CN105929287A CN201610525630.XA CN201610525630A CN105929287A CN 105929287 A CN105929287 A CN 105929287A CN 201610525630 A CN201610525630 A CN 201610525630A CN 105929287 A CN105929287 A CN 105929287A
Authority
CN
China
Prior art keywords
dtu
pulse
relay
switch
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610525630.XA
Other languages
Chinese (zh)
Inventor
何春林
戚佳金
周志全
郑正仙
陈宏挺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dayou Industrial Co ltd
Zhejiang Dayou Industrial Co ltd Hangzhou Science And Technology Development Branch
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Hangzhou Dayou Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Hangzhou Power Supply Co of State Grid Zhejiang Electric Power Co Ltd, Hangzhou Dayou Technology Development Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610525630.XA priority Critical patent/CN105929287A/en
Publication of CN105929287A publication Critical patent/CN105929287A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

The invention discloses a DTU test simulator and a DTU test system. The test simulator comprises a pulse response module and a pulse feedback module, and is characterized in that the pulse response module is connected with a DTU, and the pulse feedback module is respectively connected with the DTU and the pulse response module; the pulse response module is used for receiving pulse signals sent by the DTU and generating corresponding pulse control signals under the action of the pulse signals; and the pulse feedback module is used for generating corresponding position signals under the action of the pulse control signals and sending the position signals to the DTU so as determine whether the DTU passes the test or not based on a corresponding relation between the position signals received by the DTU and the pulse signals sent by the DTU. When on-off remote control failure emerges, testing for the DTU is implemented by using the DTU test simulator, and outage of a switching device is not required any more if the circumstance of on-off remote control failure is caused by the DTU, so that the workload is greatly reduced, and the work efficiency is improved.

Description

A kind of DTU test gimulator and DTU test system
Technical field
The present invention relates to Distribution Automation Technology field, more particularly, it relates to a kind of DTU test simulation Device and DTU test system.
Background technology
Along with distribution needs increasing of distribution power automation terminal (DTU) quantity run, the O&M of DTU The workloads such as defect elimination increase the most therewith.
At present, the O&M defect elimination for DTU works, it is common that when there is switch remote control failure, directly After stopping using as a servant a switchgear, switching devices and DTU investigate respectively and overhaul, to be set by switch Standby and DTU determines the equipment causing switch remote control failed;But, inventor finds, at actual motion In, be typically due to the DTU switch remote control caused of breaking down and unsuccessfully occupy majority, therefore, for due to DTU breaks down the switch failed situation of remote control caused, stop labour switchgear switching devices and DTU investigates simultaneously and overhauls, and workload can be caused to increase, in turn result in work efficiency relatively low.
In sum, for realizing the technical scheme existence of the work such as the O&M defect elimination of DTU in prior art The problem that work efficiency is relatively low.
Summary of the invention
It is an object of the invention to provide a kind of DTU test gimulator and DTU tests system, be used for solving now With the presence of relatively low for realizing the work efficiency of the technical scheme of the work such as the O&M defect elimination of DTU in technology Problem.
To achieve these goals, the present invention provides following technical scheme:
A kind of DTU test gimulator, including impulse response module and pulse feedback module, described pulse rings Answer module to be connected with DTU, described pulse feedback module respectively with described DTU and described impulse response module Connect;
Described impulse response module, for receiving the pulse signal that described DTU sends, and in described pulse The effect of signal is lower generates corresponding pulse control signal;
Described pulse feedback module, for generating the position of correspondence under the effect of described pulse control signal Signal, and described position signalling is sent to described DTU, for the position received based on described DTU The corresponding relation of the pulse signal that signal sends with described DTU determines that whether this DTU is by test.
Preferably, described impulse response module includes the first relay, the second relay and the 3rd relay, The two ends of described first relay are connected with positive source and the power cathode of described DTU respectively, and described Two relays connect its two ends while described pulse feedback modules the most respectively with the closing pulse of described DTU Outfan and described power cathode connect, the two ends of described 3rd relay respectively with the separating brake of described DTU Pulse output end and described power cathode connect, described second relay and described closing pulse outfan it Between the first switch of also including being connected with described first relay and the be connected with described 3rd relay the 3rd Switch, described first switch connects one end of described second relay also by with described second relay even The second switch connect is connected with described positive source.
Preferably, described first relay also with the first diode is just connecting one end of described power cathode Pole connects, and described first relay connects one end of described positive source also negative with described first diode Pole connects;Described second relay connects one end of described power cathode also with the positive pole of the second diode even Connect, described second relay connect described closing pulse outfan one end also with described second diode Negative pole connects;Described 3rd relay connect one end of described power cathode also with the positive pole of the 3rd diode Connecting, described 3rd relay connects one end of described separating brake pulse signal output end also with the described 3rd 2 The negative pole of pole pipe connects.
Preferably, described pulse feedback module includes that the shutting-brake control being all connected with described second relay is opened Close and separating brake control switch, described shutting-brake control switch and described separating brake control switch two ends respectively with The power cathode of described DTU and position signalling receiving terminal connect.
Preferably, described pulse feedback module also includes that ground connection controls switch, and described ground connection controls switch Two ends are connected with power cathode and the position signalling receiving terminal of described DTU respectively.
Preferably, described DTU test gimulator is connected by cable between described DTU.
A kind of DTU tests system, including DTU and the DTU test gimulator as described in above-mentioned any one.
Preferably, described DTU includes display lamp group, described display lamp group and described DTU test simulation Device connects, and lights the display lamp of correspondence under the effect of described position signalling.
Preferably, described DTU includes voice broadcast module, described voice broadcast module and described DTU Test gimulator connects, and carries out the report of corresponding voice under the effect of described position signalling.
Preferably, described DTU includes display module, described display module and described DTU test gimulator Connect, and under the effect of described position signalling, carry out the display of corresponding content.
The invention provides a kind of DTU test gimulator and DTU tests system, wherein, this test simulation Device includes impulse response module and pulse feedback module, and described impulse response module is connected with DTU, described Pulse feedback module is connected with described DTU and described impulse response module respectively;Described impulse response module, For receiving the pulse signal that described DTU sends, and under the effect of described pulse signal, generate correspondence Pulse control signal;Described pulse feedback module, for generating under the effect of described pulse control signal Corresponding position signalling, and described position signalling is sent to described DTU, connect for based on described DTU The corresponding relation of the pulse signal that the position signalling received sends with described DTU determines whether this DTU passes through Test.Utilize above-mentioned DTU test gimulator disclosed in the present application, when the position letter determining that DTU receives Number with DTU send pulse signal be corresponding signal time, determine DTU pass through test, otherwise, the most really Determine DTU not by test.Thus, when switch remote control failure occurs, above-mentioned DTU test simulation is utilized Device realizes the test for DTU, if DTU is by test, then switch remote control failure is not that DTU causes , the test of switchgear is carried out the most again by stopping labour switchgear;If DTU is not by test, Then switch remote control is unsuccessfully that DTU causes, then without stopping to use as a servant switchgear, more without switching devices again Test, thus decrease and stop using as a servant the number of times of switchgear and switching devices carries out the number of times tested, Greatly reduce workload, improve work efficiency.
Accompanying drawing explanation
In order to be illustrated more clearly that the embodiment of the present invention or technical scheme of the prior art, below will be to reality Execute the required accompanying drawing used in example or description of the prior art to be briefly described, it should be apparent that below, Accompanying drawing in description is only embodiments of the invention, for those of ordinary skill in the art, not On the premise of paying creative work, it is also possible to obtain other accompanying drawing according to the accompanying drawing provided.
The structural representation of a kind of DTU test gimulator that Fig. 1 provides for the embodiment of the present invention;
In a kind of DTU test gimulator that Fig. 2 provides for the embodiment of the present invention the first of impulse response module Plant structural representation;
In a kind of DTU test gimulator that Fig. 3 provides for the embodiment of the present invention the second of impulse response module Plant structural representation;
In a kind of DTU test gimulator that Fig. 4 provides for the embodiment of the present invention the first of pulse feedback module Plant structural representation;
In a kind of DTU test gimulator that Fig. 5 provides for the embodiment of the present invention the second of pulse feedback module Plant structural representation.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not doing Go out the every other embodiment obtained under creative work premise, broadly fall into the scope of protection of the invention.
Refer to Fig. 1 to Fig. 5, for the concrete reality of a kind of DTU test gimulator that the embodiment of the present invention provides Executing mode, wherein, 11 represent impulse response module, and 12 represent pulse feedback module, and K1 represents that first continues Electrical equipment, K2 represents the second relay, and K3 represents the 3rd relay, and K1:1 represents the first switch, K2:1 table Showing that second switch, K3:1 represent the 3rd switch, D1 represents that the first diode, D2 represent the second diode, D3 represents the 3rd diode, and 133 represent separating brake pulse signal output end, and 103 represent that closing pulse signal is defeated Going out end, 102 and 802 represent power cathode, and 101 represent positive source, and K2:2 represents that shutting-brake control switchs, K2:3 represents that separating brake controls switch, and T represents that ground connection controls switch, and 803,805 and 807 represent the letter of DTU The distinct interface of number receiving terminal, it addition, some connected modes in embodiment, as the first relay with The connection of the first switch, the second relay and second switch, separating brake control switch, shutting-brake control switchs Connecting, the connection etc. of the 3rd relay and the 3rd switch does not embody in the drawings.
Refer to Fig. 1, it illustrates the structure of a kind of DTU test gimulator that the embodiment of the present invention provides Schematic diagram, can include impulse response module 11 and pulse feedback module 12, described impulse response module 11 are connected with DTU, described pulse feedback module 12 respectively with described DTU and described impulse response module 11 connect;
Described impulse response module 11, for receiving the pulse signal that described DTU sends, and at described arteries and veins Rush the lower pulse control signal generating correspondence of effect of signal;
Described pulse feedback module 12, for generating the position of correspondence under the effect of described pulse control signal Confidence number, and described position signalling is sent to described DTU, for the position received based on described DTU The corresponding relation of the pulse signal that confidence number sends with described DTU determines that whether this DTU is by test.
It should be noted that in a kind of DTU test gimulator of embodiment of the present invention offer, pulse signal Can include closing pulse signal and separating brake pulse signal etc., correspondence, position signalling can include closing a floodgate Position signalling and open position signal etc., arranged it is of course also possible to carry out other according to actual needs.Tool For body, after DTU test gimulator receives the pulse signal that DTU sends, by impulse response module and The response to this signal of the pulse feedback module, obtains the position signalling of correspondence, and is sent by this position signalling To DTU, by staff or DTU or the judgment means that pre-sets determine described position signalling with Its described pulse signal sent is the most corresponding, sets it is, of course, also possible to carry out other according to actual needs Put the corresponding relation judging above-mentioned two signals, when determining that both are corresponding signal, then prove DTU By test, i.e. it can normally realize remote switch function;When determining that both are not corresponding signal, Then proving that DTU does not passes through test, i.e. it cannot normally realize remote switch function.With pulse signal for closing Illustrate as a example by lock pulse signal, if the position signalling that DTU receives is closing position signal, i.e. The closing pulse signal sent is the signal corresponding with closing operation with the closing position signal of reception, then The position signalling determining pulse signal and the reception sent is corresponding signal;If the position that DTU receives Confidence number is not closing position signal, and the closing pulse signal i.e. sent and the position signalling of reception are not The signal corresponding with closing operation, it is determined that the pulse signal sent is not corresponding with the position signalling of reception Signal.
Utilize above-mentioned DTU test gimulator disclosed in the present application, when switch remote control failure occurs, utilize Above-mentioned DTU test gimulator realizes the test for DTU, if DTU is by test, then switchs distant Controlling is not that DTU causes, and carries out the test of switchgear the most again by stopping labour switchgear;As Really DTU by test, then switch remote control be unsuccessfully that DTU causes, then without stop again labour switch set Standby, more test without switching devices, thus decrease and stop using as a servant the number of times of switchgear and split Close the number of times of testing equipment, greatly reduce workload, improve work efficiency.
