CN105970997A - Steel tower-aloft object prefabricated compound assembled suit pile foundation and manufacturing method thereof - Google Patents

Steel tower-aloft object prefabricated compound assembled suit pile foundation and manufacturing method thereof Download PDF

Info

Publication number
CN105970997A
CN105970997A CN201610387105.6A CN201610387105A CN105970997A CN 105970997 A CN105970997 A CN 105970997A CN 201610387105 A CN201610387105 A CN 201610387105A CN 105970997 A CN105970997 A CN 105970997A
Authority
CN
China
Prior art keywords
inorganic gel
reinforced concrete
gel mixture
steel
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610387105.6A
Other languages
Chinese (zh)
Other versions
CN105970997B (en
Inventor
李夏
余利静
陈波
刘宇君
任聪
王虹
张大鹏
张涛
张琪玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610387105.6A priority Critical patent/CN105970997B/en
Publication of CN105970997A publication Critical patent/CN105970997A/en
Application granted granted Critical
Publication of CN105970997B publication Critical patent/CN105970997B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ

Abstract

The invention discloses a steel tower-aloft object prefabricated compound assembled suit pile foundation. The steel tower-aloft object prefabricated compound assembled suit pile foundation comprises a bottom layer reinforced concrete prefabricated piece provided with a plurality of casing pipes with threads; a thread fixing piece is installed in each casing pipe; the multiple thread fixing pieces are sequentially provided with a plurality of inorganic cementitious mixture tamping layers, middle reinforced concrete prefabricated pieces and top reinforced concrete prefabricated pieces from bottom to top, and the inorganic cementitious mixture tamping layers, the middle reinforced concrete prefabricated pieces and the top reinforced concrete prefabricated pieces are installed at intervals; strengthening thread fixing pieces are arranged between the top reinforced concrete prefabricated pieces and the middle reinforced concrete prefabricated pieces on the uppermost layer; the top reinforced concrete prefabricated pieces are provided with fasteners used for fixing the thread fixing pieces and the strengthening thread fixing pieces; rib rings and rib plates are arranged in all the inorganic cementitious mixture tamping layers or only rib plates are arranged in all the inorganic cementitious mixture tamping layers; and the upper side and the lower side of the first inorganic cementitious mixture tamping layer are each provided with pure lime or a pure cement layer. The construction process is simple and convenient, prefabricated suits are modularized and factorized, the construction period is substantially shortened, the construction cost is substantially reduced, and low carbon and environmental protection are achieved.

Description

A kind of steel towers thing prefabricated complex group assembling kit pile foundation and preparation method thereof
Technical field
The present invention relates to a kind of pile foundation, particularly relate to a kind of steel and tower thing prefabricated complex group assembling kit stake Basis and preparation method thereof.
Background technology
The steel thing that towers is a kind of utility model steel tower, few with specious floor space, cost performance high and Used by vast construction unit, such as communication apparatus signal tower, electric power transmission tower, large-scale street lamp and height Speed highway sign board is applied, and owing to using traditional handicraft and method for designing, basis and the pedestal of tower are adopted more With cast-in-situ steel reinforced concrete bored concrete pile or raft foundation, whole construction period about 35 days, in city or main Arterial highway is bigger owing to long construction period affects aspect, it has also become the bottleneck of such project under construction and a difficult problem.
Summary of the invention
The present invention is to solve above-mentioned technical problem, it is provided that a kind of steel towers thing prefabricated complex group encapsulation Part pile foundation and preparation method thereof, uses prefabricated external member Assembling and welding, and work progress is simple and convenient, Prefabricated external member modularity, batch production, construction period significantly shortens, and construction cost is greatly reduced, low carbocyclic ring Protect.
The present invention is to be achieved through the following technical solutions:
A kind of steel towers thing prefabricated complex group assembling kit pile foundation, including being embedded in installing hole bottom centre The bottom layer of the reinforcing steel precast concrete of position, bottom layer of the reinforcing steel precast concrete is vertically provided with multiple band spiral shell The antiseptic and rustproof sleeve pipe of stricture of vagina, is mounted on antiseptic and rustproof threaded fasteners, multiple spiral shells in each sleeve pipe From bottom to top, the first inorganic gel mixture compacting layer it is sequentially installed with, for fixing on stricture of vagina fixture And the first middle reinforced concrete precast member of strengthened thread fixture vertical rigidity, the second inorganic gel mix Compound compacting layer, the second middle reinforced concrete precast member, the 3rd inorganic gel mixture compacting layer and Top rebars precast concrete, top rebars precast concrete and the second middle armored concrete are prefabricated It is additionally provided with the antiseptic and rustproof strengthened thread through the 3rd inorganic gel mixture compacting layer between part to fix Part, top rebars precast concrete is provided with and fixes for fixing threaded fasteners and strengthened thread The antiseptic and rustproof securing member of part, the first inorganic gel mixture compacting layer and the second inorganic gel mix Thing compacting layer is equipped with gilled rings and floor, the 3rd inorganic gel mixture compacting layer is provided with floor, the One inorganic gel mixture compacting layer be equipped with pure white ash or pure water mud layer, wherein, bottom layer of the reinforcing steel up and down Precast concrete, the first middle reinforced concrete precast member, the second middle reinforced concrete precast member and Top rebars precast concrete is the circular reinforced concrete precast member of a diameter of 1m~3m, bottom The thickness of reinforced concrete precast member and top rebars precast concrete is 100~3000mm, in first Between the thickness of reinforced concrete precast member and the second middle reinforced concrete precast member be 100~2000mm.
The threaded sleeve pipe of at least six is uniformly offered on described bottom layer of the reinforcing steel precast concrete, and Multiple sleeve pipes are along central point.
12 threaded sleeve pipes are uniformly offered on described bottom layer of the reinforcing steel precast concrete, and many Individual sleeve pipe is along central point.
Described threaded fasteners, strengthened thread fixture are the screw rod that radius is different, and gilled rings is reinforced steel bar ring, Floor is steel plate dish.
Along many in the first described inorganic gel mixture compacting layer and the second inorganic gel mixture compacting layer Individual threaded fasteners outer ring is repeated in being provided with two reinforced steel bar rings and a reinforcing bar dish, and the 3rd inorganic gel is mixed Compound compacting layer is provided with multiple reinforcing bar dish along multiple threaded fasteners outer rings.
Reinforced concrete precast member includes floor, lower floor, the double-deck netted steel bar layer in bottom, top pair Layer steel mesh reinforcement layer, steel reinforcement cage and sleeve pipe;Vertically it is fixed with many between described upper floor and lower floor Individual antiseptic and rustproof sleeve pipe, casing shoe is provided with the double-deck netted steel bar layer in bottom, and cannula tip is provided with The double-deck netted steel bar layer in top, is provided with between the double-deck netted steel bar layer of the double-deck netted steel bar layer in top and bottom It is coated on the steel reinforcement cage of set outer tube layer.
A kind of steel based on described pile foundation towers thing prefabricated complex group assembling kit pile foundation making side Method, comprises the following steps:
1) every at the smooth bottom layer of the reinforcing steel precast concrete being positioned at installing hole bottom centre position Individual sleeve pipe all fixedly mounts threaded fasteners, and compacting compacting around bottom layer of the reinforcing steel precast concrete The inorganic gel mixture that coefficient is more than or equal to 0.94 and unit weight is not less than 18KN;
2) levelling to bottom layer of the reinforcing steel precast concrete and inorganic gel mixture by level indicator, then lay The pure white ash of 30mm thickness or striaght cement, and the most levelling;
3) the first inorganic gel mixture is laid on pure white ash after levelling or striaght cement, and the most levelling; And along interval, multiple threaded fasteners outer rings, multiple gilled rings and multiple are installed in the first inorganic gel mixture Floor, then installs the pure white ash of 20mm or striaght cement and successively on the first inorganic gel mixture top One middle reinforced concrete precast member;
4) on the first middle reinforced concrete precast member, lay the second inorganic gel mixture, and again look for Flat;And in the second inorganic gel mixture along multiple threaded fasteners outer rings interval install multiple gilled rings and Multiple floors, then install the second middle reinforced concrete precast member on the second inorganic gel mixture top;
5) strengthened thread fixture is installed on the second middle reinforced concrete precast member, at the second middle steel The 3rd inorganic gel mixture is laid on reinforced concrete prefabricated component, and the most levelling;And in the 3rd inorganic glue Solidifying mixture installs multiple floors, then at the 3rd inorganic gel along interval, multiple threaded fasteners outer rings Top rebars precast concrete is installed on mixture top;Then pacify on top rebars precast concrete Dress is for fixing threaded fasteners and the securing member of strengthened thread fixture.
Bottom layer of the reinforcing steel precast concrete, the first middle reinforced concrete precast member, the second middle reinforcing bar are mixed Solidifying soil prefabricated component and the preparation method of top rebars precast concrete:
1) by threaded sleeve pipe through upper floor and lower floor, then by upper floor, lower floor respectively with Sleeve pipe welds;
2) in step 1) welded reinforcement cage on the basis of the component that formed, the double-deck netted steel bar layer in top and The double-deck netted steel bar layer in bottom forms reinforced concrete precast member cage bone;
3) reinforced concrete precast member cage bone is put in precast concrete mould, fill rammed concrete Form reinforced concrete precast member;
In step 1) before the method also include:
1) bottom layer of the reinforcing steel precast concrete is lifted to installing hole bottom centre position, and ensure bottom steel The flatness of reinforced concrete prefabricated component.
Described step 3) particularly as follows:
Lay two step the first inorganic gel mixtures on pure white ash after levelling or striaght cement, and again look for Flat;After levelling, smooth for gilled rings is inserted in bottom multiple threaded fasteners, is directed at bottom layer of the reinforcing steel coagulation It is welded and fixed after soil prefabricated component;Then on gilled rings, lay the first inorganic gel mixture in two steps, And the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and carry out It is welded and fixed;The first inorganic gel mixture is laid again in two steps on another gilled rings, and the most levelling; Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;More than repetition Step;Then the pure white ash of 20mm or striaght cement and are installed successively on the first inorganic gel mixture top One middle reinforced concrete precast member, and ensure that each sleeve pipe of the first middle reinforced concrete precast member divides Dui Qi not be inserted in multiple threaded fasteners;Wherein, the thickness of a step is 150mm;
Step 4) particularly as follows:
First middle reinforced concrete precast member lays two step the second inorganic gel mixtures, and again Levelling;By smooth being inserted in multiple threaded fasteners of gilled rings after levelling, it is directed at bottom layer of the reinforcing steel coagulation It is welded and fixed after soil prefabricated component;Then on gilled rings, lay the second inorganic gel mixture in two steps, And the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and carry out It is welded and fixed;The second inorganic gel mixture is laid again in two steps on another gilled rings, and the most levelling; Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;More than repetition Step;Then on the second inorganic gel mixture top, the second middle reinforced concrete precast member is installed, and Ensure that each sleeve pipe of the second middle reinforced concrete precast member aligns respectively and be inserted in multiple threaded fasteners In;Wherein, the thickness of a step is 150mm;
Step 5) particularly as follows:
At the distance second above 200mm of middle reinforced concrete precast member, A level structure anchor adhesive is noted Enter the centre bore of the second middle reinforced concrete precast member, and in centre bore, be screwed into 300mm install and add Strong threaded fasteners, then lays step a 3rd inorganic gel mixture, and levelling;By a floor pair Steadily call in bottom after accurate multiple threaded fasteners and strengthened thread fixture to be welded and fixed;Then exist The 3rd inorganic gel mixture is laid in two steps on floor, and the most levelling;The most again by a floor Steadily call in bottom after being directed at multiple threaded fasteners and strengthened thread fixture to be welded and fixed, then Floor is laid the 3rd inorganic gel mixture in two steps, and the most levelling, repeatedly this step; Then on the floor of upper strata, a point step lays the 3rd inorganic gel mixture, and the most levelling, in triplicate This step;Then top rebars precast concrete is installed on the top of the 3rd inorganic gel mixture, and In its sleeve pipe, A level structure anchor adhesive is first injected, on top when installing top rebars precast concrete Portion's reinforced concrete precast member backing plate installed above, and the multiple threaded fasteners on backing plate and strengthen spiral shell Installing nut on stricture of vagina fixture and contain pad, wherein, the thickness of a step is 150mm;
Step 1) also include: before threaded fasteners being installed in each sleeve pipe, sleeve pipe injects A Level structure anchor adhesive, all fixedly mounts threaded fasteners the most again in each sleeve pipe, is wherein screwed It is 350mm-450mm that part is screwed into the degree of depth.
Described inorganic gel mixture, the first inorganic gel mixture, the second inorganic gel mixture with And the 3rd inorganic gel mixture be 3: 7 dirt mixtures or 3: 7 soil cement mixtures.
Compared with prior art, the present invention has a following useful technique effect:
The present invention applies prefabricated complex group assembling kit in steel towers thing foundation construction so that construction period Significantly shortening (on about 35 working days of traditional construction cycle, applies this pile foundation to make the integral construction cycle big Width shortens needs 1 working day, the reduction of erection time 93%);Reduce material consumption, cost-effective, reduce construction Cost about 40%;Low-carbon environment-friendly, energy-saving and cost-reducing, apply this pile foundation to be greatly decreased construction surrounding enviroment Pollute, demand to concrete and interference to periphery are greatly decreased, are not affected by winter construction; Technique, operation realize standardization.
Accompanying drawing explanation
Fig. 1 towers thing prefabricated complex group assembling kit pile foundation structure schematic diagram for the steel that the present invention provides;
Fig. 2 towers the thing prefabricated complex group another structural representation of assembling kit pile foundation for the steel that the present invention provides Figure;
Fig. 3 is the 1-1 profile of Fig. 1;
Fig. 4 is the 2-2 profile of Fig. 1;
Fig. 5 is reinforced concrete precast member structural representation one;
Fig. 6 is reinforced concrete precast member structural representation two.
Wherein, 1 is bottom layer of the reinforcing steel precast concrete;2 is the first middle reinforced concrete precast member;3 For top rebars precast concrete;4 is threaded fasteners;5 is strengthened thread fixture;6 is first Inorganic gel mixture compacting layer;7 is gilled rings;8 is floor;9 is that the second middle armored concrete is prefabricated Part;10 is the second inorganic gel mixture compacting layer;11 is the 3rd inorganic gel mixture compacting layer;12 For upper floor;13 is lower floor;14 is the double-deck netted steel bar layer in bottom;15 is top bilayer net-shaped steel Muscle layer;16 is steel reinforcement cage;17 is sleeve pipe.
Detailed description of the invention
Below in conjunction with specific embodiment, the present invention is described in further detail, described in be to the present invention Explanation rather than restriction.
Seeing Fig. 1 to Fig. 4, a kind of steel towers thing prefabricated complex group assembling kit pile foundation, including embedding In the bottom layer of the reinforcing steel precast concrete 1 of installing hole bottom centre position, bottom layer of the reinforcing steel precast concrete 1 On be vertically provided with multiple threaded antiseptic and rustproof sleeve pipe, each sleeve pipe is mounted on antiseptic and rustproof Threaded fasteners 4, multiple threaded fasteners 4 are sequentially installed with the first inorganic gel from bottom to top Mixture is tamped layer 6, is mixed for fixing and strengthened thread fixture 4 vertical rigidity the first middle reinforcing bar Solidifying soil prefabricated component the 2, second inorganic gel mixture compacting layer the 10, second middle reinforced concrete precast member 9, the 3rd inorganic gel mixture compacting layer 11 and top rebars precast concrete 3, top rebars It is additionally provided with through the 3rd inorganic glue between precast concrete 3 and the second middle reinforced concrete precast member 9 The antiseptic and rustproof strengthened thread fixture 5 of solidifying mixture compacting layer 11, top rebars precast concrete The antiseptic and rustproof fastening for fixing threaded fasteners 4 and strengthened thread fixture 5 it is provided with on 3 Part, the first inorganic gel mixture compacting layer 6 and the second inorganic gel mixture compacting layer 10 are all provided with Having gilled rings 7 and floor 8, be provided with floor 8 in the 3rd inorganic gel mixture compacting layer 11, first is inorganic Gelling mixture compacting layer 6 be equipped with pure white ash or pure water mud layer, wherein, bottom layer of the reinforcing steel coagulation up and down Soil prefabricated component 1, first middle reinforced concrete precast member the 2, second middle reinforced concrete precast member 9 With the circular reinforced concrete precast member that top rebars precast concrete 3 is a diameter of 1m~3m, The thickness of bottom layer of the reinforcing steel precast concrete 1 and top rebars precast concrete 3 is 100~3000mm, The thickness of the first middle reinforced concrete precast member 2 and the second middle reinforced concrete precast member 9 is 100~2000mm.
Further, described bottom layer of the reinforcing steel precast concrete 1 uniformly offers at least six band spiral shell The sleeve pipe of stricture of vagina, and multiple sleeve pipe is along central point.
Concrete, described bottom layer of the reinforcing steel precast concrete 1 uniformly offers 12 threaded Sleeve pipe, and multiple sleeve pipe is along central point, its bearing capacity of do so pile foundation out is high, fixed stably Fixed;The first described inorganic gel mixture compacting layer 6 and the second inorganic gel mixture compacting layer 10 Middle it is repeated in being provided with two reinforced steel bar rings and a reinforcing bar dish, the 3rd nothing along multiple threaded fasteners 4 outer rings Machine gelling mixture compacting layer 11 is provided with multiple reinforcing bar dish along multiple threaded fasteners 4 outer rings.
Wherein, described threaded fasteners 4, strengthened thread fixture 5 are the screw rod that radius is different, rib Ring 7 is reinforced steel bar ring, and floor 8 is steel plate dish.Owing to the requirement to support force at top is high, therefore on top It is additionally provided with strengthened thread between portion's reinforced concrete precast member 3 and the second inorganic gel mixture compacting layer 10 Fixture 5, further improves by arranging the strengthened thread fixture 5 of large radius and ensure that whole The vertical rigidity of pile foundation.
It should be noted that reinforced concrete precast member and each prefabricated external member all use multiple reinforcing bar and mix Solidifying soil makes.
Concrete, see Fig. 5-Fig. 6, reinforced concrete precast member include floor 12, lower floor 13, The double-deck netted steel bar layer 14 in bottom, the double-deck netted steel bar layer 15 in top, steel reinforcement cage 16 and sleeve pipe 17;Institute Multiple antiseptic and rustproof sleeve pipe 17, sleeve pipe vertically it is fixed with between upper floor 12 and the lower floor 13 stated 17 bottoms are provided with the double-deck netted steel bar layer 14 in bottom, and sleeve pipe 17 top is provided with top bilayer net-shaped steel Muscle layer 15, is provided with between the double-deck netted steel bar layer 14 of the double-deck netted steel bar layer 15 in top and bottom and is coated on The steel reinforcement cage 16 of sleeve pipe 17 outer layer.
Seeing Fig. 2, a kind of steel based on pile foundation described above towers thing prefabricated complex group assembling kit Pile foundation manufacture method, comprises the following steps:
1) bottom layer of the reinforcing steel precast concrete is lifted to installing hole bottom centre position, and ensure bottom steel The flatness of reinforced concrete prefabricated component.
2) in each sleeve pipe of bottom layer of the reinforcing steel precast concrete, threaded fasteners is all fixedly mounted, and More than or equal to 0.94 and unit weight is not less than 18KN to tamp compacting factor around bottom layer of the reinforcing steel precast concrete Inorganic gel mixture.Wherein, before threaded fasteners being installed in each sleeve pipe, note in sleeve pipe Enter A level structure anchor adhesive, in each sleeve pipe, all fixedly mount threaded fasteners, wherein screw thread the most again It is 350mm-450mm that fixture is screwed into the degree of depth.
3) levelling to bottom layer of the reinforcing steel precast concrete and inorganic gel mixture by level indicator, then lay The pure white ash of 30mm thickness or striaght cement, and the most levelling.
4) two step the first inorganic gel mixtures are laid on pure white ash after levelling or striaght cement, and again Levelling;Being inserted in bottom multiple threaded fasteners by smooth for gilled rings after levelling, alignment bottom layer of the reinforcing steel mixes It is welded and fixed after solidifying soil prefabricated component;Then on gilled rings, lay the first inorganic gel mixture in two steps, And the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and carry out It is welded and fixed;The first inorganic gel mixture is laid again in two steps on another gilled rings, and the most levelling; Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;More than repetition Step;Then the pure white ash of 20mm or striaght cement and are installed successively on the first inorganic gel mixture top One middle reinforced concrete precast member 2, and ensure each set of the first middle reinforced concrete precast member 2 Pipe aligns respectively and is inserted in multiple threaded fasteners 4;Wherein, the thickness of a step is 150mm.
5) on the first middle reinforced concrete precast member 2, two step the second inorganic gel mixtures are laid, and The most levelling;By smooth being inserted in multiple threaded fasteners of gilled rings after levelling, it is directed at bottom layer of the reinforcing steel It is welded and fixed after precast concrete;Then on gilled rings, lay the second inorganic gel mix in two steps Thing, and the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and It is welded and fixed;The second inorganic gel mixture is laid again in two steps on another gilled rings, and again Levelling;Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;Weight Multiple above step;Then on the first inorganic gel mixture top, the second middle armored concrete is installed prefabricated Part 9, and ensure that each sleeve pipe of the second middle reinforced concrete precast member 2 aligns respectively and be inserted in multiple spiral shell In stricture of vagina fixture 4;Wherein, the thickness of a step is 150mm.
6) at distance second middle reinforced concrete precast member more than 9 200mm, A level structure is anchored Glue injects the centre bore of the second middle reinforced concrete precast member 9, and is screwed into 300mm in centre bore Strengthened thread fixture 5 is installed, then lays step a 3rd inorganic gel mixture, and levelling;By one Individual floor is steadily called in bottom and is welded after being directed at multiple threaded fasteners 4 and strengthened thread fixture 5 Fixing;Then on floor, lay the 3rd inorganic gel mixture in two steps, and the most levelling;The most again Secondary floor is directed at multiple threaded fasteners 4 and strengthened thread fixture 5 after steadily call in bottom and enter Row is welded and fixed, and then lays the 3rd inorganic gel mixture on floor in two steps, and the most levelling, Repeatedly this step;Then point step laying a 3rd inorganic gel mixture on the floor of upper strata, and again Secondary levelling, this step in triplicate;Then top rebars is installed on the top of the 3rd inorganic gel mixture Precast concrete 3, and first inject in its sleeve pipe when installing top rebars precast concrete 3 A level structure anchor adhesive, at top rebars precast concrete 3 backing plate installed above, and on backing plate Nut is installed containing pad, wherein, the thickness of a step in multiple threaded fasteners 4 and strengthened thread fixture 5 Degree is 150mm.
Wherein, described inorganic gel mixture, the first inorganic gel mixture, the second inorganic gel are mixed Compound and dirt mixture that the 3rd inorganic gel mixture is 3: 7 or the soil cement mixture of 3: 7.
Further, bottom layer of the reinforcing steel precast concrete, the first middle reinforced concrete precast member, second Middle reinforced concrete precast member and the preparation method of top rebars precast concrete:
1) by threaded sleeve pipe 17 through upper floor 12 and lower floor 13, then by upper floor 12, Lower floor 13 welds with sleeve pipe 17 respectively;
2) in step 1) welded reinforcement cage 16, the double-deck netted steel bar layer in top on the basis of the component that formed 15 and the double-deck netted steel bar layer 14 in bottom form reinforced concrete precast member cage bone;
3) reinforced concrete precast member cage bone is put in precast concrete mould, fill rammed concrete Form reinforced concrete precast member.
Material explanation in the present invention:
Bottom layer of the reinforcing steel precast concrete in the present invention, the first middle reinforced concrete precast member, second Middle reinforced concrete precast member and top rebars precast concrete, in material be: concrete Being numbered C40, reinforcing bar is grade III steel, and material all should meet corresponding code requirement;
Screw rod uses round steel: 45# high intensity carbon structural steels, nut hardness level is 8.8.Before steel are marched into the arena Antiseptic and rustproof process should be carried out and meet design and related specifications requirement.
It should be noted that concrete label, reinforcing bar model and thickness for precast concrete can be adjusted Whole, 3: 7 dirt mixtures or 3: 7 soil cement mixtures can use other Binder Materials;Screw diameter can To tune up;Prefabricated components are possible with other shapes such as square or rhombus.
The design principle of the present invention:
1. make bottom layer of the reinforcing steel precast concrete, by 12 (particular number should design and become) reinforcing bar spiral shells Bar is screwed in bottom layer of the reinforcing steel precast concrete, is screwed into the degree of depth and is specifically shown in design requirement;This bottom layer of the reinforcing steel mixes Solidifying soil prefabricated component is equivalent to base and forms build-in point, by screw rod fixation;
2., after screw rod fixation, tamp 3: 7 dirt mixs at bottom layer of the reinforcing steel precast concrete higher slice Thing or 3: 7 soil cement mixtures, compacted thickness is generally 1.5~about 2m;Degree of compaction and unit weight are intended to reach To design requirement;In 3: 7 dirt mixtures or 3: 7 soil cement mixture work progress, every two steps set Put gilled rings or floor, for standing screw and reinforcement screw rod vertical rigidity;This region arranges and makes 3: 7 dirt Mixture or 3: 7 soil cement mixtures serve interconnection function;
3. after first area 3: 7 dirt mixture or 3: 7 soil cement mixtures are constructed, by first Between reinforced concrete precast member be inserted in screw rod, this prefabricated external member is in order to increase the vertical rigidity in whole region;
4. construction second area 3: 7 dirt mixture or 3: 7 soil cement mixtures, work progress and effect are shown in 2nd step;
5. top rebars precast concrete is inserted in screw rod, then uses bolt fixation, construct complete;
Shown in the structure chart See Figure 2 of the most whole pile body:
The Specific construction technique of the present invention sees Fig. 2:
Wherein, F1 component is bottom layer of the reinforcing steel precast concrete 1;F2 component is 12 a diameter of 36mm Screw rod;F3, F4 are reinforced steel bar ring;F5 is steel plate dish;F6, F7 are reinforced steel bar ring;F8 is steel plate dish; F9 is reinforced steel bar ring;F10 is the first middle reinforced concrete precast member 2;F11, F12 are reinforced steel bar ring;F13 For steel plate dish;F14, F15 are reinforced steel bar ring;F16 is steel plate dish;F17 is the second middle armored concrete Prefabricated component;F18~F24 is steel plate dish;F25 is 50 screw rods;F26 is top rebars precast concrete; F27 is backing plate;F28 is that 50 nuts are containing pad;F29 is that 36 nuts are containing pad;F30 be pure white ash or Striaght cement;First inorganic gel mixture compacting layer is first area;Second inorganic gel mixture compacting Layer is second area;3rd inorganic gel mixture compacting layer is the 3rd region.
1. preparation of construction
Survey data with passing through after entering job site, design drawing determines arrangement and method for construction, enters workmen Row safety measure and technical measures are told somebody what one's real intentions are, to the clear and definite dangerous spot of workmen and the precautionary measures.Job site Smooth location, determines job site scope, carry out pinpointing, levelling, measurement, unwrapping wire, electric adjustable is installed Fortune support, after checking that support firmly installs, continue power supply unit, checks that power supply unit is for defeated safety.Right Multiple prefabricated external member construction hoistings order is numbered.
2. pore-forming
1. it is ensured that pore-forming round dot and design drawing pile center's point deviation are not more than 50mm (reference during pore-forming " building pile foundation specification " relevant criterion), the every 300mm of hand digging, once correct.
2. safety event during pore-forming should refer to the requirement of " technical code for building pile foundation " relevant corresponding safety;
3. tackle hole wall after pore-forming completes and carry out smooth, check whether hole wall has and loosen or abnormal phenomena, enter Dangerous spot is processed by row hole wall construction of prevention work (seeing existing " technical code for building pile foundation ") in time;
4. measure hole depth the most qualified, measure qualified after, carry out each 15 centimeter of 3: the 7 dirt mix of two steps Thing or the compacting of 3: 7 soil cement mixtures, compacted coefficient 0.94 (is wanted with reference to " technical code for building pile foundation " Ask);
5. level measurement dirt flatness, carries out pre-shift meeting view, carries out Analysis about Dangerous Point and make after measurement Determine solution, all prefabricated external member inspections and numbering are checked.
The lifting of the most prefabricated external member
Lifting sequence before and after prefabricated external member is numbered, refers to Fig. 2, F1 component is steadily lifted to hole Bottom centre position, uses level measurement degree of plainness for structural memer, to a sleeve pipe on F1 component after inspection Inject A level structure anchor adhesive and rapidly in F2 diameter 36mm screw rod be screwed into F1 component 350mm (other sleeve pipe ways are by that analogy), by whole for F2 screw rods, below i.e. 12 screw rods, all it is called for short F2, Check after being all screwed into F1 component.Then point 4 steps by 3: the 7 dirt mixtures of 150mm or 37 soil cement mixtures are tamped around F1 component, it should be noted that 3: 7 dirt mixtures or 3: 7 All being called for short dirt mixture below soil cement mixture, the construction of dirt mixture answers back-filling in layers layering to ram Real, often step is not to be exceeded 150mm, and virtual resurfacing thickness is less than 250mm, and dirt mixture has been constructed Its compacting factor rear should be greater than equal to 0.94, and unit weight is no less than 18KN;Remaining matters sees " building Basic design specification of the foundation " regulation, processed inspection after use level indicator inspection.Use level indicator Levelling with dirt mixture entirety to component, lay pure white ash or striaght cement F3030mm, level indicator is looked for Lay two steps each 150mm dirt mixture after flat inspection is errorless, then use level indicator to carry out flatness Checking, be inserted in bottom F2 by smooth for F3 component, after alignment F1 component, alignment F3 red-label is carried out Spot welding, butt welding point carries out an acceptance inspection.Lay and tamp 150mm dirt mixture in two steps, wherein, F4, F6, F7, F9 and F3 with standard with construction method.Level indicator checks flatness, by F5 Component is smooth is inserted in F2, puts into bottom, checks errorless rear laying two steps each 150mm dirt mixture, F8 Yu F5, with the same construction method of standard, uses level indicator to carry out 20mm after carrying out flatness inspection pure white Ash or striaght cement are laid.Level indicator is used to carry out flatness inspection, by 12 sleeve pipes pair of F10 component It is inserted in respectively in F2 component together, hangs in bottom gently, use level indicator to check whether smooth, and to flat Whole degree is adjusted.Lay in two steps and tamp 150mm dirt mixture, by smooth for F11 component set Enter F2, put into bottom, check F11 component and dirt integral smoothness, wherein, F11, F12, F14, F15 construction method same F3, F4, F6, F7, F9 lay.Level indicator is used to check flatness, It is inserted in F2 by smooth for F13 component, wherein, F13, F16 construction method same F5, F8.Hang in F17, By its 12 sleeve pipe alignment each screw rods of F2, hang in the above 200mm of distance F17 member bottom section gently, will A level structure anchor adhesive injects F17 centre bore.Hang in F25 component, distance F17 component 200mm gently Injecting structure glue, steadily lifts F25 component to F17 member center, is screwed into 300mm, passed examination After, carry out a step 150mm dirt mixture and lay compacting, use level indicator to check flatness, by F18 In 13 holes alignment F2 and F25 steadily hang in bottom, F2 and F25 is carried out 13 with F18 component The welding of solder joint.Lay and tamp 150mm dirt mixture the most in two steps, use level indicator inspection Flatness, F19~F24 construction method is identical with F18, and wherein between F19 to F23, dirt mixture is thick Degree is two steps, often step thickness 150mm;Between F23~F25, dirt mixture thickness is a step, thick Degree 150mm.Steadily hang in F26 component, be directed at F2 and F25 screw rod, 200mm bottom distance installation Place, injects A level structure anchor adhesive in 13 sleeve pipes of F26 component, F26 is directed at F2 and F25 Each screw rod puts into bottom, uses level indicator to check flatness, steadily hangs in F27 component, alignment F2 and F25 screw rod, puts into F27 bottom, then F28 is screwed into rapidly F25, then is screwed into by F29 successively F2.The steel beam column wrapping up of leaking outside is wiped with machinery oil.Check and collator, recover job site original appearance, Construction terminates.
The method have the advantages that
1.. the logical height of original design reinforced concrete structure is arranged, and additionally also sets up 18 not less than 1.9M length Pre embedded bolt, armored concrete about 22m3;Logical for screw rod height is only arranged by existing design, armored concrete Structure 3m3, remaining employing 3: 7 dirt mixtures or 3: 7 soil cement mixtures, armored concrete consumption subtracts Few, construction costs reduces;
2.. original being designed with cast-in-place, needing to wait for 28 day curing period can enter next procedure, uses pre- Disposably install after can entering job site after structure external member processed, shorten concrete setting and censorship phase, Shorten construction period;Do not affected by winter construction;
The most original design need to tie up reinforcing bar casting concrete at the scene, and occupied ground pollutes environment and is likely to result in Disturbing residents, existing design directly lifts welding.Have occupation of land less, pollute less, the feature such as noise is little;
This invention has short construction period in sum, and operating expenses is few, technique process standardization, low carbocyclic ring Protect, save the advantages such as the energy, important technical innovation and creation should be belonged to.
The present invention applies prefabricated complex group assembling kit in steel towers thing foundation construction so that construction period Significantly shortening (on about 35 working days of traditional construction cycle, applies this pile foundation to make the integral construction cycle big Width shortens needs 1 working day, the reduction of erection time 93%);Reduce material consumption, cost-effective, reduce construction Cost about 40%;Low-carbon environment-friendly, energy-saving and cost-reducing, apply this pile foundation to be greatly decreased construction surrounding enviroment Pollute, demand to concrete and interference to periphery are greatly decreased, are not affected by winter construction; Technique, operation realize standardization.Meanwhile, ensure that whole screw rod perpendicularity by the circular orientation of gilled rings, And stability and the water proofing property of whole pile foundation is ensure that by the anticorrosion of screw rod and sleeve pipe and bonding.
The ultimate principle of the present invention and principal character and advantages of the present invention have more than been shown and described.One's own profession Skilled person will appreciate that of industry, the present invention is not restricted to the described embodiments, above-described embodiment and explanation The principle that the present invention is simply described described in book, without departing from the spirit and scope of the present invention, The present invention also has various changes and modifications, and these changes and improvements both fall within claimed invention model In enclosing.Claimed scope is defined by appending claims and equivalent thereof.

Claims (10)

1. a steel towers thing prefabricated complex group assembling kit pile foundation, it is characterised in that include being embedded in The bottom layer of the reinforcing steel precast concrete (1) of installing hole bottom centre position, bottom layer of the reinforcing steel precast concrete (1) vertically it is provided with multiple threaded antiseptic and rustproof sleeve pipe on, each sleeve pipe is mounted on anticorrosion and prevents The threaded fasteners (4) of rust, multiple threaded fasteners are sequentially installed with first on (4) from bottom to top Inorganic gel mixture compacting layer (6), for the of fixing and strengthened thread fixture (4) vertical rigidity One middle reinforced concrete precast member (2), the second inorganic gel mixture compacting layer (10), the second centre Reinforced concrete precast member (9), the 3rd inorganic gel mixture compacting layer (11) and top rebars are mixed Solidifying soil prefabricated component (3), top rebars precast concrete (3) and the second middle reinforced concrete precast member (9) the antiseptic and rustproof reinforcement spiral shell through the 3rd inorganic gel mixture compacting layer (11) it is additionally provided with between Stricture of vagina fixture (5), top rebars precast concrete (3) is provided with for fixing threaded fasteners (4) And the antiseptic and rustproof securing member of strengthened thread fixture (5), the first inorganic gel mixture compacting layer (6) and the second inorganic gel mixture compacting layer (10) is equipped with gilled rings (7) and floor (8), Being provided with floor (8) in 3rd inorganic gel mixture compacting layer (11), the first inorganic gel mixture rams Real layer (6) be equipped with pure white ash or pure water mud layer up and down, wherein, bottom layer of the reinforcing steel precast concrete (1), First middle reinforced concrete precast member (2), the second middle reinforced concrete precast member (9) and top steel Reinforced concrete prefabricated component (3) is the circular reinforced concrete precast member of a diameter of 1m~3m, bottom steel The thickness of reinforced concrete prefabricated component (1) and top rebars precast concrete (3) is 100~3000mm, First middle reinforced concrete precast member (2) and the thickness of the second middle reinforced concrete precast member (9) It is 100~2000mm.
Steel the most according to claim 1 towers thing prefabricated complex group assembling kit pile foundation, its feature It is, described bottom layer of the reinforcing steel precast concrete (1) uniformly offers the threaded set of at least six Pipe, and multiple sleeve pipe is along central point.
Steel the most according to claim 2 towers thing prefabricated complex group assembling kit pile foundation, its feature It is, described bottom layer of the reinforcing steel precast concrete (1) uniformly offers 12 threaded sleeve pipes, And multiple sleeve pipe is along central point.
Steel the most according to claim 1 towers thing prefabricated complex group assembling kit pile foundation, its feature Being, described threaded fasteners (4), strengthened thread fixture (5) are the screw rod that radius is different, rib Ring (7) is reinforced steel bar ring, and floor (8) is steel plate dish.
Steel the most according to claim 4 towers thing prefabricated complex group assembling kit pile foundation, its feature It is, the first described inorganic gel mixture compacting layer (6) and the second inorganic gel mixture compacting layer (10) it is repeated in along multiple threaded fasteners (4) outer ring in being provided with two reinforced steel bar rings and a reinforcing bar dish, 3rd inorganic gel mixture compacting layer (11) is provided with multiple steel along multiple threaded fasteners (4) outer ring Muscle dish.
Steel the most according to claim 1 towers thing prefabricated complex group assembling kit pile foundation, its feature Being, reinforced concrete precast member includes floor (12), lower floor (13), bottom bilayer net-shaped steel Muscle layer (14), the double-deck netted steel bar layer (15) in top, steel reinforcement cage (16) and sleeve pipe (17);Described Multiple antiseptic and rustproof sleeve pipe (17) vertically it is fixed with between upper floor (12) and lower floor (13), Sleeve pipe (17) bottom is provided with the double-deck netted steel bar layer (14) in bottom, and sleeve pipe (17) top is provided with top The double-deck netted steel bar layer (15) in portion, the double-deck netted steel bar layer (15) in top netted steel bar layer double-deck with bottom (14) steel reinforcement cage (16) being coated on sleeve pipe (17) outer layer it is provided with between.
7. a steel based on the pile foundation described in any one of claim 1-6 towers the prefabricated complex group of thing Assembling kit pile foundation manufacture method, it is characterised in that comprise the following steps:
1) every at the smooth bottom layer of the reinforcing steel precast concrete being positioned at installing hole bottom centre position Individual sleeve pipe all fixedly mounts threaded fasteners, and compacting compacting around bottom layer of the reinforcing steel precast concrete The inorganic gel mixture that coefficient is more than or equal to 0.94 and unit weight is not less than 18KN;
2) levelling to bottom layer of the reinforcing steel precast concrete and inorganic gel mixture by level indicator, then lay The pure white ash of 30mm thickness or striaght cement, and the most levelling;
3) the first inorganic gel mixture is laid on pure white ash after levelling or striaght cement, and the most levelling; And in the first inorganic gel mixture along multiple threaded fasteners (4) outer ring interval install multiple gilled rings and Multiple floors, then install the pure white ash of 20mm or striaght cement successively on the first inorganic gel mixture top With the first middle reinforced concrete precast member (2);
4) at the upper second inorganic gel mixture of laying of the first middle reinforced concrete precast member (2), and The most levelling;And install along interval, multiple threaded fasteners (4) outer ring in the second inorganic gel mixture Multiple gilled rings and multiple floor, then install the second middle reinforcing bar and mix on the second inorganic gel mixture top Solidifying soil prefabricated component (9);
5) at the second middle reinforced concrete precast member (9) upper installation strengthened thread fixture (5), Second middle reinforced concrete precast member (9) is upper lays the 3rd inorganic gel mixture, and the most levelling; And along interval, multiple threaded fasteners (4) outer ring, multiple floors are installed in the 3rd inorganic gel mixture, Then on the 3rd inorganic gel mixture top, top rebars precast concrete (3) is installed;Then on top The upper installation of portion's reinforced concrete precast member (3) is used for fixing threaded fasteners (4) and strengthened thread is solid The securing member of locking member (5).
Steel the most according to claim 7 towers thing prefabricated complex group assembling kit pile foundation making side Method, it is characterised in that
Bottom layer of the reinforcing steel precast concrete, the first middle reinforced concrete precast member, the second middle reinforcing bar are mixed Solidifying soil prefabricated component and the preparation method of top rebars precast concrete:
1) by threaded sleeve pipe (17) through upper floor (12) and lower floor (13), then by upper Floor (12), lower floor (13) weld with sleeve pipe (17) respectively;
2) in step 1) welded reinforcement cage (16), top bilayer net-shaped steel on the basis of the component that formed The double-deck netted steel bar layer (14) of muscle layer (15) and bottom forms reinforced concrete precast member cage bone;
3) reinforced concrete precast member cage bone is put in precast concrete mould, fill rammed concrete Form reinforced concrete precast member;
In step 1) before the method also include:
1) bottom layer of the reinforcing steel precast concrete is lifted to installing hole bottom centre position, and ensure bottom steel The flatness of reinforced concrete prefabricated component.
Steel the most according to claim 7 towers thing prefabricated complex group assembling kit pile foundation making side Method, it is characterised in that described step 3) particularly as follows:
Lay two step the first inorganic gel mixtures on pure white ash after levelling or striaght cement, and again look for Flat;After levelling, smooth for gilled rings is inserted in bottom multiple threaded fasteners, is directed at bottom layer of the reinforcing steel coagulation It is welded and fixed after soil prefabricated component;Then on gilled rings, lay the first inorganic gel mixture in two steps, And the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and carry out It is welded and fixed;The first inorganic gel mixture is laid again in two steps on another gilled rings, and the most levelling; Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;More than repetition Step;Then the pure white ash of 20mm or striaght cement and are installed successively on the first inorganic gel mixture top One middle reinforced concrete precast member (2), and ensure the every of the first middle reinforced concrete precast member (2) Individual sleeve pipe aligns respectively and is inserted in multiple threaded fasteners (4);Wherein, the thickness of a step is 150mm;
Step 4) particularly as follows:
At upper two step the second inorganic gel mixtures of laying of the first middle reinforced concrete precast member (2), and The most levelling;By smooth being inserted in multiple threaded fasteners of gilled rings after levelling, it is directed at bottom layer of the reinforcing steel It is welded and fixed after precast concrete;Then on gilled rings, lay the second inorganic gel mix in two steps Thing, and the most levelling, levelling after more smooth for another gilled rings is inserted in multiple threaded fasteners, and It is welded and fixed;The second inorganic gel mixture is laid again in two steps on another gilled rings, and again Levelling;Again smooth for floor is inserted in multiple threaded fasteners after levelling, and is welded and fixed;Weight Multiple above step;Then on the second inorganic gel mixture top, the second middle armored concrete is installed prefabricated Part (9), and ensure each sleeve pipe of the second middle reinforced concrete precast member (9) align respectively be inserted in many In individual threaded fasteners (4);Wherein, the thickness of a step is 150mm;
Step 5) particularly as follows:
At distance second middle reinforced concrete precast member (9) above 200mm, A level structure is anchored Glue injects the centre bore of the second middle reinforced concrete precast member (9), and is screwed into 300mm in centre bore Strengthened thread fixture (5) is installed, then lays step a 3rd inorganic gel mixture, and levelling;Will Bottom the most steadily called in by one floor multiple threaded fasteners of alignment (4) and strengthened thread fixture (5) It is welded and fixed;Then on floor, lay the 3rd inorganic gel mixture in two steps, and the most levelling; The most again a floor is directed at multiple threaded fasteners (4) and strengthened thread fixture (5) is put down afterwards Surely call in bottom to be welded and fixed, on floor, then lay the 3rd inorganic gel mixture in two steps, And the most levelling, repeatedly this step;Then on the floor of upper strata, a point step lays the 3rd inorganic gel Mixture, and the most levelling, this step in triplicate;Then on the top of the 3rd inorganic gel mixture Install top rebars precast concrete (3), and install top rebars precast concrete (3) time Its sleeve pipe first injects A level structure anchor adhesive, in top rebars precast concrete (3) top peace Fill backing plate, and multiple threaded fasteners (4) and the strengthened thread fixture (5) on backing plate is above installed Nut contains pad, and wherein, the thickness of a step is 150mm;
Step 1) also include: before threaded fasteners being installed in each sleeve pipe, sleeve pipe injects A Level structure anchor adhesive, all fixedly mounts threaded fasteners the most again in each sleeve pipe, is wherein screwed It is 350mm-450mm that part is screwed into the degree of depth.
Steel the most according to claim 7 towers thing prefabricated complex group assembling kit pile foundation making side Method, it is characterised in that described inorganic gel mixture, the first inorganic gel mixture, second inorganic Gelling mixture and dirt mixture that the 3rd inorganic gel mixture is 3: 7 or the soil cement of 3: 7 Mixture.
CN201610387105.6A 2016-06-02 2016-06-02 A kind of steel towers prefabricated compound assembling external member pile foundation of thing and preparation method thereof Active CN105970997B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610387105.6A CN105970997B (en) 2016-06-02 2016-06-02 A kind of steel towers prefabricated compound assembling external member pile foundation of thing and preparation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610387105.6A CN105970997B (en) 2016-06-02 2016-06-02 A kind of steel towers prefabricated compound assembling external member pile foundation of thing and preparation method thereof

Publications (2)

Publication Number Publication Date
CN105970997A true CN105970997A (en) 2016-09-28
CN105970997B CN105970997B (en) 2017-08-08

Family

ID=57010650

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610387105.6A Active CN105970997B (en) 2016-06-02 2016-06-02 A kind of steel towers prefabricated compound assembling external member pile foundation of thing and preparation method thereof

Country Status (1)

Country Link
CN (1) CN105970997B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396192A (en) * 2021-12-13 2022-04-26 中国能源建设集团安徽省电力设计院有限公司 Plug-in type concrete-filled steel tube column base for large power transmission tower and construction method thereof
TWI823797B (en) * 2023-03-13 2023-11-21 潤弘精密工程事業股份有限公司 Precast base, method of manufacturing the precast base and method of mounting architectural structure having the precast base

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222735A (en) * 1992-02-12 1993-08-31 Daiho Constr Co Ltd Building method for deep foundation type well base
CN202073114U (en) * 2011-05-18 2011-12-14 北京中水恒信环境科技发展有限公司 Splice joint type post-tensioned prestressed foundation structure
CN102677688A (en) * 2011-12-30 2012-09-19 深圳市海生机房技术有限公司 Prefabricated concrete assembled foundation
CN102979109A (en) * 2012-12-17 2013-03-20 中国水电顾问集团西北勘测设计研究院 Design method of assembled-type prestressed concrete cylindrical column base
CN105239593A (en) * 2015-10-20 2016-01-13 中国科学院武汉岩土力学研究所 Assembled pre-stressed anchor cable wind turbine foundation system and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05222735A (en) * 1992-02-12 1993-08-31 Daiho Constr Co Ltd Building method for deep foundation type well base
CN202073114U (en) * 2011-05-18 2011-12-14 北京中水恒信环境科技发展有限公司 Splice joint type post-tensioned prestressed foundation structure
CN102677688A (en) * 2011-12-30 2012-09-19 深圳市海生机房技术有限公司 Prefabricated concrete assembled foundation
CN102979109A (en) * 2012-12-17 2013-03-20 中国水电顾问集团西北勘测设计研究院 Design method of assembled-type prestressed concrete cylindrical column base
CN105239593A (en) * 2015-10-20 2016-01-13 中国科学院武汉岩土力学研究所 Assembled pre-stressed anchor cable wind turbine foundation system and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114396192A (en) * 2021-12-13 2022-04-26 中国能源建设集团安徽省电力设计院有限公司 Plug-in type concrete-filled steel tube column base for large power transmission tower and construction method thereof
CN114396192B (en) * 2021-12-13 2024-03-15 中国能源建设集团安徽省电力设计院有限公司 Inserted steel tube concrete column base for large power transmission tower and construction method thereof
TWI823797B (en) * 2023-03-13 2023-11-21 潤弘精密工程事業股份有限公司 Precast base, method of manufacturing the precast base and method of mounting architectural structure having the precast base

Also Published As

Publication number Publication date
CN105970997B (en) 2017-08-08

Similar Documents

Publication Publication Date Title
CN107268424B (en) Can fast leveling precast assembly bridge pier structure and its construction method
CN104452795B (en) A kind of old house additional elevator base structure and construction method thereof
CN107842035B (en) Ultra-high performance concrete prefabricated assembled comprehensive pipe gallery system and construction method
CN109505229B (en) Stress balance and vibration-damping disaster-prevention high pier structure for high and steep side slope of highway and construction method
CN109611102B (en) Construction method for cold excavation underpass overpass
CN1452678A (en) Construction of high-rise building with large modular units
KR100787178B1 (en) Light weight steel frame foundation flooring material and method for construction
CN104594361B (en) A kind of I shape fender post and building enclosure also serve as the construction method of agent structure
CN107476470A (en) Steel pipe built in assembled and GFRP pipe regeneration concrete compound shear walls and its construction method
CN110485429A (en) A kind of prestressing force fashioned iron assembled combination inner support construction method
CN206545215U (en) A kind of precast spliced sinking type garage parking
CN104863063B (en) Cofferdam method for rapidly reinforcing is exempted from based on the bridge submerged structure of PVC composite shuttering
CN103388357A (en) Shock-proof prefabricated steel tube shear wall mixed structural building
CN101858082A (en) Soft soil foundation new construction post pile pressing technology and construction method thereof
CN101333815B (en) Concrete anchor rod and its construction method
CN106988603A (en) A kind of Assembled enclosing wall and its construction method
CN106812153A (en) Beam and slab type construction elevator foundation construction engineering method in a kind of backfill
CN111910679B (en) Construction method of overlong and ultrahigh-weight retaining wall under complex terrain
CN109750681A (en) A kind of embankment side slope framework parts La Tuoding anchor slab supporting construction and its construction method a little
CN105970997A (en) Steel tower-aloft object prefabricated compound assembled suit pile foundation and manufacturing method thereof
CN110578287A (en) assembled earth covering corrugated steel plate-prestressed concrete combined arch bridge and construction method thereof
CN108118689B (en) Prefabricated underground diaphragm wall capable of being partially recycled, lifting appliance and construction method
CN206571248U (en) A kind of Assembled enclosing wall
CN113417300A (en) Slope support system and construction method thereof
CN205677070U (en) A kind of building frame construction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant