Prior art keywords
isolated
cover
top board
isolation cover
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610318381.7A
Other languages
English (en)
Other versions
CN105932592B (zh
Inventor
苏伟
丁文渊
奚晓莉
周家骏
水炜
蒋晨平
张捷
苏海靖
颜旭昊
朱飞
何忠良
顾士刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai South Electric Power Engineering Co., Ltd.
State Grid Shanghai Electric Power Co Ltd
Original Assignee
SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd filed Critical SHANGHAI SOUTH ELECTRIC POWER ENGINEERING Co Ltd
Priority to CN201610318381.7A priority Critical patent/CN105932592B/zh
Publication of CN105932592A publication Critical patent/CN105932592A/zh
Application granted granted Critical
Publication of CN105932592B publication Critical patent/CN105932592B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/02Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for overhead lines or cables

Landscapes

  • Insulating Bodies (AREA)
  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

本发明公开了一种用于直线杆开分段的绝缘罩,包括两个侧边相隔离箱和两个中相隔离罩,一个所述侧边相隔离箱、一个所述中相隔离罩、另一个所述中相隔离罩和另一个所述侧边相隔离箱从前至后依次相连;所述两个侧边相隔离箱对称设置;所述两个中相隔离罩对称设置,且一个所述中相隔离罩的隔离罩顶板上的半圆形凸缘与另一个所述中相隔离罩的隔离罩顶板上的半圆形凸缘相连形成一个圆形的电杆防护孔。本发明的用于直线杆开分段的绝缘罩,使操作人员在作业中无法同时接触到不同电位物体,降低触电事故率的发生。

Description

一种用于直线杆开分段的绝缘罩
技术领域
本发明涉及一种用于直线杆开分段的绝缘罩,属于电力带电作业工器具领域。
背景技术
随着电力市场的不断开放,带电作业逐渐取代传统的停电检修,带电作业将是今后10kV配电网检修的发展方向。在开展配网直线杆带电开分段作业时,由于带电作业时铁横担会发生地电位接地事故,因此需要对直线杆更换后的和合横担进行隔离。目前使用的隔离工具为绝缘布,绝缘布柔软、易污损、年损耗量大,同时在包裹铁和合横担时难以全面将和合横担隔离,导致操作人员在电杆高处需要使用更长的作业时间进行绝缘隔离作业,无形中增加了工作强度和操作难度。
发明内容
本发明的目的是克服现有技术的缺陷,提供一种用于直线杆开分段的绝缘罩,使操作人员在作业中无法同时接触到不同电位物体,避免了操作人员与接地体之间的接触,降低触电事故率的发生。
实现上述目的的技术方案是:一种用于直线杆开分段的绝缘罩,包括两个侧边相隔离箱和两个中相隔离罩,其中:
每个所述侧边相隔离箱均呈下端开口和后端开口的箱体结构,每个所述侧边相隔离箱均由隔离箱顶板、隔离箱前板、隔离箱左侧板和隔离箱右侧板依次相连围成,所述隔离箱前板上设置有绝缘把手;
每个所述中相隔离罩均包括隔离罩顶板、隔离罩左侧板和隔离罩右侧板,所述隔离罩左侧板和隔离罩右侧板相对设置,所述隔离罩顶板跨接在所述隔离罩左侧板的顶端和隔离罩右侧板的顶端之间,所述隔离罩顶板的后端的中部开设一个半圆形孔,该半圆形孔上固定有半圆形凸缘;
每个所述隔离箱顶板和每个所述隔离罩顶板上均设置有两个顶板插槽,所述两个顶板插槽一左一右地设置;
每个所述顶板插槽上插接一个插板,每个所述插板的顶端设置一个导线勾;
一个所述侧边相隔离箱、一个所述中相隔离罩、另一个所述中相隔离罩和另一个所述侧边相隔离箱从前至后依次相连;
所述两个侧边相隔离箱对称设置;
所述两个中相隔离罩对称设置,且一个所述中相隔离罩的隔离罩顶板上的半圆形凸缘与另一个所述中相隔离罩的隔离罩顶板上的的半圆形凸缘相连形成一个圆形的电杆防护孔。
上述的一种用于直线杆开分段的绝缘罩,其中,所述侧边相隔离箱、中相隔离罩、电杆防护孔、顶板插槽和插板均采用聚丙乙烯绝缘板制成。
上述的一种用于直线杆开分段的绝缘罩,其中,每个所述中相隔离罩的前端均设置一个插接段,该插接段插接在相应的所述侧边相隔离箱的后端开口内。
上述的一种用于直线杆开分段的绝缘罩,其中,所述插板呈U形结构,所述导线勾固定在所述插板的上端开口。
本发明的用于直线杆开分段的绝缘罩,使操作人员在作业中无法同时接触到不同电位物体,避免了操作人员与接地体之间的接触,降低触电事故率的发生。
附图说明
图1为本发明的用于直线杆开分段的绝缘罩的结构示意图;
图2为本发明的绝缘罩的侧边相隔离箱的结构示意图(前视);
图3为本发明的绝缘罩的侧边相隔离箱的结构示意图(后视);
图4为本发明的绝缘罩的中相隔离罩的结构示意图(前视);
图5为本发明的绝缘罩的中相隔离罩的结构示意图(后视)。
具体实施方式
为了使本技术领域的技术人员能更好地理解本发明的技术方案,下面结合附图对其具体实施方式进行详细地说明:
请参阅图1至图5,本发明的最佳实施例,一种用于直线杆开分段的绝缘罩,包括两个侧边相隔离箱1和两个中相隔离罩2。
请参阅图2和图3,每个侧边相隔离箱1均呈下端开口和后端开口的箱体结构,每个侧边相隔离箱1均由隔离箱顶板11、隔离箱前板12、隔离箱左侧板13和隔离箱右侧板14依次相连围成,隔离箱前板12上设置有绝缘把手3,方便操作人员放置及取回侧边相隔离箱1。
请参阅图4和图5,每个中相隔离罩2均包括隔离罩顶板21、隔离罩左侧板22和隔离罩右侧板23,隔离罩左侧板22和隔离罩右侧板23相对设置,隔离罩顶板21跨接在隔离罩左侧板22的顶端和隔离罩右侧板23的顶端之间,隔离罩顶板21的后端的中部开设一个半圆形孔24,该半圆形孔上固定有半圆形凸缘25。
每个隔离箱顶板11和每个隔离罩顶板21上均设置有两个顶板插槽4,两个顶板插槽4一左一右地设置;每个顶板插槽4上插接一个插板5,每个插板5的顶端设置一个导线勾6;优选地,插板5呈U形结构,导线勾6固定在所述插板的上端开口
再请参阅图1,一个侧边相隔离箱1、一个中相隔离罩2、另一个中相隔离罩2和另一个侧边相隔离箱1从前至后依次相连;两个侧边相隔离箱1对称设置;两个中相隔离罩2对称设置,中相隔离罩2的前端均设置一个插接段26,该插接段26插接在相应的侧边相隔离箱1的后端开口内。一个中相隔离罩2的隔离罩顶板21上的半圆形凸缘25与另一个中相隔离罩2的隔离罩顶板21上的的半圆形凸缘25相连形成一个圆形的电杆防护孔7。
侧边相隔离箱1、中相隔离罩2、电杆防护孔7、顶板插槽4和插板5均采用聚丙乙烯绝缘板制成。
本发明的用于直线杆开分段的绝缘罩,在使用时,两个中相隔离罩2组合后形成圆形的电杆防护孔7,用于中相隔离罩与电杆良好贴合,将整根和合横担隔离;两个侧边相隔离箱1及两个中相隔离罩2上设计有顶板插槽4,操作人员可以将插板5插入顶板插槽4内,将导线架在导线勾6内,使操作人员在作业中无法同时接触到不同电位物体,避免了操作人员与接地体之间的接触,降低触电事故率的发生。
综上所述,本发明的用于直线杆开分段的绝缘罩,使操作人员在作业中无法同时接触到不同电位物体,避免了操作人员与接地体之间的接触,降低触电事故率的发生。
本技术领域中的普通技术人员应当认识到,以上的实施例仅是用来说明本发明,而并非用作为对本发明的限定,只要在本发明的实质精神范围内,对以上所述实施例的变化、变型都将落在本发明的权利要求书范围内。

