CN105979549A CN201610530194.5A CN201610530194A CN105979549A CN 105979549 A CN105979549 A CN 105979549A CN 201610530194 A CN201610530194 A CN 201610530194A CN 105979549 A CN105979549 A CN 105979549A
Authority
CN
China
Prior art keywords
user
base station
cell base
small
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610530194.5A
Other languages
Chinese (zh)
Other versions
CN105979549B (en
Inventor
张月霞
高田润
张玉宣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG CENTRAL CORPORATION OF TECHNOLOGY AND TECHNOLOGY Co.,Ltd.
Original Assignee
Beijing Information Science and Technology University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Information Science and Technology University filed Critical Beijing Information Science and Technology University
Priority to CN201610530194.5A priority Critical patent/CN105979549B/en
Publication of CN105979549A publication Critical patent/CN105979549A/en
Application granted granted Critical
Publication of CN105979549B publication Critical patent/CN105979549B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/02Traffic management, e.g. flow control or congestion control
    • H04W28/08Load balancing or load distribution
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W28/00Network traffic management; Network resource management
    • H04W28/16Central resource management; Negotiation of resources or communication parameters, e.g. negotiating bandwidth or QoS [Quality of Service]
    • H04W28/18Negotiating wireless communication parameters
    • H04W28/22Negotiating communication rate
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/02Access restriction performed under specific conditions
    • H04W48/04Access restriction performed under specific conditions based on user or terminal location or mobility data, e.g. moving direction, speed
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W48/00Access restriction; Network selection; Access point selection
    • H04W48/16Discovering, processing access restriction or access information

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Computer Security & Cryptography (AREA)
  • Quality & Reliability (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The embodiment of the present invention discloses a load balancing method and device which are applied to small cell base stations, wherein the load balancing method comprises the following steps: obtaining predefined load information, data rate requirement information of current access users in the current small cell base stations, and unit resource carrying data rate information between the current access users and other small cell base stations; reporting the load information, the data rate requirement information and the unit resource carrying data rate information to a center base station, and enabling the center base station to obtain user access control information according to the load information, the data rate requirement information and the unit resource carrying data rate information; and receiving the user access control information fed back by the center base station, transferring the current access users in the current small cell base station, and implementing resource redistribution on the access users in the current small cell base station except the current access users.

