power is effectively ensured.
2, UPS takes double mains supply to power, the internal band auto-conversion function of UPS, when I section of power supply due to When fault is stopped power supply, II section of power supply will not be damaged simultaneously, so that II section of power supply is internal real at UPS The most automatically change, it is ensured that the normal supply of UPS civil power.
3, carry out load classification, the power supply of insignificant load is separated with important load, will insignificant load 1 office computer power from UPS reject, change II section of power supply into and directly power, so that it is guaranteed that other 8 The normal power supply of platform visual plant and safe operation.

Claims (1)

1. the power supply and distribution method of important load in a control room first order load, it is characterised in that:
(1) use on-Line UPS electric power system i.e. for important load in control room first order load UPS power supply mode, the base load rate of UPS design capacity selects below 40%;
(2) UPS takes double mains supply to power, the internal band auto-conversion function of UPS, when I section of power supply by When fault is stopped power supply, II section of power supply realizes conversion automatically inside UPS;
(3) carry out load classification, insignificant load is separated with important load, and by the confession of insignificant load Electricity is rejected from UPS, changes other service poweies into and powers.
CN201510087547.4A 2015-02-25 2015-02-25 Power supply and distribution method for important loads in first-level loads of control room Pending CN105990901A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510087547.4A CN105990901A (en) 2015-02-25 2015-02-25 Power supply and distribution method for important loads in first-level loads of control room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510087547.4A CN105990901A (en) 2015-02-25 2015-02-25 Power supply and distribution method for important loads in first-level loads of control room

Publications (1)

Publication Number Publication Date
CN105990901A true CN105990901A (en) 2016-10-05

Family

ID=57038231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510087547.4A Pending CN105990901A (en) 2015-02-25 2015-02-25 Power supply and distribution method for important loads in first-level loads of control room

Country Status (1)

Country Link
CN (1) CN105990901A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107591883A (en) * 2017-09-26 2018-01-16 国网冀北电力有限公司承德供电公司 A kind of reliability electric power system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101378204A (en) * 2008-09-11 2009-03-04 中国移动通信集团设计院有限公司 Device and method for AC/UPS mixed networking
CN101562349A (en) * 2009-04-28 2009-10-21 中兴通讯股份有限公司 Method and system of energy-saving control for modular UPS
CN103441568A (en) * 2013-09-03 2013-12-11 凤冈县黔北新能源有限责任公司 Uninterruptible automatic-switchover control system for photovoltaic power supply and electric supply
CN103730948A (en) * 2013-12-23 2014-04-16 浪潮电子信息产业股份有限公司 Server cabinet continuous power supply method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101378204A (en) * 2008-09-11 2009-03-04 中国移动通信集团设计院有限公司 Device and method for AC/UPS mixed networking
CN101562349A (en) * 2009-04-28 2009-10-21 中兴通讯股份有限公司 Method and system of energy-saving control for modular UPS
CN103441568A (en) * 2013-09-03 2013-12-11 凤冈县黔北新能源有限责任公司 Uninterruptible automatic-switchover control system for photovoltaic power supply and electric supply
CN103730948A (en) * 2013-12-23 2014-04-16 浪潮电子信息产业股份有限公司 Server cabinet continuous power supply method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107591883A (en) * 2017-09-26 2018-01-16 国网冀北电力有限公司承德供电公司 A kind of reliability electric power system

Similar Documents

Publication Publication Date Title
CN102088209B (en) Self-healing control method of distribution network
CN205231835U (en) Structure for large -scale thermal power factory unit high pressure service power each other is being equipped with
CN201656549U (en) Automatic switching device of UPS
CN103138390A (en) Power distribution network fault handling method based on self-recovering control
CN203504285U (en) UPS integrated power supply
CN207652128U (en) A kind of dual power supply uninterruptible power system
CN103812113A (en) Front feed type voltage drop dynamic compensating device based on complementation of wind electricity and solar electricity
CN205960668U (en) Photovoltaic power plant is with energy -conserving protection switch device
CN104269874B (en) A kind of electric control system
CN104333126A (en) Large hydropower engineering power supply system
CN105322582A (en) Emergency power supply device realized by utilizing silicon controlled rectifier technology
CN102946108A (en) Voltage automatic compensation device
CN105990901A (en) Power supply and distribution method for important loads in first-level loads of control room
CN204885910U (en) Intelligent low tension distribution box
CN104377805A (en) Communication station low-voltage distribution system
CN204696788U (en) A kind of large-size thermal power plant high-voltage Auxiliary power supply three power supply automatic switchover wiring construction
CN204947718U (en) A kind of mirror field, solar energy thermal-power-generating station electric supply installation
CN203326701U (en) Automatic control converting power source preventing power interruption and transient voltage sag for production equipment
CN104701872A (en) Power control system
CN202772656U (en) Standby power supply online device
CN202068231U (en) Standby power wiring structure with voltage regulating function used for station
CN105426979A (en) Optimizing method for operation cost of transformer
CN105071249A (en) Intelligent low voltage power distribution box
CN104037947A (en) Method and system for preventing coking gas from being exhausted abnormally
CN104836332A (en) Parallel power supplying method of electrolytic aluminum different-power-supply-point direct-current sides

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20161005

WD01 Invention patent application deemed withdrawn after publication