It is further to note that for the installation and debugging of DTU, in prior art, it usually needs stop labour Switchgear corresponding in distribution, completes DTU and debugs to the divide-shut brake on the spot of switchgear, treat that the domain leads to After letter transformation completes to satisfy the requirements, then carry out switchgear stopping labour, complete main website-DTU-switchgear Remote control joint debugging works, it is seen then that need during whole debugging to stop using as a servant switchgear twice, and in actual work In work, it is extremely difficult thing that switchgear stops using as a servant, and will shift to an earlier date 2 weeks and arrange to stop labour plan, exists simultaneously Repeatedly stopping to use as a servant in switchgear grid switching operation repeatedly makes the workload of O&M teams and groups be greatly increased, and stops for twice The time that labour switchgear spends accounts for about 70 the percent of debugging process, i.e. spends the time longer, enters And cause work efficiency relatively low.Utilize above-mentioned DTU test gimulator disclosed in the present application, in domain communication Transform after satisfying the requirements, it is not necessary to stop again to use as a servant switchgear, but directly utilize DTU test gimulator Complete corresponding debugging efforts, i.e. worked by the remote control joint debugging of main website-DTU-switchgear and change into main website -DTU-DTU test gimulator remote control joint debugging work, thus decrease switchgear stop use as a servant number of times, Greatly reduce workload while saving the time, and then improve work efficiency.
Meanwhile, above-mentioned DTU test gimulator disclosed in the present application is utilized to complete the test for DTU, Simple to operate, relevance grade and reliability are the highest, and, due to the minimizing of workload, greatly reduce Cost of labor.
A kind of DTU test gimulator that the embodiment of the present invention provides, the structure of described impulse response module is shown It is intended to as in figure 2 it is shown, the first relay, the second relay and the 3rd relay can be included, described the The two ends of one relay are connected with positive source and the power cathode of described DTU respectively, described second relay Device connect its two ends while described pulse feedback module the most respectively with the closing pulse outfan of described DTU And described power cathode connects, the two ends of described 3rd relay are defeated with the separating brake pulse of described DTU respectively Go out end and described power cathode connects, also wrap between described second relay and described closing pulse outfan Include the first switch being connected with described first relay and the 3rd switch being connected with described 3rd relay, Described first switch connects one end of described second relay also by the be connected with described second relay Two switches are connected with described positive source.
It should be noted that the first relay and the first switch connect, control the on off state of the first switch, Second relay is connected with second switch, controls the on off state of second switch, the 3rd relay and the 3rd Switch connects, and controls the on off state of the 3rd switch.Wherein, the first relay is the power supply of inspection DTU Supply relay, thus, add processing safety, the second relay is closing relay, the 3rd Relay is separating brake relay, and specifically, pulse signal can include closing pulse signal and separating brake arteries and veins Rush signal, and the first switch and second switch can be normal open switch, and the 3rd switch can be normally closed opening Closing, thus, the operation principle of above-mentioned impulse response module can be:
The closing pulse outfan of remote control closing operation: DTU sends closing pulse signal, and DTU opens simultaneously Discharge source, due to the opening of power supply, the first relay work, i.e. controls the first switch Guan Bi, and the 3rd opens Closing is normally closed switch, and therefore, the second relay circuit conducting, the second relay receives closing pulse letter Number and action, i.e. control second relay Guan Bi, to realize self-sustaining, and send closing pulse control letter Number, with control pulse feedback module generate under the effect of described closing pulse control signal correspondence combined floodgate Position signalling, completes remote control closing operation;
The separating brake pulse output end of remote control separating brake process: DTU sends separating brake pulse signal, and (now DTU is Open operation power supply, the i.e. first switch is closure state), the 3rd relay receives separating brake pulse signal And action, i.e. controlling the 3rd relay and disconnect, the second relay circuit disconnects, the second relay involution, Second switch disconnects, and sends separating brake pulse control signal, to control pulse feedback module at described separating brake The effect of pulse signal is lower generates corresponding open position signal, completes remote control sub-switching operation.
Thus, by the setting of above-mentioned impulse response module, it is achieved the response of pulse signals, and generate Corresponding pulse control signal, to utilize this pulse control signal to realize the control to pulse feedback module, Complete the operation of correspondence.
It addition, in above-mentioned impulse response module, as it is shown on figure 3, described first relay connects described electricity One end of source negative pole can also be connected with the positive pole of the first diode, and described first relay connects described electricity One end of source positive pole can also be connected with the negative pole of described first diode;Described second relay connects institute The one end stating power cathode can also be connected with the positive pole of the second diode, and described second relay connects institute The one end stating closing pulse outfan can also be connected with the negative pole of described second diode;Described 3rd continues Electrical equipment connects one end of described power cathode and can also be connected with the positive pole of the 3rd diode, and the described 3rd continues Electrical equipment connects one end of described separating brake pulse signal output end can also with the negative pole of described 3rd diode even Connect.Above three diode, the effect of the i.e. first diode, the second diode and the 3rd diode is anti- Inductive coil of the most corresponding relay has a high voltage meeting of reverse comparison in the moment of power-off Damage equipment, because this voltage is above the voltage of power supply several times, it is likely to cause line Other equipment of road cannot normally work even punch through damage equipment (such as burning out the audion of relay). Therefore, had after the reverse diode of above three in the moment of relay power-off, just given this anti- To one path of releasing of voltage, and then avoid this voltage damage equipment.
A kind of DTU test gimulator that the embodiment of the present invention provides, described pulse feedback module can be such as figure Shown in 4, can include that the shutting-brake control switch being all connected with described second relay and separating brake control switch, Described shutting-brake control switch and described separating brake control the two ends of switch respectively with the power cathode of described DTU And position signalling receiving terminal connects.
It should be noted that separating brake control switch and shutting-brake control switch respectively with in pulse feedback module Second relay connects, and is controlled by the second relay.Specifically, the work of above-mentioned pulse feedback module Making principle can be: when pulse signal is closing pulse signal, and the second relay generates corresponding combined floodgate Pulse control signal, shutting-brake control switch closes after receiving closing pulse control signal, and separating brake controls to open Pass is opened after receiving closing pulse control signal, i.e. generates closing position signal, and DTU detects separating brake Control switch and the above-mentioned action of shutting-brake control switch, i.e. receive closing position signal;Work as pulse signal During for separating brake pulse signal, the second relay generates corresponding separating brake pulse control signal, and shutting-brake control is opened Pass is opened after receiving separating brake pulse control signal, and separating brake controls switch and receives separating brake pulse control signal Rear Guan Bi, i.e. generates open position signal, and DTU detects that separating brake controls switch and shutting-brake control switch Above-mentioned action, i.e. receives open position signal.Hereby it is achieved that it is raw under the effect of pulse control signal Become the process of corresponding position signalling.
It addition, specifically, closing position switch is specifically as follows normal open switch, and separating brake controls switch tool Body can be normally closed switch, arranges, all in the present invention it is of course also possible to carry out other according to actual needs Protection domain within.
It should be noted that pulse feedback module described above can also include that ground connection controls switch, such as Fig. 5 Shown in, described ground connection controls the two ends of switch and receives with the power cathode of described DTU and position signalling respectively End connects.
This ground connection controls switch and is specifically as follows normal open switch, and its ground connection that can directly receive the external world controls Signal, and then close under the effect of this control signal, i.e. generating earthing position signal, DTU detects Ground connection controls the above-mentioned action of switch, i.e. receives earthing position signal, and carries out corresponding operation, enters And complete the operation of remote control ground connection.Thus, the i.e. external world's input of operation that staff is carried out it is available for according to DTU The corresponding relation of ground connection control signal determine DTU whether by test, if the behaviour that i.e. DTU completes Operate as ground connection, then explanation DTU is by test, and otherwise, then explanation DTU is not by test.Separately Outward, DTU need to be only real by test by every test herein and above, had one not lead to Cross, then illustrate not by test.
It should be noted that can by cable even between described DTU test gimulator and described DTU Connect.Arrange, all within protection scope of the present invention it is of course also possible to carry out other according to actual needs.
In the manufacturing process to above-mentioned DTU test gimulator, following step can be included: design Perfect circuit structure diagram, designs and produces circuit board, welding relay and switch based on this circuit structure diagram Deng element, encapsulation includes the DTU test gimulator of foregoing circuit plate, completes to make.
Corresponding with above-mentioned DTU test gimulator, the embodiment of the present invention additionally provides a kind of DTU test System, can include DTU and the DTU test gimulator as described in above-mentioned any one.
Wherein, described DTU can include that display lamp group, described display lamp group test mould with described DTU Intend device to connect, and under the effect of described position signalling, light the display lamp of correspondence.
Specifically, the quantity of the lamp that display lamp group includes can be identical with the kind quantity of position signalling, When DTU receives position signalling, can control bright with the display lamp of this position signalling respective operations, its His display lamp goes out, as position signalling includes closing position signal, open position signal and earthing position signal, Then display lamp group includes three display lamps, when DTU receives closing position signal, with closing operation pair The display lamp answered is bright, and other display lamps go out, when DTU receives open position signal, with sub-switching operation Corresponding display lamp is bright, and other display lamps go out, and when DTU receives earthing position signal, grasps with ground connection Making corresponding display lamp bright, other display lamps go out.
In above-mentioned DTU test system, described DTU can include that voice broadcast module, described voice are broadcast Report module is connected with described DTU test gimulator, and carries out corresponding language under the effect of described position signalling The report of sound.
Specifically, voice broadcast module reports the voice corresponding with position signalling, as DTU receives Position signalling is closing position signal, then voice broadcast module then reports " combined floodgate " class voice.
In above-mentioned DTU test system, described DTU can include display module, described display module with Described DTU test gimulator connects, and carries out the display of corresponding content under the effect of described position signalling.
Specifically, display module shows the content corresponding with position signalling, the position received such as DTU Signal is closing position signal, then display module then shows " combined floodgate " class printed words.
By one or more in above-mentioned display lamp group, voice broadcast module and display module, work Personnel can the most quickly know the kind of the position signalling that DTU receives, and then judges that DTU sends out The relation that the pulse signal gone out is corresponding with position signalling, determines whether whether DTU can be by test.
It addition, include illustrating as a example by display lamp group by DTU, utilize above-mentioned DTU test gimulator Complete the test experiments of correspondence, can include the following steps:
1, DTU test gimulator is connected to DTU;
2, combined floodgate test, on DTU, power turn-on sky is opened, and i.e. opens power supply, by switch knob, i.e. Sending closing pulse signal, if display lamp corresponding to closing operation is bright, then explanation is closed a floodgate success of the test, Otherwise, then combined floodgate the failure of an experiment is described;
3, separating brake test, on DTU, power turn-on sky is opened, and i.e. opens power supply, by opening button, i.e. Send separating brake pulse signal, if display lamp corresponding to sub-switching operation is bright, then explanation separating brake success of the test, Otherwise, then separating brake the failure of an experiment is described;
4, test for ground, the external world presses ground connection button, i.e. sends ground connection operation to DTU test gimulator Signal, if the display lamp of the ground connection operation correspondence on DTU is bright, then explanation test for ground success, otherwise, Then explanation ground connection the failure of an experiment.
Described above to the disclosed embodiments, makes those skilled in the art be capable of or uses this Bright.Multiple amendment to these embodiments will be apparent from, herein for a person skilled in the art Defined in General Principle can be real at other without departing from the spirit or scope of the present invention Execute in example and realize.Therefore, the present invention is not intended to be limited to the embodiments shown herein, and is intended to Meet the widest scope consistent with principles disclosed herein and features of novelty.