Claims (4)

1.一种用于直线杆开分段的绝缘罩,其特征在于,包括两个侧边相隔离箱和两个中相隔离罩,其中:
每个所述侧边相隔离箱均呈下端开口和后端开口的箱体结构,每个所述侧边相隔离箱均由隔离箱顶板、隔离箱前板、隔离箱左侧板和隔离箱右侧板依次相连围成,所述隔离箱前板上设置有绝缘把手;
每个所述中相隔离罩均包括隔离罩顶板、隔离罩左侧板和隔离罩右侧板,所述隔离罩左侧板和隔离罩右侧板相对设置,所述隔离罩顶板跨接在所述隔离罩左侧板的顶端和隔离罩右侧板的顶端之间,所述隔离罩顶板的后端的中部开设一个半圆形孔,该半圆形孔上固定有半圆形凸缘;
每个所述隔离箱顶板和每个所述隔离罩顶板上均设置有两个顶板插槽,所述两个顶板插槽一左一右地设置;
每个所述顶板插槽上插接一个插板,每个所述插板的顶端设置一个导线勾;
一个所述侧边相隔离箱、一个所述中相隔离罩、另一个所述中相隔离罩和另一个所述侧边相隔离箱从前至后依次相连;
所述两个侧边相隔离箱对称设置;
所述两个中相隔离罩对称设置,且一个所述中相隔离罩的隔离罩顶板上的半圆形凸缘与另一个所述中相隔离罩的隔离罩顶板上的的半圆形凸缘相连形成一个圆形的电杆防护孔。
2.根据权利要求1所述的一种用于直线杆开分段的绝缘罩,其特征在于,所述侧边相隔离箱、中相隔离罩、电杆防护孔、顶板插槽和插板均采用聚丙乙烯绝缘板制成。
3.根据权利要求1所述的一种用于直线杆开分段的绝缘罩,其特征在于,每个所述中相隔离罩的前端均设置一个插接段,该插接段插接在相应的所述侧边相隔离箱的后端开口内。
4.根据权利要求1所述的一种用于直线杆开分段的绝缘罩,其特征在于,所述插板呈U形结构,所述导线勾固定在所述插板的上端开口。
CN201610318381.7A 2016-05-13 2016-05-13 一种用于直线杆开分段的绝缘罩 Active CN105932592B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610318381.7A CN105932592B (zh) 2016-05-13 2016-05-13 一种用于直线杆开分段的绝缘罩

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610318381.7A CN105932592B (zh) 2016-05-13 2016-05-13 一种用于直线杆开分段的绝缘罩

Publications (2)

Publication Number Publication Date
CN105932592A true CN105932592A (zh) 2016-09-07
CN105932592B CN105932592B (zh) 2017-08-25

Family

ID=56834928

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610318381.7A Active CN105932592B (zh) 2016-05-13 2016-05-13 一种用于直线杆开分段的绝缘罩

Country Status (1)

Country Link
CN (1) CN105932592B (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910812A (zh) * 2017-12-21 2018-04-13 国网山东省电力公司烟台供电公司 一种绝缘杆法带负荷更换中相隔离开关的专用绝缘遮蔽工具
CN115986605A (zh) * 2022-12-28 2023-04-18 国网山东省电力公司宁津县供电公司 一种配电线路绝缘遮蔽装置

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201355748Y (zh) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 用于配电线路的电缆过渡支架绝缘遮蔽装置
US7663461B2 (en) * 2005-11-10 2010-02-16 Prolec GE. S. de R.L. de C.V. Modular tank coupled to a self-assembly cabinet for ground level transformers
CN201408940Y (zh) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 用于10kV柱式绝缘子的绝缘隔离罩套件
CN202206071U (zh) * 2011-09-19 2012-04-25 湖南省电力公司长沙电业局 用于直线杆绝缘子更换的绝缘遮蔽罩
CN205212334U (zh) * 2015-12-17 2016-05-04 国家电网公司 柱式绝缘子屏蔽套
CN205753181U (zh) * 2016-05-13 2016-11-30 上海市南电力工程有限公司 一种用于直线杆开分段的绝缘罩

