CN105976097A - Electricity charge risk management and control prompting system and method - Google Patents

Electricity charge risk management and control prompting system and method Download PDF

Info

Publication number
CN105976097A
CN105976097A CN201610280003.4A CN201610280003A CN105976097A CN 105976097 A CN105976097 A CN 105976097A CN 201610280003 A CN201610280003 A CN 201610280003A CN 105976097 A CN105976097 A CN 105976097A
Authority
CN
China
Prior art keywords
client
electricity charge
customer
module
information
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610280003.4A
Other languages
Chinese (zh)
Inventor
徐倩
张娟
黄福兰
翟波
李雯雯
卫立伟
付娟
安欣
国迎秋
侯亮
杨阳
亓航
王学
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Jinan Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610280003.4A priority Critical patent/CN105976097A/en
Publication of CN105976097A publication Critical patent/CN105976097A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to an electricity charge risk management and control prompting system. The system includes an customer information storage module which is used for storing customer information in a power marketing system, a customer information prompting module which is used for prompting work personnel to carry out information query, a customer information query module which is used by the work personnel to carry out customer information query, a customer grade authentication module which is used for grading customers, an information processing module which is used for processing the information data of the customers, an information communication module which communicates with a banking system and the customers, and a central control module which is used for controlling each module. The invention provides an electricity charge risk management and control prompting method. With the electricity charge risk management and control prompting system and the electricity charge risk management and control prompting method of the invention adopted, electricity charge collection risks can be effectively reduced, the workload of the work personnel can be decreased, the work efficiency of the work personnel can be improved, and a win-win situation between of a company and the customers can be realized.

Description

Electricity charge risk management and control prompt system and method
Technical field
The present invention relates to technical field, specifically a kind of electricity charge risk management and control prompt system and method.
Background technology
Tariff recovery is the final link that power supply enterprise realizes management performance, is also that electric power enterprise produces warp The most important embodiment of battalion's achievement.Along with socioeconomic development, the change of electricity supply and demand situation and excellent Being pushed further into of matter service, power supply enterprise's tariff recovery difficulty increased, and some electrical power user drag The phenomenon owing the electricity charge has badly influenced the sound and stable operation of power supply enterprise.Currently, Macro-economic situation is held Continuous depression, problem of excess production capacity is especially prominent, and part highly energy-consuming trade is on the verge of bankruptcy edge, and the electricity charge are propped up The ability of paying is decreased obviously, and within 2015, big industrial customer power consumption declines about 6%, and indivedual enterprises occur short Time phenomenon of defaulting, tariff recovery task faces huge challenge.
, easily there is arrears risk in the big industrial customer that particularly power consumption is big, my company at present and this The pre-agreement of paying tariff that class client carries out has two kinds: one is bank's small amount payment debit transaction;Another Kind it is that client pays tariff agreement in advance.Regulation client pay dues the most in three times, front twice for pay tariff in advance, Remove the electricity charge pre-payed for first twice during the last accounting period according to electricity charge whole month total amount, calculate electricity Expense difference is to close the of that month electricity charge, although this kind of method alleviates tariff recovery pressure to a certain extent, But bank is when the stipulated time transfers the electricity charge automatically, often because of system problem, client account balance is not enough, Festivals or holidays, the reason such as system delay, caused the electricity charge to be transferred unsuccessful.It is thus desirable to staff monthly three Secondary check that account situation is arrived in the electricity charge, but the customer quantity signing this agreement is more, and according to the actual feelings of client Condition, pre-time of paying tariff of monthly transferring by several times, the amount of money cannot accomplish that unanimously this is accomplished by work people Member checked repeatedly in strict accordance with the time of remitting money of each unit, if not arriving account, and transmitting bank or visitor immediately Remit money in family.Along with the customer quantity signing this quasi-protocol increases, staff is proposed higher Requirement, staff need to check the bank transfer or agreement of paying tariff in advance that client signs, the most one by one Repeatedly should transfer by moon time of the electricity charge and the amount of money, slightly carelessness is forgotten to inquire about in regulation Payouts to Dat, Arrears risk will be produced.
Summary of the invention
In order to solve the problems referred to above, the invention provides a kind of electricity charge risk management and control prompt system and method.
The present invention solves its technical problem and is adopted the technical scheme that: electricity charge risk management and control prompt system, It is characterized in that, including
For storing the customer information memory module of the customer information in Electric Power Marketing System;
For the customer information reminding module pointing out staff to carry out information inquiry, customer information is pointed out Module uses the form in system interface pop-up dialogue box to point out;
The customer information enquiry module of customer information inquiry is carried out for staff;
For client being carried out the customer grade authentication module of ranking;
For the message processing module that the information data of client is processed, described information processing mould Block includes for gathering the information acquisition unit of customer information in customer information memory module, believing client Cease the storage unit being analyzed and the information process unit that customer information is processed;
The information communication module of communication is carried out respectively with banking system and client;With
For being controlled the central control module of modules;
Described central control module respectively with information storage module, customer information reminding module, client Information inquiry module, customer grade authentication module, message processing module are connected with information communication module.
Further, described client include with company sign bank small amount payment debit transaction client, The client signing payment agreement with Utilities Electric Co. and the client paid tariff in advance by several times;
Described customer information includes Customs Assigned Number in Electric Power Marketing System, customer name, client Number of times, the electricity charge to account Query Dates and the amount of money that pay charge way, client monthly pay the fees, the electricity charge are actual arrives The reason of account is arrived in account date and the amount of money, the electricity charge the most on schedule.
Further, the described storage unit in message processing module combines customer information, visitor The family history electricity charge pay situation, the change of power user consumption, client financial financial condition to client It is analyzed, client is carried out the evaluation of credit grade;Information process unit is to the electricity of client and electricity Expense processes.
Further, described credit grade includes excellent, good and general;
Described excellent tier customer is that the electricity charge should arrive account time and the actual client to account time consistency, institute The good tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive account time delay 0h-24h, institute The general tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive more than account time delay 24h.
Further, described customer grade authentication module according to the credit grade of client by authenticated client For: A class client, B class client and C class client;
The corresponding excellent tier customer of described A class client, the corresponding good tier customer of described B class client, The corresponding general tier customer of described C class client.
Further, fixed dates in every month, described information alert module carries out customer information Prompting, suggested information include the Customs Assigned Number of client, customer name, the pay charge way of client, Number of times that client monthly pays the fees, this which time payment being this month, account date and the amount of money and front should be arrived Phase, each electricity charge were to account situation.
A kind of electricity charge risk management and control reminding method, uses electricity charge risk management and control prompt system, it is characterized in that, Comprise the following steps:
Step 1), central control module control customer information memory module classification storage customer information;
Step 2), central control module controls message processing module and carries out customer information process, and to visitor Family carries out the evaluation of credit grade;
Step 21), information acquisition unit gather the customer information in customer information memory module;
Step 22), customer information is analyzed by storage unit;
Step 23), the power consumption of client processes by information process unit, it is judged that the residue of client Electricity, should arrive the account time according to client's electricity charge and the credit grade of client is carried out by the actual time to account Evaluation;
Step 3), credit rating commented by customer grade authentication module by message processing module The result of valency, carries out the evaluation certification of grade to client;
Step 4), the central control module set time in every month control customer information reminding module to work Customer information prompting is carried out as personnel;
Step 5) if the dump energy of client is less than certain value, then electricity charge risk management and control prompt system Central control module control information communication module transmitting bank's system and client and carry out electricity payment.
Further, step 1) described in client include and company signs bank small amount payment debit industry The client that there is payment agreement in the client of business and Utilities Electric Co. and the client paid tariff in advance by several times;Client believes Breath includes that Electric Power Marketing System Customs Assigned Number, customer name, the pay charge way of client, client monthly pay The number of times, the electricity charge to account Query Dates and the amount of money that take, the electricity charge are actual to account date and the amount of money, the electricity charge not Arrive the reason of account on schedule.
Further, step 2) described in credit grade include excellent, good and general;
Described excellent tier customer is that the electricity charge should arrive account time and the actual client to account time consistency, institute The good tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive account time delay 0h-24h, institute The general tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive more than account time delay 24h;
Described step 3) in the result of authenticated client include A class client, B class client and C class client;
The corresponding excellent tier customer of described A class client, the corresponding good tier customer of described B class client, The corresponding general tier customer of described C class client.
Further, step 4) in remind mode used to include the electricity charge risk pipe customer information Control prompt system automatic spring customer information dialog box;Described A class client, B class client and C class visitor The customer information dialog box at family represents by different colors respectively.
The invention has the beneficial effects as follows: a kind of electricity charge risk management and control prompt system of present invention offer and side The method application by electricity charge risk management and control prompt system, points out the tariff recovery date of respective client automatically, Enable staff to check immediately, any omission does not occur, effectively reduce tariff recovery wind Danger.
Because each client actual electricity consumption situation is different, the electricity charge in signing are transferred or the electricity charge are pre-payed in agreement, The electricity charge are transferred by several times or time, number of times and the amount of money pre-payed all differ, and staff easily obscures, The most monthly before the electricity charge are checked to account situation, it is both needed to compare agreement and clearly distinguishes, pass through the electricity charge Customer information reminding module in risk management and control prompt system, time and gold are checked in the electricity charge of each client Volume is pointed out automatically, greatly reduces the workload of staff, improves work efficiency.
Inquire about for convenience of the electricity charge to account, all hold consultation with client when signing an agreement with client, strive Electricity charge time adjustment of multiple clients being transferred is consistent, but client financial system situation is different, is difficult to reach Unanimously, easily there is service public sentiment;The present invention can be on the premise of being effectively ensured tariff recovery, visitor Family can select the electricity charge to transfer the time voluntarily, it is achieved that company and the doulbe-sides' victory of client.
The tariff recovery risk class of client is indefinite, needs electric charge collection personnel by customer historical Property electricity charge fund pays situation, power consumption change, the finance relevant information such as financial condition are received comprehensively Collection, the test and appraisal implementing comprehensive parameters realize the scientific evaluation of credit rating, and the present invention is according to client The electricity charge should arrive account time and the actual contrast to the account time, automatically according to late days client is divided into A, B, C Three Estate, carries out different promptings when next month points out according to risk class, it is simple to work people Member improves credit rating evaluation and a risk prevention mechanism in time, formulates the personalized precautionary measures.
Accompanying drawing explanation
Fig. 1 is the modular structure schematic diagram of the present invention;
Fig. 2 is the reminding method flow chart of the present invention.
Detailed description of the invention
As it is shown in figure 1, electricity charge risk management and control prompt system, including
For storing the customer information memory module of the customer information in Electric Power Marketing System;
For the customer information reminding module pointing out staff to carry out information inquiry, customer information is pointed out Module uses the form in system interface pop-up dialogue box to point out;
The customer information enquiry module of customer information inquiry is carried out for staff;
For client being carried out the customer grade authentication module of ranking;
For the message processing module that the information data of client is processed, described information processing mould Block includes for gathering the information acquisition unit of customer information in customer information memory module, believing client Cease the storage unit being analyzed and the information process unit that customer information is processed;
The information communication module of communication is carried out respectively with banking system and client;With
For being controlled the central control module of modules;
Central control module is looked into information storage module, customer information reminding module, customer information respectively Inquiry module, customer grade authentication module, message processing module are connected with information communication module.
Client includes signing the client of bank small amount payment debit transaction with company and Utilities Electric Co. signs The client that the client of payment agreement and gradation are paid tariff in advance.
Customer information includes the Customs Assigned Number in Electric Power Marketing System, customer name, the payment side of client Number of times, the electricity charge to account Query Dates and the amount of money, the electricity charge that formula, client monthly pay the fees are actual to the account date With the reason that account is arrived in the amount of money, the electricity charge the most on schedule.
Storage unit in message processing module combines customer information, the customer historical electricity charge are paid Client is analyzed, to client by situation, the change of power user consumption, the financial financial condition of client Carry out the evaluation of credit grade;Electricity and the electricity charge of client are processed by information process unit.
Credit grade includes excellent, good and general;Excellent tier customer is that the electricity charge should arrive the account time and reality arrives The client of account time consistency, good tier customer is that the electricity charge are actual should arrive account time delay to account time ratio The client of 0h-24h, general tier customer is that the electricity charge are actual should arrive account time delay 24h to account time ratio Above client.
In order to protect the privacy of client, customer grade authentication module according to the credit grade of client by client Certification is: A class client, B class client and C class client;The corresponding excellent tier customer of A class client, B class The corresponding good tier customer of client, the corresponding general tier customer of C class client.
The information alert of client is included client to staff, suggested information by information alert module Customs Assigned Number, customer name, the pay charge way of client, client monthly pay the fees number of times, this be Which time of this month is paid the fees, should be arrived account date and the amount of money and each electricity charge of early stage to account situation.Carry in time The basic condition of awake staff inhomogeneity client and electricity consumption situation so that staff improves visitor in time Family Credit Rank Appraisal and a risk prevention mechanism, formulate the personalized precautionary measures.
As in figure 2 it is shown, a kind of electricity charge risk management and control reminding method, electricity charge risk management and control is used to point out system System, comprises the following steps:
Step 1), central control module control customer information memory module classification storage customer information;
Step 2), central control module controls message processing module and carries out customer information process, and to visitor Family carries out the evaluation of credit grade;
Step 21), information acquisition unit gather the customer information in customer information memory module;
Step 22), customer information is analyzed by storage unit;
Step 23), the power consumption of client processes by information process unit, it is judged that the residue of client Electricity, should arrive the account time according to client's electricity charge and the credit grade of client is carried out by the actual time to account Evaluation;
Step 3), credit rating commented by customer grade authentication module by message processing module The result of valency, carries out the evaluation certification of grade to client;
Step 4), the central control module set time in every month control customer information reminding module to work Customer information prompting is carried out as personnel;
Step 5) if the dump energy of client is less than certain value, then electricity charge risk management and control prompt system Central control module control information communication module transmitting bank's system and client and carry out electricity payment.
Step 1) in client include signing client and the electricity of bank small amount payment debit transaction with company There are the client of payment agreement and the client paid tariff in advance by several times in power company;Customer information includes power marketing Number of times that system user numbering, customer name, the pay charge way of client, client monthly pay the fees, the electricity charge To account Query Dates and the amount of money, the actual reason arriving account to account date and the amount of money, the electricity charge of the electricity charge the most on schedule.
Step 2) described in credit grade include excellent, good and general;
Described excellent tier customer is that the electricity charge should arrive account time and the actual client to account time consistency, institute The good tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive account time delay 0h-24h, institute The general tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive more than account time delay 24h;
Step 3) in the result of authenticated client include A class client, B class client and C class client;
The corresponding excellent tier customer of A class client, the corresponding good tier customer of described B class client, described C The corresponding general tier customer of class client.
Step 4) in remind mode used to include the electricity charge risk management and control prompt system customer information Automatic spring customer information dialog box;Client's letter of described A class client, B class client and C class client Breath dialog box represents by different colors respectively.
Although the detailed description of the invention of the present invention is described by the above-mentioned accompanying drawing that combines, but not to this The restriction of invention protection domain, on the basis of technical scheme, those skilled in the art are not Need to pay various amendments that creative work can make or deformation still protection scope of the present invention with In.

Claims (10)

1. electricity charge risk management and control prompt system, is characterized in that, including
For storing the customer information memory module of the customer information in Electric Power Marketing System;
For the customer information reminding module pointing out staff to carry out information inquiry, customer information is pointed out Module uses the form in system interface pop-up dialogue box to point out;
The customer information enquiry module of customer information inquiry is carried out for staff;
For client being carried out the customer grade authentication module of ranking;
For the message processing module that the information data of client is processed, described information processing mould Block includes for gathering the information acquisition unit of customer information in customer information memory module, believing client Cease the storage unit being analyzed and the information process unit that customer information is processed;
The information communication module of communication is carried out respectively with banking system and client;With
For being controlled the central control module of modules;
Described central control module respectively with information storage module, customer information reminding module, client Information inquiry module, customer grade authentication module, message processing module are connected with information communication module.
Electricity charge risk management and control prompt system the most according to claim 1, is characterized in that, described Client includes signing the client of bank small amount payment debit transaction with company and Utilities Electric Co. signs payment The client of agreement and the client paid tariff in advance by several times;
Described customer information includes Customs Assigned Number in Electric Power Marketing System, customer name, client Number of times, the electricity charge to account Query Dates and the amount of money that pay charge way, client monthly pay the fees, the electricity charge are actual arrives The reason of account is arrived in account date and the amount of money, the electricity charge the most on schedule.
Electricity charge risk management and control prompt system the most according to claim 2, is characterized in that, described Storage unit in message processing module combines customer information, situation is paid in the customer historical electricity charge, Client is analyzed by the change of power user consumption, the financial financial condition of client, and client is carried out letter With the evaluation of grade;Electricity and the electricity charge of client are processed by information process unit.
Electricity charge risk management and control prompt system the most according to claim 3, is characterized in that, described Credit grade includes excellent, good and general;
Described excellent tier customer is that the electricity charge should arrive account time and the actual client to account time consistency, institute The good tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive account time delay 0h-24h, institute The general tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive more than account time delay 24h.
Electricity charge risk management and control prompt system the most according to claim 4, is characterized in that, described Authenticated client according to the credit grade of client is by customer grade authentication module: A class client, B class client With C class client;
The corresponding excellent tier customer of described A class client, the corresponding good tier customer of described B class client, The corresponding general tier customer of described C class client.
Electricity charge risk management and control prompt system the most according to claim 1, is characterized in that, each The fixed dates of the moon, described information alert module carries out the prompting of customer information, suggested information The number of times monthly paid the fees including the Customs Assigned Number of client, customer name, the pay charge way of client, client, This is which time payment of this month, should arrive account date and the amount of money and each electricity charge of early stage to account situation.
7. an electricity charge risk management and control reminding method, uses electricity charge risk management and control prompt system, its feature It is to comprise the following steps:
Step 1), central control module control customer information memory module classification storage customer information;
Step 2), central control module controls message processing module and carries out customer information process, and to visitor Family carries out the evaluation of credit grade;
Step 21), information acquisition unit gather the customer information in customer information memory module;
Step 22), customer information is analyzed by storage unit;
Step 23), the power consumption of client processes by information process unit, it is judged that the residue of client Electricity, should arrive the account time according to client's electricity charge and the credit grade of client is carried out by the actual time to account Evaluation;
Step 3), credit rating commented by customer grade authentication module by message processing module The result of valency, carries out the evaluation certification of grade to client;
Step 4), the central control module set time in every month control customer information reminding module to work Customer information prompting is carried out as personnel;
Step 5) if the dump energy of client is less than certain value, then electricity charge risk management and control prompt system Central control module control information communication module transmitting bank's system and client and carry out electricity payment.
A kind of electricity charge risk management and control reminding method the most according to claim 7, is characterized in that, step Rapid 1) client described in includes signing client and the electric power of bank small amount payment debit transaction with company There are the client of payment agreement and the client paid tariff in advance by several times in company;Customer information includes power marketing system Number of times, the electricity charge that system Customs Assigned Number, customer name, the pay charge way of client, client monthly pay the fees are arrived Account Query Dates and the amount of money, the actual reason the most on schedule arriving account to account date and the amount of money, the electricity charge of the electricity charge.
A kind of electricity charge risk management and control reminding method the most according to claim 7, is characterized in that, Step 2) described in credit grade include excellent, good and general;
Described excellent tier customer is that the electricity charge should arrive account time and the actual client to account time consistency, institute The good tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive account time delay 0h-24h, institute The general tier customer stated is that the electricity charge are actual arrives the account time than the client that should arrive more than account time delay 24h;
Described step 3) in the result of authenticated client include A class client, B class client and C class client;
The corresponding excellent tier customer of described A class client, the corresponding good tier customer of described B class client, The corresponding general tier customer of described C class client.
A kind of electricity charge risk management and control reminding method the most according to claim 7, is characterized in that, Step 4) in remind mode used to include customer information electricity charge risk management and control prompt system is automatic Eject customer information dialog box;Described A class client, B class client and the customer information pair of C class client Words frame represents by different colors respectively.
CN201610280003.4A 2016-04-28 2016-04-28 Electricity charge risk management and control prompting system and method Pending CN105976097A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610280003.4A CN105976097A (en) 2016-04-28 2016-04-28 Electricity charge risk management and control prompting system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610280003.4A CN105976097A (en) 2016-04-28 2016-04-28 Electricity charge risk management and control prompting system and method

Publications (1)

Publication Number Publication Date
CN105976097A true CN105976097A (en) 2016-09-28

Family

ID=56993389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610280003.4A Pending CN105976097A (en) 2016-04-28 2016-04-28 Electricity charge risk management and control prompting system and method

Country Status (1)

Country Link
CN (1) CN105976097A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529914A (en) * 2016-11-28 2017-03-22 国网山东省电力公司济宁供电公司 Automatic-urge charge method and device
CN107133822A (en) * 2017-04-28 2017-09-05 国网山东省电力公司泰安供电公司 User credit evaluation method and device
CN109034992A (en) * 2018-09-07 2018-12-18 重庆满集网络科技有限公司 A kind of financial risk monitoring system and its working method
CN110599237A (en) * 2019-08-15 2019-12-20 国网山东省电力公司临清市供电公司 Electric power marketing management information acquisition module based on intelligent monitoring

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103699957A (en) * 2013-11-27 2014-04-02 国家电网公司 Power utilization control system and control method thereof
CN104978695A (en) * 2015-06-24 2015-10-14 国家电网公司 Electricity charge data processing method and apparatus
CN105427196A (en) * 2015-12-23 2016-03-23 国网山东省电力公司聊城供电公司 Credit risk management and control system of electric power consumer

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103699957A (en) * 2013-11-27 2014-04-02 国家电网公司 Power utilization control system and control method thereof
CN104978695A (en) * 2015-06-24 2015-10-14 国家电网公司 Electricity charge data processing method and apparatus
CN105427196A (en) * 2015-12-23 2016-03-23 国网山东省电力公司聊城供电公司 Credit risk management and control system of electric power consumer

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106529914A (en) * 2016-11-28 2017-03-22 国网山东省电力公司济宁供电公司 Automatic-urge charge method and device
CN107133822A (en) * 2017-04-28 2017-09-05 国网山东省电力公司泰安供电公司 User credit evaluation method and device
CN109034992A (en) * 2018-09-07 2018-12-18 重庆满集网络科技有限公司 A kind of financial risk monitoring system and its working method
CN110599237A (en) * 2019-08-15 2019-12-20 国网山东省电力公司临清市供电公司 Electric power marketing management information acquisition module based on intelligent monitoring

Similar Documents

Publication Publication Date Title
Yadav et al. Pay-As-You-Go financing: A model for viable and widespread deployment of solar home systems in rural India
US20190197635A1 (en) Eleutheria (Freedom), Digital Cryptocurrency for Virtual Electricity Trading Platform
US8781955B2 (en) System and method for providing time to cure negative balances in financial accounts while encouraging rapid curing of those balances to a positive net position
US8544732B2 (en) Controlling card-based greenlife computing
CN103390210A (en) Fund payment management system
CN103020816A (en) Online virtual currency third-party credit method and data processing system thereof
CN105976097A (en) Electricity charge risk management and control prompting system and method
CN104021456A (en) Method and system used for all-around enterprise group capital data monitoring
US20150220904A1 (en) Account Management and Transfer System and Method of Use
US20150317729A1 (en) Financial Evaluation Based on Foreign Remittance Activity
Mas Why are banks so scarce in developing countries? A regulatory and infrastructure perspective
US20200202424A1 (en) Real-name consumption system-based new pension saving method and saving system therefor
WO2017009726A1 (en) A cash flow management system
CN109636496A (en) Credit and debt management system and management method
CN110069535A (en) The system that Insurance Product Design is carried out using the technology and data of networking
Baruah et al. Country Brief: Mozambique Off-grid solar power in Mozambique: opportunities for universal energy access and barriers to private sector participation
Mberi et al. Challenges to the successful implementation of e-governance systems in Africa: A case of Taita Taveta County, Kenya
CN113011964A (en) Group integrated product management method and device
US20080091597A1 (en) Bill Payment Methods
Angko Innovation in bank payment systems and related services among selected commercial bank branches in Wa municipality
WO2020033342A1 (en) Method, system, and computer program product for processing a fund disbursement transaction
KR101702858B1 (en) Method for managing an automatic investment using a hybrid account and system for performing the same
JP2002207952A (en) System and method for suspense receipt management
KR101753148B1 (en) Pension system based on consuming activity
US20120022895A1 (en) Annuity Maintenance Messaging Protocol

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20160928