CN105944373B - A kind of multilayer basketball special spliced installed floor - Google Patents

A kind of multilayer basketball special spliced installed floor Download PDF

Info

Publication number
CN105944373B
CN105944373B CN201610557753.1A CN201610557753A CN105944373B CN 105944373 B CN105944373 B CN 105944373B CN 201610557753 A CN201610557753 A CN 201610557753A CN 105944373 B CN105944373 B CN 105944373B
Authority
CN
China
Prior art keywords
pedestal
hollow square
provided
equally distributed
card column
Prior art date
Application number
CN201610557753.1A
Other languages
Chinese (zh)
Other versions
CN105944373A (en
Inventor
徐永华
张顺利
李永华
丁利勤
李金朋
Original Assignee
上蔡县华联文体器材有限公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 上蔡县华联文体器材有限公司 filed Critical 上蔡县华联文体器材有限公司
Priority to CN201610557753.1A priority Critical patent/CN105944373B/en
Publication of CN105944373A publication Critical patent/CN105944373A/en
Application granted granted Critical
Publication of CN105944373B publication Critical patent/CN105944373B/en

Links

Abstract

The present invention relates to a kind of multilayer basketball special spliced installed floors,It includes face layer and is formed with the pedestal of face layer clamping,It is provided with equally distributed card column on the downside of face layer,The lower part of card column is open type structure,The checkering reticular structure that the downside of pedestal is made of hollow square lattice,The top of pedestal be respectively arranged with equally distributed fixing groove and with the matched card column slot of card column,Spring washer is connected in fixing groove,Spring washer is made of the hollow square body part on top and the hemisphere part of lower part,It is provided on the upper side of hemisphere part and the matched fixed column of fixing groove,Hollow square body part,Hemisphere part and fixed column are integrated integer structure,Pedestal any two is both provided with equally distributed female locking device on adjacent side,Be both provided on the symmetric side of the side of pedestal where female locking device it is equally distributed and with the matched sub- lock of female locking device;The present invention has the advantages that convenience reasonable for structure, sturdy and durable, quick and easy for installation, maintenance cost are low.

Description

A kind of multilayer basketball special spliced installed floor

Technical field

The invention belongs to novel floor technical fields, and in particular to a kind of multilayer basketball special spliced installed floor.

Background technology

Assembled floor-board is a kind of very novel athletic ground surface material, its special structure design adds plus firm Strong type support construction creates remarkable vertical damping effect, and anti-skidding surface can effectively prevent injury gained in sports, combined type movement The finished product on floor is bulk, the surface of base that can directly mat formation in cement or pitch, without bonding, with card between every floorboard Button is attached, and installation is simply, easy to disassemble, is the ideal chose of sports ground transformation, and assembled floor-board has environmental protection, buffering and height Elastic energy, indoor the advantages that using utilization rate height, beautiful not dizziness, existing assembled floor-board Imbalance in weight itself can cause When as sports ground, ball game track it is irregular, limit the popularization of assembled floor-board, the existing special floor of basketball uses When damping effect it is bad, and since support construction is not sufficiently stable, exacerbate the unstability of its own structure;Therefore it provides A kind of convenience reasonable for structure, sturdy and durable, quick and easy for installation, the much lower special assembled floor-board of layer basketball of maintenance cost are just very It is necessary.

Invention content

The purpose of the invention is to overcome the deficiencies in the prior art, and provide a kind of reasonable for structure, sturdy and durable, installation The much lower special assembled floor-board of layer basketball of convenient and efficient convenience, maintenance cost.

The object of the present invention is achieved like this:A kind of multilayer basketball special spliced installed floor, it include face layer and with face layer The pedestal of clamping forms, and equally distributed card column is provided on the downside of face layer, and the lower part of the card column is to open The upper side of mouth formula structure, the pedestal is planar structure, and the downside of the pedestal is made of hollow square lattice Checkering reticular structure, the top of the pedestal be respectively arranged with equally distributed fixing groove and with the matched card column of card column Slot is connected with spring washer in the fixing groove, and the spring washer is the hemisphere part of the hollow square body part and lower part by top Composition, be provided on the upper side of the hemisphere part with the matched fixed column of fixing groove, the hollow square body part, Hemisphere part and fixed column are integrated integer structure, are both provided with and are uniformly distributed on the adjacent side of the pedestal any two Female locking device, be both provided with equally distributed and and female locking device on the symmetric side of the side of the pedestal where the female locking device Matched sub- lock.

The hollow square lattice are internally provided with reinforcing rib.

The hollow square body part is matched with hollow square lattice.

Beneficial effects of the present invention:Face layer is inserted into using card column in the card column slot of pedestal by the present invention when in use, is utilized The fixed column of spring washer is inserted into the fixing groove of pedestal, and to complete whole assembling, this structure has quick, labor easy to assembly The small advantage of fatigue resistance, and when in later maintenance such as any one damage in face layer, pedestal and spring washer, only need to change damage Bad item does not need integral replacing, this just largely to reduce use cost and easy to maintain quick, in addition The setting of spring washer can increase the elastic force of the present invention, while reduce the impact force that pedestal is in direct contact with ground, to effectively The probability of damage for reducing pedestal, extend the service life of pedestal, the reinforcing rib of the inside setting of hollow square lattice can The mechanical strength for effectively increasing pedestal, reduces the spoilage of pedestal, and the present invention has reasonable for structure, sturdy and durable, peace Fill the low advantage of convenient and efficient convenience, maintenance cost.

Description of the drawings

Fig. 1 is a kind of assembling schematic diagram of multilayer basketball special spliced installed floor of the present invention.

Fig. 2 is a kind of structural schematic diagram of the face layer of multilayer basketball special spliced installed floor of the present invention.

Fig. 3 is a kind of structural schematic diagram of the pedestal of multilayer basketball special spliced installed floor of the present invention.

Fig. 4 is a kind of structural schematic diagram of the spring washer of multilayer basketball special spliced installed floor of the present invention.

In figure:1, face layer 2, pedestal 3, card column 4, fixing groove 5, card column slot 6, spring washer 7, hollow square body 8, hemisphere part 9, fixed column 10, female locking device 11, sub- lock.

Specific implementation mode

Following further describes the present invention with reference to the drawings.

Embodiment 1

As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of multilayer basketball special spliced installed floor, it include face layer 1 and with face layer 1 The pedestal 2 of clamping forms, and equally distributed card column 3, the lower part of the card column 3 are provided on the downside of face layer 1 Upper side for open type structure, the pedestal 2 is planar structure, and the downside of the pedestal 2 is by hollow square lattice The checkering reticular structure of composition, the top of the pedestal 2 be respectively arranged with equally distributed fixing groove 4 and with 3 phase of card column The card column slot 5 of cooperation is connected with spring washer 6 in the fixing groove 4, and the spring washer 6 is 7 He of hollow square body part by top The hemisphere part 8 of lower part forms, be provided on the upper side of the hemisphere part 8 with 4 matched fixed column 9 of fixing groove, Hollow square body part 7, hemisphere part 8 and the fixed column 9 is integrated integer structure, and 2 any two of pedestal is adjacent Side on be both provided with equally distributed female locking device 10, the symmetric side of the side of the pedestal 2 where the female locking device 10 On be both provided with it is equally distributed and with the matched sub- lock of female locking device 10 11.

Face layer is inserted into using card column in the card column slot of pedestal by the present invention when in use, and base is inserted into using the fixed column of spring washer In the fixing groove of frame, to complete whole assembling, this structure have the advantages that it is easy to assembly it is quick, labor intensity is small, and And when in later maintenance such as any one damage in face layer, pedestal and spring washer, damage item is only needed to change, is not needed whole Body is replaced, and this just largely to reduce use cost and easy to maintain quick, the in addition setting of spring washer can increase The elastic force of the present invention, while the impact force that pedestal is in direct contact with ground is reduced, to effectively reduce the damage of pedestal Probability, extends the service life of pedestal, and the reinforcing rib of the inside setting of hollow square lattice can effectively increase pedestal Mechanical strength, reduces the spoilage of pedestal, and the present invention has convenience reasonable for structure, sturdy and durable, quick and easy for installation, maintenance The low advantage of expense.

Embodiment 2

As shown in Figure 1, Figure 2, Figure 3 and Figure 4, a kind of multilayer basketball special spliced installed floor, it include face layer 1 and with face layer 1 The pedestal 2 of clamping forms, and equally distributed card column 3, the lower part of the card column 3 are provided on the downside of face layer 1 Upper side for open type structure, the pedestal 2 is planar structure, and the downside of the pedestal 2 is by hollow square lattice The checkering reticular structure of composition, the top of the pedestal 2 be respectively arranged with equally distributed fixing groove 4 and with 3 phase of card column The card column slot 5 of cooperation is connected with spring washer 6 in the fixing groove 4, and the spring washer 6 is 7 He of hollow square body part by top The hemisphere part 8 of lower part forms, be provided on the upper side of the hemisphere part 8 with 4 matched fixed column 9 of fixing groove, Hollow square body part 7, hemisphere part 8 and the fixed column 9 is integrated integer structure, and 2 any two of pedestal is adjacent Side on be both provided with equally distributed female locking device 10, the symmetric side of the side of the pedestal 2 where the female locking device 10 On be both provided with it is equally distributed and with the matched sub- lock 11 of female locking device 10, the hollow square lattice are internally provided with Reinforcing rib, the hollow square body part 7 are matched with hollow square lattice.

Face layer is inserted into using card column in the card column slot of pedestal by the present invention when in use, and base is inserted into using the fixed column of spring washer In the fixing groove of frame, to complete whole assembling, this structure have the advantages that it is easy to assembly it is quick, labor intensity is small, and And when in later maintenance such as any one damage in face layer, pedestal and spring washer, damage item is only needed to change, is not needed whole Body is replaced, and this just largely to reduce use cost and easy to maintain quick, the in addition setting of spring washer can increase The elastic force of the present invention, while the impact force that pedestal is in direct contact with ground is reduced, to effectively reduce the damage of pedestal Probability, extends the service life of pedestal, and the reinforcing rib of the inside setting of hollow square lattice can effectively increase pedestal Mechanical strength, reduces the spoilage of pedestal, and the present invention has convenience reasonable for structure, sturdy and durable, quick and easy for installation, maintenance The low advantage of expense.

Claims (3)

1. a kind of multilayer basketball special spliced installed floor, it includes face layer and is formed with the pedestal of face layer clamping, it is characterised in that:Institute Equally distributed card column is provided on the downside for the face layer stated, the lower part of the card column is open type structure, the base The upper side of frame is planar structure, the checkering reticular structure that the downside of the pedestal is made of hollow square lattice, institute The top for the pedestal stated be respectively arranged with equally distributed fixing groove and with the matched card column slot of card column, in the fixing groove It is connected with spring washer, the spring washer is made of the hollow square body part on top and the hemisphere part of lower part, the hemisphere It is provided on the upper side of part and the matched fixed column of fixing groove, hollow square body part, hemisphere part and the fixed column It is integrated integer structure, the pedestal any two is both provided with equally distributed female locking device on adjacent side, described Be both provided on the symmetric side of the side of pedestal where female locking device it is equally distributed and with the matched sub- lock of female locking device.
2. a kind of multilayer basketball special spliced installed floor as described in claim 1, it is characterised in that:The hollow square lattice It is internally provided with reinforcing rib.
3. a kind of multilayer basketball special spliced installed floor as described in claim 1, it is characterised in that:The hollow square body part It is matched with hollow square lattice.
CN201610557753.1A 2016-07-15 2016-07-15 A kind of multilayer basketball special spliced installed floor CN105944373B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610557753.1A CN105944373B (en) 2016-07-15 2016-07-15 A kind of multilayer basketball special spliced installed floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610557753.1A CN105944373B (en) 2016-07-15 2016-07-15 A kind of multilayer basketball special spliced installed floor

Publications (2)

Publication Number Publication Date
CN105944373A CN105944373A (en) 2016-09-21
CN105944373B true CN105944373B (en) 2018-09-25

Family

ID=56900801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610557753.1A CN105944373B (en) 2016-07-15 2016-07-15 A kind of multilayer basketball special spliced installed floor

Country Status (1)

Country Link
CN (1) CN105944373B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106621275A (en) * 2016-11-28 2017-05-10 洛阳师范学院 Assembly-type sports training device

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2461738Y (en) * 2001-01-05 2001-11-28 赵英春 Block-shape frame type floor
US6684592B2 (en) * 2001-08-13 2004-02-03 Ron Martin Interlocking floor panels
CN2657732Y (en) * 2003-06-20 2004-11-24 雷爱新 Suspension assembling floor board
CN201809942U (en) * 2010-09-29 2011-04-27 张健 Ground heating floor
CN104343068A (en) * 2014-09-30 2015-02-11 王鹏 Split type sport floor
CN205134866U (en) * 2015-09-30 2016-04-06 张亚东 Sports flooring piece and sports flooring
CN205948333U (en) * 2016-07-15 2017-02-15 上蔡县华联文体器材有限公司 Special assembled floor of multilayer basketball

Also Published As

Publication number Publication date
CN105944373A (en) 2016-09-21

Similar Documents

Publication Publication Date Title
CN1037868C (en) Modular sports tile with lateral absorption
US8424257B2 (en) Modular tile with controlled deflection
EP1585580B1 (en) Portable golf putting and chipping practice green
CN102231998A (en) Modular sub-flooring system
WO2012167313A8 (en) Trompolines
BRPI0805812A2 (en) panel, in particular, floor panel
US9739053B2 (en) Multi-tiered recoiling energy absorbing system with lateral stabilizer
CN103097624A (en) Synthetic floor tile having partially compliant support structure
AT510089B1 (en) Flooring
NZ590904A (en) Roof anchor with shock absorbing means using breakaway links and plastic deformation zones of a sheet material to achieve gradual energy absorption
US20050108968A1 (en) Arch-ribbed tile system
CA2505076A1 (en) Stackable outdoor screen fence
US20020015840A1 (en) Elastic blocks and process for producing the same
US20140311074A1 (en) Recoiling energy absorbing system
KR100975984B1 (en) Assemble type of field flooring and fabricating method the same
CN203467787U (en) Damping shoe sole and shoe
US20140206505A1 (en) Trampoline park frame
CA2757797A1 (en) Portable assembly type flat bench
WO2012116419A3 (en) Construction toy
JP5037568B2 (en) Turf protection mat
WO2008088519A3 (en) Compression post assembly for wind up-lift of suspension soffits
WO2008021980A3 (en) Modular frame with parabolic top
MX2008004936A (en) Damping for tall structures.
WO2011061659A3 (en) Floor panel and methods for manufacturing floor panels
US20150224354A1 (en) Waterfall pit trampoline

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 463800 Shangcai industrial agglomeration area, Zhumadian, Henan

Patentee after: Henan three public Lihua Sports Technology Co., Ltd.

Address before: 463800 Shangcai industrial agglomeration area, Zhumadian, Henan

Patentee before: Shangcai Hualian stationery and sports equipment Co., Ltd.