Description

A kind of load-balancing method and device
Technical field
The present invention relates to the communications field, particularly to a kind of load-balancing method and device.
Background technology
The current load balancing scheme used in small-cell base station has cell range to extend handover scheme With cell breathing scheme.The principle of cell range extension handover scheme is when user accesses, to access The signal intensity of criterion adds amount of bias, so that user is linked in the small-cell that load is sparse, Load balancing based on handover operation is then by setting switching criterion, it is achieved in small-cell between user Transfer, thus realize between user the balance between resource and demand;Cell breathing scheme is then logical Cross the user controlling to access in small-cell sends strong and weak each community of change adjustment of signal, thus realize The equilibrium of load.
The definition of common small-cell base station load has two kinds.A kind of is the user with service under node Number is as load, this relatively rough using number of users as the definition of load, it is impossible to reflect different The diversity of the demand between user;Another kind be using node use stock number as load, this Load definition can not well reflect the service ability of present node.But, with number of users or make The load of access node can not be characterized accurately as definition by stock number.
Traditional network design criteria with signal quality maximization as criterion may cause system domestic-investment The unfairness of source distribution.Some small-cells may be crowded with user, thus causes can use of each user Resource scarcity, and on the other hand, the most adjacent community, then almost without user, result in wireless money The waste in source.Cause the essential reason of this phenomenon be between resource requirement and resource provision not Join.
Summary of the invention
The purpose of the embodiment of the present invention is to provide a kind of load-balancing method and device, and solving resource needs Mismatch problem between summation resource provision, it is achieved the load balancing in small-cell base station.
For reaching above-mentioned purpose, the embodiment of the invention discloses a kind of load-balancing method, be applied to little Cell base station, including:
Obtain the data rate being currently accessed user in predefined load information, current small-cell base station Demand information and described in be currently accessed between user and other small-cell base stations unit resource carrying Data-rate information, wherein, described load information is user's request speed and described current small-cell carries For the maximum of data rate, described current small-cell base station is to be currently accessed the little of user described in access Cell base station, other small-cell base stations described are except the small-cell base station of current small-cell base station;
Described load information, described data-rate requirements information and described unit resource are carried number Center base station is reported, by described center base station according to described load information, described number according to rate information User access control letter is obtained according to rate requirement information, described unit resource carrying data-rate information Breath, wherein, described center base station is to process described load information, the described data speed that small-cell reports Rate demand information and the base station of described unit resource carrying data-rate information;
Receive the described user access control information fed back by described center base station, carry out described the least It is currently accessed user's transfer described in cell base station and works as except described in described current small-cell base station The front access user accessed beyond user re-starts resource distribution.
More preferably, the described user access control information that described reception is fed back by described center base station, enter User's transfer it is currently accessed and to described current small-cell base described in the described current small-cell base station of row In standing except described in be currently accessed user in addition to access user re-start resource distribution, including:
When described user access control information is the first preset value, keep being currently accessed described in access User is constant;
When described user access control information is the second preset value, it is currently accessed user described in transfer and connects Enter to other small-cell base stations;
To in described current small-cell base station except described in be currently accessed user in addition to access user again Carry out resource distribution.
More preferably, described when described user access control information is the second preset value, transfer is described works as After front access user accesses to other small-cell base stations, described load-balancing method also includes:
Delete corresponding the accessing of described current small-cell base station and be currently accessed use described in user's set Family, except described in be currently accessed user in addition to access user.
For reaching above-mentioned purpose, the embodiment of the invention discloses a kind of load-balancing method, in being applied to Heart base station, including:
Obtain predefined load information, small-cell base station be currently accessed user data-rate requirements letter Breath and described in be currently accessed between user and other small-cell base stations unit resource carrying data speed Rate information, wherein, described load information provides for user's request speed and described current small-cell base station The maximum of data rate, described current small-cell base station is to be currently accessed the slight of user described in access Base station, district, other small-cell base stations described are except the small-cell base station of current small-cell base station;
According to described load information, described data-rate requirements information, described unit resource carrying data Rate information obtains user access control information, and wherein, described subscriber control information at least includes user The resource data obtained with the access relation of small-cell base station and each user;
Feed back described user access control information extremely described current small-cell base station, and by described the least It is currently accessed user's transfer described in cell base station and works as except described in described current small-cell base station The front access user accessed beyond user re-starts resource distribution.
More preferably, described according to described load information, described data-rate requirements information, described unit Resource bearing data-rate information obtains user access control information, including: according to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Obtain user access control information.