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7663461B2 (en) * 2005-11-10 2010-02-16 Prolec GE. S. de R.L. de C.V. Modular tank coupled to a self-assembly cabinet for ground level transformers
CN201355748Y (zh) * 2008-12-30 2009-12-02 上海市南电力工程有限公司 用于配电线路的电缆过渡支架绝缘遮蔽装置
CN201408940Y (zh) * 2009-05-15 2010-02-17 上海市南电力工程有限公司 用于10kV柱式绝缘子的绝缘隔离罩套件
CN202206071U (zh) * 2011-09-19 2012-04-25 湖南省电力公司长沙电业局 用于直线杆绝缘子更换的绝缘遮蔽罩
CN205212334U (zh) * 2015-12-17 2016-05-04 国家电网公司 柱式绝缘子屏蔽套
CN205753181U (zh) * 2016-05-13 2016-11-30 上海市南电力工程有限公司 一种用于直线杆开分段的绝缘罩

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107910812A (zh) * 2017-12-21 2018-04-13 国网山东省电力公司烟台供电公司 一种绝缘杆法带负荷更换中相隔离开关的专用绝缘遮蔽工具
CN115986605A (zh) * 2022-12-28 2023-04-18 国网山东省电力公司宁津县供电公司 一种配电线路绝缘遮蔽装置
CN115986605B (zh) * 2022-12-28 2023-08-25 国网山东省电力公司宁津县供电公司 一种配电线路绝缘遮蔽装置

Also Published As

Publication number Publication date
CN105932592B (zh) 2017-08-25

Similar Documents

Publication Publication Date Title
EP2224573B1 (de) Elektrisches Installationsgerät mit Ladegerät und Ablagemöglichkeit für Mobiltelefon
CN104597378B (zh) 基于暂态非工频零序电流的含dg配电网的故障选线方法
CN104635107A (zh) 一种小电流接地故障选线系统及选线方法
DE102015004119A1 (de) Kraftfahrzeug mit einem elektrischen Energiespeicher und zwei Ladeschnittstellen, Ladesystem sowie Verfahren
CN105932592A (zh) 一种用于直线杆开分段的绝缘罩
CN102435970A (zh) 一种小电流接地系统单相接地故障选线装置的选线功能测试方案
CN205753181U (zh) 一种用于直线杆开分段的绝缘罩
CN103296604B (zh) 用于中压配电站的功能测量组
CN204422692U (zh) 一种小电流接地故障选线系统
CN209805249U (zh) 一种0.4kV配网不停电作业用绝缘遮蔽工具
CN207765880U (zh) 10kV硬质组合拼接式遮蔽装置
CN205753179U (zh) 一种用于避雷器支架的绝缘罩
CN105743021A (zh) 一种用于更换杆刀桩头线的绝缘罩
CN202110230U (zh) 一种新型继电保护及自动控制设备综合试验台
CN205753178U (zh) 一种用于支接搭头的绝缘罩
CN209497172U (zh) 一种新型高压开关柜
CN210840165U (zh) 一种用于智能电表的防静电装置
CN105762711A (zh) 一种用于避雷器支架的绝缘罩
CN203871785U (zh) 二次安全措施隔离器
CN204045091U (zh) 低压配电故障查找实训柜
CN205753182U (zh) 一种用于更换杆刀桩头线的绝缘罩
CN106505419A (zh) 一种能快速二次连接的开关柜
CN104462391A (zh) 一种基于广度搜索的矿井高压电网设备参数快速录入方法
CN207572824U (zh) 一种配电设备接线柱握式线夹
DE202009004983U1 (de) Elektrischer Steckverbinder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20170527

Address after: 201100 No. 2888 Gu Dai Road, Shanghai, Minhang District

Applicant after: Shanghai South Electric Power Engineering Co., Ltd.

Applicant after: State Grid Shanghai Municipal Electric Power Company

Address before: 201100 No. 2888 Gu Dai Road, Shanghai, Minhang District

Applicant before: Shanghai South Electric Power Engineering Co., Ltd.

GR01 Patent grant
GR01 Patent grant