Claims (10)

1. a DTU test gimulator, it is characterised in that include impulse response module and pulse feedback Module, described impulse response module is connected with DTU, described pulse feedback module respectively with described DTU And described impulse response module connects;
Described impulse response module, for receiving the pulse signal that described DTU sends, and in described pulse The effect of signal is lower generates corresponding pulse control signal;
Described pulse feedback module, for generating the position of correspondence under the effect of described pulse control signal Signal, and described position signalling is sent to described DTU, for the position received based on described DTU The corresponding relation of the pulse signal that signal sends with described DTU determines that whether this DTU is by test.
Simulator the most according to claim 1, it is characterised in that described impulse response module includes First relay, the second relay and the 3rd relay, the two ends of described first relay are respectively with described The positive source of DTU and power cathode connect, and described second relay connects described pulse feedback module Its two ends are connected with closing pulse outfan and the described power cathode of described DTU the most respectively simultaneously, described The two ends of the 3rd relay are connected with separating brake pulse output end and the described power cathode of described DTU respectively, Also include between described second relay with described closing pulse outfan being connected with described first relay First switch and the 3rd switch being connected with described 3rd relay, described first switch connects described second One end of relay is also by the second switch being connected with described second relay with described positive source even Connect.
Simulator the most according to claim 2, it is characterised in that described first relay connects institute Stating one end of power cathode positive pole also with the first diode to be connected, described first relay connects described electricity One end of source positive pole also negative pole with described first diode is connected;Described second relay connects described electricity One end of source negative pole also positive pole with the second diode is connected, and described second relay connects described combined floodgate arteries and veins Rush one end of outfan negative pole also with described second diode to be connected;Described 3rd relay connects described One end of power cathode also positive pole with the 3rd diode is connected, and described 3rd relay connects described separating brake One end of pulse signal output end also negative pole with described 3rd diode is connected.
Simulator the most according to claim 2, it is characterised in that described pulse feedback module includes The shutting-brake control switch being all connected with described second relay and separating brake control switch, and described shutting-brake control is opened Close and described separating brake controls the two ends of switch and receives with the power cathode of described DTU and position signalling respectively End connects.
Simulator the most according to claim 4, it is characterised in that described pulse feedback module is also wrapped Include ground connection and control switch, described ground connection control the two ends of switch respectively with power cathode and the position of described DTU Put signal receiving end to connect.
Simulator the most according to claim 5, it is characterised in that described DTU test gimulator It is connected by cable with between described DTU.
7. a DTU tests system, it is characterised in that include DTU and such as claim 1 to 6 times One described DTU test gimulator.
DTU the most according to claim 7 tests system, it is characterised in that described DTU includes Display lamp group, described display lamp group is connected with described DTU test gimulator, and at described position signalling The display lamp of correspondence is lighted under effect.
DTU the most according to claim 7 tests system, it is characterised in that described DTU includes Voice broadcast module, described voice broadcast module is connected with described DTU test gimulator, and in institute's rheme The report of corresponding voice is carried out under the effect of confidence number.
DTU the most according to claim 7 tests system, it is characterised in that described DTU bag Including display module, described display module is connected with described DTU test gimulator, and at described position signalling Effect under carry out the display of corresponding content.
CN201610525630.XA 2016-07-01 2016-07-01 DTU test simulator and DTU test system Pending CN105929287A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610525630.XA CN105929287A (en) 2016-07-01 2016-07-01 DTU test simulator and DTU test system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610525630.XA CN105929287A (en) 2016-07-01 2016-07-01 DTU test simulator and DTU test system

Publications (1)

Publication Number Publication Date
CN105929287A true CN105929287A (en) 2016-09-07

Family

ID=56827547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610525630.XA Pending CN105929287A (en) 2016-07-01 2016-07-01 DTU test simulator and DTU test system

Country Status (1)

Country Link
CN (1) CN105929287A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106855598A (en) * 2016-12-29 2017-06-16 山东鲁能智能技术有限公司 DTU automatic test devices and method based on core processing unit
CN107976596A (en) * 2017-11-27 2018-05-01 国网山东省电力公司聊城供电公司 A kind of distribution power automation terminal experimental rig and its method of work

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004077251A (en) * 2002-08-15 2004-03-11 Meidensha Corp Performance test system of protection relay
CN202141763U (en) * 2011-05-12 2012-02-08 航天科工深圳(集团)有限公司 Pulse detection and digital state output indicating device and system
CN203191816U (en) * 2013-03-26 2013-09-11 国家电网公司 Test system for automatic control equipment of power distribution network
CN204129130U (en) * 2014-09-01 2015-01-28 国家电网公司 Distribution substation institute terminal D TU on-the-spot test instrument
CN205749746U (en) * 2016-07-01 2016-11-30 国网浙江省电力公司杭州供电公司 A kind of DTU test gimulator and DTU test system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004077251A (en) * 2002-08-15 2004-03-11 Meidensha Corp Performance test system of protection relay
CN202141763U (en) * 2011-05-12 2012-02-08 航天科工深圳(集团)有限公司 Pulse detection and digital state output indicating device and system
CN203191816U (en) * 2013-03-26 2013-09-11 国家电网公司 Test system for automatic control equipment of power distribution network
CN204129130U (en) * 2014-09-01 2015-01-28 国家电网公司 Distribution substation institute terminal D TU on-the-spot test instrument
CN205749746U (en) * 2016-07-01 2016-11-30 国网浙江省电力公司杭州供电公司 A kind of DTU test gimulator and DTU test system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106855598A (en) * 2016-12-29 2017-06-16 山东鲁能智能技术有限公司 DTU automatic test devices and method based on core processing unit
CN107976596A (en) * 2017-11-27 2018-05-01 国网山东省电力公司聊城供电公司 A kind of distribution power automation terminal experimental rig and its method of work

Similar Documents

Publication Publication Date Title
CN103941176A (en) Fault detection system for VBE system device of high-voltage direct current transmission converter valve
CN110299041B (en) Intelligent power distribution terminal and communication operation and maintenance integrated training system and method
CN108983006A (en) Type feeder automation switch terminal scene does not have a power failure full-automatic testing method on the spot
CN104965429A (en) Automation monitoring system and restarting control device
CN203365563U (en) Intelligent simulated circuit breaker
CN105929287A (en) DTU test simulator and DTU test system
CN209028866U (en) A kind of 10kV route protection simulation system for operation training
CN104967216A (en) Transformer station, monitoring system and monitoring method
CN204287358U (en) The debugging apparatus of intelligent controller
CN203929925U (en) A kind of protective relaying device divide-shut brake return circuit testing device
CN210780231U (en) Intelligent distributed comprehensive test platform
CN205749746U (en) A kind of DTU test gimulator and DTU test system
CN205504125U (en) Nuclear level electric actuator's local control box
CN112213592A (en) Distributed terminal double-loop network self-healing transfer detection system and method thereof
CN204719205U (en) Isolating switch time-parameters test simulator
CN104393667B (en) Portable power supply switching device
CN207036969U (en) A kind of prepared auto restart action logic test accessory
CN204257089U (en) Switch cubicle analogue experiment installation
CN104104144B (en) A kind of intelligent substation prepared auto restart debugging system, method and intelligent substation
CN208902846U (en) A kind of magnetic-levitation train electrical cubicle test device
CN208298434U (en) A kind of experiment device for teaching of transmission line simulation automatic reclosing
CN108460960B (en) Voice prompting device for preventing misoperation and locking of high-voltage switch cabinet
CN202305748U (en) Testing device for remote control motherboard of distribution automation terminal
CN115064024B (en) Analog switch synchronous circuit of feeder automation training system
CN111929574A (en) Auxiliary simulator for relay protection test

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 310009 Jianguozhong Road 219, Shangcheng District, Hangzhou City, Zhejiang Province

Applicant after: HANGZHOU POWER SUPPLY COMPANY, STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

Address before: 310009 Jianguozhong Road 219, Hangzhou, Zhejiang Province

Applicant before: HANGZHOU POWER SUPPLY COMPANY OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Applicant before: State Grid Corporation of China

Applicant before: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

CB02 Change of applicant information
TA01 Transfer of patent application right

Effective date of registration: 20181123

Address after: 310009 Jianguozhong Road 219, Shangcheng District, Hangzhou City, Zhejiang Province

Applicant after: HANGZHOU POWER SUPPLY COMPANY, STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Applicant after: STATE GRID CORPORATION OF CHINA

Applicant after: ZHEJIANG DAYOU INDUSTRIAL Co.,Ltd.

Applicant after: ZHEJIANG DAYOU INDUSTRIAL Co.,Ltd. HANGZHOU SCIENCE AND TECHNOLOGY DEVELOPMENT BRANCH

Address before: 310009 Jianguozhong Road 219, Shangcheng District, Hangzhou City, Zhejiang Province

Applicant before: HANGZHOU POWER SUPPLY COMPANY, STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Applicant before: STATE GRID CORPORATION OF CHINA

Applicant before: HANGZHOU DA YOU SCIENCE TECHNOLOGY DEVELOPMENT Co.,Ltd.

TA01 Transfer of patent application right
RJ01 Rejection of invention patent application after publication

Application publication date: 20160907

RJ01 Rejection of invention patent application after publication