CN105953630A - Heating furnace with coil pipes capable of being pulled away - Google Patents

Heating furnace with coil pipes capable of being pulled away Download PDF

Info

Publication number
CN105953630A
CN105953630A CN201610467812.6A CN201610467812A CN105953630A CN 105953630 A CN105953630 A CN 105953630A CN 201610467812 A CN201610467812 A CN 201610467812A CN 105953630 A CN105953630 A CN 105953630A
Authority
CN
China
Prior art keywords
coil pipe
coil
furnace
heating furnace
furnace wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610467812.6A
Other languages
Chinese (zh)
Other versions
CN105953630B (en
Inventor
陈孙艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Challenge Petrochemical Machinery Corp
Original Assignee
Challenge Petrochemical Machinery Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Challenge Petrochemical Machinery Corp filed Critical Challenge Petrochemical Machinery Corp
Priority to CN201610467812.6A priority Critical patent/CN105953630B/en
Publication of CN105953630A publication Critical patent/CN105953630A/en
Application granted granted Critical
Publication of CN105953630B publication Critical patent/CN105953630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F9/00Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
    • F28F9/02Header boxes; End plates
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F27FURNACES; KILNS; OVENS; RETORTS
    • F27DDETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS, OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
    • F27D1/00Casings; Linings; Walls; Roofs
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F1/00Tubular elements; Assemblies of tubular elements
    • F28F1/10Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses
    • F28F1/12Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses the means being only outside the tubular element
    • F28F1/14Tubular elements and assemblies thereof with means for increasing heat-transfer area, e.g. with fins, with projections, with recesses the means being only outside the tubular element and extending longitudinally
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F28HEAT EXCHANGE IN GENERAL
    • F28FDETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
    • F28F2275/00Fastening; Joining
    • F28F2275/06Fastening; Joining by welding

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Thermal Sciences (AREA)
  • Geometry (AREA)
  • General Induction Heating (AREA)

Abstract

The invention discloses a heating furnace with coil pipes capable of being pulled away. The heating furnace is formed by assembling a plurality of heat exchange coil pipe modules; each heat exchange coil pipe module comprises furnace walls on the two sides, bend boxes arranged at the two ends of each furnace wall and the coil pipes arranged in the furnace walls; each coil pipe is formed by connecting and installing and welding of a pipe plate, a furnace pipe, a bend, a flange short pipe and a collection box; the pipe plates are borne on supporting lugs on the inner sides of the furnace walls, and the coil pipes can be drawn out from the furnace walls or pushed into the furnace walls; the coil pipes of the heat exchange pipe module at the lower portion of the heating furnace are changed to be assembled and welded on the job site of the furnace, and a new efficient and safe construction method of the building block modular type heating furnace is perfected; during construction, the upper modules are not affected by the delivery period of the furnace pipes of the modules on the lower portion, production conditions and product quality conditions are improved, the phenomenon that outdoor construction sites are affected by poor weather is avoided, and aerial work and crossing work at the job site are greatly reduced; and the individual coil pipes which are prone to being damaged are conveniently constructed, overhauled and replaced, the structure is simple, and the service life of the whole heating furnace can be prolonged.

Description

The heating furnace that a kind of coil pipe is drawable
Technical field
The present invention relates to the tubular heater technical field in petroleum refining, petrochemical industry and other chemical industry, be specifically related to the heating furnace that a kind of coil pipe is drawable.
Background technology
(1) structure of traditional heating stove designs and function
Heating furnace is the tap in petrochemical industry, including atmospheric pressure kiln, vacuum furnace, SECTION TUBE FOR HYDROGEN MANNU-FACTURING FURNACE, reformer, coking furnace, reburner and pyrolysis furnace etc..The effect of tubular heater is that medium (oil plant or gas) is heated to the temperature needed for technique.
The four sides of body of heater is surrounded burner hearth by tall and big furnace wall, and furnace wall is by profile steel frame upper berth welding steel plates such as I-steel, and on steel plate, distribution welding bar for line, is molded into heat insulation and high-abrasive material between bar for line.The support installed on furnace wall supports tube sheet, boiler tube is supported through perforated pipe plate by tube sheet, flow through in boiler tube is the oil plant needing heating, and flow through from the bottom up in burner hearth outside boiler tube is high-temperature flue gas or hot blast, and heat passes to the oil plant in pipe or other medium by tube wall.
Such as, ethane cracking furnace is assembled up and down by convection section and the big section of radiant section two, and one the 150000 tons/year general overall dimensions of ethane cracking furnace convection section often reach long 18m × high 28m × wide 3m, belong to towering steel construction.
(2) current heating furnace method of construction
Due to historical reasons, during body of heater is built, traditional usual practice is that enginerring works produce the accessories such as tube sheet, finned tube and elbow, is then responsible for, at building-site, these parts are assembled into together with steel construction furnace wall body of heater by Construction Company overall.At device site welding technology, its boiler tube pierce into and anti-revisionist, the furnace wall surface of the assembly welding of elbow and the ray detection of weld seam, weld defect is strict sprays paint all because the construction of outdoor high-altitude brings inconvenience, having gap with the HSE policy of modern project management, furnace wall Wear-resistant heat insulation lining is affected meeting strain cracking by weather, get loose or drench with rain inefficacy.
The beginning of this century, Modular petrochemical-engineering heating furnace building technology is developed and applied, each heating furnace is by the module closed assembly or assembled of some cuboids, each module includes the journal stirrup inside both sides furnace wall, furnace wall, tube sheet, boiler tube, middle header and the header box at two ends, on two furnace walls of bottom, be provided with regulation and the fixed mechanism of both sides furnace wall spacing in each module, governor motion through the wall thickness of furnace wall, be mutually symmetrical with matching the furnace wall of both sides set of.Module top connects truss structure or the hanger having convenient lifting.The furnace wall top and bottom of each group of module all have substantial amounts of circular bolt holes.Change heating furnace to carry out, at device building-site, the modularity that the assembly welding of parts is on-the-spot and " play with building blocks " formula new construction method.Technology path is: (1), according to the overall dimension of heating furnace and transportation route, is designed as length and the most some of weight the segmentation of heating furnace entirety, so reaches the purpose broken the whole up into parts;(2) the complete each module of assembly welding body of heater in maker plant building;(3) modular transportation is installed to building-site.
(3) problem that modularized design building technology exists
Existing modular construction method is all first assembly welding each heat exchange coil module good, then multiple complete heat exchange coil modules are built, and convection section bottom coil pipe often selects the boiler tube of high-grade material because of radiation and higher temperatures flue gas environment, the delivery cycle of boiler tube is relatively long, the manufacture supply of material of delayed convection section lower module, need the requirement first installing lower module to contradict with device in-site installation, become the key of large project construction progress.
All there is a common old furnace wall and repair problem in the modularity building technology that either conventional construction techniques of heating furnace is still innovated.The lining of convection section is generally lightening casting material form, in pyrolysis furnace running, once furnace wall castable is aging or other reasons produces cracking, peels off, when needing to repair, it is necessary to blowing out immediately, then open header box, destroy weld seam between boiler tube and elbow, being extracted out by boiler tube, then repair lining or adjust boiler tube, the elbow dismantled can not repeat use.During this, whole cracking furnace installation must quit work, then dismount and repair, and workload is the hugest, and work difficulty is higher.Because space is the narrowest in furnace wall, it is again the most poor at device site operation, construction environment and construction equipment, cannot ensure to repair the quality of lining, it cannot be guaranteed that pyrolysis furnace has the higher thermal efficiency and longer service life, make convection section maintenance cost higher, there is potential safety hazard.
As can be seen here, petrochemical heating furnace is designed and improvement in terms of building technology, can increase economic efficiency, there is the strongest engineering significance.
Summary of the invention
There is above-mentioned technical problem for prior art, the present invention provides a kind of simple in construction, can improve construction and Maintenance and Repair work efficiency, and can shorten the drawable heating furnace of coil pipe of installation period, flexible operating.
For achieving the above object, the present invention provides techniques below scheme:
The heating furnace that a kind of coil pipe is drawable is provided, formed by several heat exchange coil module assembleds, described heat exchange coil module includes the furnace wall of both sides, the header box being arranged at the two ends of described furnace wall and the coil pipe being arranged in described furnace wall, coil pipe is connected assembly welding by tube sheet, boiler tube, elbow, flange short tube and header and forms, described tube sheet is bearing on the journal stirrup inside described furnace wall, and described coil pipe can be extracted out in described furnace wall or be pushed into described furnace wall.
Wherein, described coil pipe is integrated the coil pipe of assembly welding, and described coil pipe overall can be extracted out or advance in described furnace wall.
Wherein, described coil pipe is made up of some component coil pipes stacking, connects for fixing between the tube sheet of some component coil pipes, and described coil pipe overall can be extracted out or advance in described furnace wall.
Wherein, described coil pipe is made up of some component coil pipes stacking, and for being slidably connected between the tube sheet of some component coil pipes, described coil pipe overall can be extracted out or advance in described furnace wall, or the described point coil pipe of part can be extracted out in described furnace wall or advance.
Wherein, the group number of the journal stirrup inside described furnace wall is corresponding with the quantity of described point of coil pipe, and the tube sheet of every component coil pipe is bearing in respectively and often organizes on journal stirrup.
Wherein, being provided only with one group of journal stirrup inside described furnace wall, the bottom of some component coil pipes divides the tube sheet of coil pipe to be supported on described journal stirrup, and remaining point of coil pipe up stacks.
Wherein, being provided only with one group of journal stirrup inside described furnace wall, the tube sheet of point coil pipe of several point of coil pipe top layer is supported on described journal stirrup, and remaining point of coil pipe is down stacked by hanging hook.
Wherein, described tube sheet is provided with some pieces, and is provided with distance sink tube between adjacent described tube sheet.
Wherein, described coil pipe is made up of some component coil pipes stacking, and the distance scalable between the tube sheet of different described point of coil pipes is arranged, and divides the tube sheet of coil pipe that cross section is provided with spacing up and down, and/or divides coil pipe that longitudinal axis is provided with spacing up and down.
Wherein, fixing between described boiler tube with described tube sheet it be connected or be slidably connected.
Beneficial effects of the present invention:
The heating furnace that a kind of coil pipe of the present invention is drawable, formed by several heat exchange coil module assembleds, heat exchange coil module includes the furnace wall of both sides, the header box being arranged at the two ends of furnace wall and the coil pipe being arranged in furnace wall, coil pipe includes tube sheet, boiler tube and elbow, tube sheet is bearing on the journal stirrup inside furnace wall, and coil pipe can be extracted out in furnace wall or be pushed into furnace wall.Compared with prior art, the application is in use, after opening header box, coil pipe can be extracted out in furnace wall or is pushed into furnace wall, have the advantage that (1) carries out assembly welding by the coil pipe of the bottom heat exchange tube module of heating furnace is changed at device building-site, the perfect highly effective and safe new construction method of " playing with building blocks " Modular heating furnace;(2) when building, the module on top is not affected by the boiler tube delivery cycle of the module of bottom, can first build the remainders such as furnace wall, follow-up advance coil pipe again, working condition and product quality situation are improved, open work building site is avoided to be affected by adverse weather, greatly reduce building-site work high above the ground and cross-operation, do not affect the installation of other modules, it is ensured that project duration;(3) field of heat exchange equipment be applicable to air-conditioning, chemical industry, petrochemical industry, electric power energy, smelting iron and steel industry, avoiding building-site welded seam need to carry out the radiographic inspection impact on environment, designing technique theory meets the most popular petrochemical equipment manufacture maintenance HSE (health, safety, environment) system;(4) conveniently build, overhaul and change the indivedual coil pipes being easily damaged, simple in construction, it is possible to extend the service life of whole heating furnace.
Accompanying drawing explanation
The invention will be further described to utilize accompanying drawing, but the embodiment in accompanying drawing does not constitute any limitation of the invention, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to the following drawings.
Fig. 1 is the structural representation of the first coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 2 is the structural representation of the second coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 3 is the structural representation of the third coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 4 is the structural representation of the 4th kind of coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 5 be Fig. 3 A to schematic diagram.
Fig. 6 is the structural representation of the 5th kind of coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 7 is the structural representation of the 6th kind of coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 8 is the structural representation of the 7th kind of coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
Fig. 9 is the structural representation of the 8th kind of coil pipe of the drawable heating furnace of a kind of coil pipe of the present invention.
The reference that Fig. 1 to Fig. 9 comprises:
1 boiler tube, 2 tube sheets, 3 distance sink tubes,
4 first points of coil pipes, 5 second points of coil pipes, 6 first points of tube sheets of coil pipe, 7 second points of tube sheets of coil pipe, 8 sliding pairs,
9 stationary planes, 10 slip boiler tubes, 11 pipe hold gaps,
12 fix boiler tube, 13 pores, 20 rollers,
14 the 3rd points of coil pipes, 15 journal stirrups, 16 furnace walls, 17 back timbers, 18 bottom girders, 19 the 3rd points of coil pipe tube sheets,
20 rollers, 21 hanging hooks.
Horizontal, the B of A coil pipe——Coil pipe longitudinal,L ——Packet coil pipe tube sheet spacing,L1 L2——Two kinds of tube sheet spacing in packet coil pipe.
Detailed description of the invention
Below in conjunction with specific embodiment and accompanying drawing, the present invention is described in detail.
Embodiment 1
One of heating furnace that a kind of coil pipe of the present embodiment is drawable, heating furnace is formed by several heat exchange coil module assembleds, wherein heat exchange coil module sees shown in Fig. 1 and Fig. 7, heat exchange coil module includes the furnace wall 16 of both sides, back timber 17, bottom girder 18, the header box being arranged at the two ends of furnace wall 16 and the coil pipe being arranged in furnace wall 16, coil pipe is by some pieces of tube sheets 2, boiler tube 1, elbow, flange short tube and header (not drawing in figure) connect assembly welding and form, the pore 13 that boiler tube 1 is arranged on tube sheet, coil pipe passes through on the journal stirrup 15 inside furnace wall 16 of the supporting leg on tube sheet 2, in Fig. 1, coil pipe is integrated the coil pipe of assembly welding, in Fig. 7, coil pipe is made up of three component coil pipes, coil pipe can be extracted out in furnace wall 16 in whole or in part or advance.Be provided with distance sink tube 3 between adjacent tube sheet 2, for ensure spacing L1 between tube sheet 2 and L2, L1 and L2 are equal or.The two ends of boiler tube 1 connected by elbow or with header assembly welding.Back timber 17 and bottom girder 18 play width location and improve the effect of module integral rigidity.
Compared with prior art, the application is in use, after opening header box, coil pipe can be extracted out in furnace wall or is pushed into furnace wall, have the advantage that (1) carries out assembly welding by the coil pipe of the foot heat exchange tube module of heating furnace is changed at device building-site, the perfect highly effective and safe new construction method of " playing with building blocks " Modular heating furnace;(2) not affected by boiler tube delivery cycle when building, working condition and product quality situation are improved, it is to avoid open work building site is affected by adverse weather, greatly reduce building-site work high above the ground and cross-operation;(3) field of heat exchange equipment be applicable to air-conditioning, chemical industry, petrochemical industry, electric power energy and smelting iron and steel industry, avoiding building-site welded seam need to carry out the radiographic inspection impact on environment, designing technique theory meets the most popular petrochemical equipment manufacture maintenance HSE (health, safety, environment) system;(4) conveniently build, overhaul and change the indivedual coil pipes being easily damaged, simple in construction, it is possible to extend the service life of whole heating furnace.
Embodiment 2
The two of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 1, the most unaccounted feature, uses the explanation in embodiment 1, no longer repeats at this.The present embodiment is with the difference of embodiment 1, shown in Figure 2, coil pipe is made up of two component coil pipe stackings, sliding pair 8 is formed between tube sheet 6 and the tube sheet 7 of second point of coil pipe 5 of first point of coil pipe 4, for being slidably connected, coil pipe overall can be extracted out or advance in furnace wall, or a point coil pipe for part can be extracted out in furnace wall or advance.Coil pipe is spaced further apart being two points of coil pipes, alleviates weight, conveniently coil pipe from one end of module extraction or is pushed.
Embodiment 3
The three of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 1, the most unaccounted feature, uses the explanation in embodiment 1, no longer repeats at this.The present embodiment is with the difference of embodiment 1, shown in Figure 3, and coil pipe is made up of two groups of component coil pipe stackings, and the contact surface between the tube sheet of two component coil pipes is stationary plane 9, and for fixing connection, coil pipe overall can be extracted out or advance in furnace wall.Coil pipe is spaced further apart being two points of coil pipes, convenient transport, alleviates weight, conveniently coil pipe from one end of module extraction or is pushed.
Embodiment 4
The four of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 2, the most unaccounted feature, uses the explanation in embodiment 2, no longer repeats at this.The present embodiment is with the difference of embodiment 2, shown in Figure 4, coil pipe is made up of two component coil pipe stackings, divides the distance scalable between the tube sheet of coil pipe to arrange up and down, the tube sheet dividing coil pipe up and down is provided with spacing L at cross section, divides coil pipe that longitudinal axis is provided with spacing up and down.
Embodiment 5
The five of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 2, the most unaccounted feature, uses the explanation in embodiment 2, no longer repeats at this.The present embodiment is with the difference of embodiment 2, shown in participation Fig. 5, Fig. 5 is the A direction view of Fig. 3, describe structure between the upper surface 7 of tube sheet 6 lower surface of first point of coil pipe 4 and the tube sheet 7 of second point of coil pipe 5, tube sheet 7 is provided with groove, tube sheet 6 falls in groove, first point of coil pipe 4 by spacing and can not be along the horizontal A of coil pipe to slip, can only be along longitudinal B of coil pipe to slip.The bottom surface of upper perforated plate 6 can also be manufactured into herringbone, fork, the most also can not be along A to slip on lower perforated plate 7.In Fig. 5, between the pore of slip boiler tube 10 and tube sheet 2, there is gap 11, so slip boiler tube 10 can be along B to slip.
Embodiment 6
The six of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 5, the most unaccounted feature, uses the explanation in embodiment 5, no longer repeats at this.The present embodiment is with the difference of embodiment 5, participates in shown in Fig. 6, and Fig. 6 is also the A direction view of Fig. 3, fix and between boiler tube 12 and the pore of tube sheet 7, there is not pipe hold gap, but form pore and be adjacent to 13, so boiler tube 12 can not individually can only slide to slip, boiler tube along B together with tube sheet 7.
Embodiment 7
The seven of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 1, the most unaccounted feature, uses the explanation in embodiment 1, no longer repeats at this.The present embodiment is with the difference of embodiment 1, shown in Figure 7, and coil pipe is made up of three component coil pipe stackings, and the group number of the journal stirrup 15 inside furnace wall is corresponding with the quantity of point coil pipe, and the tube sheet of every component coil pipe is bearing in respectively and often organizes on journal stirrup.Can fill from the bottom up during installation, first load onto first point of coil pipe 4, refill second point of coil pipe 5, finally fill the 3rd point of coil pipe 14, or install in other sequences.For convenience of propelling or the extraction of coil pipe, can install a pair roller 20 in coil pipe bottom, roller 20 can be pulled down after coil pipe is installed.
Embodiment 8
The eight of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 7, the most unaccounted feature, uses the explanation in embodiment 7, no longer repeats at this.The present embodiment is with the difference of embodiment 7, shown in Figure 8, is provided only with one group of journal stirrup 15 inside furnace wall 16, and the bottom of three component coil pipes divides the tube sheet of coil pipe to be supported on journal stirrup, and remaining point of coil pipe up stacks.Can only fill from the bottom up during installation, first first point of coil pipe 4 is arranged on unique journal stirrup, then install on 5 to the first point of coil pipe of second point of coil pipe 4, finally fill 14 to the second point of coil pipe of the 3rd point of coil pipe 5.
Embodiment 9
The nine of the detailed description of the invention of the heating furnace that a kind of coil pipe of the present embodiment is drawable, the main technical schemes of the present embodiment is same as in Example 7, the most unaccounted feature, uses the explanation in embodiment 7, no longer repeats at this.The present embodiment is with the difference of embodiment 7, shown in Figure 9, is provided only with one group of journal stirrup 15 inside furnace wall 16, and the tube sheet of three the 3rd point of coil pipes 14 of component coil pipe is supported on journal stirrup, and remaining point of coil pipe is down stacked by hanging hook.Can only fill from top to bottom during installation, first the 3rd point of coil pipe 14 is arranged on unique journal stirrup 15, then be installed on the 3rd point of coil pipe 14 by 20 second point of coil pipes 5 of hanging hook, hang on second point of coil pipe 5 finally by 21 first point of coil pipes 4 of hanging hook.
Finally should be noted that; above example is only in order to illustrate technical scheme; rather than limiting the scope of the invention; although having made to explain to the present invention with reference to preferred embodiment; it will be understood by those within the art that; technical scheme can be modified or equivalent, without deviating from the spirit and scope of technical solution of the present invention.

Claims (10)

1. the heating furnace that a coil pipe is drawable, formed by several heat exchange coil module assembleds, described heat exchange coil module includes the furnace wall of both sides, the header box being arranged at the two ends of described furnace wall and the coil pipe being arranged in described furnace wall, described coil pipe includes tube sheet, boiler tube and elbow, described tube sheet is bearing on the journal stirrup inside described furnace wall, it is characterised in that: described coil pipe can be extracted out in described furnace wall or is pushed into described furnace wall.
The heating furnace that a kind of coil pipe the most according to claim 1 is drawable, is characterized in that: described coil pipe is by tube sheet, boiler tube, elbow, flange short tube and the coil pipe of header one assembly welding, and described coil pipe overall can be extracted out or advance in described furnace wall.
The heating furnace that a kind of coil pipe the most according to claim 1 is drawable, is characterized in that: described coil pipe is made up of some component coil pipes stacking, connects for fixing between the tube sheet of some component coil pipes, and described coil pipe overall can be extracted out or advance in described furnace wall.
The heating furnace that a kind of coil pipe the most according to claim 1 is drawable, it is characterized in that: described coil pipe is made up of some component coil pipes stacking, for being slidably connected between the tube sheet of some component coil pipes, described coil pipe overall can be extracted out or advance in described furnace wall, or the described point coil pipe of part can be extracted out in described furnace wall or advance.
5. according to the heating furnace that a kind of coil pipe described in claim 3 or 4 is drawable, it is characterized in that: the group number of the journal stirrup inside described furnace wall is corresponding with the quantity of described point of coil pipe, and the tube sheet of every component coil pipe is bearing in respectively and often organizes on journal stirrup.
6. according to the heating furnace that a kind of coil pipe described in claim 3 or 4 is drawable, it is characterized in that: be provided only with one group of journal stirrup inside described furnace wall, the bottom of some component coil pipes divides the tube sheet of coil pipe to be supported on described journal stirrup, and remaining point of coil pipe up stacks.
7. according to the heating furnace that a kind of coil pipe described in claim 3 or 4 is drawable, it is characterized in that: be provided only with one group of journal stirrup inside described furnace wall, the tube sheet of point coil pipe of several point of coil pipe top layer is supported on described journal stirrup, and remaining point of coil pipe is down stacked by hanging hook.
The heating furnace that a kind of coil pipe the most according to claim 1 is drawable, is characterized in that: described tube sheet is set to some pieces, and is provided with distance sink tube between adjacent described tube sheet.
The heating furnace that a kind of coil pipe the most according to claim 7 is drawable, it is characterized in that: described coil pipe is made up of some component coil pipes stacking, distance scalable between the tube sheet of different described point of coil pipes is arranged, the tube sheet dividing coil pipe up and down is provided with spacing at cross section, and/or divides coil pipe that longitudinal axis is provided with spacing up and down.
The heating furnace that a kind of coil pipe the most according to claim 1 is drawable, is characterized in that: fixes between described boiler tube with described tube sheet and is connected or is slidably connected.
CN201610467812.6A 2016-06-24 2016-06-24 A kind of heating furnace that coil pipe is drawable Active CN105953630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610467812.6A CN105953630B (en) 2016-06-24 2016-06-24 A kind of heating furnace that coil pipe is drawable

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610467812.6A CN105953630B (en) 2016-06-24 2016-06-24 A kind of heating furnace that coil pipe is drawable

Publications (2)

Publication Number Publication Date
CN105953630A true CN105953630A (en) 2016-09-21
CN105953630B CN105953630B (en) 2019-02-19

Family

ID=56903756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610467812.6A Active CN105953630B (en) 2016-06-24 2016-06-24 A kind of heating furnace that coil pipe is drawable

Country Status (1)

Country Link
CN (1) CN105953630B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109341403A (en) * 2018-10-26 2019-02-15 隆华科技集团(洛阳)股份有限公司 A kind of assemble method of the heat-exchanging tube bundle for closed cooling tower

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1160530A1 (en) * 1999-03-04 2001-12-05 Ebara Corporation Plate type heat exchanger
CN202303927U (en) * 2011-11-02 2012-07-04 赵树森 Horizontal drawable water jacket heating furnace
CN102914189A (en) * 2012-11-02 2013-02-06 江苏巴威工程技术股份有限公司 Modular removable heat exchanger
CN104566975A (en) * 2013-10-12 2015-04-29 史晨 Multi-functional heating furnace
CN104774640A (en) * 2015-03-30 2015-07-15 茂名重力石化机械制造有限公司 Heating furnace with obliquely-arranged coil pipes
CN205784800U (en) * 2016-06-24 2016-12-07 茂名重力石化机械制造有限公司 The heating furnace that a kind of coil pipe is drawable

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1160530A1 (en) * 1999-03-04 2001-12-05 Ebara Corporation Plate type heat exchanger
CN202303927U (en) * 2011-11-02 2012-07-04 赵树森 Horizontal drawable water jacket heating furnace
CN102914189A (en) * 2012-11-02 2013-02-06 江苏巴威工程技术股份有限公司 Modular removable heat exchanger
CN104566975A (en) * 2013-10-12 2015-04-29 史晨 Multi-functional heating furnace
CN104774640A (en) * 2015-03-30 2015-07-15 茂名重力石化机械制造有限公司 Heating furnace with obliquely-arranged coil pipes
CN205784800U (en) * 2016-06-24 2016-12-07 茂名重力石化机械制造有限公司 The heating furnace that a kind of coil pipe is drawable

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109341403A (en) * 2018-10-26 2019-02-15 隆华科技集团(洛阳)股份有限公司 A kind of assemble method of the heat-exchanging tube bundle for closed cooling tower

Also Published As

Publication number Publication date
CN105953630B (en) 2019-02-19

Similar Documents

Publication Publication Date Title
CN105369002A (en) Repair tooling of hot-blast branch pipe lining of hot-blast furnace and repair method thereof
CN202432493U (en) Modular afterheat boiler
CN104774640B (en) A kind of tiltedly row's coil pipe heating furnace
CN205784800U (en) The heating furnace that a kind of coil pipe is drawable
CN105953630A (en) Heating furnace with coil pipes capable of being pulled away
CN105486086B (en) A kind of heating furnace with module lining
CN104130797B (en) A kind of ethane cracking furnace convection section module remodeling method and convection section module thereof
CN202089776U (en) Calcium carbide waste heat collection tank
CN104498996A (en) Temperature-regulating and deformation-preventing structure for aluminum electrolysis cell shell
CN201293554Y (en) Furnace top vertical wall steel structure of large heating furnace
CN201706527U (en) Combination air preheater
CN103357720A (en) Method for bending bridge U-shaped rib in ignition general yield manner by adopting special clamping device
CN202915395U (en) Built-in flue plate type preheater
CN203855603U (en) Flue sliding support and flue sliding support group
CN211146446U (en) Industrial exhaust-heat boiler
CN104946846A (en) Flue support device
CN217900489U (en) High-strength tube plate and industrial furnace with same
CN113831932A (en) Installation device and installation method for cracking furnace radiation coil
CN102978317A (en) Hot-blast stove double-preheating device
WO2012041002A1 (en) Large-scale steam generator
CN219283959U (en) Tube plate with closed reinforcing ribs and industrial furnace with tube plate
CN204607930U (en) One tiltedly arranges coil pipe heating furnace
CN103574569B (en) cement kiln head waste heat boiler
CN217442249U (en) Tube plate with arched transverse arc plate and industrial furnace with tube plate
CN218237873U (en) Industrial furnace with high-efficiency low-resistance tube plate

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 525024 Guangdong City, Maoming Province Ring West Road, No. 91

Applicant after: Maoming gravity Petrochemical Equipment Co Ltd

Address before: 525024 Maoming City, Guangdong Province West Road, Maoming City, the gravity of the Petrochemical Machinery Manufacturing Co., Ltd.,