CN105974303A - Reliability evaluation test method of built-in load switch for electric energy meter - Google Patents
Reliability evaluation test method of built-in load switch for electric energy meter Download PDFInfo
- Publication number
- CN105974303A CN105974303A CN201610278270.8A CN201610278270A CN105974303A CN 105974303 A CN105974303 A CN 105974303A CN 201610278270 A CN201610278270 A CN 201610278270A CN 105974303 A CN105974303 A CN 105974303A
- Authority
- CN
- China
- Prior art keywords
- test
- product
- level
- failure
- upgrade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/327—Testing of circuit interrupters, switches or circuit-breakers
- G01R31/3277—Testing of circuit interrupters, switches or circuit-breakers of low voltage devices, e.g. domestic or industrial devices, such as motor protections, relays, rotation switches
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/003—Environmental or reliability tests
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The invention discloses a reliability evaluation test method of a built-in load switch for an electric energy meter. The reliability evaluation test method is characterized by including a load switch mechanical reliability and electrical reliability evaluation method. According to the method, a failure rate is adopted as a reliability characteristic parameter, and grading testing is carried out through adopting a fixed event censoring mode. The method includes the following steps that: S01, an allowable failure number Ac and a censoring failure number rc are selected, wherein rc and Ac satisfies a relational expression that rc=Ac+1; S02, the number Tc of times of censoring is obtained according to the allowable failure number Ac and a pre-selected failure rate grade; S03, the number tz of times of test censoring of test pieces is selected; S04, the number n of the test pieces is determined according to Tc, Ac and tz; S05, n test pieces are randomly sampled from products in batch production; S06, test and inspection are carried out according to regulations; S07, a failure number r and the number of times of the test of failed products are calculated; and S08, a test result is judged. The test method of the invention has the advantages of simple operation, accurate detection and the like.
Description
Technical field
The invention mainly relates to electrical equipment technical field, refer in particular to a kind of built-in on-load switch reliability assessment of electric energy meter
Test method.
Background technology
The electric energy meter quality of built-in on-load switch is directly connected to customer service quality and safe operation of electric network.Entirely
Since state carries out low-voltage collecting meter reading construction on a large scale, Guo Wang company telephone traffic is huge, and the metering fault accepted reports for repairment in business, electric energy
Table is in higher proportion by built-in on-load switch fault, account for that whole metering fault reports for repairment 60%.According to statistics, Hunan Province in 2014
Utilities Electric Co. accepts metering device troublshooting 28000, wherein reaches 16800 because of reporting for repairment of causing of built-in on-load switch fault
Rising, the quality problems of built-in on-load switch bring huge economic loss and bad social influence to grid company.Cause
This, promote the reliability of built-in on-load switch, inherently promotes the quality of built-in on-load switch, reduces because of built-in on-load switch
The fault lost efficacy and cause, for promoting good service level, it is ensured that the stabilization of power grids, saves business manpower, material resources, financial resources, tool
There are great social meaning and economic implications.
By analyze, electric energy meter is relatively low with built-in on-load switch operation frequency, but higher to reliability requirement, typically with
Family arrearage or short circuit etc. the most just can operate separating brake, and after subscriber payment completes or when recovering normal, operation is closed a floodgate.With
Time, when demand charge is abundant and state is normal, action do not answered by built-in on-load switch, it is ensured that user's normal electricity consumption;When circuit is sent out
When raw overload or short trouble, should action in time, open failure electric current, with protection circuit and electrical equipment.
Summary of the invention
The technical problem to be solved in the present invention is that the technical problem existed for prior art, and the present invention provides one
Kind principle is simple, easy and simple to handle and detects the built-in on-load switch reliability assessment test method of electric energy meter accurately.
For solving above-mentioned technical problem, the technical scheme that the present invention proposes is:
A kind of electric energy meter is by built-in on-load switch reliability assessment test method, including on-load switch Mechanical Reliability and electricity
Gas reliability estimation method, all as characteristic quantities and uses Based on Censored Data mode to carry out deciding grade and level test, step using crash rate
Suddenly it is:
S01, selected permission failure number AcWith truncation failure number rc, wherein rc=Ac+1;
S02, according to allow failure number AcWith the failure rate level of preliminary election, determine from machinery set in advance and electrical reliability
Level test table obtains truncation number of times Tc;
S03, the test cut-off number of times t of selected test productz, tzShould be less than the electrical endurance specified in product standard and machinery
Life-span number of times;
S04, according to Tc、AcAnd tz, formula (15) determine test product number n, wherein
N=Tc/tz+Ac(15);
S05, randomly drawing n test product from the product of batch production, wherein the product quantity for sampling is no less than trying
10 times of product number n;
S06, be carried out in accordance with regulations test with detection;
S07, statistics failure number r and the test number (TN) of each inefficacy test product, the test number (TN) of each inefficacy test product presses off-test
Time number of times calculate, and statistics accumulation test number (TN);
S08, result of the test judge: when failure number r is not up to truncation failure number rc, i.e. r≤Ac, and accumulation test number (TN) reaches
To or exceeded truncation number of times Tc, then pass the test it is judged to;When accumulation test number (TN) is not up to truncation number of times, and relevant failure number
R has met or exceeded truncation failure number rc, i.e. r > Ac, then it is judged to test defective.
Preferably, after deciding grade and level pass the test, carrying out the maintenance test of this failure rate level, step is as follows:
S21, selected permission failure number Ac, according to failure rate level and the selected permission failure number of product pass the test
Ac, from test table defined the level by machinery set in advance and electrical reliability, obtain truncation number of times;
S22, the test cut-off number of times of selected test product, determine test product number n;
S23, extraction test product, be carried out in accordance with regulations test and detection;
S24, statistics failure number r and the test number (TN) of each inefficacy test product, statistics accumulation test number (TN);
S25, result of the test judge: if maintaining pass the test, then should continue to tie up by the maintenance cycle of regulation next time
Hold test;If maintaining test defective, then should redefine its failure rate level;When redefining failure rate level, by this product
Product total Test data from test of defining the level first add up, and the failure rate level of product should be according to accumulative relevant failure
Number redefines.
Preferably, after deciding grade and level pass the test, the upgrade test of this failure rate level, the wherein data of upgrade test are carried out
From deciding grade and level test and maintain test test product carry out extend test and for upgrade test put into test product test draw, upgrading try
The step tested is as follows:
S31, selected product failure rate grade to be upgraded, this failure rate level is than the failure level determined in deciding grade and level test
High one-level;
S32, selected permission failure number Ac;
S33, according to selected failure rate level and allow failure number, upgrade from machinery set in advance and electrical reliability
Test table is found truncation number of times Tc;
S34, according to TcDetermine and extend the number of times tested and the test product number put into for upgrade test and test number (TN);
S35, extraction test product, be carried out in accordance with regulations test and detection;
S36, statistics failure number r and the test number (TN) of each inefficacy test product, statistics accumulation test number (TN) T;
S37, result of the test judge: if upgrade test is qualified, then should carry out the maintenance of this grade by the maintenance cycle of regulation
Test;If upgrade test is defective, then should redefine its failure rate level;When redefining failure rate level, by this product
Total Test data add up, the failure rate level of product is the most true according to the test number (TN) of accumulative failure number and accumulation
Fixed.
Preferably, in step S02, the generation process of described machinery and electrical reliability deciding grade and level test table is as follows:
S41, according to the crash rate operational characteristic curve in reliability sampling theory, and the on-load switch life-span obeys and singly refers to
The characteristic of number distribution, can obtain
Wherein 1-L (λ0)=α (1)
L(λ1)=β (2)
λ0Receivable crash rate;α producer risk rate;λ1The most receivable crash rate;β user risk
Rate;
S42, set n extracted sampling test to inefficacy r during stipulated number t, due to built-in on-load switch crash rate
Relatively low, meet n λ t < 5 and λ t < 0.1, binomial distribution can be approximately Poisson distribution, i.e.
T=nt (5)
Formula (5) is substituted into formula (4) can obtain:
Formula (6) substitution (2) can be obtained:
If f is (x, 2Ac+ 2) it is that degree of freedom is equal to 2AcThe χ of+22The density function of distribution, then
Obviously, 2 λ1T is 2A equal to degree of freedomcThe χ of+22Quantile on the downside of distribution 1-βI.e.
Or it is
S43, the sampling scheme of employing crash rate checking, by the λ in formula (11)1By maximum failure rate λmaxReplace, confidence level
1-β takes 0.9, calculates truncation number of times Tc, according to test statistics result, to different AcValue tries to achieve the T of correspondencec, thus obtain machine
Tool and electrical reliability deciding grade and level test table.
Preferably, also include on-load switch short circuits appraisal procedure, as characteristic quantities and adopt using success rate
Carrying out deciding grade and level test by Based on Censored Data mode, step is:
S51, according to allow failure number AcWith the ranked success ratio of preliminary election, short circuits set in advance deciding grade and level test
Looking into test product number n in table, n typically cannot be less than 10;
S52, from batch production product randomly draw n test product, for sample product quantity be no less than test product number n
10 times;
S53, be carried out in accordance with regulations test with detection, add up failure number r;
S54, result of the test judge: when failure number r has met or exceeded cut-off failure number rc, i.e. r > Ac, then it is judged to test not
Qualified.
Preferably, after deciding grade and level pass the test, carrying out the maintenance test of this failure rate level, step is as follows:
S61, selected permission failure number AcAnd ranked success ratio, short circuits set in advance maintain test table to look into examination
Product number n;
S62, extraction test product, be carried out in accordance with regulations test and detection, add up failure number r;
S63, result of the test judge: if maintaining pass the test, then should continue to tie up by the maintenance cycle of regulation next time
Hold test;If maintaining test defective, then should redefine its ranked success ratio;When redefining ranked success ratio, by deciding grade and level
Experiment performs.
Preferably, the product of deciding grade and level pass the test proceeds upgrade test, and the data of upgrade test can be from deciding grade and level test
Carrying out extending test with the test product maintaining test and the test product test for upgrade test input draws, step is as follows:
S71, selected permission success rate and product ranked success ratio to be upgraded, this ranked success ratio is higher than original grade
One-level;
S72, according to selected ranked success ratio and allow successfully to count, by short circuits upgrade test table set in advance
Finding test product number, wherein short circuits upgrade test table is identical with short circuits deciding grade and level test table;
S73, extraction test product, be carried out in accordance with regulations test and detection, add up success rate;
S74, result of the test judge: if upgrade test is qualified, then should carry out the maintenance of this grade by the maintenance cycle of regulation
Test;If upgrade test is defective, then should redefine its ranked success ratio;When redefining ranked success ratio, directly by fixed
Level experiment performs.
Preferably, in step s 51, the generation process of described short circuits deciding grade and level test table is:
Success rate operational characteristic curve in S81, foundation reliability sampling theory, can obtain:
1-L(R0)=α (11)
L(R1)=β (12)
And success rate discrimination ratio
S82, based on binomial distribution, built-in on-load switch short circuits test sampling verification scheme can be by formula
(14) represent:
S83, according to test statistics result, in the deciding grade and level test and upgrade test of short circuits, α, β take 0.2, success
Rate discrimination ratio DrTake 3, AcTake 3, then can calculate the test product number of corresponding different success rate, thus obtain short circuits deciding grade and level examination
Test table.
Compared with prior art, it is an advantage of the current invention that:
The electric energy meter of the present invention is by built-in on-load switch reliability assessment test method, and tool is in following several big features:
(1) by analyzing the electric energy meter work characteristics of built-in on-load switch, it is proposed that employing crash rate can as machinery
By property and the performance assessment criteria of electrical reliability, use success rate as the performance assessment criteria of short circuits.
(2) to the detection limit in the experimental condition of Mechanical Reliability, electrical reliability and short circuits, process of the test and
Detection limit and detection method, test criterion after detection method, test have made clear and definite regulation, it is ensured that result of the test accurate
Property.
(3) set up and study the mathematical model of crash rate and success rate, propose machinery and electrical reliability deciding grade and level test and
Upgrade test scheme, machinery and electrical reliability maintain the deciding grade and level of testing program, short circuits and upgrade test scheme, short circuit can
Testing program is maintained by property.
(4) the deciding grade and level test of electric energy meter built-in on-load switch three class reliability, upgrade test, the examination of maintenance test are proposed
Test program, it is ensured that the operability of test method.
Accompanying drawing explanation
Fig. 1 is the crash rate operating characteristic curve figure of the present invention.
Fig. 2 is 2 λ of the present invention1Graph of relation between T and β.
Fig. 3 is the success rate operating characteristic curve figure of the present invention.
Detailed description of the invention
Below in conjunction with Figure of description and specific embodiment, the invention will be further described.
As shown in Figure 1 to Figure 3, the electric energy meter of the present embodiment by built-in on-load switch reliability assessment test method, including
The assessment of on-load switch Mechanical Reliability, electrical reliability assessment and short circuits assessment, wherein electric energy meter is opened with built-in load
The Mechanical Reliability closed and electrical reliability use crash rate as its characteristic quantities, and short circuits uses success rate to make
For its characteristic quantities.Reliability index and reliability test method to test illustrate below:
1, reliability index:
By the numerical value of its maximum failure rate (success rate) be divided into six grades (three grades, level Four, sub-Pyatyi, Pyatyi, six grades,
Seven grades).The title of grade and maximum failure rate (minimum success rate) are shown in Table 1:
Table 1: grade name and maximum failure rate (minimum success rate)
Tab.1Grade name and maximum failure rate(minimum success rate)
2, reliability test method
The experimental condition of 2.1 every reliability assessments is respectively as follows:
2.1.1 Mechanical Reliability experimental condition
When carrying out Mechanical Reliability test, test product should use control circuit rated voltage, and pulsewidth uses 120ms, built-in negative
Lotus switch contact loop adds 24VDC voltage 100mA current monitor signal, and during test, test product cycle-index hourly should be less than
Setting in product standard, operating frequency preferably chooses 30 times/min, and closure state time and off-state time are than for 1:1.
2.1.2 electrical reliability experimental condition
When carrying out electrical reliability test, test product should use control circuit rated voltage, and pulsewidth uses 120ms, built-in negative
Lotus switch passes to rated voltage, and rated operational current, and 10s connects, and 20s disconnects.Test sequence sees table 2.
Table 2: electrical reliability test sequence
Tab.2Electric reliability test sequence
2.1.3 short circuits experimental condition
The test of short circuits sets experimental condition according to the requirement of IEC62053-21 and IEC 62055-31 standard,
The built-in on-load switch experimental condition of different rated operational currents is shown in Table 3.According to IEC 62055-31 standard, built-in load is opened
Closing and be categorized as UC1, UC2, UC3, UC4 by use, In is rated current.
Table 3: different rated current built-in on-load switch experimental conditions
Tab.3Different rated current latching relay test conditions
Short circuit current tolerance 1 test: test preload switch should action 3 under the conditions of rated voltage and rated operational current
Secondary, each 5s Guan Bi, 5s disconnect;Then being installed by the regulation of mounting condition by test product, on-load switch is in closure state, presses
" shorted load condition " of table 3 regulation is carried out continuously 3 tolerances, every time time interval 1min of tolerance.
Short circuit current tolerance 2 test: test preload switch should action 3 under the conditions of rated voltage and rated operational current
Secondary, each 5s Guan Bi, 5s disconnect;Then being installed by the regulation of mounting condition by test product, on-load switch is in closure state, presses
" shorted load condition " of table 3 regulation carries out 3 short-circuit resistance test, cools down 1min every time, use specified driving voltage after test
Test product carries out closed and disconnected operation test, and twice short circuit resistance test interval was less than 5 minutes.
Fault turn-on current is tested: test preload switch should action 3 under the conditions of rated voltage and rated operational current
Secondary, each 5s Guan Bi, 5s disconnect;Then being installed by the regulation of mounting condition by test product, on-load switch is off, and presses
" shorted load condition " of table 3 regulation carries out 3 call through tests, and the phase angle of current turns ON should be random, each call through test
After rear cooling 1min, with specified driving voltage, test product being carried out closed and disconnected operation test, twice short circuit resistance test is spaced
Less than 5 minutes.
Tolerance 1 and the sampling test products of the tolerance 2 each use 1/3n of test, and according to round when there is decimal, its
Remaining sample carries out the test of project fault turn-on current.
2.2 test products prepare
First being test product extraction, test product should be from producing in batches under stable process conditions and through the qualified product detected
Product are randomly drawed, and the product quantity for sampling is no less than 10 times of test product number n.
Then screening sample from test product, unless product standard states otherwise, screening uses under room temperature (15 DEG C~35 DEG C)
Carrying out, screening conditions are outward appearance, closed procedure voltage, opening operation voltage, turn-off time, closing time, dielectric withstanding voltage, insulation
The routine test project such as resistance, contact resistance.If test product has defective under screening conditions, defective test product should be rejected,
And supply sample by regulation.The test product weeded out is not counted in relevant failure number r.
2.3 test product detections
2.3.1 process of the test detects
(1) mechanically and electrically detect during reliability test.Unless product standard states otherwise, owning of reply test product
With in 40% time of "off" phase in 40% time of contact " on " phase within each action cycle, detection closes contact
Contact drop and break contact between voltage.Process of the test does not allow test product is cleared up and adjusts.
(2) short circuits process of the test detects.Short circuit current tolerance 1 test does not detects in process of the test;Short circuit
Electric current tolerance 2 test and fault current call through test detect the function of built-in on-load switch in process of the test.
2.3.2 detect after Shi Yan
(1) mechanically and electrically detect after reliability test.Unless product standard states otherwise, after test, tackle all mistake
The effect outward appearance of test product, closed procedure voltage, opening operation voltage, closing time, turn-off time, contact resistance, dielectric properties, absolutely
The projects such as edge resistance are tested.
(2) detect after short circuits test.Unless product standard states otherwise, short circuit tolerance electric current 2 is tested and fault
The following items tackling all test products that do not lost efficacy after turn-on current test is tested:
When a) applying specified excitation first, the action situation of built-in on-load switch;
B) dielectric properties, contact resistance, surge voltage.
2.4 failure criteria
2.4.1 Mechanical Reliability failure criteria:
When any one situation following occurs, i.e. think that this test product lost efficacy:
(1), during built-in on-load switch Guan Bi, the ultimate value of contact drop is more than the 5% of contact circuit open-circuit voltage;
(2), when built-in on-load switch disconnects, the voltage between break contact is less than the 90% of contact circuit open-circuit voltage;
(3) built-in on-load switch is failure to actuate;
(4) test product parts have destructive damage, connection wire and parts to loosen;
(5) after test, contact resistance is more than the 150% of nominal value;
(6), in test product detection after experiment, in addition to contact resistance, other any one purpose testing results do not meet product
The regulation of standard.
2.4.2 electrical reliability failure criteria
When any one situation following occurs, i.e. think that this test product lost efficacy:
(1) test product occurred in process of the test can not normal break-make;
(2) test product parts have destructive damage, connect wire and loose-parts;
(3) after test, contact resistance is more than the 150% of nominal value;
(4) after test, insulation resistance is less than the 10% of nominal value;
(5) dielectric properties after test, between contact, dielectric is pressure less than the 75% of nominal withstand voltage;
(6) test product after experiment detection in, in addition to above-mentioned project, other any one purpose testing result does not meets product
The regulation of product standard.
2.4.3 short circuits failure criteria
When any one situation following occurs, i.e. think that this test product lost efficacy:
(1) short circuit current resistance test 1 is exploded, and outward appearance has damage;
(2) contact resistance is more than the 150% of nominal value;
(3) dielectric properties, between contact, dielectric is pressure less than the 75% of nominal withstand voltage;
(4) surge voltage does not meets product standard requirement.
3, before carrying out test procedure, reliability test sampling scheme is determined.
3.1 sampling scheme
Unless product standard states otherwise, the reliability compliance test of built-in on-load switch is recommended to use Based on Censored Data examination
Test.Using crash rate checking sampling scheme for Mechanical Reliability and electrical reliability, short circuits uses success rate checking
Sampling scheme.
3.1.1 crash rate checking sampling scheme
Theoretical according to reliability sampling, crash rate operational characteristic curve is as it is shown in figure 1, represent crash rate probability L (λ) and lose
Relation between efficiency λ.
Understand according to Fig. 1, as built-in on-load switch crash rate λ < λ0Time, then this pass the test of this batch of product;As λ=λ0
Time, the probability that erroneous judgement does not receives is α;Work as λ > λ1Time, then this test of this batch of product is judged to defective;As λ=λ1Time, produce
It is β that product are mistaken for probability that is qualified and that receive.
1-L(λ0)=α (1)
L(λ1)=β (2)
The built-in on-load switch life-span obeys single index distribution, and the available binomial probability formula (3) of L (λ) calculates
When determining the crash rate sampling scheme of built-in on-load switch, according to given λ1, β value, take inefficacy truncation number Ac=
0,1,2..., obtain sampling number n, thus obtain the sampling scheme of crash rate test.
In crash rate proof scheme, by total number of operations T of test product and permission failure number AcBetween relation come really
The reliability level of fixed built-in on-load switch.If n the sampling test extracted is to inefficacy r during stipulated number t, due to built-in
On-load switch crash rate is relatively low, meets n λ t < 5 and λ t < 0.1, and binomial distribution can be approximately Poisson distribution, i.e.
T=nt (5)
Formula (5) is substituted into formula (4) can obtain:
Formula (6) substitution (2) can be obtained:
If f is (x, 2Ac+ 2) it is that degree of freedom is equal to 2AcThe χ of+22The density function of distribution, then
Wherein 2 λ1Relation between T and β is as shown in Figure 2.
Obviously, 2 λ1It is 2A that T is equal to degree of freedomcThe χ of+22Quantile on the downside of distribution 1-βI.e.
Or
For deciding grade and level test and the upgrade test of Mechanical Reliability and electrical reliability, use the sampling side of crash rate checking
Case, by the λ in formula (10)1By maximum failure rate λ in table 1maxReplacing, confidence level 1-β takes 0.9, then can calculate in table 4
Truncation number of times Tc, according to test statistics result, to different AcValue can try to achieve the T of correspondencec, thus it is (the most mechanical and electric to obtain table 4
The deciding grade and level test of gas reliability and upgrade test).When maintaining test, confidence level 1-β takes 0.6, calculates table 5 (the most mechanical and electric
Gas reliability maintains test table).
Table 4: machinery and electrical reliability deciding grade and level test and upgrade test scheme
Tab.4Mechanical and electrical reliability grading test and upgrade
test scheme
Table 5: machinery and electrical reliability maintain testing program
Tab.5Mechanical and electrical reliability maintain test scheme
4.1.2 success rate checking sampling scheme
Owing to short circuit is occurrent event for unique user, therefore verify as built-in load using success rate
The sampling scheme of switch short test.The probability L that success rate receivesRAnd the relation between success rate R is as shown in Figure 3.
