CN105979549B - A kind of load-balancing method and device - Google Patents

A kind of load-balancing method and device Download PDF

Info

Publication number
CN105979549B
CN105979549B CN201610530194.5A CN201610530194A CN105979549B CN 105979549 B CN105979549 B CN 105979549B CN 201610530194 A CN201610530194 A CN 201610530194A CN 105979549 B CN105979549 B CN 105979549B
Authority
CN
China
Prior art keywords
user
base station
cell base
small
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610530194.5A
Other languages
Chinese (zh)
Other versions
CN105979549A (en
Inventor
张月霞
高天润
张玉宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG CENTRAL CORPORATION OF TECHNOLOGY AND TECHNOLOGY Co.,Ltd.
Original Assignee
Beijing Information Science and Technology University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Information Science and Technology University filed Critical Beijing Information Science and Technology University
Priority to CN201610530194.5A priority Critical patent/CN105979549B/en
Publication of CN105979549A publication Critical patent/CN105979549A/en
Application granted granted Critical
Publication of CN105979549B publication Critical patent/CN105979549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • H04W28/18Negotiating wireless communication parameters
    • H04W28/22Negotiating communication rate
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/02Access restriction performed under specific conditions
    • H04W48/04Access restriction performed under specific conditions based on user or terminal location or mobility data, e.g. moving direction, speed
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention is that embodiment discloses a kind of load-balancing method and device, applied to small-cell base station, wherein, the load-balancing method includes: the data-rate requirements information and the unit resource carrying data-rate information being currently accessed between user and other small-cell base stations for obtaining predefined load information, being currently accessed user in current small-cell base station;The load information, the data-rate requirements information and the unit resource carrying data-rate information are reported to center base station, user access control information is obtained according to the load information, the data-rate requirements information, unit resource carrying data-rate information by the center base station;Receive the user access control information fed back by the center base station, carry out the current small-cell base station it is described be currently accessed user's transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation.

Description

A kind of load-balancing method and device
Technical field
The present invention relates to the communications field, in particular to a kind of load-balancing method and device.
Background technique
Currently the load balancing scheme used in small-cell base station has cell range extension handover scheme and cell breathing Scheme.The principle of cell range extension handover scheme is to add amount of bias to the signal strength of access criterion in user's access, It is loaded in sparse cell so that user is linked into, and the load balancing based on handover operation then passes through setting switching standard Then, the transfer between small intra-cell users is realized, to realize the balance between user between resource and demand;Cell breathing side Case is then to send the strong and weak of signal by control cell to change the user for adjusting and accessing in each cell, to realize load It is balanced.
There are two types of the definition of common small-cell base station load.One is the user's numbers serviced using under node as negative It carries, this definition using number of users as load is relatively rough, cannot reflect the otherness of the demand between different users; Another kind is the stock number that is used using node as load, and this load definition cannot reflect the service energy of present node well Power.However, using number of users or using stock number that can accurately not characterize the load of access node as definition.
It is traditional to may cause in system resource allocation not by the network design criteria of criterion of signal quality maximization It is fair.Some cells may be crowded with user, and the available resources so as to cause each user are in short supply, and on the other hand, surrounding Adjacent cell then almost without user, results in the waste of radio resource.The essential reason for causing this phenomenon is that resource needs Mismatch between summation resource provision.
Summary of the invention
The embodiment of the present invention is designed to provide a kind of load-balancing method and device, solves resource requirement and resource supplies Mismatch problem between giving realizes the load balancing in small-cell base station.
In order to achieve the above objectives, the embodiment of the invention discloses a kind of load-balancing methods, are applied to small-cell base station, packet It includes:
Obtain predefined load information, the data-rate requirements information that user is currently accessed in current small-cell base station, And the unit resource carrying data-rate information being currently accessed between user and other small-cell base stations, wherein described Load information provides the maximum value of data rate, the current small-cell base station for user demand rate and the current cell To be currently accessed the small-cell base station of user described in access, other described small-cell base stations are slight except current small-cell base station Area base station;
The load information, the data-rate requirements information and the unit resource are carried into data-rate information It is reported to center base station, is provided by the center base station according to the load information, the data-rate requirements information, the unit Source carrying data-rate information obtains user access control information, wherein the institute that the center base station reports for processing cell State the base station of load information, the data-rate requirements information and unit resource carrying data-rate information;
The user access control information fed back by the center base station is received, the current small-cell base station is carried out It is described be currently accessed user transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user Re-start resource allocation.
More preferably, described to receive the user access control information fed back by the center base station, it carries out described current Small-cell base station it is described be currently accessed user's transfer and in the current small-cell base station except it is described be currently accessed user with Outer accessing user re-starts resource allocation, comprising:
When the user access control information is the first preset value, keeping access described, to be currently accessed user constant;
When the user access control information is the second preset value, user is currently accessed described in transfer, and to access to other small Cell base station;
To in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource point Match.
More preferably, described when the user access control information is the second preset value, user is currently accessed described in transfer It accesses to after other small-cell base stations, the load-balancing method further include:
Delete in the current small-cell base station corresponding accessing user set it is described be currently accessed user, obtain except institute State the accessing user being currently accessed other than user.
In order to achieve the above objectives, the embodiment of the invention discloses a kind of load-balancing methods, are applied to center base station, packet It includes:
Obtain predefined load information, small-cell base station is currently accessed the data-rate requirements information of user, Yi Jisuo State the unit resource carrying data-rate information being currently accessed between user and other small-cell base stations, wherein the load letter Breath provides the maximum value of data rate for user demand rate and the current small-cell base station, and the current small-cell base station is The small-cell base station of user is currently accessed described in access, other described small-cell base stations are the cell except current small-cell base station Base station;
It is obtained according to the load information, the data-rate requirements information, unit resource carrying data-rate information To user access control information, wherein the subscriber control information include at least user and small-cell base station access relation and The resource data that each user obtains;
The user access control information is fed back to the current small-cell base station, and by the current small-cell base station It is described be currently accessed user transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user Re-start resource allocation.
More preferably, described that data are carried according to the load information, the data-rate requirements information, the unit resource Rate information obtains user access control information, comprising: according to formula:
Obtain user access control information.
Wherein, ρiFor the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,Data-rate information, i i-th are carried to be currently accessed the unit resource between other small-cell base stations of user's measurement A small-cell base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt presses According to the non-vector increased after arranging of element size, LiFor the available resource units of i-th of small-cell base station, αi,jFor scheduling instruction The factor,It is linked into i-th of small-cell base station for j-th of user,It is not accessed for j-th of user i-th slight Area base station.
In order to achieve the above objectives, the embodiment of the invention discloses a kind of load balancing apparatus, are applied in small-cell base station, Include:
First obtains module, is currently accessed described in predefined load information, the current small-cell base station for obtaining The data-rate requirements information of user and the unit resource carrying being currently accessed between user and other small-cell base stations Data-rate information, wherein the load information provides data rate most for user demand rate and the current cell Big value, the current small-cell base station are the small-cell base station that user is currently accessed described in access, other described small-cell base stations For the small-cell base station in addition to the current small-cell base station;
Reporting module, for carrying the load information, the data-rate requirements information and the unit resource Data-rate information is reported to the center base station, by the center base station according to the load information, the data rate need Information, unit resource carrying data-rate information is asked to obtain user access control information;Wherein, the center base station is place Manage the load information, the data-rate requirements information and unit resource carrying data rate that cell reports The base station of information;
First feedback processing modules, for receiving the user access control information fed back by the center base station, into The row current small-cell base station it is described be currently accessed user's transfer and in the current small-cell base station except described current Accessing user other than accessing user re-starts resource allocation.
More preferably, first feedback processing modules, comprising:
Submodule is kept, for keeping the described of access to work as when the user access control information is the first preset value Preceding accessing user is constant;
Submodule is shifted, for being currently accessed described in transfer when the user access control information is the second preset value User accesses to other small-cell base stations;
Resource allocation submodule, for in the current small-cell base station except it is described be currently accessed user in addition to access User re-starts resource allocation.
More preferably, the load balancing apparatus further include:
Second obtains module, and the accessing user for obtaining multiple small-cell base stations gathers, wherein accessing user's collection Conjunction includes: the corresponding accessing user's set of each small-cell base station;
Processing module, for being currently accessed described in deleting in the current small-cell base station corresponding accessing user set User, obtain except it is described be currently accessed user in addition to accessing user.
In order to achieve the above objectives, the embodiment of the invention discloses a kind of load balancing apparatus, are applied to center base station, packet It includes:
Third obtains module, is currently accessed described in predefined load information, the current small-cell base station for obtaining The data-rate requirements information of user and the unit resource carrying being currently accessed between user and other small-cell base stations Data-rate information, wherein the load information provides data rate most for user demand rate and the current cell Big value, the current small-cell base station are the small-cell base station that user is currently accessed described in access, other described small-cell base stations For the small-cell base station except current small-cell base station;
Determining module, for carrying number according to the load information, the data-rate requirements information, the unit resource User access control information is obtained according to rate information, wherein the subscriber control information includes at least accessing user and cell base The resource data that the access relation stood and each accessing user obtain;
Second feedback processing modules, for feeding back the user access control information to the current small-cell base station, and Be currently accessed as described in the current small-cell base station user's transfer and in the current small-cell base station except described current Accessing user other than accessing user re-starts resource allocation.
More preferably, the determining module is further used for: according to formula:
Obtain user access control information.
Wherein, ρiFor the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,Data-rate information, i i-th are carried to be currently accessed the unit resource between other small-cell base stations of user's measurement A small-cell base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt presses According to the non-vector increased after arranging of element size, LiFor the available resource units of i-th of small-cell base station, αi,jFor scheduling instruction The factor,It is linked into i-th of small-cell base station for j-th of user,It is not accessed for j-th of user i-th slight Area base station.
As seen from the above technical solutions, the embodiment of the present invention is defined load, and user's access is obtained by calculation Information is controlled, and uses the user access control information, user is currently accessed as described in the current small-cell base station and is turned Move and in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation, solve The mismatch problem determined between resource requirement and resource provision realizes the load balancing in small-cell base station.Certainly, implement Any product of the invention or method do not necessarily require achieving all the advantages described above at the same time.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with It obtains other drawings based on these drawings.
Fig. 1 is a kind of flow chart of the load-balancing method of the embodiment of the present invention;
Fig. 2 is another flow chart of the load-balancing method of the embodiment of the present invention;
Fig. 3 is a kind of structural block diagram of the load balancing apparatus of the embodiment of the present invention;
Fig. 4 is another structural block diagram of the load balancing apparatus of the embodiment of the present invention;
Fig. 5 is the structural block diagram of the SiteServer LBS of the embodiment of the present invention;
Fig. 6 is that the user of the load-balancing method of the embodiment of the present invention obtains the cumulative distribution function curve of data rate Figure;
Fig. 7 is the cumulative distribution function curve graph of the small-cell base station load of the load balancing apparatus of the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Referring to Fig. 1, Fig. 1 is a kind of flow chart of the load-balancing method of the embodiment of the present invention, is applied to small-cell base station, Include:
S100: the data-rate requirements for obtaining predefined load information, being currently accessed user in current small-cell base station Information and the unit resource carrying data-rate information being currently accessed between user and other small-cell base stations, wherein The load information provides the maximum value of data rate, the current cell for user demand rate and the current cell Base station is the small-cell base station that user is currently accessed described in access, other described small-cell base stations are except current small-cell base station Small-cell base station;
S110: the load information, the data-rate requirements information and the unit resource are carried into data rate Information reporting is to center base station, by the center base station according to the load information, the data-rate requirements information, the list Position resource bearing data-rate information obtains user access control information, wherein the center base station is that processing cell reports The load information, the data-rate requirements information and the unit resource carrying data-rate information base station;
S120: receiving the user access control information fed back by the center base station, carries out the current cell Base station it is described be currently accessed user's transfer and in the current small-cell base station except it is described be currently accessed user in addition to connect Access customer re-starts resource allocation.
Specifically, described to receive the user access control information fed back by the center base station, it carries out described current Small-cell base station it is described be currently accessed user's transfer and in the current small-cell base station except it is described be currently accessed user with Outer accessing user re-starts resource allocation, comprising:
S121: when the user access control information is the first preset value, the described of access is kept to be currently accessed user It is constant;
S122: when the user access control information is the second preset value, user is currently accessed described in transfer and is accessed to Other small-cell base stations;
S123: in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start money Source distribution.
Further, described when the user access control information is the second preset value, use is currently accessed described in transfer Family accesses to after other small-cell base stations, the load-balancing method further include:
Obtain accessing user's set of multiple small-cell base stations, wherein accessing user's set includes: each cell The corresponding accessing user's set in base station;
Delete in the current small-cell base station corresponding accessing user set it is described be currently accessed user, obtain except institute State the accessing user being currently accessed other than user.
As it can be seen that user access control information is obtained by calculation in the embodiment of the present invention, and use the user access control Information, by the current small-cell base station carry out the current small-cell base station be currently accessed user transfer and resource allocation, Solves the mismatch problem between resource requirement and resource provision;Meanwhile it is corresponding by deleting the current small-cell base station Accessing user's set in active user's access, the problem of being able to solve a user occupancy multiple small-cell base stations, thus Avoid the waste of small-cell base station resource.
Referring to fig. 2, Fig. 2 is another flow chart of the load-balancing method of the embodiment of the present invention, is applied to center base station, Include:
S200: obtain predefined load information, small-cell base station be currently accessed user data-rate requirements information, with And the unit resource carrying data-rate information being currently accessed between user and other small-cell base stations, wherein described negative Information carrying breath provides the maximum value of data rate, the current cell base for user demand rate and the current small-cell base station It stands to be currently accessed the small-cell base station of user described in access, other described small-cell base stations are small except current small-cell base station Cell base station;
S210: according to the load information, the data-rate requirements information, unit resource carrying data rate letter Breath obtains user access control information, wherein the subscriber control information includes at least the access of accessing user and small-cell base station The resource data that relationship and each accessing user obtain;
S220: feeding back the user access control information to the current small-cell base station, and by the current cell Base station it is described be currently accessed user's transfer and in the current small-cell base station except it is described be currently accessed user in addition to connect Access customer re-starts resource allocation.
Specifically, described carry data according to the load information, the data-rate requirements information, the unit resource Rate information obtains user access control information, comprising: according to formula:
Obtain user access control information.
Wherein, ρiFor the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,Data-rate information, i i-th are carried to be currently accessed the unit resource between other small-cell base stations of user's measurement A small-cell base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt presses According to the non-vector increased after arranging of element size, LiFor the available resource units of i-th of small-cell base station, αi,jFor scheduling instruction The factor,It is linked into i-th of small-cell base station for j-th of user,It is not accessed for j-th of user i-th slight Area base station.
Referring to Fig. 3, Fig. 3 is a kind of structural block diagram of the load balancing apparatus of the embodiment of the present invention, comprising:
First obtains module 300, currently connects described in predefined load information, the current small-cell base station for obtaining The data-rate requirements information of access customer and the unit resource being currently accessed between user and other small-cell base stations are held Carry data-rate information, wherein the load information provides data rate for user demand rate and the current cell Maximum value, the current small-cell base station are the small-cell base station that user is currently accessed described in access, other described cell bases It stands as the small-cell base station in addition to the current small-cell base station;
Reporting module 310 is used for the load information, the data-rate requirements information and the unit resource Carrying data-rate information is reported to the center base station, by the center base station according to the load information, data speed Rate demand information, unit resource carrying data-rate information obtain user access control information;
First feedback processing modules 320, for receiving the user access control information fed back by the center base station, The described of the current small-cell base station is carried out to be currently accessed user's transfer and work as in the current small-cell base station except described Accessing user other than preceding accessing user re-starts resource allocation.
The current small-cell base station of the embodiment of the present invention is connect by user access control information using the user Enter to control information, by the current small-cell base station carry out the current small-cell base station be currently accessed user transfer and resource Distribution, solves the mismatch problem between resource requirement and resource provision.
It should be noted that the device of the embodiment of the present invention is the device using above-mentioned load-balancing method, then it is above-mentioned negative All embodiments for carrying equalization methods are suitable for the device, and can reach the same or similar beneficial effect.
In the load balancing apparatus of further embodiment of this invention, first feedback processing modules 320, comprising:
Submodule 321 is kept, for keeping the described of access when the user access control information is the first preset value It is constant to be currently accessed user;
Submodule 322 is shifted, for when the user access control information is the second preset value, transfer is described currently to be connect Access customer accesses to other small-cell base stations;
Resource allocation submodule 323, for in the current small-cell base station except it is described be currently accessed user in addition to Accessing user re-starts resource allocation.
The load balancing apparatus of further embodiment of this invention, the load balancing apparatus, further includes:
Second obtains module 330, and the accessing user for obtaining multiple small-cell base stations gathers, wherein the access is used Family set includes: the corresponding accessing user's set of each small-cell base station;
Processing module 340, it is described current in the corresponding accessing user's set of the current small-cell base station for deleting Accessing user, obtain except it is described be currently accessed user in addition to accessing user.
Referring to fig. 4, Fig. 4 is another structural block diagram of the load balancing apparatus of the embodiment of the present invention, comprising:
Third obtains module 400, currently connects described in predefined load information, the current small-cell base station for obtaining The data-rate requirements information of access customer and the unit resource being currently accessed between user and other small-cell base stations are held Carry data-rate information, wherein the load information provides data rate for user demand rate and the current cell Maximum value, the current small-cell base station are the small-cell base station that user is currently accessed described in access, other described cell bases It stands as the small-cell base station except current small-cell base station;
Determining module 410, for being held according to the load information, the data-rate requirements information, the unit resource Carry data-rate information obtain user access control information, wherein the subscriber control information include at least accessing user with it is slight The resource data that the access relation of area base station and each accessing user obtain;
Second feedback processing modules 420, for feeding back the user access control information to the current small-cell base station, And it is currently accessed user's transfer as described in the current small-cell base station and works as in the current small-cell base station except described Accessing user other than preceding accessing user re-starts resource allocation.
Subscriber control information is obtained by calculation in the center base station of the embodiment of the present invention, and subscriber control information is sent out The current small-cell base station is given, is currently accessed use by what the current small-cell base station carried out the current small-cell base station Family transfer and resource allocation, solve the mismatch problem between resource requirement and resource provision.
In the load balancing apparatus of further embodiment of this invention, the determining module is further used for: according to formula:
Obtain user access control information.
Wherein, ρiFor the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,Data-rate information, i i-th are carried to be currently accessed the unit resource between other small-cell base stations of user's measurement A small-cell base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt presses According to the non-vector increased after arranging of element size, LiFor the available resource units of i-th of small-cell base station, αi,jFor scheduling instruction The factor,It is linked into i-th of small-cell base station for j-th of user,It is not accessed for j-th of user i-th slight Area base station.
It should be noted that the device of the embodiment of the present invention is the device using above-mentioned load-balancing method, then it is above-mentioned negative All embodiments for carrying equalization methods are suitable for the device, and can reach the same or similar beneficial effect.
The SiteServer LBS scene of the concrete application of the load balancing apparatus of the embodiment of the present invention is exemplified below: specific ginseng See that Fig. 5, Fig. 5 are the structural block diagram of the SiteServer LBS of the embodiment of the present invention;
The SiteServer LBS of application includes: current small-cell base station 510, center control base station 500 and is currently accessed use Family 520;
The current small-cell base station 510 obtains described in predefined load information, the current small-cell base station 510 It is currently accessed the data-rate requirements information of user 520 and described is currently accessed between user 520 and other small-cell base stations Unit resource carry data-rate information, wherein the load information is user demand rate and the current cell base Stand 510 provide data rates maximum value, the current small-cell base station 510 be access described in be currently accessed the small of user 520 Cell base station, other described small-cell base stations are the small-cell base station in addition to the current small-cell base station 510;
The current small-cell base station 510 is by the load information, the data-rate requirements information and the unit Resource bearing data-rate information is reported to the center base station 500, by the center base station 500 according to the load information, The data-rate requirements information, unit resource carrying data-rate information obtain user access control information, wherein institute Stating center base station 500 is the load information, the data-rate requirements information and the unit for handling cell and reporting The base station of resource bearing data-rate information;
The current small-cell base station 510 receives the user access control information fed back by the center base station 500, It carries out the described of the current small-cell base station 510 and is currently accessed the transfer of user 520 and in the current small-cell base station 500 Except it is described be currently accessed user 520 in addition to accessing user re-start resource allocation.
It is assumed that user's collection is combined intoSmall set of cells isTheA available resource units collection of small-cell base station is combined intoAnd its lower accessing user Collection is combined into
According to the load information, the data-rate requirements information described in the center base station 500The unit Resource bearing data-rate informationAccording to formula:
Wherein, lexmin is vectorPartial ordering relation minimum.
Further,It is asked according to the non-increasing arrangement of progress defined below Obtain minimum value:
It is assumed that two vectors Definition is compared " < " and is less than by lexcographical order." x < y " is and if only if presenceMeet xω=yωTo all ω ∈ 1, 2 ..., v-1 } it sets up, and xv< yv;Wherein, whereinIndicate the nonnegative real number space of N × 1.
Acquiring optimal solution by dependent linearity optimization method is
By using formula
Obtain user access control information.
Wherein, ρiFor the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,Data-rate information, i i-th are carried to be currently accessed the unit resource between other small-cell base stations of user's measurement A small-cell base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt presses According to the non-vector increased after arranging of element size, LiFor the available resource units of i-th of small-cell base station, αi,jFor scheduling instruction The factor,It is linked into i-th of small-cell base station for j-th of user,It is not accessed for j-th of user i-th slight Area base station.
Specifically,Indicate that j-th of user is linked into i-th of small-cell base station,Indicate j-th of user I-th of small-cell base station is not accessed.
Further, if given j, after handlingIn there are it is two or more value be 1, then at random Therefrom one of them is selected to be assigned a value of 1, remaining is assigned a value of 0.
Further, first preset value isSecond preset value isWhen When, it is currently accessed user 520 described in and is transferred to other small-cell base stations i*In, wherein i*MeetWhenUser 520 is currently accessed described in then keeps access constant.Wherein, i*For other in addition to the current cell Any one cell.
After user shifts completion, theThe service user set of a small-cell base station is updated toSo give its lower the servicedThe resource allocation of a user's distribution For
Wherein,To delete i-th of small-cell base station accessing user set after the active user 520.
Referring to Fig. 6, Fig. 6 is that a kind of user of load-balancing method of the embodiment of the present invention obtains the iterated integral of data rate Cloth function curve diagram (cumulative distribution function, CDF).User obtains data in the embodiment of the present invention Rate is narrow compared with the acquisition data rate CDF curve of comparison scheme.CDF is bent in low data rate area, the embodiment of the present invention Line is located at the right side of comparison scheme.However the CDF curve in higher data rate region, the embodiment of the present invention is located to analogy The left side of case.The results show that the acquisition data rate of user has obtained better processing in embodiments of the present invention, wherein The comparison scheme is the technical solution that traditional accessing user accesses small-cell base station according to received signal strength.Cumulative distribution Function is common data statistics function, and details are not described herein again.
Referring to the cumulative distribution function for the small-cell base station load that Fig. 7, Fig. 7 are the load balancing apparatus of the embodiment of the present invention Curve graph;The load balancing lower bound of the load balancing apparatus of the embodiment of the present invention possesses most narrow loading range, it means that small Cell base station has better fairness relative to other two schemes;Comparison scheme possesses widest loading range, this meaning Fairness between small-cell base station it is worst;The load proposed has been approached in high load area, in the embodiment of the present invention Lower bound;In low-load region, in the embodiment of the present invention between comparison scheme and put boundary.It can be seen that the present invention is real The technical solution for applying example more tends to a vertical line compared to comparison scheme, illustrates the load of the small-cell base station of the embodiment of the present invention It is more balanced.And proposed system load balancing is approached, in embodiments of the present invention, needed for almost all of user meets The data rate wanted.
It should be noted that, in this document, relational terms such as first and second and the like are used merely to a reality Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those Element, but also including other elements that are not explicitly listed, or further include for this process, method, article or equipment Intrinsic element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that There is also other identical elements in process, method, article or equipment including the element.
Each embodiment in this specification is all made of relevant mode and describes, same and similar portion between each embodiment Dividing may refer to each other, and each embodiment focuses on the differences from other embodiments.Especially for system reality For applying example, since it is substantially similar to the method embodiment, so being described relatively simple, related place is referring to embodiment of the method Part explanation.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the scope of the present invention.It is all Any modification, equivalent replacement, improvement and so within the spirit and principles in the present invention, are all contained in protection scope of the present invention It is interior.

Claims (8)

1. a kind of load-balancing method, which is characterized in that be applied to small-cell base station, comprising:
Obtain predefined load information, be currently accessed in current small-cell base station user data-rate requirements information and The unit resource carrying data-rate information being currently accessed between user and other small-cell base stations, wherein the load Information provides the maximum value of data rate for user demand rate and the current cell, and the current small-cell base station is to connect Enter the small-cell base station for being currently accessed user, other described small-cell base stations are the cell base except current small-cell base station It stands;
The load information, the data-rate requirements information and the unit resource carrying data-rate information are reported To center base station, held by the center base station according to the load information, the data-rate requirements information, the unit resource It carries data-rate information and obtains user access control information;
The user access control information fed back by the center base station is received, the described of the current small-cell base station is carried out Be currently accessed user transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user again Carry out resource allocation;
It is described to receive the user access control information fed back by the center base station, carry out the current small-cell base station It is described be currently accessed user transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user Re-start resource allocation, comprising:
When the user access control information is the first preset value, keeping access described, to be currently accessed user constant;
When the user access control information is the second preset value, user is currently accessed described in transfer and accesses to other cells Base station;
Pass through formula:
To in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation, In, ni,jFor under i-th of small-cell base station j-th of user distribution resource allocation,For the number for being currently accessed user According to rate requirement information,For the unit resource carrying between other small-cell base stations for being currently accessed user's measurement Data-rate information, LiFor the available resource units of i-th of small-cell base station,It is linked into for j-th of user i-th small Cell base station,I-th of small-cell base station is not accessed for j-th of user,For user's set.
2. load-balancing method as described in claim 1, which is characterized in that described in the user access control information is the It is currently accessed user when two preset values, described in transfer to access to after other small-cell base stations, the load-balancing method also wraps It includes:
Obtain accessing user's set of multiple small-cell base stations, wherein accessing user's set includes: each small-cell base station Corresponding accessing user's set;
Delete in the current small-cell base station corresponding accessing user set it is described be currently accessed user, obtain working as except described Accessing user other than preceding accessing user.
3. a kind of load-balancing method, which is characterized in that be applied to center base station, comprising:
Obtain predefined load information, small-cell base station is currently accessed the data-rate requirements information of user and described works as Unit resource between preceding accessing user and other small-cell base stations carries data-rate information, wherein the load information is User demand rate and the current small-cell base station provide the maximum value of data rate, and the current small-cell base station is access The small-cell base station for being currently accessed user, other described small-cell base stations are the cell base except current small-cell base station It stands;
It is used according to the load information, the data-rate requirements information, unit resource carrying data-rate information Family access control information;
The user access control information is fed back to the current small-cell base station, and as described in the current small-cell base station Be currently accessed user transfer and in the current small-cell base station except it is described be currently accessed user in addition to accessing user again Carry out resource allocation;
Wherein, the described of the current small-cell base station is currently accessed user's transfer and to removing institute in the current small-cell base station It states the accessing user being currently accessed other than user and re-starts resource allocation, comprising:
When the user access control information is the first preset value, keeping access described, to be currently accessed user constant;
When the user access control information is the second preset value, user is currently accessed described in transfer and accesses to other cells Base station;
Pass through formula:
To in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation, In, ni,jFor under i-th of small-cell base station j-th of user distribution resource allocation,For the number for being currently accessed user According to rate requirement information,For the unit resource carrying between other small-cell base stations for being currently accessed user's measurement Data-rate information, LiFor the available resource units of i-th of small-cell base station,It is linked into for j-th of user i-th small Cell base station,I-th of small-cell base station is not accessed for j-th of user,For user's set.
4. load-balancing method as claimed in claim 3, which is characterized in that described according to the load information, the data Rate requirement information, unit resource carrying data-rate information obtain user access control information, comprising: according to formula:
Obtain user access control information;
Wherein,For the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,To work as The unit resource between other small-cell base stations of preceding accessing user's measurement carries data-rate information, and i is i-th of cell Base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt is big according to element The small non-vector increased after arrangement, LiFor the available resource units of i-th of small-cell base station, αi,jTo dispatch indicator,It is linked into i-th of small-cell base station for j-th of user,I-th of cell base is not accessed for j-th of user It stands,For small set of cells.
5. a kind of load balancing apparatus, it is applied in small-cell base station, which is characterized in that the load balancing apparatus includes:
First obtains module, for obtaining the number for being currently accessed user described in predefined load information, current small-cell base station Data rate is carried according to rate requirement information and the unit resource being currently accessed between user and other small-cell base stations Information, wherein the load information provides the maximum value of data rate for user demand rate and the current cell, described Current small-cell base station is the small-cell base station that user is currently accessed described in access, other described small-cell base stations are to work as except described Small-cell base station other than preceding small-cell base station;
Reporting module, for the load information, the data-rate requirements information and the unit resource to be carried data Rate information is reported to center base station, by the center base station according to the load information, the data-rate requirements information, institute It states unit resource carrying data-rate information and obtains user access control information;
First feedback processing modules carry out institute for receiving the user access control information fed back by the center base station The described of current small-cell base station is stated to be currently accessed user's transfer and be currently accessed in the current small-cell base station except described Accessing user other than user re-starts resource allocation;
First feedback processing modules, comprising:
Submodule is kept, for keeping the described of access currently to connect when the user access control information is the first preset value Access customer is constant;
Submodule is shifted, for being currently accessed user described in transfer when the user access control information is the second preset value Access to other small-cell base stations;
Resource allocation submodule passes through formula for receiving the user access control information fed back by the center base station:
To in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation, In, ni,jFor under i-th of small-cell base station j-th of user distribution resource allocation,For the number for being currently accessed user According to rate requirement information,For the unit resource carrying between other small-cell base stations for being currently accessed user's measurement Data-rate information, LiFor the available resource units of i-th of small-cell base station,It is linked into for j-th of user i-th small Cell base station,I-th of small-cell base station is not accessed for j-th of user,For user's set.
6. load balancing apparatus as claimed in claim 5, which is characterized in that the load balancing apparatus further include:
Second obtains module, and the accessing user for obtaining multiple small-cell base stations gathers, wherein the accessing user gathers packet It includes: the corresponding accessing user's set of each small-cell base station;
Processing module, for being currently accessed use described in deleting in the current small-cell base station corresponding accessing user set Family, obtain except it is described be currently accessed user in addition to accessing user.
7. a kind of load balancing apparatus, which is characterized in that be applied to center base station, the load balancing apparatus includes:
Third obtains module, for obtaining the number for being currently accessed user described in predefined load information, current small-cell base station Data rate is carried according to rate requirement information and the unit resource being currently accessed between user and other small-cell base stations Information, wherein the load information provides the maximum value of data rate for user demand rate and the current cell, described Current small-cell base station is the small-cell base station that user is currently accessed described in access, other described small-cell base stations are except current small The small-cell base station of cell base station;
Determining module, for according to the load information, the data-rate requirements information, unit resource carrying data speed Rate information obtains user access control information;
Second feedback processing modules, for feeding back the user access control information to the current small-cell base station, and by institute The described of current small-cell base station is stated to be currently accessed user's transfer and be currently accessed in the current small-cell base station except described Accessing user other than user re-starts resource allocation;
Wherein, the described of the current small-cell base station is currently accessed user's transfer and to removing institute in the current small-cell base station It states the accessing user being currently accessed other than user and re-starts resource allocation, comprising:
When the user access control information is the first preset value, keeping access described, to be currently accessed user constant;
When the user access control information is the second preset value, user is currently accessed described in transfer and accesses to other cells Base station;
Pass through formula:
To in the current small-cell base station except it is described be currently accessed user in addition to accessing user re-start resource allocation, In, ni,jFor under i-th of small-cell base station j-th of user distribution resource allocation,For the number for being currently accessed user According to rate requirement information,For the unit resource carrying between other small-cell base stations for being currently accessed user's measurement Data-rate information, LiFor the available resource units of i-th of small-cell base station,It is linked into for j-th of user i-th small Cell base station,I-th of small-cell base station is not accessed for j-th of user,For user's set.
8. load balancing apparatus as claimed in claim 7, which is characterized in that the determining module is further used for: according to public affairs Formula:
Obtain user access control information;
Wherein,For the load of i-th of small-cell base station,For the data-rate requirements information for being currently accessed user,To work as The unit resource between other small-cell base stations of preceding accessing user's measurement carries data-rate information, and i is i-th of cell Base station, j are j-th of user in i-th of small-cell base station,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TIt is big according to element The small non-vector increased after arrangement, LiFor the available resource units of i-th of small-cell base station, αi,jTo dispatch indicator,It is linked into i-th of small-cell base station for j-th of user,I-th of cell base is not accessed for j-th of user It stands,For small set of cells.
CN201610530194.5A 2016-07-06 2016-07-06 A kind of load-balancing method and device Active CN105979549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610530194.5A CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610530194.5A CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Publications (2)

Publication Number Publication Date
CN105979549A CN105979549A (en) 2016-09-28
CN105979549B true CN105979549B (en) 2019-11-15

Family

ID=56955251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610530194.5A Active CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Country Status (1)

Country Link
CN (1) CN105979549B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106792812B (en) * 2016-12-16 2020-05-26 重庆邮电大学 LTE-Hi small cell switch control method based on service load assessment
CN109525536A (en) * 2017-09-18 2019-03-26 深圳市中兴微电子技术有限公司 A kind of IP multimedia subsystem cut-in method and device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101754279A (en) * 2009-12-11 2010-06-23 中国科学技术大学 Load balancing method for guaranteeing quality of service of real-time services
CN102625389A (en) * 2011-01-31 2012-08-01 华为技术有限公司 Access method of mobile communication network, apparatus and system
CN104768187A (en) * 2015-03-10 2015-07-08 华信咨询设计研究院有限公司 LTE load balancing method based on critical triggering
CN105163351A (en) * 2015-10-21 2015-12-16 重庆邮电大学 Multi-cell resource allocation algorithm based on energy efficiency in LTE system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2856794A4 (en) * 2012-06-04 2016-02-10 Eden Rock Communications Llc Method&system for cellular network load balance

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101754279A (en) * 2009-12-11 2010-06-23 中国科学技术大学 Load balancing method for guaranteeing quality of service of real-time services
CN102625389A (en) * 2011-01-31 2012-08-01 华为技术有限公司 Access method of mobile communication network, apparatus and system
CN104768187A (en) * 2015-03-10 2015-07-08 华信咨询设计研究院有限公司 LTE load balancing method based on critical triggering
CN105163351A (en) * 2015-10-21 2015-12-16 重庆邮电大学 Multi-cell resource allocation algorithm based on energy efficiency in LTE system

Also Published As

Publication number Publication date
CN105979549A (en) 2016-09-28

Similar Documents

Publication Publication Date Title
CN102111813B (en) Method and equipment for balancing loads of carriers
CN103796244B (en) A kind of many net access selection methods of the wireless isomer of equally loaded
CN105813214B (en) A kind of resource regulating method, equipment and the system of shared network
CN105979549B (en) A kind of load-balancing method and device
US10257759B2 (en) Load balancing among wireless access points
CN103249160B (en) A kind of resource allocation methods in lte-a system under CoMP
CN110445518B (en) Pilot frequency distribution method based on micro cell clustering under large-scale MIMO heterogeneous network system
CN102026304A (en) Resource allocation method and device in cooperative multi-point transmission network
CN108282761A (en) Social attribute progress resource allocation methods are utilized in a kind of D2D communication
WO2014094191A1 (en) Method and apparatus for coordinated multipoint transmission
CN105517057B (en) A kind of load-balancing method and system based on frequency spectrum perception
CN105517163B (en) The method for virtualizing the reversed resource allocation of base station parallel task
CN103079277B (en) Scheduling of resource distribution method and system in a kind of ofdm system
CN105792378B (en) Virtual resource multiple target mapping method based on Wireless Heterogeneous Networks
CN101056473B (en) Method and device for user group management and application
CN106413073B (en) Dynamic power allocation method and device for MRRU cell
CN101742660B (en) Method and device for distributing multi-carrier frequency
CN103826309B (en) A kind of method and apparatus of scheduling resource
CN108541059A (en) A kind of Poewr control method and device
CN104684097B (en) A kind of method, apparatus and base station for distributing backhaul link resource for multi-hop user
CN106550270B (en) A kind of user packet method and device for DASH video multicasting
CN105792223B (en) A kind of method and apparatus distributing frequency spectrum
CN110389839A (en) Hierarchical structure load-balancing method and system based on request
CN105578475B (en) A kind of data dispatching method and device
CN109474959A (en) A kind of method and apparatus of cell access

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Yuexia

Inventor after: Gao Tianrun

Inventor after: Zhang Yuxuan

Inventor before: Zhang Yuexia

Inventor before: Gao Tianrun

Inventor before: Zhang Yuxuan

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211227

Address after: 313100 room 310, building 1, No. 669, Gaotie railway, Taihu street, Changxing County, Huzhou City, Zhejiang Province

Patentee after: ZHEJIANG CENTRAL CORPORATION OF TECHNOLOGY AND TECHNOLOGY Co.,Ltd.

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 12

Patentee before: BEIJING INFORMATION SCIENCE AND TECHNOLOGY University

TR01 Transfer of patent right