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
For reaching above-mentioned purpose, the embodiment of the invention discloses a kind of load balancing apparatus, be applied to little In cell base station, including:
First acquisition module, is used for obtaining predefined load information, described current small-cell base station institute State be currently accessed user data-rate requirements information and described in be currently accessed user slight with other Unit resource carrying data-rate information between base station, district, wherein, described load information is that user needs Asking speed and described current small-cell to provide the maximum of data rate, described current small-cell base station is Be currently accessed the small-cell base station of user described in access, other small-cell base stations described be except described currently Small-cell base station beyond small-cell base station;
Reporting module, for by described load information, described data-rate requirements information and described Unit resource carrying data-rate information reports described center base station, by described center base station according to institute State load information, described data-rate requirements information, described unit resource carrying data-rate information obtain To user access control information;Wherein, described center base station is to process the described load that small-cell reports Information, described data-rate requirements information and the base of described unit resource carrying data-rate information Stand;
First feedback processing modules, accesses control for receiving the described user fed back by described center base station Information processed, carry out being currently accessed described in described current small-cell base station user's transfer and to described currently In small-cell base station except described in be currently accessed user in addition to access user re-start resource distribution.
More preferably, described first feedback processing modules, including:
Keep submodule, for when described user access control information is the first preset value, keep connecing User it is currently accessed constant described in entering;
Transfer submodule, for when described user access control information is the second preset value, shifts institute State and be currently accessed user and access to other small-cell base stations;
Resource distribution sub module, for being currently accessed user described in removing in described current small-cell base station Access user in addition re-starts resource distribution.
More preferably, described load balancing apparatus also includes:
Second acquisition module, for obtaining the access user set of multiple small-cell base station, wherein, institute State access user's set to include: the access user set that each small-cell base station is corresponding;
Processing module, for deleting the institute accessed in user's set that described current small-cell base station is corresponding State and be currently accessed user, except described in be currently accessed user in addition to access user.
For reaching above-mentioned purpose, the embodiment of the invention discloses a kind of load balancing apparatus, in being applied to Heart base station, including:
3rd acquisition module, is used for obtaining predefined load information, described current small-cell base station institute State be currently accessed user data-rate requirements information and described in be currently accessed user slight with other Unit resource carrying data-rate information between base station, district, wherein, described load information is that user needs Asking speed and described current small-cell to provide the maximum of data rate, described current small-cell base station is Being currently accessed the small-cell base station of user described in access, other small-cell base stations described are for except the slightest The small-cell base station of base station, district;
Determine module, for according to described load information, described data-rate requirements information, described list Position resource bearing data-rate information obtains user access control information, wherein said subscriber control information At least include accessing user and the access relation of small-cell base station and the resource of each access user acquisition Data;
Second feedback processing modules, is used for feeding back described user access control information to described the slightest Base station, district, and by be currently accessed described in described current small-cell base station user transfer and to described currently In small-cell base station except described in be currently accessed user in addition to access user re-start resource distribution.
More preferably, described determine that module is further used for: according to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Obtain user access control information.
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
As seen from the above technical solutions, load is defined by the embodiment of the present invention, by calculating To user access control information, and use described user access control information, by described current small-cell It is currently accessed user's transfer described in base station and currently connects except described in described current small-cell base station Access user beyond access customer re-starts resource distribution, solve resource requirement and resource provision it Between mismatch problem, it is achieved that the load balancing in small-cell base station.Certainly, implement the present invention's Arbitrary product or method it is not absolutely required to reach all the above advantage simultaneously.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below by right In embodiment or description of the prior art, the required accompanying drawing used is briefly described, it should be apparent that, Accompanying drawing in describing below is only some embodiments of the present invention, for those of ordinary skill in the art From the point of view of, on the premise of not paying creative work, it is also possible to obtain the attached of other according to these accompanying drawings Figure.
Fig. 1 is a kind of flow chart of the load-balancing method of the embodiment of the present invention;
Fig. 2 is the another kind of flow chart of the load-balancing method of the embodiment of the present invention;
Fig. 3 is a kind of structured flowchart of the load balancing apparatus of the embodiment of the present invention;
Fig. 4 is the another kind of structured flowchart of the load balancing apparatus of the embodiment of the present invention;
Fig. 5 is the structured flowchart of the SiteServer LBS of the embodiment of the present invention;
Fig. 6 is the iterated integral that the user of the load-balancing method of the embodiment of the present invention obtains data rate Cloth function curve diagram;
Fig. 7 is the cumulative distribution of the small-cell base station load of the load balancing apparatus of the embodiment of the present invention Function curve diagram.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is entered Row clearly and completely describes, it is clear that described embodiment is only a part of embodiment of the present invention, Rather than whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art are not having Have and make the every other embodiment obtained under creative work premise, broadly fall into present invention protection Scope.
See a kind of flow chart of the load-balancing method that Fig. 1, Fig. 1 are the embodiment of the present invention, application In small-cell base station, including:
S100: obtain the number being currently accessed user in predefined load information, current small-cell base station According to rate requirement information and described in be currently accessed between user and other small-cell base stations unit money Source carrying data-rate information, wherein, described load information is user's request speed and described the least Community provides the maximum of data rate, and described current small-cell base station is currently accessed use described in accessing The small-cell base station at family, other small-cell base stations described are the small-cell base except current small-cell base station Stand;
S110: by described load information, described data-rate requirements information and described unit resource Carrying data-rate information report center base station, by described center base station according to described load information, Described data-rate requirements information, described unit resource carrying data-rate information obtains user and accesses control Information processed, wherein, described center base station is to process described load information, the described number that small-cell reports The base station of data-rate information is carried according to rate requirement information and described unit resource;
S120: receive the described user access control information fed back by described center base station, carries out described It is currently accessed user's transfer described in current small-cell base station and removes in described current small-cell base station Access user beyond the described user of being currently accessed re-starts resource distribution.
Specifically, the described user access control information that described reception is fed back by described center base station, enter User's transfer it is currently accessed and to described current small-cell base described in the described current small-cell base station of row In standing except described in be currently accessed user in addition to access user re-start resource distribution, including:
S121: when described user access control information is the first preset value, keeps the described of access to work as Front access user is constant;
S122: when described user access control information is the second preset value, is currently accessed described in transfer User accesses to other small-cell base stations;
S123: in described current small-cell base station except described in be currently accessed user in addition to access user Re-start resource distribution.
Further, described when described user access control information is the second preset value, transfer is described Being currently accessed after user accesses to other small-cell base stations, described load-balancing method also includes:
Obtaining the access user set of multiple small-cell base station, wherein, described access user's set includes: The access user set that each small-cell base station is corresponding;
Delete corresponding the accessing of described current small-cell base station and be currently accessed use described in user's set Family, except described in be currently accessed user in addition to access user.
Visible, the embodiment of the present invention is by being calculated user access control information, and uses described use Family Access Control information, is carried out the current of described current small-cell base station by described current small-cell base station Accessing user's transfer and resource is distributed, solving not mating between resource requirement and resource provision asks Topic;Meanwhile, corresponding by the deleting described current small-cell base station current use accessing during user gathers Family is accessed, it is possible to the problem solving a multiple small-cell base station of CU, thus avoids small-cell The waste of base station resource.
See the another kind of flow chart of the load-balancing method that Fig. 2, Fig. 2 are the embodiment of the present invention, should For center base station, including:
S200: obtain predefined load information, small-cell base station is currently accessed the data rate of user Demand information and described in be currently accessed between user and other small-cell base stations unit resource carrying Data-rate information, wherein, described load information is user's request speed and described current small-cell base Standing and provide the maximum of data rate, described current small-cell base station is currently accessed user described in accessing Small-cell base station, other small-cell base stations described are except the small-cell base station of current small-cell base station;
S210: hold according to described load information, described data-rate requirements information, described unit resource Carrying data-rate information and obtain user access control information, wherein said subscriber control information at least includes Access user and the access relation of small-cell base station and the resource data of each access user acquisition;
S220: feed back described user access control information extremely described current small-cell base station, and by described It is currently accessed user's transfer described in current small-cell base station and removes in described current small-cell base station Access user beyond the described user of being currently accessed re-starts resource distribution.
Concrete, described according to described load information, described data-rate requirements information, described unit Resource bearing data-rate information obtains user access control information, including: according to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Obtain user access control information.
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
See a kind of structured flowchart of the load balancing apparatus that Fig. 3, Fig. 3 are the embodiment of the present invention, including:
