CN105927275A - Method for storing metal blanks based on hard gypsum mine gob - Google Patents

Method for storing metal blanks based on hard gypsum mine gob Download PDF

Info

Publication number
CN105927275A
CN105927275A CN201610382915.2A CN201610382915A CN105927275A CN 105927275 A CN105927275 A CN 105927275A CN 201610382915 A CN201610382915 A CN 201610382915A CN 105927275 A CN105927275 A CN 105927275A
Authority
CN
China
Prior art keywords
tunnel
door
foundation
anhydrite ore
ore goaf
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610382915.2A
Other languages
Chinese (zh)
Other versions
CN105927275B (en
Inventor
黄河
戚家忠
苗玉亮
郎宝华
胡振法
李祥飞
丰红波
陈跃武
郑司光
许浩
李军
韩喜子
余洪玲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hengtai New Material Co.,Ltd.
Original Assignee
ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd HANSHAN HENGTAI NON-METAL MTERIALS BRANCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd HANSHAN HENGTAI NON-METAL MTERIALS BRANCH filed Critical ANHUI WANBEI COAL-ELECTRICITY GROUP Co Ltd HANSHAN HENGTAI NON-METAL MTERIALS BRANCH
Priority to CN201610382915.2A priority Critical patent/CN105927275B/en
Publication of CN105927275A publication Critical patent/CN105927275A/en
Application granted granted Critical
Publication of CN105927275B publication Critical patent/CN105927275B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/16Modification of mine passages or chambers for storage purposes, especially for liquids or gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/103Dams, e.g. for ventilation
    • E21F17/12Dam doors
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/18Special adaptations of signalling or alarm devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Housing For Livestock And Birds (AREA)
  • Storage Of Harvested Produce (AREA)
  • Warehouses Or Storage Devices (AREA)

Abstract

The invention discloses a method for storing metal blanks based on a hard gypsum mine gob. The method comprises the following steps that equipment of a mine is cleaned, the surface of the hard gypsum mine gob is processed, a storage bin is built, and the distance between the top of a bearing conveying facility and the horizontal surface of a branch roadway is 10-50 cm in height; and a protection facility and a ventilation system are built. The metal blanks are stored through the exploited roadway of the hard gypsum mine gob; as the hard gypsum mine gob is located in the position of 300-400 m underground, the mine environment is constant in temperature, low in oxygen and dry in weather, and the corrosion volume of the surfaces of the metal blanks is small; in addition, the metal blanks are stored inside the hard gypsum mine to reduce the building cost of a ground storage warehouse, so that the metal blanks are stored and managed more conveniently, and the protection cost for the easily-corrosive metal blanks is reduced.

Description

A kind of method storing metal stock based on Anhydrite Ore goaf
Technical field
The invention belongs to Anhydrite Ore geological storage technical field, particularly relate to a kind of based on Anhydrite Ore Goaf stores the method for metal stock.
Background technology
Metal stock generally comprises non-ferrous metal or the alloys such as aluminium ingot, ingot iron, copper ingot.Owing to smelting Metal stock needs to carry out preliminary storage, and is easily subject to the corrosion of air ambient, causes metal embryo The quality of material reduces.
Aluminium profile product, have that intensity is high, lightweight, rotproofness strong, novel structure, easy to assembly, With material save, long-lived feature, but irrational maintenance, install and safeguard and also can affect aluminium profiles The good looking appearance of material product, the color and luster on surface.Therefore the method that should have correct maintenance and maintenance.Aluminium section bar In handling process, it is necessary to handle with care, being strictly on guard against collides with causes surface to damage, and affects surface aesthetic;Aluminum Section bar is in transportation, it is necessary to build with tarpaulin, is strictly on guard against the intrusion of rainwater, snow;The storage of aluminium section bar Environment should be dried, become clear, well-ventilated, and corrosion-free weather should be strictly on guard against that rain, water, snow invade simultaneously; Aluminium section bar, when storage, must separate with ground with chock bottom it, keeps being more than with ground distance 10CM;Aluminium section bar, when storage, is forbidden together to deposit with chemical material and dampness material;Aluminum and aluminum The feature of alloy corrosion includes spot corrosion, homogeneous corrosion, crevice corrosion, stress corrosion cracking.
The character of ingot iron: pure iron is the metallic crystal with silvery white metallic luster, under normal circumstances in ash Color, to greyish black high-purity amorphous particulate of iron wire color or powder, has ductility;During room temperature, ferrum is dry It is difficult in air react, if there being impurity, in malaria with non-metal simple-substance such as oxygen, sulfur, chlorine Easy-to-rust;The humid air of the solution with the presence of acid, alkali or salt gets rusty faster.When high temperature, then acute Strong reaction, as ferrum burns in oxygen, generates Fe3O4, fervid ferrum and steam react and also generate Fe3O4.All can the chemical combination such as same halogen, sulfur, silicon, carbon, phosphorus during heating.Except generation+2 and+trivalent oxide Outward, also composite oxides Fe3O4(being magnetic oxide) generates.
Copper is the most active heavy metal, does not closes with the oxidation in dry air, energy during heating Produce the copper oxide of black: putting in malaria long afterwards, copper surface can slowly generate one layer of Aerugo (alkali Formula curpic carbonate), Aerugo can prevent metal from corroding further.
In prior art, the mode to the storage of metal stock stores for individually setting up storehouse, is easily subject to To the impact of air ambient, therefore, the protective measure of metal stock is added the cost of storage, and, The storehouse bottom surface area occupied set up is bigger.
Summary of the invention
The present invention is a kind of method storing metal stock based on Anhydrite Ore goaf, is exploited by utilization After the tunnel in Anhydrite Ore goaf carry out the storage to metal stock, it is provided that temperature constant, hypoxia, Dry storage condition, solves in prior art the mode of storage to metal stock for individually to build Vertical library room stores, and is easily subject to the impact of air ambient, therefore, the protective measure to metal stock Add the cost of storage, and, the problem such as the storehouse bottom surface area occupied of foundation is bigger.
The invention provides Anhydrite Ore goaf method in terms of energy storage, storing, comprise the steps:
The equipment cleaning of a mine: by the mining machine device clear in Anhydrite Ore goaf, retains fortune Transfer device;
The surface in b Anhydrite Ore goaf processes: by the ground rubble in main tunnel and a tunnel, dust Foreign material are cleaned out, then are carried out the cleaning on surface by water under high pressure, then are air-dried by air blast, in main tunnel Painting a coating with the surface in a tunnel, thickness is at 2mm-5mm;
The foundation of c storage bin: lay a track, at track in a tunnel in Anhydrite Ore goaf On be combined with carrying conveying facility;
Wherein, described carrying conveying facility is a pair of bearing metal plate, fixing between two bearing metal plates There is one layer of rubber layer, be fixed with bakelite plate on a surface of a bearing metal plate, another bearing metal plate One surface is fixed with roller;
Wherein, the distance from top of carrying conveying facility props up the horizontal surface distance in tunnel 10cm-50cm's Highly;
The foundation of d protective equipment: in step c, installs one by the port in a tunnel and seals up a door, described envelope Temperature-detecting device, electronics psychrometer and alarm for flammable gas are installed on Men;
The foundation of e ventilating system: be separately installed with fan at the two ends of hoistway.
Further, the hoistway in Anhydrite Ore goaf is also included by described step a carry elevator, Haul train and track is also included in described main tunnel.
Further, described step c storage bin foundation in, described in seal up a door employing opposite opened solid door, Described seal up a door employing bakelite plate make, use the material of wooden or resin or plastics avoid with metal stock Corrosion reaction is produced during contact.
Further, in the foundation of described step d protective equipment, described temperature-detecting device is along sealing up a door The position of upper, middle and lower is arranged;Described electronics psychrometer is arranged along the position of upper, middle and lower of sealing up a door, and is used for The humidity of detection tunnel environment, is carried out the improvement of environment, improves ring residing for metal stock by venting practice The quality in border, it is to avoid the corrosion of metal stock;Described alarm for flammable gas is along the position of upper, middle and lower of sealing up a door Install, for the fuel gas in tunnel is detected, it is to avoid explosion danger occurs.
Further, in the foundation of described step e ventilating system, fan uses industrial large-sized blower fan, logical Cross the ventilating system arranged and set up the circulation of air.
The method have the advantages that
The present invention makes full use of Anhydrite Ore goaf and applies in terms of energy storage, storing, Gypsum Mine energy storage or The mode of storing, have Economization on land, reduced investment, operation staffing is few, safety is high, environmental pollution is few, Service life the feature such as length.The tunnel in the Anhydrite Ore goaf after being exploited by utilization is carried out metal embryo The storage of material, due to the position of Anhydrite Ore goaf 300-400m located underground, hole, ore deposit environment has Temperature constant, hypoxia, dry, less to the surface corrosion amount of metal stock, and, by metal Stock reduces the construction cost of ground storage repository in being stored in Anhydrite Ore hole to metal stock Storage management convenient, reduce protection cost to perishable metal stock.
Certainly, the arbitrary product implementing the present invention it is not absolutely required to reach all the above excellent simultaneously Point.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, embodiment will be described required below Accompanying drawing to be used is briefly described, it should be apparent that, the accompanying drawing in describing below is only the present invention Some embodiments, for those of ordinary skill in the art, in the premise not paying creative work Under, it is also possible to other accompanying drawing is obtained according to these accompanying drawings.
Fig. 1 is main tunnel and the layout drawing of entry well in the Anhydrite Ore goaf of invention.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, the technical scheme in the embodiment of the present invention is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the present invention, and It is not all, of embodiment.Based on the embodiment in the present invention, those of ordinary skill in the art are not making Go out all other embodiments obtained under creative work premise, broadly fall into the scope of protection of the invention.
Referring to shown in Fig. 1, the present invention is a kind of side storing metal stock based on Anhydrite Ore goaf Method, comprises the steps:
(1) equipment cleaning of mine: by the mining machine device clear in Anhydrite Ore goaf, retains Transporting equipment;Also include the hoistway 3 in Anhydrite Ore goaf carrying elevator 2, described main tunnel 4 The most also include haul train and track, by conveying elevator 2, metal stock is transported to the master of Anhydrite Ore On tunnel 4, then the train and track by transport anhydrite carries out transport metal stock.
(2) surface in Anhydrite Ore goaf processes: by the ground rubble in main tunnel 4 and a tunnel 5, Dust foreign material are cleaned out, then are carried out the cleaning on surface by water under high pressure, then are air-dried by air blast, are leading A coating is painted on surface in tunnel 4 and a tunnel 5, and thickness is at 2mm-5mm, it is to avoid main tunnel 4 With dropping of the ore particles on surface, tunnel 5, storage condition is impacted;
(3) foundation of bin is stored: in a tunnel 5 in Anhydrite Ore goaf, lay a track, Carrying conveying facility it is combined with on track;Described seal up a door employing opposite opened solid door, described in seal up a door employing electricity Plank is made, and uses the material of wooden or resin or plastics to avoid when contacting with metal stock and produces corrosion Reaction.
Wherein, described carrying conveying facility is a pair of bearing metal plate, fixing between two bearing metal plates There is one layer of rubber layer, be fixed with bakelite plate on a surface of a bearing metal plate, another bearing metal plate One surface is fixed with roller;Wherein, the distance from top of carrying conveying facility prop up the horizontal surface in tunnel 5 away from From the height at 10cm-50cm;
(4) foundation of protective equipment: the port in tunnel 5 is installed one and seals up a door, described in seal up a door upper installation There are temperature-detecting device, electronics psychrometer and alarm for flammable gas;Described temperature-detecting device edge The position upper, middle and lower of sealing up a door is arranged;Described electronics psychrometer is arranged along the position of upper, middle and lower of sealing up a door, For detecting the humidity of tunnel environment, carried out the improvement of environment by venting practice, improve metal stock institute The quality of place's environment, it is to avoid the corrosion of metal stock;Described alarm for flammable gas is along upper, middle and lower of sealing up a door Position arrange, for the fuel gas in tunnel is detected, it is to avoid there is explosion danger.
(5) foundation of ventilating system: be separately installed with fan at the two ends of hoistway 3;Fan uses industry Large fan, sets up the circulation of air by the ventilating system arranged.
During the storage carrying out metal stock, by the gold that plant produced out or is come by transport Belong to stock, as metal stock is transported to the master of Anhydrite Ore by aluminium ingot or ingot iron or copper ingot by conveying elevator On tunnel 4, then the train and track by transport anhydrite carries out transport metal stock, by metal stock It is stored in a tunnel 5, closes seal door above, complete the storage to metal stock;When needs are by metal stock When transporting, by the transportation system of Gypsum Mine, i.e. conveying elevator 2 carries out being transported on ground 1.
In the description of this specification, reference term " embodiment ", " example ", " concrete example " Deng the specific features that description means to combine this embodiment or example describes, structure, material live feature bag It is contained at least one embodiment or the example of the present invention.In this manual, the signal to above-mentioned term Property statement be not necessarily referring to identical embodiment or example.And, the specific features of description, structure, Material or feature can combine in any one or more embodiments or example in an appropriate manner.
Present invention disclosed above preferred embodiment is only intended to help to illustrate the present invention.Preferred embodiment is also There is no all of details of detailed descriptionthe, be not intended to the detailed description of the invention that this invention is only described yet.Obviously, According to the content of this specification, can make many modifications and variations.This specification is chosen and specifically describes this A little embodiments, are to preferably explain the principle of the present invention and actual application, so that affiliated technology neck Field technique personnel can be best understood by and utilize the present invention.The present invention is only by claims and whole model thereof Enclose the restriction with equivalent.

Claims (5)

1. one kind based on Anhydrite Ore goaf store metal stock method, it is characterised in that include as Lower step:
The equipment cleaning of a mine: by the mining machine device clear in Anhydrite Ore goaf, retains Transporting equipment;
The surface in b Anhydrite Ore goaf processes: by the ground in main tunnel (4) and a tunnel (5) Face rubble, dust foreign material are cleaned out, then are carried out the cleaning on surface by water under high pressure, then pass through air blast Air-drying, a coating is painted on the surface in main tunnel (4) and a tunnel (5), and thickness is at 2mm-5mm;
The foundation of c storage bin: lay a track in a tunnel (5) in Anhydrite Ore goaf, It is combined with carrying conveying facility in orbit;
Wherein, described carrying conveying facility is a pair of bearing metal plate, solid between two bearing metal plates Surely there is one layer of rubber layer, be fixed with bakelite plate on a surface of a bearing metal plate, another bearing metal One surface of plate is fixed with roller;
Wherein, the distance from top of carrying conveying facility props up the horizontal surface distance in tunnel (5) and exists The height of 10cm-50cm;
The foundation of d protective equipment: in step c, installs one by the port in a tunnel (5) and seals up a door, Described seal up a door on temperature-detecting device, electronics psychrometer and alarm for flammable gas are installed;
The foundation of e ventilating system: be separately installed with fan at the two ends of hoistway (3).
A kind of side storing metal stock based on Anhydrite Ore goaf the most according to claim 1 Method, it is characterised in that in described step a, the hoistway (3) in Anhydrite Ore goaf is also included Conveying elevator, also includes haul train and track in described main tunnel (4).
A kind of side storing metal stock based on Anhydrite Ore goaf the most according to claim 1 Method, it is characterised in that in the foundation of described step c storage bin, described in employing opposite opened of sealing up a door real Ostium, described in seal up a door employing bakelite plate make.
A kind of side storing metal stock based on Anhydrite Ore goaf the most according to claim 1 Method, it is characterised in that in the foundation of described step d protective equipment, described temperature-detecting device along The position of upper, middle and lower of sealing up a door is arranged;Described electronics psychrometer is arranged along the position of upper, middle and lower of sealing up a door; Described alarm for flammable gas is arranged along the position of upper, middle and lower of sealing up a door.
A kind of side storing metal stock based on Anhydrite Ore goaf the most according to claim 1 Method, it is characterised in that in the foundation of described step e ventilating system, fan uses industrial large-sized blower fan.
CN201610382915.2A 2016-05-27 2016-05-27 A kind of method based on Anhydrite Ore goaf storage metal embryo material Active CN105927275B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610382915.2A CN105927275B (en) 2016-05-27 2016-05-27 A kind of method based on Anhydrite Ore goaf storage metal embryo material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610382915.2A CN105927275B (en) 2016-05-27 2016-05-27 A kind of method based on Anhydrite Ore goaf storage metal embryo material

Publications (2)

Publication Number Publication Date
CN105927275A true CN105927275A (en) 2016-09-07
CN105927275B CN105927275B (en) 2017-12-08

Family

ID=56833093

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610382915.2A Active CN105927275B (en) 2016-05-27 2016-05-27 A kind of method based on Anhydrite Ore goaf storage metal embryo material

Country Status (1)

Country Link
CN (1) CN105927275B (en)

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3501917A (en) * 1968-06-14 1970-03-24 Phillips Petroleum Co Liquid storage
US3807181A (en) * 1971-05-29 1974-04-30 Edeleanu Gmbh Underground storage of gas
US4045963A (en) * 1975-05-28 1977-09-06 Armerad Betong Vagforbattringar Aktiebolag Underground installation for storing petrol products
SU924377A1 (en) * 1980-10-08 1982-04-30 Inst Geotekhnicheskoi Mekhanik Method for underground winning of mineral using chambers and storage of mineral
DK161826B (en) * 1985-07-03 1991-08-19 Avesta Lining Ab System for the storage of gas or liquid in a cavern in a mountain
CN102102536A (en) * 2010-12-15 2011-06-22 中国神华能源股份有限公司 Method for storing gas by using abandoned tunnel
CN102261299A (en) * 2010-05-24 2011-11-30 陈汉保 Method for performing energy storage and electricity generation by utilizing underground mines
CN102587980A (en) * 2012-03-12 2012-07-18 中国石油大学(华东) Multiple-interlayer salt cavern gas storage and building method of multiple-interlayer salt cavern gas storage
CN102852367A (en) * 2012-07-10 2013-01-02 孔令先 Safe and covert high-capacity oil depot arranged underground
CN103089306A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Method for constructing underground gas storage by depleted oil-gas reservoir

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3501917A (en) * 1968-06-14 1970-03-24 Phillips Petroleum Co Liquid storage
US3807181A (en) * 1971-05-29 1974-04-30 Edeleanu Gmbh Underground storage of gas
US4045963A (en) * 1975-05-28 1977-09-06 Armerad Betong Vagforbattringar Aktiebolag Underground installation for storing petrol products
SU924377A1 (en) * 1980-10-08 1982-04-30 Inst Geotekhnicheskoi Mekhanik Method for underground winning of mineral using chambers and storage of mineral
DK161826B (en) * 1985-07-03 1991-08-19 Avesta Lining Ab System for the storage of gas or liquid in a cavern in a mountain
CN102261299A (en) * 2010-05-24 2011-11-30 陈汉保 Method for performing energy storage and electricity generation by utilizing underground mines
CN102102536A (en) * 2010-12-15 2011-06-22 中国神华能源股份有限公司 Method for storing gas by using abandoned tunnel
CN103089306A (en) * 2011-11-03 2013-05-08 大港油田集团有限责任公司 Method for constructing underground gas storage by depleted oil-gas reservoir
CN102587980A (en) * 2012-03-12 2012-07-18 中国石油大学(华东) Multiple-interlayer salt cavern gas storage and building method of multiple-interlayer salt cavern gas storage
CN102852367A (en) * 2012-07-10 2013-01-02 孔令先 Safe and covert high-capacity oil depot arranged underground

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
张国文: "《石膏矿废弃矿坑怎么用?储油!》", 《中国煤炭报》 *
彭振华等: "《利用废弃石膏矿储存原油可行性分析》", 《工程地质学报》 *

Also Published As

Publication number Publication date
CN105927275B (en) 2017-12-08

Similar Documents

Publication Publication Date Title
CN105303949B (en) A kind of robot vision experiment environmental system based on coal mine roadway
CN205387326U (en) Dustless modularization belt conveyor
CN102963630A (en) Large-volume dry bulk cargo transportation container for railway
CN104944010A (en) Large steel plate coal house
CN107814127A (en) A kind of closed storage warehouse
CN105927275A (en) Method for storing metal blanks based on hard gypsum mine gob
CN102251804B (en) Mobile steel refuge chamber
CN204591331U (en) The mine development end dash system of adjoint high-concentration hydrogen sulfide and gas
CN212977217U (en) Support tarpaulin for welding steel box girder
CN204607126U (en) Environment-friendly type reversible adhesive belt conveyor system
JP4748721B2 (en) Air blasting and painting equipment block moving method and apparatus
JP4897845B2 (en) Dust diffusion control method outside the building
CN204199166U (en) Modularization haulage gantry
CN205688820U (en) A kind of installation system of high-rise building large area cell cube curtain wall block
CN210557328U (en) Concrete mixing plant gravel and sand conveyor with dustproof function
CN202691190U (en) Explosion-proof device
CN204073690U (en) A kind of novel tunnel and bottom of the reservior pocket type ultrafine dust dust arrester
CN218541954U (en) Rubber threshold safety cover
Zou Analysis on dust control technology in open-pit quarry
CN103171885B (en) To turn back buffer slide chute and installation method thereof
CN207209196U (en) A kind of material conveyer belt protector
CN207658895U (en) Working at height glass hanging equipment
CN205259650U (en) Bulk cargo field closed system
CN212225292U (en) Mining ventilation system is with supply-air outlet of conveniently adjusting wind direction
CN204282945U (en) Wind-proof dust-suppression net

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
CB03 Change of inventor or designer information

Inventor after: Huang He

Inventor after: Xu Hao

Inventor after: Li Jun

Inventor after: Han Xizi

Inventor after: Qi Jiazhong

Inventor after: Miao Yuliang

Inventor after: Lang Baohua

Inventor after: Hu Zhenfa

Inventor after: Li Xiangfei

Inventor after: Feng Hongbo

Inventor after: Chen Yuewu

Inventor after: Zheng Siguang

Inventor before: Huang He

Inventor before: Xu Hao

Inventor before: Li Jun

Inventor before: Han Xizi

Inventor before: Yu Hongling

Inventor before: Qi Jiazhong

Inventor before: Miao Yuliang

Inventor before: Lang Baohua

Inventor before: Hu Zhenfa

Inventor before: Li Xiangfei

Inventor before: Feng Hongbo

Inventor before: Chen Yuewu

Inventor before: Zheng Siguang

COR Change of bibliographic data
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210106

Address after: 238171 No.1 Hengtai Avenue, taochang Town, Hanshan County, Maanshan City, Anhui Province

Patentee after: Anhui Hengtai New Material Co.,Ltd.

Address before: Taochang Town, Hanshan County, Maanshan City, Anhui Province

Patentee before: HANSHAN HENGTAI NON-METALLIC MATERIALS BRANCH OF ANHUI WANBEI COAL-ELECTRICITY GROUP Co.,Ltd.