CN105971555A - Leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to fractured formation - Google Patents

Leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to fractured formation Download PDF

Info

Publication number
CN105971555A
CN105971555A CN201610293031.XA CN201610293031A CN105971555A CN 105971555 A CN105971555 A CN 105971555A CN 201610293031 A CN201610293031 A CN 201610293031A CN 105971555 A CN105971555 A CN 105971555A
Authority
CN
China
Prior art keywords
leaking stoppage
leak stopping
leakage
plugging slurry
slurry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610293031.XA
Other languages
Chinese (zh)
Other versions
CN105971555B (en
Inventor
陈添
钟德华
刘焕玉
张研蕾
石俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Bohai Drilling Engineering Co Ltd
Original Assignee
CNPC Bohai Drilling Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CNPC Bohai Drilling Engineering Co Ltd filed Critical CNPC Bohai Drilling Engineering Co Ltd
Priority to CN201610293031.XA priority Critical patent/CN105971555B/en
Publication of CN105971555A publication Critical patent/CN105971555A/en
Application granted granted Critical
Publication of CN105971555B publication Critical patent/CN105971555B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • E21B33/134Bridging plugs
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Sealing Material Composition (AREA)

Abstract

The invention provides a leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to a fractured formation. The method comprises the following steps that whether leakage is fractured leakage or not is judged, and the position of a leakage layer is determined; a leaking stoppage barrel is machined; the leaking stoppage barrel is driven into the position below the drilling fluid level in a well; when the leaking stoppage barrel is driven into the upper portion of a leakage layer well section, water ways are filled in the position 30-50 m away from the leakage layer, and filler in the barrel is ejected and released by starting a pump; leaking stoppage slurry is driven into a drill stem, and substitutive slurry is in place; and the leaking stoppage slurry is driven into the drill stem, so that the fillers and the leaking stoppage slurry enter the leakage layer, and leaking stoppage is achieved. According to the leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to the fractured formation, the leaking stoppage measurement and technical problems in vicious well leakage are solved, especially for the fractured formation leakage, the leaking stoppage method is effective, and the well leakage of the fractured formation is well solved.

Description

A kind of leak stopping cylinder for fractured reservoir and plugging slurry associating blocking method
Technical field
The invention belongs to drilling failure complex process field, especially relate to the leak stopping for fractured reservoir Cylinder and plugging slurry associating blocking method.
Background technology
In current drilling process, owing to strata condition is complicated, when drilling strata exists extensive crack Time, easily there is severe well leakage, in causing pit shaft, drilling fluid reduces until losing and returning rapidly, and impact is normal bores Well, cause borehole well instability, induction formation fluid pour in pit shaft blowout.Therefore, the leakage of fractured reservoir Mistake must draw attention, and focuses on the plugging operations of fractured reservoir.
Fractured reservoir blocking method purpose is to block formation fracture, thus reduces drilling fluid leakage, releases Leakage is dangerous.A lot of class plugging slurry is had been developed for currently for fractured reservoir, but due to crack Not of uniform size, in practical operation, it is difficult to release leakage by single plugging slurry.
This method derives from on-the-spot actual plugging operations, after there is fractured leakage, uses plugging slurry Leak stopping is repeatedly continuously, does not obtains effect.Then the leak stopping cylinder for fractured reservoir and leak stopping mud have been invented Slurry associating blocking method, successfully releases leakage.
Summary of the invention
In view of this, it is contemplated that be proposed for the leak stopping cylinder of fractured reservoir and plugging slurry is combined stifled Leakage method, can effectively realize leak stopping purpose, saves the Slot Handling time, and improves drillng operation efficiency.
For reaching above-mentioned purpose, the technical scheme is that and be achieved in that:
A kind of leak stopping cylinder for fractured reservoir, including sleeve pipe and implant, described its lower end is provided with Chamfering;Described casing length is 7~9m, the diameter of sleeve pipe than borehole wall diameter at drop ply little 2~5mm, and Sleeve opening is welded with reinforcing bar, and described implant is located in sleeve pipe.
Further, described implant is rubber wheel mole, coir rope section, wooden unit, cotton yarn and cloth.
Further, described implant surface speckles with lubricant, and described lubricant is machine oil or lead oil.
Further, described implant a length of 5~20cm.
Further, described reinforcing bar is arranged in a crossed manner.
Present invention also offers the leak stopping cylinder for fractured reservoir and plugging slurry associating blocking method, bag Include following steps:
1) determine whether fractured leakage according to mud wastage, determine drop ply position simultaneously, described The wastage of fractured leakage is 20~100m3/h;
2) when judging that above-mentioned leakage is fractured leakage, variable buckle joint will be connect on described leak stopping cylinder and float Valve;
3) by drilling rod by 10m under leak stopping cylinder G.I.H drilling well liquid level, first pour in drilling rod 300~500m drilling fluids, after pour into plugging slurry, keep during pouring into plugging slurry in drilling rod be Negative pressure state;
4), when leak stopping cylinder is lowered into drop ply well section top, at distance drop ply 30~50m, hydrophthalmia is filled, The implant that turn on pump ejects, discharges in leak stopping cylinder;
5) in drilling rod, squeeze into plugging slurry, put in place for slurry;
6) if plugging slurry returns out, close blowout preventer, pressure of spraining, continue to squeeze into plugging slurry, make implant Being directly entered fracture formation, follow-up plugging slurry follows up immediately, blocks drop ply;
7) if plugging slurry does not returns out, first calculate according to the leakage speed injecting plugging slurry amount and early stage, In anticipated well, the height of plugging slurry, rises drilling rod and gets into this height and position, adds in well head pressurization or circulation Pressure, makes implant enter drop ply with plugging slurry, thus realizes leak stopping.
Further, pressure pressure of spraining described in is less than 10MPa.
Further, the pressure of the pressurization of described well head or circulation pressurization is 3~5MPa.
Relative to prior art, the leak stopping cylinder for fractured reservoir of the present invention and plugging slurry connection Conjunction blocking method has the advantage that
Leak stopping cylinder for fractured reservoir of the present invention and plugging slurry associating blocking method, solve Leaking-stopping measure when there is severe well leakage and technical problem, be particularly suited for fractured reservoir leakage, be A kind of effective blocking method, preferably solves the circulation problems of fractured reservoir.
Accompanying drawing explanation
The accompanying drawing of the part constituting the present invention is used for providing a further understanding of the present invention, the present invention's Schematic description and description is used for explaining the present invention, is not intended that inappropriate limitation of the present invention.? In accompanying drawing:
Fig. 1 is the leak stopping cylinder for fractured reservoir described in the embodiment of the present invention and plugging slurry is combined stifled The schematic diagram of leakage method;
Fig. 2 is the leak stopping cylinder for fractured reservoir described in the embodiment of the present invention and plugging slurry is combined stifled The flow chart of leakage method.
Description of reference numerals:
1-drilling rod;2-plugging slurry;The 3-borehole wall;4-leak stopping cylinder;5-crack;6-fractured reservoir;7-fills out Fill thing.
Detailed description of the invention
It should be noted that in the case of not conflicting, the embodiment in the present invention and the spy in embodiment Levy and can be mutually combined.
In describing the invention, it is to be understood that term " " center ", " longitudinally ", " laterally ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", " end ", " interior ", " outward " It is based on orientation shown in the drawings or position relationship in the orientation indicated or position relationship, is for only for ease of Describe the present invention and simplification description rather than instruction or the device of hint indication or element must have specific Orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.Additionally, Term " first ", " second " etc. are only used for describing purpose, and it is not intended that indicate or imply relatively important Property or the implicit quantity indicating indicated technical characteristic.Thus, " first ", " second " etc. are defined Feature can express or implicitly include one or more this feature.In description of the invention In, except as otherwise noted, " multiple " are meant that two or more.
In describing the invention, it should be noted that unless otherwise clearly defined and limited, term " install ", " being connected ", " connection " should be interpreted broadly, and connect for example, it may be fixing, it is also possible to be Removably connect, or be integrally connected;Can be to be mechanically connected, it is also possible to be electrical connection;Can be straight Connect connected, it is also possible to be indirectly connected to by intermediary, can be the connection of two element internals.For For those of ordinary skill in the art, can understand that above-mentioned term is in the present invention by concrete condition Concrete meaning.
Describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
As a example by the AGCSXX well of XX oil field, the method is implemented step and is:
1) creeping into 3069m when well, find that pump pressure declines suddenly, well head loses and returns, and liquid level loses, institute Rock drilling is limestone, is judged as Fractured severe leakage according to on-the-spot wastage;
2) preparing leak stopping cylinder 4, the radius of sleeve pipe is 6-5/8 ", 2mm less than the diameter of the borehole wall 3, long Degree is 9m, and its lower end is provided with chamfering;
3) prepare implant 7, such as rubber wheel mole, coir rope section, wooden unit, cotton yarn and cloth, prepare useless Machine oil 20L, is stained with machine oil by described implant 7, a length of the 10~15cm of described implant 7;
4) the described implant 7 being stained with machine oil being filled in leak stopping cylinder 4, top actual load is full, is handed over by four reinforcing bars Fork is welded in 4 mouthfuls of leak stopping cylinder;
5) variable buckle joint and float valve are connect by leak stopping cylinder 4;
6) before going into the well, evaluating borehole liquid level is 2850m;
7), when leak stopping cylinder enters to 219m for 4 times, start to pour into drilling fluid in drilling rod 1;
8) in drilling rod 1, first pour into the isolation of 500m normal drilling fluid, after pour into plugging slurry 2, all the time Keep negative pressure state in drilling rod 1;
9), when leak stopping cylinder 4 is lowered into drop ply well section top, at 3020m, hydrophthalmia is filled, turn on pump ejects, Release cylinder inner stuffing 7;
10) squeezing into plugging slurry 2 in drilling rod 1 is 30 sides, puts in place for slurry;
11) plugging slurry 2 returns out, directly closes blowout preventer and sprains pressure, and leak stopping mud is squeezed in continuation in drilling rod 1 Slurry 2, keeps vertical and is pressed in 3~5MPa, make implant 7 be directly entered fractured reservoir 6, follow-up leak stopping mud Slurry 2 drop ply of follow-up closure immediately.
This method during operation be applicable to relatively deep-well, is bored and is met large fracture stratum 6, and circulation mistake is returned, no See the severe leakage situation of liquid level, effectively can throw in the flexibility or rigidity implant of large-size in drop ply 7, first in drop ply, play bridge formation plugging action, after follow up common plugging slurry 2, enrich and fill out crack 5 Dual measure leak stopping, effect is notable, and practicality is stronger.Before not carrying out associating leak stopping, wastage reaches 3984.2m3, cannot creep at all, after this well carries out four associating leak stopping, leakage situation substantially alleviates, Reach the requirement normally crept into.
The foregoing is only presently preferred embodiments of the present invention, not in order to limit the present invention, all at this Within the spirit of invention and principle, any modification, equivalent substitution and improvement etc. made, should be included in Within protection scope of the present invention.

Claims (8)

1. the leak stopping cylinder for fractured reservoir, it is characterised in that: include sleeve pipe and implant (7), Described its lower end is provided with chamfering;Described casing length is 7~9m, and the diameter of sleeve pipe is than the borehole wall at drop ply (3) diameter little 2~5mm, and sleeve opening are welded with reinforcing bar, and described implant (7) is located in sleeve pipe.
A kind of leak stopping cylinder for fractured reservoir the most according to claim 1, it is characterised in that: Described implant (7) is rubber wheel mole, coir rope section, wooden unit, cotton yarn and cloth.
A kind of leak stopping cylinder for fractured reservoir the most according to claim 2, it is characterised in that: Described implant (7) surface speckles with lubricant, and described lubricant is machine oil or lead oil.
A kind of leak stopping cylinder for fractured reservoir the most according to claim 2, it is characterised in that: Described implant (7) a length of 5~20cm.
A kind of leak stopping cylinder for fractured reservoir the most according to claim 1, it is characterised in that: Described reinforcing bar is arranged in a crossed manner.
6. one kind uses according to the leak stopping cylinder for fractured reservoir described in any one of Claims 1 to 5 And plugging slurry associating blocking method, it is characterised in that: comprise the steps:
1) determine whether fractured leakage according to mud wastage, determine drop ply position simultaneously, described The wastage of fractured leakage is 20~100m3/h;
2) when judging that above-mentioned leakage is fractured leakage, variable buckle joint will be connect on described leak stopping cylinder (4) And float valve;
3) by drilling rod by 10m under leak stopping cylinder (4) G.I.H drilling well liquid level, in drilling rod (1) First pour into 300~500m drilling fluids, after pour into plugging slurry (2), pouring into plugging slurry (2) mistake It is negative pressure state in journey keeps drilling rod (1);
4), when leak stopping cylinder (4) is lowered into drop ply well section top, at distance drop ply 30~50m, water is filled Eye, the implant (7) that turn on pump ejects, discharges in leak stopping cylinder (4);
5) in drilling rod (1), squeeze into plugging slurry (2), put in place for slurry;
6) if plugging slurry (2) returns out, close blowout preventer, pressure of spraining, continue to squeeze into plugging slurry (2), Making implant (7) be directly entered fractured reservoir (6), follow-up plugging slurry (2) follows up immediately, Closure drop ply;
7) if plugging slurry (2) does not returns out, first according to injecting the amount of plugging slurry (2) and early stage Leakage speed calculates, it is contemplated that the height of plugging slurry (2) in well, is risen by drilling rod (1) and gets into this height Position, in well head pressurization or circulation pressurization, makes implant (7) enter drop ply with plugging slurry (2), Thus realize leak stopping.
Leak stopping cylinder for fractured reservoir the most according to claim 6 and plugging slurry are combined stifled Leakage method, it is characterised in that pressure pressure of spraining described in: is less than 10MPa.
Leak stopping cylinder for fractured reservoir the most according to claim 6 and plugging slurry are combined stifled Leakage method, it is characterised in that: the pressure of the pressurization of described well head or circulation pressurization is 3~5MPa.
CN201610293031.XA 2016-05-05 2016-05-05 A kind of leak stopping cylinder and plugging slurry joint blocking method for fractured reservoir Active CN105971555B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610293031.XA CN105971555B (en) 2016-05-05 2016-05-05 A kind of leak stopping cylinder and plugging slurry joint blocking method for fractured reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610293031.XA CN105971555B (en) 2016-05-05 2016-05-05 A kind of leak stopping cylinder and plugging slurry joint blocking method for fractured reservoir

Publications (2)

Publication Number Publication Date
CN105971555A true CN105971555A (en) 2016-09-28
CN105971555B CN105971555B (en) 2019-03-29

Family

ID=56992452

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610293031.XA Active CN105971555B (en) 2016-05-05 2016-05-05 A kind of leak stopping cylinder and plugging slurry joint blocking method for fractured reservoir

Country Status (1)

Country Link
CN (1) CN105971555B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107722954A (en) * 2017-11-01 2018-02-23 中石化石油工程技术服务有限公司 A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
CN109538158A (en) * 2018-10-31 2019-03-29 中国石油集团川庆钻探工程有限公司 The method for improving cement slurry blocking construction success rate
CN109723404A (en) * 2019-03-04 2019-05-07 中国煤炭地质总局广东煤炭地质局勘查院 Coal measure gas prospect pit naked eye device for plugging and method
CN110439498A (en) * 2019-08-08 2019-11-12 中国石油集团渤海钻探工程有限公司 A kind of use can postpone the middle-deep well blocking method of water swelling sealing agent
CN110984887A (en) * 2019-11-12 2020-04-10 中国石油大学(北京) Drilling fluid flow guide device and drill column for plugging offshore high-temperature and high-pressure well
CN113323619A (en) * 2020-02-28 2021-08-31 中国石油化工股份有限公司 Leakage blocking method for oil and gas well
CN113775313A (en) * 2021-09-13 2021-12-10 中石化石油工程技术服务有限公司 Method for breaking cement plug in case of losing return of superficial layer
US11261692B2 (en) * 2020-04-15 2022-03-01 Saudi Arabian Oil Company Method and apparatus for identifying and remediating loss circulation zone

Family Cites Families (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2451726Y (en) * 2000-11-07 2001-10-03 张福营 Flexible sleeve plug
CN2654845Y (en) * 2003-10-24 2004-11-10 四川石油管理局川东钻探公司 Built in bag type leaking stoppage apparatus
CN2675851Y (en) * 2003-10-24 2005-02-02 四川石油管理局川东钻探公司 Leakage stopper with externally placed bag
CN100510314C (en) * 2005-10-17 2009-07-08 中国石油集团川庆钻探工程有限公司 Filling and leakage blocking process for cracking leak gravel
CN201024981Y (en) * 2007-04-24 2008-02-20 中国石油天然气股份有限公司 Physical leakage and lockage prevention under-well toll with a driller
CN101250398A (en) * 2008-03-25 2008-08-27 施晓红 Well drilling leak-proof sealing agent
GB201317626D0 (en) * 2013-10-04 2013-11-20 Schlumberger Holdings Solids in borehole fluids
CN104194748A (en) * 2014-08-06 2014-12-10 中国石油集团渤海钻探工程有限公司 Pressure-bearing plugging agent for high temperature deep well

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107722954A (en) * 2017-11-01 2018-02-23 中石化石油工程技术服务有限公司 A kind of sealing agent, leak stopping slurries and leak-blocking construction method for borehole wall fractures leakage
CN107722954B (en) * 2017-11-01 2020-03-24 中石化石油工程技术服务有限公司 Plugging agent for fractured leakage of drilling well, plugging slurry and plugging construction method
CN109538158A (en) * 2018-10-31 2019-03-29 中国石油集团川庆钻探工程有限公司 The method for improving cement slurry blocking construction success rate
CN109723404A (en) * 2019-03-04 2019-05-07 中国煤炭地质总局广东煤炭地质局勘查院 Coal measure gas prospect pit naked eye device for plugging and method
CN109723404B (en) * 2019-03-04 2024-04-16 中国煤炭地质总局广东煤炭地质局勘查院 Naked eye plugging device and method for coal gas exploration well
CN110439498A (en) * 2019-08-08 2019-11-12 中国石油集团渤海钻探工程有限公司 A kind of use can postpone the middle-deep well blocking method of water swelling sealing agent
CN110439498B (en) * 2019-08-08 2021-09-28 中国石油集团渤海钻探工程有限公司 Medium-deep well plugging method adopting plugging agent capable of delaying water absorption expansion
CN110984887A (en) * 2019-11-12 2020-04-10 中国石油大学(北京) Drilling fluid flow guide device and drill column for plugging offshore high-temperature and high-pressure well
CN113323619A (en) * 2020-02-28 2021-08-31 中国石油化工股份有限公司 Leakage blocking method for oil and gas well
CN113323619B (en) * 2020-02-28 2022-07-01 中国石油化工股份有限公司 Plugging method for oil and gas well
US11261692B2 (en) * 2020-04-15 2022-03-01 Saudi Arabian Oil Company Method and apparatus for identifying and remediating loss circulation zone
CN113775313A (en) * 2021-09-13 2021-12-10 中石化石油工程技术服务有限公司 Method for breaking cement plug in case of losing return of superficial layer

Also Published As

Publication number Publication date
CN105971555B (en) 2019-03-29

Similar Documents

Publication Publication Date Title
CN105971555A (en) Leaking stoppage barrel and leaking stoppage slurry combined leaking stoppage method specific to fractured formation
CN108060656B (en) The artificial dam body of groundwater reservoir and coal column dam body connection structure and its construction technology
CN106013259A (en) Method for plugging deformation joint of underground engineering concrete structure in vibration disturbing environment
CN108756806A (en) Pipe leakage administering method is altered outside a kind of production of hydrocarbons well casing
CN109630047A (en) Five steps for no safe pressure window fractured reservoir kill-job push back method and equipment
CN107387035A (en) Gas injection High Pressure Drain system in a kind of well
CN103982135A (en) Hole bottom water injection variable-pick multifunctional rock piercing drill of rotary digging pile machine
CN107217987A (en) Colliery flood administers well boring method
CN107869146A (en) A kind of method with clean-out machine Dewatering well
CN202215169U (en) Pump circulating construction device and in-water pile construction system
CN109083631B (en) Utilize the device and method for repairing and mending in coiled tubing repairing cementing concrete crack
CN108071376A (en) A kind of injection-production column jacket in coal bed gas well
CN106351603B (en) A kind of crack or solution cavity severe leakage blocking method and plugging material are sent into pipe string
CN106677739A (en) Perforation blasthole blocking method
CN108843371B (en) It is a kind of based on the coal seam subregion Dynamic Water Injection process for adopting release
CN103556555B (en) Reinforce the construction method of the nail shape drilled pile composite foundation structure of embankment widening
CN109707338A (en) The method of leak stopping after being missed in drilling process
CN206617152U (en) A kind of oil well work-in-progress control treatment process system
CN214576907U (en) Oil layer protection well-flushing device
CN104314564B (en) Wellhead sampling device for in-depth fluid diversion
CN107218010A (en) Broken hole drilling sleeve pipe water blockoff bridging plug and doube bridge plug shutoff method
CN208858330U (en) A kind of water pumping gas production integrating device
CN208330318U (en) Continuous impulse for general de-plugging is acidified tubing string and its continuous impulse generator
JP5857555B2 (en) Water stop method for steel sheet pile joints
WO2020245882A1 (en) Cement slurry supplying method, and borehole excavation method and cementing method using said supplying method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210918

Address after: 100007 No. 9 North Main Street, Dongcheng District, Beijing, Dongzhimen

Patentee after: CHINA NATIONAL PETROLEUM Corp.

Patentee after: CNPC Bohai Drilling Engineering Co.,Ltd.

Address before: No.106 Huanghai Road, Binhai New Economic and Technological Development Zone, Tianjin 300457

Patentee before: CNPC Bohai Drilling Engineering Co.,Ltd.