First acquisition module 300, is used for obtaining predefined load information, described current small-cell base Be currently accessed described in standing user data-rate requirements information and described in be currently accessed user and other Unit resource carrying data-rate information between small-cell base station, wherein, described load information is for using Family demand rate and described current small-cell provide the maximum of data rate, described current small-cell base Standing and be currently accessed the small-cell base station of user described in accessing, other small-cell base stations described are except described Small-cell base station beyond current small-cell base station;
Reporting module 310, for by described load information, described data-rate requirements information and Described unit resource carrying data-rate information reports described center base station, by described center base station root According to described load information, described data-rate requirements information, described unit resource carrying data rate letter Breath obtains user access control information;
First feedback processing modules 320, connects for receiving the described user fed back by described center base station Enter control information, carry out being currently accessed user's transfer described in described current small-cell base station and to described In current small-cell base station except described in be currently accessed user in addition to access user re-start resource and divide Join.
The described current small-cell base station of the embodiment of the present invention passes through user access control information, and uses Described user access control information, is carried out described current small-cell base station by described current small-cell base station Be currently accessed user's transfer and resource is distributed, solve between resource requirement and resource provision not Join problem.
It should be noted that the device of the embodiment of the present invention is the dress applying above-mentioned load-balancing method Putting, all embodiments of the most above-mentioned load-balancing method are all applicable to this device, and all can reach identical Or similar beneficial effect.
In the load balancing apparatus of further embodiment of this invention, described first feedback processing modules 320, Including:
Keep submodule 321, for when described user access control information is the first preset value, protect Hold that to be currently accessed user described in access constant;
Transfer submodule 322, for when described user access control information is the second preset value, turns It is currently accessed user described in shifting and accesses to other small-cell base stations;
Resource distribution sub module 323, for being currently accessed described in removing in described current small-cell base station Access user beyond user re-starts resource distribution.
The load balancing apparatus of further embodiment of this invention, described load balancing apparatus, also include:
Second acquisition module 330, for obtaining the access user set of multiple small-cell base station, wherein, The described user of access set includes: the access user that each small-cell base station is corresponding gathers;
Processing module 340, for deleting in the access user set that described current small-cell base station is corresponding Described in be currently accessed user, except described in be currently accessed user in addition to access user.
See the another kind of structured flowchart of the load balancing apparatus that Fig. 4, Fig. 4 are the embodiment of the present invention, bag Include:
3rd acquisition module 400, is used for obtaining predefined load information, described current small-cell base Be currently accessed described in standing user data-rate requirements information and described in be currently accessed user and other Unit resource carrying data-rate information between small-cell base station, wherein, described load information is for using Family demand rate and described current small-cell provide the maximum of data rate, described current small-cell base Standing and be currently accessed the small-cell base station of user described in accessing, other small-cell base stations described are for except current The small-cell base station of small-cell base station;
Determine module 410, for according to described load information, described data-rate requirements information, institute Stating unit resource carrying data-rate information and obtain user access control information, wherein said user controls Information at least includes what access user and the access relation of small-cell base station and each access user obtained Resource data;
Second feedback processing modules 420, is used for feeding back described user access control information the most described currently Small-cell base station, and by being currently accessed user's transfer described in described current small-cell base station and to described In current small-cell base station except described in be currently accessed user in addition to access user re-start resource and divide Join.
The described center base station of the embodiment of the present invention is by being calculated subscriber control information, and by user Control information is sent to described current small-cell base station, described current small-cell base station carry out described working as The user's transfer that is currently accessed of front small-cell base station distributes with resource, solves resource requirement and resource supplies Mismatch problem between giving.
In the load balancing apparatus of further embodiment of this invention, described determine that module is further used for: root According to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ]
Obtain user access control information.
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
It should be noted that the device of the embodiment of the present invention is the dress applying above-mentioned load-balancing method Putting, all embodiments of the most above-mentioned load-balancing method are all applicable to this device, and all can reach identical Or similar beneficial effect.
The SiteServer LBS scene citing of the concrete application of the load balancing apparatus of the embodiment of the present invention As follows: referring specifically to the structured flowchart of the SiteServer LBS that Fig. 5, Fig. 5 are the embodiment of the present invention;
The SiteServer LBS of application includes: current small-cell base station 510, control base station, center 500 Be currently accessed user 520;
Described current small-cell base station 510 obtains predefined load information, described current small-cell base Stand be currently accessed described in 510 user 520 data-rate requirements information and described in be currently accessed use Unit resource carrying data-rate information between family 520 and other small-cell base stations, wherein, described Load information provides the maximum of data rate for user's request speed and described current small-cell base station 510 Value, described current small-cell base station 510 is currently accessed the small-cell base station of user 520 for described in access, Other small-cell base stations described are the small-cell base station in addition to described current small-cell base station 510;
Described current small-cell base station 510 by described load information, described data-rate requirements information, And described unit resource carrying data-rate information reports described center base station 500, in described Heart base station 500 is held according to described load information, described data-rate requirements information, described unit resource Carrying data-rate information and obtain user access control information, wherein, described center base station 500 is for processing The described load information that small-cell reports, described data-rate requirements information and described unit resource The base station of carrying data-rate information;
Described current small-cell base station 510 receives the described user fed back by described center base station 500 and connects Enter control information, carry out being currently accessed user 520 described in described current small-cell base station 510 and shift With in described current small-cell base station 500 except described in be currently accessed user 520 in addition to access user Re-start resource distribution.
It is assumed that user's collection is combined intoSmall-cell collection is combined into TheIndividual small-cell base station can resource units collection be combined intoAnd its Lower access user's collection is combined into
According to described load information, described data-rate requirements information described in described center base station 500Described unit resource carrying data-rate informationAccording to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Wherein, lexmin is vectorThe minimizing of partial ordering relation.
Further,Non-increasing row is carried out according to defined below Arrange and try to achieve minima:
It is assumed that to two vectors Definition is compared " < " and is less than by lexcographical order." x < y " and if only if existMeet xω=yωRight All of ω ∈ 1,2 ..., v-1} sets up, and xv< yv;Wherein, whereinRepresent N × 1 Nonnegative real number space.
Trying to achieve optimal solution by dependent linearity optimization method is
By using formula
Obtain user access control information.
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
Specifically,Represent that jth user is linked into i-th small-cell base station,Represent Jth user does not access i-th small-cell base station.
Further, if given j, after processIn there is two or more value and be 1, then therefrom selecting one of them to be entered as 1 at random, remaining is entered as 0.
Further, described first preset value isDescribed second preset value isWhenTime, described in be currently accessed user 520 and transfer to other small-cell base stations i*In, wherein i*Full FootWhenBeing currently accessed user 520 described in then keeps access constant.Wherein, i* For other any one small-cells in addition to described current small-cell.
After user has shifted, theThe user that services of individual small-cell base station gathers more It is newlySo to the of its lower serviceIndividual user distributes Resource allocation be
Wherein,User's collection is accessed for i-th small-cell base station after deleting described active user 520 Close.
The user seeing a kind of load-balancing method that Fig. 6, Fig. 6 are the embodiment of the present invention obtains data The cumulative distribution function curve chart (cumulative distribution function, CDF) of speed. In the embodiment of the present invention, user obtains data rate and relatively contrasts the acquisition data rate CDF curve of scheme Narrow.In low data rate area, in the embodiment of the present invention, CDF curve is positioned at the right side of contrast scheme. But in higher data rate region, the CDF curve in the embodiment of the present invention is positioned at a left side for contrast scheme Side.This result shows that the acquisition data rate of user has obtained more preferable place in embodiments of the present invention Reason, wherein, the access user that described contrast scheme is traditional accesses small-cell according to received signal strength The technical scheme of base station.Cumulative distribution function is conventional data statistics function, and here is omitted.
See the small-cell base station load of the load balancing apparatus that Fig. 7, Fig. 7 are the embodiment of the present invention Cumulative distribution function curve chart;The load balancing lower bound of the load balancing apparatus of the embodiment of the present invention has The narrowest loading range, it means that small-cell base station has more preferable public affairs relative to other two schemes Levelling;Contrast scheme has the widest loading range, it means that the fairness between small-cell base station Worst;In high load area, the embodiment of the present invention is approached the load lower bound proposed;Low In load area, in the embodiment of the present invention between contrast scheme and put boundary.Can be seen that this The technical scheme of inventive embodiments more they tends to a vertical line compared to contrast scheme, illustrates that the present invention implements The load of the small-cell base station of example more equalizes.And approach put forward system load balancing, in the present invention In embodiment, almost all of user meets required data rate.
It should be noted that in this article, the relational terms of such as first and second or the like is only used By an entity or operation separate with another entity or operating space, and not necessarily require or Imply relation or the order that there is any this reality between these entities or operation.And, term " include ", " comprising " or its any other variant are intended to comprising of nonexcludability, thus Make to include that the process of a series of key element, method, article or equipment not only include those key elements, and And also include other key elements being not expressly set out, or also include for this process, method, thing Product or the intrinsic key element of equipment.In the case of there is no more restriction, statement " include one Individual ... " key element that limits, it is not excluded that include the process of described key element, method, article or Equipment there is also other identical element.
Each embodiment in this specification all uses relevant mode to describe, phase between each embodiment As homophase part see mutually, each embodiment stress with other embodiments Difference.For system embodiment, owing to it is substantially similar to embodiment of the method, So describe is fairly simple, relevant part sees the part of embodiment of the method and illustrates.
The foregoing is only presently preferred embodiments of the present invention, be not intended to limit the protection of the present invention Scope.All any modification, equivalent substitution and improvement etc. made within the spirit and principles in the present invention, It is all contained in protection scope of the present invention.

Claims (10)

1. a load-balancing method, it is characterised in that be applied to small-cell base station, including:
Obtain the data rate being currently accessed user in predefined load information, current small-cell base station Demand information and described in be currently accessed between user and other small-cell base stations unit resource carrying Data-rate information, wherein, described load information is user's request speed and described current small-cell carries For the maximum of data rate, described current small-cell base station is to be currently accessed the little of user described in access Cell base station, other small-cell base stations described are except the small-cell base station of current small-cell base station;
Described load information, described data-rate requirements information and described unit resource are carried number Center base station is reported, by described center base station according to described load information, described number according to rate information User access control letter is obtained according to rate requirement information, described unit resource carrying data-rate information Breath;
Receive the described user access control information fed back by described center base station, carry out described the least It is currently accessed user's transfer described in cell base station and works as except described in described current small-cell base station The front access user accessed beyond user re-starts resource distribution.
2. load-balancing method as claimed in claim 1, it is characterised in that described reception is by institute State the described user access control information of center base station feedback, carry out the institute of described current small-cell base station State be currently accessed user's transfer and to be currently accessed described in removing in described current small-cell base station user with Outer access user re-starts resource distribution, including:
When described user access control information is the first preset value, keep being currently accessed described in access User is constant;
When described user access control information is the second preset value, it is currently accessed user described in transfer and connects Enter to other small-cell base stations;
To in described current small-cell base station except described in be currently accessed user in addition to access user again Carry out resource distribution.
3. load-balancing method as claimed in claim 2, it is characterised in that described in described use When Access Control information in family is the second preset value, being currently accessed user described in transfer, to access to other slight After base station, district, described load-balancing method also includes:
Obtaining the access user set of multiple small-cell base station, wherein, described access user's set includes: The access user set that each small-cell base station is corresponding;
Delete corresponding the accessing of described current small-cell base station and be currently accessed use described in user's set Family, except described in be currently accessed user in addition to access user.
4. a load-balancing method, it is characterised in that be applied to center base station, including:
Obtain predefined load information, small-cell base station be currently accessed user data-rate requirements letter Breath and described in be currently accessed between user and other small-cell base stations unit resource carrying data speed Rate information, wherein, described load information provides for user's request speed and described current small-cell base station The maximum of data rate, described current small-cell base station is to be currently accessed the slight of user described in access Base station, district, other small-cell base stations described are except the small-cell base station of current small-cell base station;
According to described load information, described data-rate requirements information, described unit resource carrying data Rate information obtains user access control information;
Feed back described user access control information extremely described current small-cell base station, and by described the least It is currently accessed user's transfer described in cell base station and works as except described in described current small-cell base station The front access user accessed beyond user re-starts resource distribution.
5. load-balancing method as claimed in claim 4, it is characterised in that described in described basis Load information, described data-rate requirements information, described unit resource carrying data-rate information obtains User access control information, including: according to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Obtain user access control information;
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
6. a load balancing apparatus, is applied in small-cell base station, it is characterised in that described negative Load balancer includes:
First acquisition module, is used for obtaining predefined load information, described current small-cell base station institute State be currently accessed user data-rate requirements information and described in be currently accessed user slight with other Unit resource carrying data-rate information between base station, district, wherein, described load information is that user needs Asking speed and described current small-cell to provide the maximum of data rate, described current small-cell base station is Be currently accessed the small-cell base station of user described in access, other small-cell base stations described be except described currently Small-cell base station beyond small-cell base station;
Reporting module, for by described load information, described data-rate requirements information and described Unit resource carrying data-rate information reports described center base station, by described center base station according to institute State load information, described data-rate requirements information, described unit resource carrying data-rate information obtain To user access control information;
First feedback processing modules, accesses control for receiving the described user fed back by described center base station Information processed, carry out being currently accessed described in described current small-cell base station user's transfer and to described currently In small-cell base station except described in be currently accessed user in addition to access user re-start resource distribution.
7. load balancing apparatus as claimed in claim 6, it is characterised in that described first feedback Processing module, including:
Keep submodule, for when described user access control information is the first preset value, keep connecing User it is currently accessed constant described in entering;
Transfer submodule, for when described user access control information is the second preset value, shifts institute State and be currently accessed user and access to other small-cell base stations;
Resource distribution sub module, for being currently accessed user described in removing in described current small-cell base station Access user in addition re-starts resource distribution.
8. load balancing apparatus as claimed in claim 6, it is characterised in that described load balancing Device also includes:
Second acquisition module, for obtaining the access user set of multiple small-cell base station, wherein, institute State access user's set to include: the access user set that each small-cell base station is corresponding;
Processing module, for deleting the institute accessed in user's set that described current small-cell base station is corresponding State and be currently accessed user, except described in be currently accessed user in addition to access user.
9. a load balancing apparatus, it is characterised in that being applied to center base station, described load is equal Weighing apparatus device includes:
3rd acquisition module, is used for obtaining predefined load information, described current small-cell base station institute State be currently accessed user data-rate requirements information and described in be currently accessed user slight with other Unit resource carrying data-rate information between base station, district, wherein, described load information is that user needs Asking speed and described current small-cell to provide the maximum of data rate, described current small-cell base station is Being currently accessed the small-cell base station of user described in access, other small-cell base stations described are for except the slightest The small-cell base station of base station, district;
Determine module, for according to described load information, described data-rate requirements information, described list Position resource bearing data-rate information obtains user access control information;
Second feedback processing modules, is used for feeding back described user access control information to described the slightest Base station, district, and by be currently accessed described in described current small-cell base station user transfer and to described currently In small-cell base station except described in be currently accessed user in addition to access user re-start resource distribution.
10. load balancing apparatus as claimed in claim 9, it is characterised in that described determine module It is further used for: according to formula:
ρ ~ i = Σα i , j c ‾ j c ‾ i , j L i
l e x min ρ ~ → = [ ρ ~ 1 , ρ ~ 2 , ... , ρ ~ i , ... , ρ ~ N ] ,
Obtain user access control information;
Wherein, ρiFor the load of i-th small-cell base station,For being currently accessed the data rate of user Demand information,For being currently accessed that user measures and between other small-cell base stations unit resource Carrying data-rate information, i is i-th small-cell base station, and j is the in i-th small-cell base station J user,For vector ρ=[ρ1, ρ2..., ρi,…,ρN]TArrangement is increased according to element size is non- Vector afterwards, LiFor i-th small-cell base station can resource units, αi,jFor scheduling instruction because of Son,It is linked into i-th small-cell base station for jth user,For jth user not Access i-th small-cell base station.
CN201610530194.5A 2016-07-06 2016-07-06 A kind of load-balancing method and device Active CN105979549B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610530194.5A CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610530194.5A CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Publications (2)

Publication Number Publication Date
CN105979549A true CN105979549A (en) 2016-09-28
CN105979549B CN105979549B (en) 2019-11-15

Family

ID=56955251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610530194.5A Active CN105979549B (en) 2016-07-06 2016-07-06 A kind of load-balancing method and device

Country Status (1)

Country Link
CN (1) CN105979549B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106792812A (en) * 2016-12-16 2017-05-31 重庆邮电大学 A kind of LTE Hi cell method of controlling switch based on the assessment of business load amount
CN109525536A (en) * 2017-09-18 2019-03-26 深圳市中兴微电子技术有限公司 A kind of IP multimedia subsystem cut-in method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101754279A (en) * 2009-12-11 2010-06-23 中国科学技术大学 Load balancing method for guaranteeing quality of service of real-time services
CN102625389A (en) * 2011-01-31 2012-08-01 华为技术有限公司 Access method of mobile communication network, apparatus and system
US20150189550A1 (en) * 2012-06-04 2015-07-02 Eden Rock Communications, Llc Method & system for cellular network load balance
CN104768187A (en) * 2015-03-10 2015-07-08 华信咨询设计研究院有限公司 LTE load balancing method based on critical triggering
CN105163351A (en) * 2015-10-21 2015-12-16 重庆邮电大学 Multi-cell resource allocation algorithm based on energy efficiency in LTE system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101754279A (en) * 2009-12-11 2010-06-23 中国科学技术大学 Load balancing method for guaranteeing quality of service of real-time services
CN102625389A (en) * 2011-01-31 2012-08-01 华为技术有限公司 Access method of mobile communication network, apparatus and system
US20150189550A1 (en) * 2012-06-04 2015-07-02 Eden Rock Communications, Llc Method & system for cellular network load balance
CN104768187A (en) * 2015-03-10 2015-07-08 华信咨询设计研究院有限公司 LTE load balancing method based on critical triggering
CN105163351A (en) * 2015-10-21 2015-12-16 重庆邮电大学 Multi-cell resource allocation algorithm based on energy efficiency in LTE system

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106792812A (en) * 2016-12-16 2017-05-31 重庆邮电大学 A kind of LTE Hi cell method of controlling switch based on the assessment of business load amount
CN106792812B (en) * 2016-12-16 2020-05-26 重庆邮电大学 LTE-Hi small cell switch control method based on service load assessment
CN109525536A (en) * 2017-09-18 2019-03-26 深圳市中兴微电子技术有限公司 A kind of IP multimedia subsystem cut-in method and device

Also Published As

Publication number Publication date
CN105979549B (en) 2019-11-15

Similar Documents

Publication Publication Date Title
CN108633061A (en) Configured transmission determines method and device
CN103931262B (en) A kind of data dispatching method and equipment
CN107708065A (en) A kind of alignment system, method and apparatus
CN104754719B (en) The method and apparatus of multi-user's work(point multiplexing
CN108055701B (en) Resource scheduling method and base station
CN104780614B (en) A kind of channel distribution based on AMAB models and user-association strategy
CN105979549A (en) Load balancing method and device
CN103987047A (en) Cluster AP channel allocation and power adjustment method for dense user area
CN104684091B (en) Network architecture method of adjustment, device, network scheduling controller and base station
CN103249160B (en) A kind of resource allocation methods in lte-a system under CoMP
CN104883214A (en) Interference alignment method based on scheduling of degree of freedom
TWI261989B (en) Apparatus for assigning physical channels to time slots in a hybrid time division multiple access/code division multiple access communication system and method thereof
CN106211341A (en) Bandwidth allocation methods in a kind of wireless relay system and device
CN106331129A (en) Load balancing apparatus and load balancing method thereof
CN105846950A (en) Implementation method and device of coherent JT
CN106385274A (en) Method and device for distributing pilot frequency in large-scale MIMO system
CN106455129A (en) Control method and control apparatus of connection of light sources and access points, and wireless local area network
CN104717656B (en) The method for being dynamically determined cooperation cell
CN108769138A (en) A kind of efficient car networking data communications method
CN105848220A (en) Network adaptive adjusting method and equipment
CN104768210B (en) A kind of power regulating method and device
JP2011130432A (en) Multiuser multipoint cooperative transmission method, and central processing unit therefor
CN108541059A (en) A kind of Poewr control method and device
CN102098772B (en) Power allocation method and device
CN106937332B (en) Load balancing method and system based on wireless routing equipment mixing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhang Yuexia

Inventor after: Gao Tianrun

Inventor after: Zhang Yuxuan

Inventor before: Zhang Yuexia

Inventor before: Gao Tianrun

Inventor before: Zhang Yuxuan

GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211227

Address after: 313100 room 310, building 1, No. 669, Gaotie railway, Taihu street, Changxing County, Huzhou City, Zhejiang Province

Patentee after: ZHEJIANG CENTRAL CORPORATION OF TECHNOLOGY AND TECHNOLOGY Co.,Ltd.

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 12

Patentee before: BEIJING INFORMATION SCIENCE AND TECHNOLOGY University