Prior art keywords
oil
fracture
rho
time
oil reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610329620.9A
Other languages
Chinese (zh)
Other versions
CN105956938B (en
Inventor
王连山
孙银行
张卫国
张茂
孙庚文
汤承锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Landocean Energy Services Co Ltd
Landocean (beijing) Energy Technology Research Institute Co Ltd
Original Assignee
Xinjiang Landocean Energy Services Co Ltd
Landocean (beijing) Energy Technology Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xinjiang Landocean Energy Services Co Ltd, Landocean (beijing) Energy Technology Research Institute Co Ltd filed Critical Xinjiang Landocean Energy Services Co Ltd
Priority to CN201610329620.9A priority Critical patent/CN105956938B/en
Publication of CN105956938A publication Critical patent/CN105956938A/en
Application granted granted Critical
Publication of CN105956938B publication Critical patent/CN105956938B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
    • G06Q50/06Electricity, gas or water supply

Abstract

A fracture-vug type oil reservoir dynamic reserve calculation method provided by the present invention relates to a method for calculation aiming at the oil reservoir reserves of the elastic drive stages, and aims to realize the effects that the needed calculation parameters are less, the parameter values are all measured at an oil recovery site and are objective and accurate, and the calculation results are more credible. The fracture-vug type oil reservoir dynamic reserve calculation method of the present invention comprises the following steps of S01 measuring the bottom hole crude oil density rho 1 for the first time by a manometry method; S02 exploiting an oil well for a period of time, and recording the cumulative oil production as Np; S03, measuring the bottom hole crude oil density rho 2 for the second time by the manometry method; S04 substituting the measured rho 1, rho 2 and the Np into a formula to obtain the fracture-vug type oil reservoir dynamic reserves.

Description

The method that fracture-pore reservoir dynamic holdup calculates
Technical field
The present invention relates to a kind of reservoir reserve computational methods, particularly relate to a kind of drive the reservoir reserve in stage for elasticity and enter The method that row calculates.
Background technology
Harrar Ha Tang oil field, Tarim Basin ORDOVICIAN CARBONATE oil reservoir belongs to typical fracture-pore reservoir, reservoir space Based on crack and solution cavity, having anisotropism strong, fluid properties is changeable, fluid distrbution and the feature such as oil water relation is complicated.Shadow The factor of sound oil reservoir development feature is in addition to reservoir space type and architectural feature, well pattern and technical policy, and key exists In the scale of fracture-cavity units, the most accurately calculating fracture-cavity units dynamic holdup becomes a difficult problem.
Reservoir behavior reserves calculate and mostly use falloff curve method, pressure drop recovery curve method, water driver front, successively decrease at present Curve method, material balance method and well testing method etc., wherein, well testing method is only applicable to the sealed elastic of oil reservoir development constant volume in early days Drive, and its well-test curve obtained according to well test data matching and then to obtain dynamic holdup computing formula complicated, all can lead Activate state reserves computational accuracy relatively low;Material balance method divides in detail not according to the reservoir space of oil reservoir to be developed, because of Matter balance equation often quality after this simplification is coarse and does not meets practical situation, causes dynamic holdup computational accuracy low, inclined Difference is big;In addition same, falloff curve method, pressure drop recovery curve method, water driver front and decline curve method etc. are according to all kinds of songs Line and then obtain dynamic holdup computing formula, method is complicated, calculates process loaded down with trivial details, adds owing to artificially calculating the error caused The error gathering oil reservoir actual development data easily causes dynamic holdup computational accuracy low, and poor accuracy, to oil reservoir development and tune Whole bringing is slipped up and unnecessary time and economic loss.
Summary of the invention
It is less that the technical problem to be solved in the present invention is to provide one required calculating parameter, and parameter value is oil recovery now The field First Astronautic Research Institute for Measurement and Test obtains, objective and accurate, the method that result of calculation more believable fracture-pore reservoir dynamic holdup calculates.
The method that the present invention a kind of fracture-pore reservoir dynamic holdup calculates, comprises the steps:
S01: oil density ρ at the bottom of piezometric well for the first time1
S02: to oil development a period of time, period tires out oil production and is designated as Np
S03: oil density ρ at the bottom of piezometric well for the second time2
S04: the ρ that will record1、ρ2And NpSubstitute into formula
N = ρ 2 ρ 1 - ρ 2 N p
Ask for fracture-pore reservoir dynamic holdup.
The method that the present invention a kind of fracture-pore reservoir dynamic holdup calculates, wherein oil density computing formula in shaft bottom is:
Wherein, PThe endFor shaft bottom crude oil pressure, PrFor reference point crude oil pressure, HThe endFor bottom depth, HrFor the reference point degree of depth.
The method that the present invention a kind of fracture-pore reservoir dynamic holdup calculates, wherein HThe end-Hr=50, i.e. reference point be chosen as away from The position of shaft bottom 50m.
The method that the present invention a kind of fracture-pore reservoir dynamic holdup calculates is compared to the advantage of material balance method: 1. count Calculate the ρ that dynamic holdup required calculating parameter is less and required1、ρ2And NpThree parameters all accurately can be asked by oil recovery scene Take, it is to avoid do not survey the uncertain parameter of PVT well, oil volume factor, the oil compressibility impact on result of calculation;Cause This, it is higher that the method that the present invention provides calculates dynamic holdup accuracy than material balance method.2. fracture-cavity type carbonate has been avoided The particularity of oil reservoir, complexity, the calculating for fractured-cavernous carbonate reservoir dynamic holdup provides a kind of new method, is more as the criterion Really have rated Reservoir Size, the reasonable Efficient Development for oil field is laid a good foundation.
Detailed description of the invention
The method that the present invention a kind of fracture-pore reservoir dynamic holdup calculates, comprises the steps:
S01: oil density ρ at the bottom of piezometric well for the first time1
S02: to oil development a period of time, period tires out oil production and is designated as Np
S03: oil density ρ at the bottom of piezometric well for the second time2
S04: the ρ that will record1、ρ2And Np(1) formula of substitution asks for fracture-pore reservoir dynamic holdup.
N = ρ 2 ρ 1 - ρ 2 N p - - - ( 1 )
Wherein involved in (1) formula shaft bottom oil density parameter ρ1、ρ2Derived by (2) formula respectively and ask for
Wherein, PThe endFor shaft bottom crude oil pressure, PrFor reference point crude oil pressure, HThe endFor bottom depth, HrFor the reference point degree of depth. Reference point distance the nearlyest (the i.e. H of bottom hole spacing chosenThe end-HrValue the least), then the final shaft bottom oil density calculated gets over convergence In shaft bottom crude oil actual density, if but reference point distance shaft bottom is too near, reference point crude oil pressure and shaft bottom crude oil pressure can be recorded The most essentially identical (i.e. PThe end-Pr=0), thus can cause to shaft bottom crude oil calculate failure.In order to draw shaft bottom successfully, accurately Oil density, the reference point in the present invention chooses a point between the 50-300m scope of shaft bottom.
In order to ensure that disclosure of the invention is abundant, the existing derivation to (1) formula illustrates:
If V is ρ1It is the shaft bottom quality of crude oil under original state, V ρ2For the shaft bottom residual crude oil well after exploitation a period of time Substrate amount, NPBoρ2/ ρ is then for the shaft bottom quality of extraction crude oil.Can be obtained by shaft bottom crude quality conservation
1=V ρ2+NPBoρ2/ρ (3)
Wherein, V subsurface deposit volume ρ1Oil density at the bottom of piezometric well for the first time
ρ2Oil density N at the bottom of piezometric well for the second timePAccumulative product crude oil amount during twice pressure measurement
BoOil volume factor ρ crude oil density in stock tank at present
Further:
V=NBoi/ρ (4)
Wherein, N oil in place BoiOriginal crude oil volume factor
(3) formula of (4) formula being brought into obtains following formula:
N = ρ 2 N p ρ 1 - ρ 2 · B o B o i - - - ( 5 )
Fractured-cavernous carbonate reservoir is at initial stage of development, and the oil well of more than 90% has the Development characteristics of " well one is hidden ", Between well, fluid properties differs greatly, and causes oil volume factor between well to differ greatly, and owing to the restriction of development cost is impossible Every mouthful of well all carries out PVT (pressure, volume, temperature) sample analysis.Standard empirical equation is asked for oil volume factor and is generally deposited In bigger error, it is contemplated that the change that the volume factor of crude oil drives the stage in elasticity is less, and for ignore volume factor ask for time The error the existed impact on result of calculation, Bo/BoiCan approximate and be considered as 1, thus (5) formula can be reduced to:
N = ρ 2 ρ 1 - ρ 2 N p . - - - ( 6 )
By (6) formula it can be seen that ask for the dynamic holdup of fractured-cavernous carbonate reservoir, it is only necessary to 3 calculate parameter, i.e. Elasticity drives at the bottom of oil density, for the second time piezometric well at the bottom of the first time piezometric well in stage accumulative oil-producing between oil density and twice pressure measurement Amount.
In order to verify the present invention accuracy to fracture-pore reservoir dynamic holdup measurement result, applicant have chosen Harrar and breathes out 20 mouthfuls of oil field, pool oil well uses material balance method and method described in the invention to carry out contrast test, wherein result of the test respectively As shown in the table:
As can be seen from the above table, use result that fracture-pore reservoir dynamic holdup records by method described in the invention with Using the result measured by material balance method to compare, absolute error is only 0.0 × 104T~3.7 × 104t.As can be seen here, shaft bottom It is the most credible that oil density difference method calculates dynamic holdup.Shaft bottom oil density difference method calculates dynamic holdup and need not PVT test number According to, thus the method may apply to not carry out the oil reservoir of PVT sample analysis.
Embodiment described above is only to be described the preferred embodiment of the present invention, the not model to the present invention Enclose and be defined, on the premise of designing spirit without departing from the present invention, the those of ordinary skill in the art technical side to the present invention Various deformation that case is made and improvement, all should fall in the protection domain that claims of the present invention determines.

Claims (3)

1. the method that fracture-pore reservoir dynamic holdup calculates, comprises the steps:
S01: oil density ρ at the bottom of piezometric well for the first time1
S02: to oil development a period of time, period tires out oil production and is designated as Np
S03: oil density ρ at the bottom of piezometric well for the second time2
S04: the ρ that will record1、ρ2And NpSubstitute into formula
N = ρ 2 ρ 1 - ρ 2 N p
Ask for fracture-pore reservoir dynamic holdup.
The method that a kind of fracture-pore reservoir dynamic holdup the most according to claim 1 calculates, it is characterised in that: step S01, In S02 step, shaft bottom oil density computing formula is:
Wherein, PThe endFor shaft bottom crude oil pressure, PrFor reference point crude oil pressure, HThe endFor bottom depth, HrFor the reference point degree of depth.
The method that a kind of fracture-pore reservoir dynamic holdup the most according to claim 2 calculates, it is characterised in that: HThe end-Hr= 50, i.e. reference point is chosen as the position away from shaft bottom 50m.
CN201610329620.9A 2016-05-18 2016-05-18 Method for calculating dynamic reserves of fracture-cavity oil reservoir Active CN105956938B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610329620.9A CN105956938B (en) 2016-05-18 2016-05-18 Method for calculating dynamic reserves of fracture-cavity oil reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610329620.9A CN105956938B (en) 2016-05-18 2016-05-18 Method for calculating dynamic reserves of fracture-cavity oil reservoir

Publications (2)

Publication Number Publication Date
CN105956938A true CN105956938A (en) 2016-09-21
CN105956938B CN105956938B (en) 2020-03-27

Family

ID=56913040

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610329620.9A Active CN105956938B (en) 2016-05-18 2016-05-18 Method for calculating dynamic reserves of fracture-cavity oil reservoir

Country Status (1)

Country Link
CN (1) CN105956938B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067555A (en) * 2018-01-24 2019-07-30 中国石油天然气股份有限公司 The determination method and apparatus of the minimum dynamic holdup of carbonate rock oil well
CN110847899A (en) * 2018-08-21 2020-02-28 中国石油天然气股份有限公司 Method and device for calculating reservoir reserves of fracture-cavity carbonate rock containing closed water body
CN111794740A (en) * 2020-08-07 2020-10-20 西南石油大学 Method suitable for calculating dynamic reserve of fracture-cavity carbonate reservoir
CN111852462A (en) * 2019-04-29 2020-10-30 中国石油天然气股份有限公司 Method and device for acquiring dynamic reserves of oil well
CN112049624A (en) * 2019-06-06 2020-12-08 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserves of oil well
CN112814653A (en) * 2021-02-05 2021-05-18 西南石油大学 Fracture-cavity type oil reservoir structure judgment method
CN112049624B (en) * 2019-06-06 2024-04-30 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserve of oil well

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101899972A (en) * 2010-06-30 2010-12-01 中国石油大学(北京) Establishment method of physical model capable of forecasting waterflood development of sandstone reservoirs
CN102080531A (en) * 2009-11-30 2011-06-01 郭腾明 Method for production metering of oil wells
CN102262037A (en) * 2011-04-21 2011-11-30 西安石油大学 Measuring method and electronic measuring device for oil content and water content in oil tank
US20140174729A1 (en) * 2012-12-24 2014-06-26 Schlumberger Technology Corporation Method for determining parameters of a bottomhole and a near-bottomhole zone of a wellbore
CN104653175A (en) * 2013-11-22 2015-05-27 中国石油化工股份有限公司 Natural water-drive reservoir producing reserve calculating method
CN105464652A (en) * 2015-12-03 2016-04-06 恒泰艾普石油天然气技术服务股份有限公司 Dynamic reserve calculation method and system for fracture and cave type carbonatite oil reservoir fracture and cave unit

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102080531A (en) * 2009-11-30 2011-06-01 郭腾明 Method for production metering of oil wells
CN101899972A (en) * 2010-06-30 2010-12-01 中国石油大学(北京) Establishment method of physical model capable of forecasting waterflood development of sandstone reservoirs
CN102262037A (en) * 2011-04-21 2011-11-30 西安石油大学 Measuring method and electronic measuring device for oil content and water content in oil tank
US20140174729A1 (en) * 2012-12-24 2014-06-26 Schlumberger Technology Corporation Method for determining parameters of a bottomhole and a near-bottomhole zone of a wellbore
CN104653175A (en) * 2013-11-22 2015-05-27 中国石油化工股份有限公司 Natural water-drive reservoir producing reserve calculating method
CN105464652A (en) * 2015-12-03 2016-04-06 恒泰艾普石油天然气技术服务股份有限公司 Dynamic reserve calculation method and system for fracture and cave type carbonatite oil reservoir fracture and cave unit

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110067555A (en) * 2018-01-24 2019-07-30 中国石油天然气股份有限公司 The determination method and apparatus of the minimum dynamic holdup of carbonate rock oil well
CN110067555B (en) * 2018-01-24 2022-03-29 中国石油天然气股份有限公司 Method and device for determining minimum dynamic reserve of carbonate oil well
CN110847899A (en) * 2018-08-21 2020-02-28 中国石油天然气股份有限公司 Method and device for calculating reservoir reserves of fracture-cavity carbonate rock containing closed water body
CN111852462A (en) * 2019-04-29 2020-10-30 中国石油天然气股份有限公司 Method and device for acquiring dynamic reserves of oil well
CN112049624A (en) * 2019-06-06 2020-12-08 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserves of oil well
CN112049624B (en) * 2019-06-06 2024-04-30 中国石油天然气股份有限公司 Method, device, equipment and storage medium for predicting dynamic reserve of oil well
CN111794740A (en) * 2020-08-07 2020-10-20 西南石油大学 Method suitable for calculating dynamic reserve of fracture-cavity carbonate reservoir
CN112814653A (en) * 2021-02-05 2021-05-18 西南石油大学 Fracture-cavity type oil reservoir structure judgment method

Also Published As

Publication number Publication date
CN105956938B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
CN105956938A (en) Fracture-vug type oil reservoir dynamic reserve calculation method
CN105986815B (en) Method for identifying geological dessert in shale stratum
CN107676064B (en) Water-drive reservoir water content prediction method and prediction device thereof
CN105464652A (en) Dynamic reserve calculation method and system for fracture and cave type carbonatite oil reservoir fracture and cave unit
CN108194077B (en) Gas logging total hydrocarbon correction method
CN103912248A (en) Method for predicting water contents of water-drive oilfields
CN105447762A (en) Calculation method for low permeability reservoir flooding information of fluid replacement
CN109063232A (en) One kind being used for shale gas well reservoir "sweet spot" evaluation method
CN107130955B (en) Method for determining bottom hole flowing pressure and method for determining natural energy of reservoir
CN110532507B (en) Method for improving drilling rate of compact oil reservoir of horizontal well
CN103995297A (en) Method for correcting resistivity of crack carbonatite stratum
CN111520126A (en) Density logging hole enlargement correction method and device
CN105116466B (en) A kind of method and apparatus for determining oilfield reservoir physical property characteristic
CN111666665B (en) Method for improving accuracy of dynamic and static Young modulus conversion model of carbonatite
CN110007344A (en) A kind of seismic identification and device of disconnected solution reservoir communication
CN110159260B (en) Method and device for judging main water supply direction of fracture part closed fracturing vertical well
CN116068625A (en) Anisotropic parameter solving method for VSP driving processing while drilling
CN113189647A (en) Method for predicting formation brittleness index of transverse isotropic shale
CN111456726A (en) Sound wave time difference correction method and device
CN109630093A (en) A kind of flow rate test method in oil reservoir logging
CN113719271B (en) Well test design parameter correction method
CN114706141B (en) Underground meandering stream zone quantitative characterization method based on sedimentation analogy
CN117077419B (en) Novel formation pressure analysis method for fracture-cavity oil reservoir
CN114200538B (en) Ground stress direction determining method, device, storage medium and computer equipment
CN112267872B (en) Method for determining volume of gas well drilling karst cave system by using production dynamic data

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant