CN205894860U - A erect fence interval and adjust structure for guardrail - Google Patents

A erect fence interval and adjust structure for guardrail Download PDF

Info

Publication number
CN205894860U
CN205894860U CN201620852260.6U CN201620852260U CN205894860U CN 205894860 U CN205894860 U CN 205894860U CN 201620852260 U CN201620852260 U CN 201620852260U CN 205894860 U CN205894860 U CN 205894860U
Authority
CN
China
Prior art keywords
guardrail
horizontal bar
securing member
baltimore groove
fence
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620852260.6U
Other languages
Chinese (zh)
Inventor
尹毅剑
陈林碧
赖玉春
卢杰鹏
池志荣
张新培
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Province bamboo science and Technology Co., Ltd.
Original Assignee
Yongan Bamboo Bamboo Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongan Bamboo Bamboo Industry Co Ltd filed Critical Yongan Bamboo Bamboo Industry Co Ltd
Priority to CN201620852260.6U priority Critical patent/CN205894860U/en
Application granted granted Critical
Publication of CN205894860U publication Critical patent/CN205894860U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model relates to an erect fence interval and adjust structure for guardrail, including horizontal bar and perpendicular fence, it adjusts the structure including concave groove and the fastener of a locking with the fixed action to erect the fence interval. Wherein, the concave groove sets up respectively on the central zone with erecting two horizontal bar medial surfaces being connected on the fence along the length direction of horizontal bar, the fastener be with the square plate of concave groove assorted, simultaneously, the degree of depth that highly is not higher than the concave groove of fastener, and vertical side of fastener is tangent with vertical medial surface of concave groove, and will the fastener is arranged perpendicular fence in and is erected between the fence or erect in the concave groove between fence and the guardrail stand. The utility model discloses can adjust the distance of erecting on the guardrail between the fence at will, and go on swiftly, firmly install erecting the fence, have very strong practicality, convenience simple to use has better economic value and social value.

Description

A kind of perpendicular column gutter adjustment structure for guardrail
Technical field
The utility model belongs to protection guardrail, particularly to a kind of perpendicular column gutter adjustment structure for guardrail.
Background technology
China is bamboo resource country the abundantest in the world, in recent years, gradually deficient with world's timber resources, Rationally and effectively seem more and more important using timber and bamboo timber resource.
Bamboo and wood materials rationally using an approach be exactly material restructuring and compound, in the prior art, for building, filling The main Recombined bamboo technology in the fields such as decorations has thin bamboo strips used for weaving recombinant technique, bamboo fiber reinforced composite material manufacturing technology, bamboo side's restructuring skill Art, dwarf bamboo recombinant technique, bamboo wood arc recombinant technique etc..A kind of raising utilization rate of bamboo that Recombined bamboo is succeeded in developing in recent years Bamboo product, be currently used primarily in manufacture floor, also have part be used for manufacturing furniture.
As can be seen here, with the development of heavy bamboo process technology, heavy bamboo gradually substitutes wood as a kind of material of energy-saving and emission-reduction The application of material has become as the development trend in future, and the particularly application in guard rail field for the heavy bamboo will be more and more extensive, its Not only have the characteristics that dainty generous, attractive in fashion, and be hardly damaged, easily maintenance, the advantage of long service life.However, Still in the prior art with regard to guardrail, guardrail erects the making on hurdle to traditional guardrail mounting means and installation steps are all taken Prefabricated link slot on column or horizontal bar, then inserts the two ends on perpendicular hurdle in prefabricated link slot at the scene again and is fixedly connected, But it is mainly manifested in using the problem that this prefabricated link slot exists: first, prefabricated link slot cannot be wanted by the use of client Flexible modulation is asked to erect the spacing on hurdle;Second, prefabricated link slot is required to very to the design and fabrication level of making master worker, precision Height, once prefabricated link slot in the vertical direction on upper and lower horizontal bar cannot align, may lead to perpendicular hurdle cannot install, or Even if can install, but perpendicular hurdle is in non-vertical state, has a strong impact on attractive in appearance;Third, guardrail is usually used in outdoor field, severe use ring Border may lead to perpendicular hurdle rotten and need to change, and adopts the perpendicular hurdle that prefabricated link slot is installed may change difficulty;Fourth, adopting The perpendicular hurdle firmness that prefabricated link slot is installed is not enough, and so on.
Based on adopting prefabricated link slot to install perpendicular hurdle variety of problems on guardrail in prior art, the utility model provides a kind of There is perpendicular column gutter and freely adjust structure, not only the perpendicular hurdle between upper and lower horizontal bar firmly can be connected, and install fast Victory, and in prior art at home, also do not have similar pertinent literature to report.
Content of the invention
The purpose of this utility model is exactly for providing a kind of perpendicular column gutter adjustment structure for guardrail, realizing to upper and lower Perpendicular hurdle between horizontal bar carries out firmly and quickly installing, connects.
In order to realize above-mentioned target, the technical scheme of employing is: a kind of perpendicular column gutter adjustment structure for guardrail includes Horizontal bar and perpendicular hurdle, its design feature is that described perpendicular column gutter adjusts the fastening that structure includes Baltimore groove and a locking and fixation Part, described Baltimore groove is separately positioned on and the central area erecting two horizontal bar medial surfaces that hurdle is connected along the length direction of horizontal bar On, described securing member is the square plate matching with Baltimore groove, and the height of described securing member is not higher than the depth of Baltimore groove, and The longitudinal side of securing member is tangent with the longitudinal medial face of Baltimore groove, and described securing member is placed between perpendicular hurdle and perpendicular hurdle or perpendicular In Baltimore groove between hurdle and fence upright.
Further, the cross section of described Baltimore groove has a rectangular shape or oblong-shaped.
Further, the depth of described Baltimore groove is 1-10cm;The length of described securing member is 5-100cm.
Further, the material of described perpendicular hurdle or securing member selects recombining bamboo, preserving timber, wood and plastic composite, plastics One kind of in section bar and shape.As further preferred version, described horizontal bar adopts recombining bamboo;Described Perpendicular hurdle adopts recombining bamboo or shape;Described securing member adopts recombining bamboo.
The beneficial effect that the utility model is realized: the utility model provide a kind of erect column gutter freely adjust structure, Realize the perpendicular hurdle between upper and lower horizontal bar is carried out firmly and quickly installing, connects.Therefore, the utility model have very strong Practicality, easy to use, there is preferable economic worth and social value.
Brief description
Fig. 1 is the structural representation of Baltimore groove on horizontal bar.
Fig. 2 is the structural representation of securing member.
Fig. 3 is the b-b cross-sectional schematic of Fig. 1 middle concave groove.
Fig. 4 is that have the guard bar structure schematic diagram that perpendicular column gutter freely adjusts structure.
Fig. 5 is the a-a cross section structure diagram of Fig. 1.
In figure, 1 is column, and 2 is the first horizontal bar, and 3 is the 3rd horizontal bar, and 4 is the second horizontal bar, and 5 is perpendicular hurdle, and 6 is securing member, 7 It is Baltimore groove.
Specific embodiment
In order to further understanding is made to the utility model, in conjunction with accompanying drawing, it is explained.
Embodiment 1
As shown in accompanying drawing 1, Fig. 2 and Fig. 3, a kind of perpendicular column gutter adjustment structure for guardrail of the present embodiment, including recessed Shape groove 7 and the securing member 6 playing locking and fixation, wherein, Baltimore groove 7 is separately positioned on and perpendicular along the length direction of horizontal bar 4 On the central area of two horizontal bar medial surfaces that hurdle connects, securing member 6 is the square plate matching with Baltimore groove 7, and fastens The height of part 6 is not higher than the depth of Baltimore groove 7, and the longitudinal side of securing member 6 is tangent with the longitudinal medial face of Baltimore groove 7.
In the present embodiment, horizontal bar, perpendicular hurdle and securing member are all using recombining bamboo.Meanwhile, the cross section of Baltimore groove is in length Square shape, the depth of described Baltimore groove is 6cm;The length of securing member is 12cm, and height or thickness are 6cm, and securing member 6 is put In Baltimore groove 7 between perpendicular hurdle and the perpendicular hurdle or between perpendicular hurdle and fence upright, that is, form perpendicular column gutter adjustment structure.
Embodiment 2
As shown in accompanying drawing 4, Fig. 5, the present embodiment is a kind of guardrail with perpendicular column gutter adjustment structure, and perpendicular column gutter is freely Adjustment structure includes Baltimore groove 7 and securing member 6, and the Baltimore groove 7 of the present embodiment is separately positioned on the first horizontal bar 2, on the second horizontal bar 4 On the central area of the medial surface being connected with perpendicular hurdle 5, and Baltimore groove 7 is prefabrication groove, and the longitudinal direction that Baltimore groove 7 runs through horizontal bar is long Degree, and depth is 5cm.
In the present embodiment, the depth that the height of securing member 6 is equal to Baltimore groove 7 is 5cm for depth, and securing member 6 is embedded After in Baltimore groove 7, the surface of securing member 6 and the horizontal bar flush belonging to Baltimore groove 7;The spacing on the perpendicular hurdle 5 of setting is 12cm, recessed The cross section of shape groove 7 is rectangle shape;Column 1, the first horizontal bar, the material of the second horizontal bar, perpendicular hurdle 5 or securing member 6 are all using weight Group bamboo wood.
In the present embodiment, the installation steps on guardrail and its perpendicular hurdle include the following:
First, column 1 is fixedly installed on floor or on base, by the two ends of the first horizontal bar 2, the second horizontal bar 4 respectively Insert in the prefabricated slot in column 1 medial surface and be locked so that the first horizontal bar 2, the second horizontal bar 4 are in parallel distribution.
Secondly, with the distance of spacing 12cm, the top on perpendicular hurdle 5, bottom are inserted the first horizontal bar 2 respectively, on the second horizontal bar 4 Baltimore groove 7 in so that perpendicular hurdle 5 is in vertical state.
Finally, by length be 12cm, height or thickness be 5cm securing member embed the Baltimore groove 7 between adjacent perpendicular hurdle 5 Interior so that the surface of securing member is flushed with horizontal bar face, that is, formed there is the guardrail that perpendicular column gutter freely adjusts structure.
Although the utility model describes specific case study on implementation, scope of the present utility model is not limited to State specific embodiment, in the case of without departing from the utility model essence, to various modifications of the present utility model, variations and alternatives Each fall within protection domain of the present utility model.

Claims (8)

1. a kind of perpendicular column gutter adjustment structure for guardrail, include horizontal bar with perpendicular hurdle it is characterised in that: described perpendicular column gutter tune Whole structure includes Baltimore groove and is respectively provided with along the length direction of horizontal bar with playing the securing member of locking and fixation, described Baltimore groove On the central area of two horizontal bar medial surfaces being connected with perpendicular hurdle, described securing member is the square plate matching with Baltimore groove Block, the height of described securing member is not higher than the depth of Baltimore groove, and the longitudinal medial face of the longitudinal side of securing member and Baltimore groove Tangent, and described securing member is placed in the Baltimore groove between perpendicular hurdle and perpendicular hurdle or between perpendicular hurdle and fence upright.
2. a kind of perpendicular column gutter adjustment structure for guardrail according to claim 1 it is characterised in that: described Baltimore groove Cross section have a rectangular shape or oblong-shaped.
3. a kind of perpendicular column gutter adjustment structure for guardrail according to claim 1 and 2 it is characterised in that: described recessed The depth of shape groove is 1-10cm.
4. a kind of perpendicular column gutter adjustment structure for guardrail according to claim 1 it is characterised in that: described securing member Length be 5-100cm.
5. a kind of perpendicular column gutter adjustment structure for guardrail according to claim 1 it is characterised in that: described perpendicular hurdle or The material of securing member selects one of them in recombining bamboo, preserving timber, wood and plastic composite, plastic material and shape Kind.
6. a kind of perpendicular column gutter adjustment structure for guardrail according to claim 1 it is characterised in that: described horizontal bar is adopted Use recombining bamboo.
7. according to claim 1 or 5 a kind of perpendicular column gutter adjustment structure for guardrail it is characterised in that: described perpendicular Hurdle adopts recombining bamboo or shape.
8. according to claim 1 or 5 a kind of perpendicular column gutter adjustment structure for guardrail it is characterised in that: described tight Firmware adopts recombining bamboo.
CN201620852260.6U 2016-08-09 2016-08-09 A erect fence interval and adjust structure for guardrail Active CN205894860U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620852260.6U CN205894860U (en) 2016-08-09 2016-08-09 A erect fence interval and adjust structure for guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620852260.6U CN205894860U (en) 2016-08-09 2016-08-09 A erect fence interval and adjust structure for guardrail

Publications (1)

Publication Number Publication Date
CN205894860U true CN205894860U (en) 2017-01-18

Family

ID=57781646

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620852260.6U Active CN205894860U (en) 2016-08-09 2016-08-09 A erect fence interval and adjust structure for guardrail

Country Status (1)

Country Link
CN (1) CN205894860U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894589A (en) * 2018-07-20 2018-11-27 长久(滁州)专用汽车有限公司 A kind of fence upright structure of adjustable spacing
CN110821277A (en) * 2019-11-24 2020-02-21 徐州道亨钢绳索具有限公司 Steel wire guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108894589A (en) * 2018-07-20 2018-11-27 长久(滁州)专用汽车有限公司 A kind of fence upright structure of adjustable spacing
CN110821277A (en) * 2019-11-24 2020-02-21 徐州道亨钢绳索具有限公司 Steel wire guardrail

Similar Documents

Publication Publication Date Title
CN103697030B (en) The lock type connecting structure of a kind of solid wood or log furniture
CN205894860U (en) A erect fence interval and adjust structure for guardrail
CN112196102B (en) Composite assembly type building steel structure
CN201172953Y (en) Connecting piece for wood floor
CN205894539U (en) Guardrail with erect fence interval freedom adjustment structure
WO2009134101A3 (en) Prefabricated pallet
CN202280709U (en) Turnbuckle type joggle structure and furniture having the same
CN206070439U (en) A kind of heavy bamboo metal composite structure novel guardrail
CN112593659A (en) Engineering bamboo component reinforced by profile steel and preparation method thereof
CN204983396U (en) Bamboo - aerated concrete combination beam
CN203531286U (en) Novel rail post connecting structure
CN101328722B (en) Chain building
CN208918099U (en) A kind of wood-concrete combined floor
CN104323591B (en) A kind of steady type environment-friendlywardrobe wardrobe
CN205894277U (en) Heavy bamboo prefabricated component combination wayside pavilion
CN207314732U (en) Anti-deformation bilayer assembled floor-board
KR101670694B1 (en) Korean sperm friendly
CN202055469U (en) Combined floor capable of being laid conveniently
CN205948333U (en) Special assembled floor of multilayer basketball
CN202214950U (en) Novel outdoor wood-plastic floor board
US10626622B2 (en) Assembled floor unit
CN209145224U (en) A kind of compound floor laying structure of lightweight
CN205742888U (en) A kind of high-strength bamboo wood composite floor
CN103070556B (en) Moisture-proof fireproof environment-friendly combined cupboard
CN105944373A (en) Spliced floor special for multilayer basketball

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 366023 Hongtian Industrial Park, Hongtian Town, Yongan, Sanming City, Fujian, China, June

Patentee after: Fujian Province bamboo science and Technology Co., Ltd.

Address before: 366099 room 2201, Wynn building, 152 new Fu Road, Yanbei street, Yongan, Sanming City, Fujian

Patentee before: Yongan Bamboo Bamboo Industry Co., Ltd.

CP03 Change of name, title or address