Understand according to Fig. 3, when built-in on-load switch success rate R R0Time, then this pass the test of this batch products;Work as R=
R0Time, the probability that erroneous judgement does not receives is α;As R < R1Time, then this test of this batch products is judged to defective;Work as R=R1
Time, it is β that product is mistaken for probability that is qualified and that receive.
1-L(R0)=α (11)
L(R1)=β (12)
Success rate discrimination ratio
Based on binomial distribution, the sampling verification scheme of built-in on-load switch short circuits test can be by formula (14)
Represent.
According to test statistics result, in the deciding grade and level test and upgrade test of short circuits, α, β take 0.2, and success rate is reflected
Not than DrTake 3, AcTaking 3, then can calculate the test product number of corresponding different success rate, concrete (i.e. short circuits is fixed as shown in table 6
Level and upgrade test table).When maintaining test, α, β take 0.3, success rate discrimination ratio DrTake 3, AcTake 2, calculate table 7 (the shortest
Road reliability maintains test table).
Table 6: short circuits deciding grade and level and upgrade test scheme
Tab.6Short circuit reliability grading and upgrade test scheme
Table 7: short circuits maintains testing program
Tab.7Short circuit reliability maintain test scheme
5, after reliability test sampling scheme determines, corresponding test procedure is entered.
The assessment of the most every on-load switch Mechanical Reliability, electrical reliability assessment and the test journey of short circuits assessment
Sequence all includes deciding grade and level test, maintains test and upgrade test, particularly as follows:
5.1 mechanically and electrically reliability test programs
5.1.1 define the level test
(1) selected permission failure number AcWith truncation failure number rc(rc=Ac+ 1), it is recommended that in the range of 2~5, select Ac;
(2) according to selected failure rate level and Ac, table 4 find truncation number of times Tc;
(3) the test cut-off number of times t of selected test productz, tzShould be less than the electric life specified in product standard and mechanical life
Number of times, it is recommended that electrical reliability is preferably tz=104 times, Mechanical Reliability is preferably tz=105 times;
(4) according to Tc、AcAnd tz, formula (15) determine that test product number n, n typically cannot be less than 10.
N=Tc/tz+Ac (15)
(5) randomly drawing n test product from the product of batch production, the product quantity for sampling is no less than test product number n
10 times;
(6) test and detection it are carried out in accordance with regulations;
(7) statistical correlation failure number r and the correlation test number of times of each inefficacy test product, to the relevant failure detected after test
Test product, its correlation test number of times is calculated by number of times during off-test, statistics accumulation correlation test number of times;
(8) result of the test judges.When relevant failure number r is not up to truncation failure number rc(i.e. r≤Ac), and accumulate relevant examination
Test number of times and met or exceeded truncation number of times, be then judged to pass the test, when accumulation correlation test number of times is not up to truncation number of times, and
Relevant failure number r has met or exceeded truncation failure number rc(i.e. r > Ac), then it is judged to test defective.
5.1.2 test is maintained
The product of deciding grade and level pass the test, unless product standard states otherwise, should carry out this by the maintenance week number of regulation in table 5
The maintenance test of grade, maintains test to carry out by follow procedure:
(1) selected permission failure number Ac, according to failure rate level and the selected permission failure number of product pass the test,
Truncation number of times is found by table 5;
(2) the test cut-off number of times of selected test product, determines test product number n;
(3) extraction test product, is carried out in accordance with regulations test and detection;
(4) statistical correlation failure number r and the correlation test number of times of each inefficacy test product, statistics accumulation correlation test number of times;
(5) result of the test judges.If maintenance pass the test, then should continue to maintain by the maintenance cycle of regulation next time
Test;If maintaining test defective, then should redefine its failure rate level;When redefining failure rate level, should be by this product
Product total Test data (include maintaining and test underproof data) from test of defining the level first add up, the inefficacy of product
Rate grade should be determined by table 1 according to accumulative relevant failure number.
5.1.3 upgrade test
The product of deciding grade and level pass the test can proceed with upgrade test.The data of upgrade test can be from deciding grade and level test and maintenance
The test product of test carries out extending test and the test product test for upgrade test input draws.Upgrade test is entered by follow procedure
OK.
(1) selected product failure rate grade (typically than the original high one-level of grade) to be upgraded;
(2) selected permission failure number Ac;
(3) according to selected failure rate level and permission failure number, table 4 truncation number of times T is foundc;
(4) according to TcDetermine and extend the number of times tested and the test product number put into for upgrade test and test number (TN);
(5) extraction test product, is carried out in accordance with regulations test and detection;
(6) statistical correlation failure number r and the correlation test number of times of each inefficacy test product, statistics accumulation correlation test number of times T;
(7) result of the test judges.If upgrade test is qualified, then should by regulation the maintenance cycle carry out this grade maintenance examination
Test;If upgrade test is defective, then should redefine its failure rate level;When redefining failure rate level, should be by this product
Total Test data add up, the failure rate level of product should be according to accumulative relevant failure number and the correlation test of accumulation
Number of times is determined by table 1.
5.2 short circuits test procedures
5.2.1 define the level test
Deciding grade and level test is carried out by follow procedure:
(1) according to selected ranked success ratio and Ac, table 6 looking into test product number n, n typically cannot be less than 10;
(2) randomly drawing n test product from the product of batch production, the product quantity for sampling is no less than test product number n
10 times;
(3) test and detection, statistical correlation failure number r it are carried out in accordance with regulations;
(4) result of the test judges.When relevant failure number r has met or exceeded cut-off failure number rc(i.e. r > Ac), then it is judged to examination
Test defective.
5.2.2 test is maintained
The product of deciding grade and level pass the test, unless product standard states otherwise, should carry out this by the maintenance week number of regulation in table 7
The maintenance test of grade, maintains test to carry out by follow procedure:
(1) power grade and A it are selected toc, table 7 look into test product number n;
(2) extraction test product, is carried out in accordance with regulations test and detection, statistical correlation failure number r;
(3) result of the test judges.If maintenance pass the test, then should continue to maintain by the maintenance cycle of regulation next time
Test;If maintaining test defective, then should redefine its ranked success ratio;When redefining ranked success ratio, real by deciding grade and level
Test execution.
5.2.3 upgrade test
The product of deciding grade and level pass the test can proceed with upgrade test.The data of upgrade test can be from deciding grade and level test and maintenance
The test product of test carries out extending test and the test product test for upgrade test input draws.Upgrade test is entered by follow procedure
OK.
(1) selected product ranked success ratio (typically than the original high one-level of grade) to be upgraded, selected permission success rate;
(2) according to selected ranked success ratio and permission failure number, table 6 test product number is found;
(3) extraction test product, is carried out in accordance with regulations test and detection, statistical correlation failure number r;
(4) result of the test judges.If upgrade test is qualified, then should by regulation the maintenance cycle carry out this grade maintenance examination
Test;If upgrade test is defective, then should redefine its ranked success ratio;When redefining ranked success ratio, directly by deciding grade and level
Experiment performs.
Below being only the preferred embodiment of the present invention, protection scope of the present invention is not limited merely to above-described embodiment,
All technical schemes belonged under thinking of the present invention belong to protection scope of the present invention.It should be pointed out that, for the art
For those of ordinary skill, some improvements and modifications without departing from the principles of the present invention, should be regarded as the protection of the present invention
Scope.
Claims (8)
1. an electric energy meter is by built-in on-load switch reliability assessment test method, it is characterised in that include on-load switch machinery
Reliability and electrical reliability appraisal procedure, all as characteristic quantities and use Based on Censored Data mode to carry out determining using crash rate
Level test, step is:
S01, selected permission failure number AcWith truncation failure number rc, wherein rc=Ac+1;
S02, according to allow failure number AcWith the failure rate level of preliminary election, define the level from machinery set in advance and electrical reliability and try
Test and table obtains truncation number of times Tc;
S03, the test cut-off number of times t of selected test productz, tzShould be less than the electrical endurance specified in product standard and mechanical life
Number of times;
S04, according to Tc、AcAnd tz, formula (15) determine test product number n, wherein
N=Tc/tz+Ac(15);
S05, randomly drawing n test product from the product of batch production, wherein the product quantity for sampling is no less than test product number n
10 times;
S06, be carried out in accordance with regulations test with detection;
S07, statistics failure number r and the test number (TN) of each inefficacy test product, the test number (TN) of each inefficacy test product is by during off-test
Number of times calculates, and statistics accumulation test number (TN);
S08, result of the test judge: when failure number r is not up to truncation failure number rc, i.e. r≤Ac, and accumulation test number (TN) reaches or
Exceed truncation number of times Tc, then pass the test it is judged to;When accumulation test number (TN) is not up to truncation number of times, and relevant failure number r reaches
To or exceeded truncation failure number rc, i.e. r > Ac, then it is judged to test defective.
Electric energy meter the most according to claim 1 is by built-in on-load switch reliability assessment test method, it is characterised in that
After deciding grade and level pass the test, carrying out the maintenance test of this failure rate level, step is as follows:
S21, selected permission failure number Ac, according to failure rate level and the selected permission failure number A of product pass the testc, from
Machinery set in advance and electrical reliability deciding grade and level test table obtain truncation number of times;
S22, the test cut-off number of times of selected test product, determine test product number n;
S23, extraction test product, be carried out in accordance with regulations test and detection;
S24, statistics failure number r and the test number (TN) of each inefficacy test product, statistics accumulation test number (TN);
S25, result of the test judge: if maintaining pass the test, then should continue to maintain examination by the maintenance cycle of regulation next time
Test;If maintaining test defective, then should redefine its failure rate level;When redefining failure rate level, by this product from
The total Test data that deciding grade and level has been tested first add up, and the failure rate level of product should be according to accumulative relevant failure number weight
Newly determined.
Electric energy meter the most according to claim 2 is by built-in on-load switch reliability assessment test method, it is characterised in that
After deciding grade and level pass the test, carrying out the upgrade test of this failure rate level, wherein the data of upgrade test from deciding grade and level test and maintain
The test product of test carries out extending test and the test product test for upgrade test input draws, the step of upgrade test is as follows:
S31, selected product failure rate grade to be upgraded, this failure rate level is higher by one than the failure level determined in deciding grade and level test
Level;
S32, selected permission failure number Ac;
S33, according to selected failure rate level and allow failure number, from machinery set in advance and electrical reliability upgrade test
Table is found truncation number of times Tc;
S34, according to TcDetermine and extend the number of times tested and the test product number put into for upgrade test and test number (TN);
S35, extraction test product, be carried out in accordance with regulations test and detection;
S36, statistics failure number r and the test number (TN) of each inefficacy test product, statistics accumulation test number (TN) T;
S37, result of the test judge: if upgrade test is qualified, then should by regulation the maintenance cycle carry out this grade maintenance test;
If upgrade test is defective, then should redefine its failure rate level;When redefining failure rate level, whole by this product
Test data adds up, and the failure rate level of product redefines according to the test number (TN) of accumulative failure number and accumulation.
Electric energy meter the most according to claim 1 is by built-in on-load switch reliability assessment test method, it is characterised in that
In step S02, the generation process of described machinery and electrical reliability deciding grade and level test table is as follows:
S41, according to the crash rate operational characteristic curve in reliability sampling theory, and the on-load switch life-span obeys single index and divides
The characteristic of cloth, can obtain
Wherein 1-L (λ0)=α (1)
L(λ1)=β (2)
λ0Receivable crash rate;α producer risk rate;λ1The most receivable crash rate;β user relative risk;
S42, set n extracted sampling test to inefficacy r during stipulated number t, owing to built-in on-load switch crash rate is relatively low,
Meeting n λ t < 5 and λ t < 0.1, binomial distribution can be approximately Poisson distribution, i.e.
T=nt (5)
Formula (5) is substituted into formula (4) can obtain:
Formula (6) substitution (2) can be obtained:
If f is (x, 2Ac+ 2) it is that degree of freedom is equal to 2AcThe χ of+22The density function of distribution, then
Obviously, 2 λ1T is 2A equal to degree of freedomcThe χ of+22Quantile on the downside of distribution 1-βI.e.
Or it is
S43, the sampling scheme of employing crash rate checking, by the λ in formula (11)1By maximum failure rate λmaxReplacing, confidence level 1-β takes
0.9, calculate truncation number of times Tc, according to test statistics result, to different AcValue tries to achieve the T of correspondencec, thus obtain machinery and
Electrical reliability deciding grade and level test table.
Electric energy meter the most as claimed in any of claims 1 to 4 by built-in on-load switch reliability assessment test method,
It is characterized in that, also include on-load switch short circuits appraisal procedure, fixed using success rate as characteristic quantities employing
Number truncation mode carries out deciding grade and level test, and step is:
S51, according to allow failure number AcWith the ranked success ratio of preliminary election, short circuits set in advance deciding grade and level test in table
Looking into test product number n, n typically cannot be less than 10;
S52, from batch production product randomly draw n test product, for sample product quantity be no less than the 10 of test product number n
Times;
S53, be carried out in accordance with regulations test with detection, add up failure number r;
S54, result of the test judge: when failure number r has met or exceeded cut-off failure number rc, i.e. r > Ac, then it is judged to test and does not conforms to
Lattice.
Electric energy meter the most according to claim 5 is by built-in on-load switch reliability assessment test method, it is characterised in that
After deciding grade and level pass the test, carrying out the maintenance test of this failure rate level, step is as follows:
S61, selected permission failure number AcAnd ranked success ratio, short circuits set in advance maintain test table to look into test product number
n;
S62, extraction test product, be carried out in accordance with regulations test and detection, add up failure number r;
S63, result of the test judge: if maintaining pass the test, then should continue to maintain examination by the maintenance cycle of regulation next time
Test;If maintaining test defective, then should redefine its ranked success ratio;When redefining ranked success ratio, by deciding grade and level experiment
Perform.
Electric energy meter the most according to claim 6 is by built-in on-load switch reliability assessment test method, it is characterised in that fixed
The product of level pass the test proceeds upgrade test, and the data of upgrade test can be entered from the test product of deciding grade and level test and maintenance test
Row extends test and the test product test for upgrade test input draws, step is as follows:
S71, selected permission success rate and product ranked success ratio to be upgraded, this ranked success ratio is higher than original grade by one
Level;
S72, according to selected ranked success ratio and allow successfully to count, short circuits upgrade test table set in advance find
Test product number, wherein short circuits upgrade test table is identical with short circuits deciding grade and level test table;
S73, extraction test product, be carried out in accordance with regulations test and detection, add up success rate;
S74, result of the test judge: if upgrade test is qualified, then should by regulation the maintenance cycle carry out this grade maintenance test;
If upgrade test is defective, then should redefine its ranked success ratio;When redefining ranked success ratio, directly by deciding grade and level experiment
Perform.
8. according to the electric energy meter described in any one in claim 5 to 7 by built-in on-load switch reliability assessment test method,
It is characterized in that, in step s 51, the generation process of described short circuits deciding grade and level test table is:
Success rate operational characteristic curve in S81, foundation reliability sampling theory, can obtain:
1-L(R0)=α (11)
L(R1)=β (12)
And success rate discrimination ratio
S82, based on binomial distribution, built-in on-load switch short circuits test sampling verification scheme can be by formula (14)
Represent:
S83, according to test statistics result, in the deciding grade and level test and upgrade test of short circuits, α, β take 0.2, and success rate is reflected
Not than DrTake 3, AcTake 3, then can calculate the test product number of corresponding different success rate, thus obtain short circuits deciding grade and level test table.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610278270.8A CN105974303B (en) | 2016-04-29 | 2016-04-29 | The built-in on-load switch reliability assessment test method of electric energy meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610278270.8A CN105974303B (en) | 2016-04-29 | 2016-04-29 | The built-in on-load switch reliability assessment test method of electric energy meter |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105974303A true CN105974303A (en) | 2016-09-28 |
CN105974303B CN105974303B (en) | 2019-03-12 |
Family
ID=56993442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610278270.8A Active CN105974303B (en) | 2016-04-29 | 2016-04-29 | The built-in on-load switch reliability assessment test method of electric energy meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105974303B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106253299A (en) * | 2016-10-11 | 2016-12-21 | 杭州凯达电力建设有限公司 | Distribution transformer overload method for calculating probability, device and distribution transformer |
CN106569127A (en) * | 2016-11-02 | 2017-04-19 | 中国电力科学研究院 | Reliability evaluation method of electric energy meter load switch |
CN107038520A (en) * | 2016-12-30 | 2017-08-11 | 中核核电运行管理有限公司 | It is a kind of that relay protection and the method for insulation control are realized in ERDB |
CN109767061A (en) * | 2018-12-06 | 2019-05-17 | 中国电力科学研究院有限公司 | A kind of appraisal procedure and device of electric energy meter crash rate |
CN110678763A (en) * | 2017-09-29 | 2020-01-10 | 株式会社Lg化学 | Contactor failure rate prediction system and method |
CN115825793A (en) * | 2022-11-25 | 2023-03-21 | 楚能新能源股份有限公司 | Power battery calendar life identification test method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102508155A (en) * | 2011-11-08 | 2012-06-20 | 郑州万特电气有限公司 | Test circuit for internally installed load switch of intelligent electric energy meter |
CN103278766A (en) * | 2013-04-24 | 2013-09-04 | 国家电网公司 | Method and system for testing reliability of load switch |
CN103592615A (en) * | 2013-01-10 | 2014-02-19 | 国家电网公司 | Intelligent testing device of built-in load switch of electric energy meter |
CN105022019A (en) * | 2015-06-23 | 2015-11-04 | 国家电网公司 | Method of comprehensively estimating reliability of single-phase intelligent electric energy meter |
CN105425195A (en) * | 2015-11-02 | 2016-03-23 | 国网天津市电力公司 | High voltage electric energy meter reliability verification test statistics method |
-
2016
- 2016-04-29 CN CN201610278270.8A patent/CN105974303B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102508155A (en) * | 2011-11-08 | 2012-06-20 | 郑州万特电气有限公司 | Test circuit for internally installed load switch of intelligent electric energy meter |
CN103592615A (en) * | 2013-01-10 | 2014-02-19 | 国家电网公司 | Intelligent testing device of built-in load switch of electric energy meter |
CN103278766A (en) * | 2013-04-24 | 2013-09-04 | 国家电网公司 | Method and system for testing reliability of load switch |
CN105022019A (en) * | 2015-06-23 | 2015-11-04 | 国家电网公司 | Method of comprehensively estimating reliability of single-phase intelligent electric energy meter |
CN105425195A (en) * | 2015-11-02 | 2016-03-23 | 国网天津市电力公司 | High voltage electric energy meter reliability verification test statistics method |
Non-Patent Citations (1)
Title |
---|
曹英: "智能电能表负荷开关情况综述", 《科技创新与应用》 * |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106253299A (en) * | 2016-10-11 | 2016-12-21 | 杭州凯达电力建设有限公司 | Distribution transformer overload method for calculating probability, device and distribution transformer |
CN106253299B (en) * | 2016-10-11 | 2019-01-29 | 杭州凯达电力建设有限公司 | Distribution transformer overloads method for calculating probability, device and distribution transformer |
CN106569127A (en) * | 2016-11-02 | 2017-04-19 | 中国电力科学研究院 | Reliability evaluation method of electric energy meter load switch |
CN107038520A (en) * | 2016-12-30 | 2017-08-11 | 中核核电运行管理有限公司 | It is a kind of that relay protection and the method for insulation control are realized in ERDB |
CN110678763A (en) * | 2017-09-29 | 2020-01-10 | 株式会社Lg化学 | Contactor failure rate prediction system and method |
CN110678763B (en) * | 2017-09-29 | 2022-03-18 | 株式会社Lg化学 | Contactor failure rate prediction system and method |
US11307254B2 (en) | 2017-09-29 | 2022-04-19 | Lg Energy Solution, Ltd. | Contactor failure rate prediction system and method |
CN109767061A (en) * | 2018-12-06 | 2019-05-17 | 中国电力科学研究院有限公司 | A kind of appraisal procedure and device of electric energy meter crash rate |
CN109767061B (en) * | 2018-12-06 | 2022-07-01 | 中国电力科学研究院有限公司 | Method and device for evaluating failure rate of electric energy meter |
CN115825793A (en) * | 2022-11-25 | 2023-03-21 | 楚能新能源股份有限公司 | Power battery calendar life identification test method |
Also Published As
Publication number | Publication date |
---|---|
CN105974303B (en) | 2019-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105974303B (en) | The built-in on-load switch reliability assessment test method of electric energy meter | |
Bernabeu et al. | Methodology for a security/dependability adaptive protection scheme based on data mining | |
CN103454516B (en) | Intelligent transformer substation secondary equipment health state diagnostic method | |
CN113448763B (en) | Dynamic expansion grouping alarm service method for full life cycle management | |
CN103296757A (en) | Multi-parameter identification based secondary system fault diagnosing method for intelligent substation | |
CN105703258B (en) | GIS switchgear action state monitors system and its application method | |
CN109782060B (en) | Lean line loss analysis system | |
CN110941918A (en) | Intelligent substation fault analysis system | |
US9692258B2 (en) | Method and system for multi-IED event classification in an electrical grid | |
WO2013131392A1 (en) | Dc power supply dynamic simulation system and dc power supply test system | |
CN109474067A (en) | A kind of dispatching of power netwoks troubleshooting aid decision-making method | |
US11740266B2 (en) | Systems and methods for monitoring energy-related data in an electrical system | |
CN108919044B (en) | Active identification method for unit distribution power grid faults based on mutual verification mechanism | |
CN115048591A (en) | Power distribution network holographic data visualization intelligent display analysis system based on artificial intelligence | |
CN112508511A (en) | Automatic generation method for stability control strategy test report | |
CN111580011A (en) | Method, device and equipment for locating disconnection fault of circuit breaker control circuit | |
Sankar et al. | Synchrophasor data driven islanding detection, localization and prediction for microgrid using energy operator | |
CN108388653B (en) | Method for identifying opening type of 10kV outgoing line switch of transformer substation | |
CN115378127A (en) | Fault depth diagnosis method based on multi-dimensional data real-time analysis of power grid equipment | |
CN115932564A (en) | Fault evaluation method, device and equipment for high-voltage circuit breaker and readable storage medium | |
CN106845652B (en) | Relay protection on-line monitoring method and system based on incidence relation | |
CN115549040A (en) | Automatic fault diagnosis method and system for flexible direct current converter station | |
CN114447874A (en) | Digital twin-based transformer substation relay protection equipment parameter testing method and device | |
Zhang et al. | Research on operation evaluation technology system of smart distribution grid | |
Popov et al. | Synchrophasor-based Applications to Enhance Electrical System Performance in the Netherlands |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |