CN105927200B - A kind of method of hyposmosis heavy oil wells volume increase - Google Patents

A kind of method of hyposmosis heavy oil wells volume increase Download PDF

Info

Publication number
CN105927200B
CN105927200B CN201610473806.1A CN201610473806A CN105927200B CN 105927200 B CN105927200 B CN 105927200B CN 201610473806 A CN201610473806 A CN 201610473806A CN 105927200 B CN105927200 B CN 105927200B
Authority
CN
China
Prior art keywords
well
oil
hyposmosis
volume increase
heavy oil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610473806.1A
Other languages
Chinese (zh)
Other versions
CN105927200A (en
Inventor
梁应娟
徐静
张宇
崔波
谭耀蕾
高霞
孟丽
王超
陈静
张兴瑞
高风
耿燕新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yantai Zhiben Intellectual Property Operation and Management Co Ltd
Original Assignee
Yantai Zhiben Intellectual Property Operation and Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yantai Zhiben Intellectual Property Operation and Management Co Ltd filed Critical Yantai Zhiben Intellectual Property Operation and Management Co Ltd
Priority to CN201610473806.1A priority Critical patent/CN105927200B/en
Publication of CN105927200A publication Critical patent/CN105927200A/en
Application granted granted Critical
Publication of CN105927200B publication Critical patent/CN105927200B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Lubricants (AREA)
  • Organic Low-Molecular-Weight Compounds And Preparation Thereof (AREA)

Abstract

The invention belongs to technical field of tertiary oil recovery, and in particular to a kind of method of hyposmosis heavy oil wells volume increase, this method specifically include following steps:The screening of oil well;The pressure break of oil well;The single well stimulation processing of oil well;The processing of well wellbore.The present invention has the characteristics that simple for process and operability is strong, is conducive to field popularization application;The present invention's is with strong points, and the present invention targetedly selects the technological measure of series according to the characteristics of hyposmosis heavy oil wells, therefore, oily well yield and the term of validity can be significantly increased, individual well oil increment is more than 1000t, and the term of validity is more than 3 years, and input-output ratio is more than 1:5.Therefore, present invention is generally applicable in the field test of hyposmosis heavy oil wells volume increase.

Description

A kind of method of hyposmosis heavy oil wells volume increase
Technical field
The invention belongs to technical field of tertiary oil recovery, and in particular to a kind of method of hyposmosis heavy oil wells volume increase.
Background technology
Low-permeability oil deposit permeability is less than 10 × 10-3um2, into oil field after high water-cut development period, around how improving Water drive oil effect improves well yield, steady oil control water or oil increasing precipitation, improves reservoir water drive recovery ratio, is always oil field development Technical staff studies the problem of tackling key problem.The existing waterflooding extraction mode of hyposmosis waterflooding reservoir, waterflood recovery efficiency factor is 25% Hereinafter, still there is a large amount of oil in place that can not be converted into crude output, the huge waste of petroleum resources is caused.
Viscous crude is due to asphalt colloid content height, and wax content is few, thus viscosity is high, flow difficulties, exploits difficult, mesh Before, cyclic steam injection tech is the main method of the current thickened oil recovery in China, and the whole nation there are about 80% heavy oil production is gulped down by steam Spit acquisition.But there is the following aspects in cyclic steam injection tech:(1) generation steam cost is high, especially in water The area of shortage of resources and water price costliness, water process are costly;(2) due to steam injection, oil well heat loss is shaked out, casing damage Situations such as it is more serious, influence the implementation of the utilization rate of oil wells and technological measure;(3) with the increase of steam soak round, nearly well The aqueous rising in area consumes most of steam heat, and thermal energy Quality degree of effective utilization is deteriorated, and effectiveness is caused to be deteriorated; (4) heavy oil wells of the non-thermal recovery completion in part, can not carry out steam injection.
By literature search, the patent No. " ZL201010205368.3 ", a kind of entitled " low permeability oil field surfactant flooding Finish ", the present invention relates to a kind of nonionic-anion surfactant oil displacement agents of low permeability oil field displacement of reservoir oil volume increase;By weight Percentage be 0.1~3% polyoxyethylene sorbitan monooleate, 4~7% neopelex, 3~5% 2- acrylamide-2-methyl propane sulfonics, 2~4% organic solvents, remaining is water.The present invention has a disadvantage that and deficiency:Using Single surface-active oil displacement agent can improve the displacement efficiency of low-permeability oil deposit, but cannot effectively improve oil reservoir involves body Therefore product, affects the degree for improving recovery ratio to a certain extent;Chemical oil displacement agent dosage is big, and chemical oil displacement agent price Costliness causes chemical flooding cost of investment higher, and therefore, input-output ratio is relatively low.
Invention content
The purpose of the present invention is providing a kind of method of hyposmosis heavy oil wells volume increase in view of the deficiencies of the prior art, the party Method carries out pressure break to hyposmosis heavy oil wells first, improves the porosity and permeance property of oil well;Secondly, N is utilized2And chemical surface Active oil displacement agent carries out the single well stimulation processing of more rounds, and oily well yield is significantly increased;Finally, well wellbore is carried out Viscosity reduction processing prevents crude oil during well wellbore lifts since the reduction of temperature causes the viscosity of crude oil to reduce, flows Property reduce, so as to affect the normal production of oil well.This method has the characteristics that simple for process, specific aim and operability are strong, The field test results of hyposmosis heavy oil wells can be effectively improved.
A kind of method of hyposmosis heavy oil wells volume increase, which is characterized in that specifically include following steps:
(1)The screening of oil well
The selection criteria of oil well is:Reservoir temperature is less than 50 × 10 less than 90 DEG C, permeability-3μm2, ground viscosity of crude ﹤ 5000mPa.s, core intersection are more than 1m.
(2)Wellfracturing
Select the crack quantity of pressure break according to the thickness h of oil reservoir, the length in crack is 20 ~ 50m, 2 ~ 5m of fracture width, oil The fracturing fluid of well pressure break is aqueous fracturing fluid.
(3)The processing of oil well single well stimulation
Utilize high pressure pump truck N2It is injected in the oil jacket annular space of oil well after pressure break with chemical surfactant, injection mode is Divide four slugs, the first slug injection liquid N2;Second slug injects chemical surfactant;Third slug injection liquid N2;The Four slugs inject water flooding displacement fluid, wherein, first and third slug liquid N2Injection rate be respectively 6-8m3And 3-5m3, change Learn surfactant mass concentration for 0.3-0.5%, volume injection rate=(0.2-0.3)× crack quantity × fracture length × is split Slit width degree × core intersection, the injection rate of water flooding displacement fluid is 6-10m3, displacement fluid drives a well life after having noted after stewing well 20-30d Production, the period of single well stimulation is 12-18 months, and the number of single well stimulation is 2-3 times.
(4)The processing of well wellbore
The processing of well wellbore is carried out during oil well single well stimulation opening well and making production, using dosing pump by oil-soluble viscosity reducer The pit shaft of oil well is injected from the oil jacket annular space of oil well, oil-soluble viscosity reducer adds period adding for 20-30d, per round It measures as 80-100kg.
The crack quantity be h≤2m when pressure break crack quantity 1 ~ 2,5m < h < 2m when pressure break crack quantity 3 ~ 5, h >=5m when pressure break crack quantity 6 ~ 8.
The chemical surfactant is anion surfactant, cationic surfactant, amphoteric ion surface One kind in activating agent and nonionic surfactant.
The anion surfactant be metal carboxylate, Sulfonates and sulfuric acid ester in one kind, the sun Ionic surface active agent is one kind in amine salt, quaternary ammonium salt and heterocyclic, and the zwitterionic surfactant is phosphorus One kind in acid esters type and betaine type, the nonionic surfactant are alkyl polyglycoside type, polyoxyethylene-type and alkanol One kind in acid amide type.
The oil-soluble viscosity reducer is made of aromatic hydrocarbon and alcohols, and mass concentration is respectively 0.5-1.0% and 0.3- 0.5%。
The present invention is directed to the characteristics of hyposmosis heavy oil wells, carries out pressure break to hyposmosis heavy oil wells first, improves the hole of oil well Gap and permeance property;Secondly, using injecting N2The single well stimulation processing of more rounds is carried out with chemical surface activity oil displacement agent, greatly Improve to amplitude hyposmosis viscous crude well yield;Finally, the viscosity reduction processing of well wellbore is carried out, prevents crude oil from being lifted in well wellbore Since the reduction of temperature causes the reduction of viscosity of crude, mobility to reduce during rising, so as to affect the normal life of oil well Production.This method has the characteristics that simple for process, specific aim and operability are strong, can effectively improve the production of hyposmosis heavy oil wells Amount, individual well oil increment are more than 1000t, and the term of validity is more than 3 years.
Present invention has the advantages that:
(1)The present invention has the characteristics that simple for process and operability is strong, is conducive to field popularization application;
(2)The present invention and the method for heat extraction by steam injection with it is at low cost, risk is low and maintenance cost is low, and will not to tubing string It causes to corrode.
(3)The present invention's is with strong points, and the present invention targetedly selects series according to the characteristics of hyposmosis heavy oil wells Therefore, oily well yield and the term of validity can be significantly increased in technological measure, individual well oil increment is more than 1000t, and the term of validity is more than 3 years, input-output ratio was more than 1:5.
Specific embodiment
The present invention is described in further detail with reference to specific embodiment, and with reference to data.It should be understood that these embodiments Solely for the purpose of illustration the present invention rather than limit the scope of the invention in any way.
Embodiment 1
Certain oilfield A21, 80 DEG C of reservoir temperature, permeability 45 × 10-3μm2, viscosity of crude 3560mPa.s, core intersection 3.2m, well day oil-producing 5.0t before testing, aqueous 90.2%, using the method for the present invention in oil well A21Implement field test, specifically Implementation steps are as follows:
(1)The screening of oil well
The selection criteria of oil well is:Reservoir temperature is less than 50 × 10 less than 90 DEG C, permeability-3μm2, ground viscosity of crude ﹤ 5000mPa.s, core intersection are more than 1m;Oil well A2180 DEG C of reservoir temperature, permeability 45 × 10-3μm2, ground viscosity of crude 3560mPa.s, core intersection 3.2m meet the screening criteria of oil well, can implement the present invention in the well.
(2)The pressure break of oil well
Fracturing fluid is aqueous fracturing fluid, and crack quantity is 4, the length in crack is 30m, fracture width 3m.
(3)The single well stimulation processing of oil well
Utilize high pressure pump truck N2It is injected in the oil jacket annular space of oil well after pressure break with metal carboxylate anion surfactant, Injection mode is point four slugs, and the first slug injects liquid N2;Second slug injects metal carboxylate anion surfactant; Third slug injection liquid N2;4th slug injects water flooding displacement fluid, wherein, first and third slug liquid N2Injection rate Respectively 6m3And 4m3, the mass concentration of metal carboxylate anion surfactant is 0.3%, volume injection rate=0.2 × 4 × 30 ×3×3.2=230.4m3, the injection rate of water flooding displacement fluid is 8m3, displacement fluid opening well and making production, individual well after stewing well 25d after having noted The period handled up is 18 months, and the number of single well stimulation is 2 times.
(4)The processing of well wellbore
The processing of well wellbore is carried out during oil well single well stimulation opening well and making production, using dosing pump by oil-soluble viscosity reducer The pit shaft of oil well is injected from the oil jacket annular space of oil well, the period that adds of oil-soluble viscosity reducer is 30d, is per the dosage of round 100kg, the oil-soluble viscosity reducer are made of aromatic hydrocarbon and alcohols, and mass concentration is respectively 0.5% and 0.4%.
In oil well A21After implementing the present invention, well water has dropped 6.5 percentage points, and the term of validity is 4 years, and averagely increase day by day oil 1.5t adds up to increase oil 2190t, input-output ratio 1:5.8, field test results are good.
Embodiment 2
Certain oilfield D3, 72 DEG C of reservoir temperature, permeability 15 × 10-3μm2, viscosity of crude 4320mPa.s, core intersection 2.5m, well day oil-producing 3.5t before testing, aqueous 97.2%, using the method for the present invention in oil well D3Implement field test, specifically Implementation steps are as follows:
(1)The screening of oil well
The selection criteria of oil well is:Reservoir temperature is less than 50 × 10 less than 90 DEG C, permeability-3μm2, ground viscosity of crude ﹤ 5000mPa.s, core intersection are more than 1m;Oil well D372 DEG C of reservoir temperature, permeability 15 × 10-3μm2, ground viscosity of crude 4320mPa.s, core intersection 2.5m meet the screening criteria of oil well, can implement the present invention in the well.
(2)The pressure break of oil well
Fracturing fluid is aqueous fracturing fluid, and crack quantity is 3, the length in crack is 20m, fracture width 5m.
(3)The single well stimulation processing of oil well
Utilize high pressure pump truck N2It is injected in the oil jacket annular space of oil well after pressure break with quaternary cationic surfactant, Injection mode is point four slugs, and the first slug injects liquid N2;Second slug injects quaternary cationic surfactant; Third slug injection liquid N2;4th slug injects water flooding displacement fluid, wherein, first and third slug liquid N2Injection rate Respectively 7m3And 3m3, the mass concentration of quaternary cationic surfactant is 0.4%, volume injection rate=0.25 × 3 × 20 ×5×2.5=187.5m3, the injection rate of water flooding displacement fluid is 10m3, displacement fluid opening well and making production, individual well after stewing well 30d after having noted The period handled up is 16 months, and the number of single well stimulation is 2 times.
(4)The processing of well wellbore
The processing of well wellbore is carried out during oil well single well stimulation opening well and making production, using dosing pump by oil-soluble viscosity reducer The pit shaft of oil well is injected from the oil jacket annular space of oil well, the period that adds of oil-soluble viscosity reducer is 20d, is per the dosage of round 90kg, the oil-soluble viscosity reducer are made of aromatic hydrocarbon and alcohols, and mass concentration is respectively 1.0% and 0.3%.
In oil well D3After implementing the present invention, well water has dropped 4.3 percentage points, and the term of validity is 4.5 years, is averagely increased day by day Oily 1.3t adds up to increase oil 2135t, input-output ratio 1:6.5, field test results are good.
Embodiment 3
Certain oilfield E1, 65 DEG C of reservoir temperature, permeability 20 × 10-3μm2, viscosity of crude 4680mPa.s, core intersection 1.7m, well day oil-producing 2.0t before testing, aqueous 96.5%, using the method for the present invention in oil well E1Implement field test, specifically Implementation steps are as follows:
(1)The screening of oil well
The selection criteria of oil well is:Reservoir temperature is less than 50 × 10 less than 90 DEG C, permeability-3μm2, ground viscosity of crude ﹤ 5000mPa.s, core intersection are more than 1m;Oil well E165 DEG C of reservoir temperature, permeability 20 × 10-3μm2, ground viscosity of crude 4680mPa.s, core intersection 1.7m meet the screening criteria of oil well, can implement the present invention in the well.
(2)The pressure break of oil well
Fracturing fluid is aqueous fracturing fluid, and crack quantity is 2, the length in crack is 50m, fracture width 2m.
(3)The single well stimulation processing of oil well
Utilize high pressure pump truck N2It is noted in the oil jacket annular space of oil well after pressure break with betaine type amphoteric ionic surface active agent Enter, injection mode is point four slugs, and the first slug injects liquid N2;Second slug injection betaine type amphoteric ion surface is lived Property agent;Third slug injection liquid N2;4th slug injects water flooding displacement fluid, wherein, first and third slug liquid N2Note It is respectively 8m to enter amount3And 5m3, the mass concentration of betaine type amphoteric ionic surface active agent is 0.5%, volume injection rate=0.3 × 2×50×2×1.7=102m3, the injection rate of water flooding displacement fluid is 6m3, displacement fluid boils in a covered pot over a slow fire opening well and making production after well 20d after having noted, single The period that well is handled up is 12 months, and the number of single well stimulation is 3 times.
(4)The processing of well wellbore
The processing of well wellbore is carried out during oil well single well stimulation opening well and making production, using dosing pump by oil-soluble viscosity reducer The pit shaft of oil well is injected from the oil jacket annular space of oil well, the period that adds of oil-soluble viscosity reducer is 25d, is per the dosage of round 80kg, the oil-soluble viscosity reducer are made of aromatic hydrocarbon and alcohols, and mass concentration is respectively 0.8% and 0.5%.
In oil well E1After implementing the present invention, well water has dropped 7.2 percentage points, and the term of validity is 4 years, and averagely increase day by day oil 2.1t adds up to increase oil 3066t, input-output ratio 1:7, field test results are good.
It is obvious to a person skilled in the art that the present invention is not limited to the details of above-mentioned exemplary embodiment, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requirement rather than above description limit, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims Variation is included within the present invention.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in each embodiment can also be properly combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (8)

  1. A kind of 1. method of hyposmosis heavy oil wells volume increase, which is characterized in that specifically include following steps:
    (1) screening of oil well
    The selection criteria of oil well is:Reservoir temperature is less than 50 × 10 less than 90 DEG C, permeability-3μm2, ground viscosity of crude ﹤ 5000mPa.s, core intersection are more than 1m;
    (2) wellfracturing
    Select the crack quantity of pressure break according to the thickness h of oil reservoir, the length in crack is 20~50m, 2~5m of fracture width, oil well The fracturing fluid of pressure break is aqueous fracturing fluid;
    (3) oil well single well stimulation is handled
    Utilize high pressure pump truck N2It is injected in the oil jacket annular space of oil well after pressure break with chemical surfactant, injection mode is divides four A slug, the first slug injection liquid N2;Second slug injects chemical surfactant;Third slug injection liquid N2;4th section Plug injection water flooding displacement fluid, wherein, first and third slug liquid N2Injection rate be respectively 6-8m3And 3-5m3, chemical table The mass concentration of face activating agent is 0.3-0.5%, volume injection rate=(0.2-0.3) × crack quantity × fracture length × crack Width × core intersection, the injection rate of water flooding displacement fluid is 6-10m3, displacement fluid opening well and making production after stewing well 20-30d after having noted, The period of single well stimulation is 12-18 months, and the number of single well stimulation is 2-3 times;
    (4) processing of well wellbore
    The processing of well wellbore is carried out during oil well single well stimulation opening well and making production, using dosing pump by oil-soluble viscosity reducer from oil The pit shaft of oil well is injected in the oil jacket annular space of well, the period that adds of oil-soluble viscosity reducer is 20-30d, is per the dosage of round 80-100kg。
  2. A kind of 2. method of hyposmosis heavy oil wells volume increase according to claim 1, it is characterised in that the crack quantity Pressure break is split when the crack quantity 3~5 of pressure break, h >=5m when the crack quantity of pressure break 1~2,5m < h < 2m during for h≤2m Stitch quantity 6~8.
  3. A kind of 3. method of hyposmosis heavy oil wells volume increase according to claim 1 or 2, it is characterised in that the chemical table Face activating agent is anion surfactant, cationic surfactant, zwitterionic surfactant and non-ionic surface are lived One kind in property agent.
  4. A kind of 4. method of hyposmosis heavy oil wells volume increase according to claim 3, it is characterised in that the anion table Face activating agent is one kind in metal carboxylate, Sulfonates and sulfuric acid ester.
  5. A kind of 5. method of hyposmosis heavy oil wells volume increase according to claim 3, it is characterised in that the cation form Face activating agent is one kind in amine salt, quaternary ammonium salt and heterocyclic.
  6. A kind of 6. method of hyposmosis heavy oil wells volume increase according to claim 3, it is characterised in that the amphoteric ion Surfactant is one kind in phosphate type and betaine type.
  7. A kind of 7. method of hyposmosis heavy oil wells volume increase according to claim 3, it is characterised in that the nonionic table Face activating agent is one kind in alkyl polyglycoside type, polyoxyethylene-type and alkylol amide type.
  8. A kind of 8. method of hyposmosis heavy oil wells volume increase according to claim 1, it is characterised in that the oil-soluble drop Stick is made of aromatic hydrocarbon and alcohols, and mass concentration is respectively 0.5-1.0% and 0.3-0.5%.
CN201610473806.1A 2016-06-27 2016-06-27 A kind of method of hyposmosis heavy oil wells volume increase Active CN105927200B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610473806.1A CN105927200B (en) 2016-06-27 2016-06-27 A kind of method of hyposmosis heavy oil wells volume increase

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610473806.1A CN105927200B (en) 2016-06-27 2016-06-27 A kind of method of hyposmosis heavy oil wells volume increase

Publications (2)

Publication Number Publication Date
CN105927200A CN105927200A (en) 2016-09-07
CN105927200B true CN105927200B (en) 2018-06-12

Family

ID=56828297

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610473806.1A Active CN105927200B (en) 2016-06-27 2016-06-27 A kind of method of hyposmosis heavy oil wells volume increase

Country Status (1)

Country Link
CN (1) CN105927200B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114427407A (en) * 2021-12-15 2022-05-03 中国石油化工股份有限公司 Water injection huff and puff oil production method for low-pore ultralow-permeability reservoir

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4842065A (en) * 1988-05-11 1989-06-27 Marathon Oil Company Oil recovery process employing cyclic wettability alteration
CN101310093A (en) * 2005-11-16 2008-11-19 罗迪亚公司 Methods for recovering oil from an oil reservoir
CN101705811A (en) * 2009-10-12 2010-05-12 西安中孚凯宏石油科技有限责任公司 Chemical pressure decreasing and augmented injection technology for strong sensitivity oil layer water injection well
CN103003521A (en) * 2010-05-17 2013-03-27 普拉德研究及开发股份有限公司 Methods for providing proppant slugs in fracturing treatments
CN103820095A (en) * 2014-01-26 2014-05-28 中国石油天然气股份有限公司 Hydroxysulfobetaine viscoelastic surfactant and application thereof in tertiary oil recovery
CN104975839A (en) * 2014-04-09 2015-10-14 东营广贸石油技术服务有限公司 Composite multi-stage fracturing acidification and nitrogen foam fast flow back process

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4842065A (en) * 1988-05-11 1989-06-27 Marathon Oil Company Oil recovery process employing cyclic wettability alteration
CN101310093A (en) * 2005-11-16 2008-11-19 罗迪亚公司 Methods for recovering oil from an oil reservoir
CN101705811A (en) * 2009-10-12 2010-05-12 西安中孚凯宏石油科技有限责任公司 Chemical pressure decreasing and augmented injection technology for strong sensitivity oil layer water injection well
CN103003521A (en) * 2010-05-17 2013-03-27 普拉德研究及开发股份有限公司 Methods for providing proppant slugs in fracturing treatments
CN103820095A (en) * 2014-01-26 2014-05-28 中国石油天然气股份有限公司 Hydroxysulfobetaine viscoelastic surfactant and application thereof in tertiary oil recovery
CN104975839A (en) * 2014-04-09 2015-10-14 东营广贸石油技术服务有限公司 Composite multi-stage fracturing acidification and nitrogen foam fast flow back process

Also Published As

Publication number Publication date
CN105927200A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
He et al. Practice and development suggestions of hydraulic fracturing technology in the Gulong shale oil reservoirs of Songliao Basin, NE China
CN108830020A (en) A method of the micro- Fracturing Technology crack extension of simulation offshore oilfield based on heat flow piercement theory
CN102518415B (en) Steam assisted gravity drainage method for fractured single horizontal well
CN104727799A (en) Pulse sand fracturing method for realizing high flow conductivity of fracture
CN105863598B (en) A kind of technique of hyposmosis heavy oil wells volume increase
CN106050209B (en) A method of improving hyposmosis viscous crude well production
CN107060704B (en) Supercritical CO2It is atomized deep penetration acid fracturing method
CN109958426A (en) A kind of fracturing process improving deep layer shale gas crack complexity
CN107762474A (en) Low-permeability heavy oil reservoir fracturing method
CN104704197A (en) SAGD control in leaky reservoirs
CN109236263A (en) A kind of oil-gas reservoir reservoir fracturing method
CN105756649B (en) A kind of method of hyposmosis Waxy Production Wells volume increase
CN109630086A (en) A kind of energization refracturing process for old well
CN105927200B (en) A kind of method of hyposmosis heavy oil wells volume increase
CN204457702U (en) SAGD horizontal well system
CN107401397B (en) Communication method of double horizontal wells
CN107246257B (en) Heterogeneous reservoir is acidified remodeling method
CN106907134A (en) A kind of method of heavy oil wells microbial single well treatment
CN115324545B (en) Variable pressure steam assisted heavy oil drainage thick oil exploitation method
CN104179488B (en) A kind of method for improving exploitation hyposmosis carbonate rock heavy crude reservoir effect
CN107247816A (en) A kind of heavy crude reservoir is carried out cold chemical viscosity reduction of adopting and farthest constructed the decision method of radius
CN105626026B (en) A kind of method that hyposmosis Waxy Production Wells improve well yield
CN114370259A (en) Offshore low-yield heavy oil cold production well thermal composite huff and puff synergy system and operation method
CN107143319A (en) The cold method adopted of shallow oil reservoir reducing thick oil viscosity
CN103045211A (en) Method for preparing repeated fracturing blocking agent based on selective gel breaker

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Liang Yingjuan

Inventor after: Zhang Xingrui

Inventor after: Gao Feng

Inventor after: Geng Yanxin

Inventor after: Xu Jing

Inventor after: Zhang Yu

Inventor after: Cui Bo

Inventor after: Tan Yaolei

Inventor after: Gao Xia

Inventor after: Meng Li

Inventor after: Wang Chao

Inventor after: Chen Jing

Inventor before: Liu Qin

CB03 Change of inventor or designer information
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: A method for increasing production of low permeability heavy oil wells

Effective date of registration: 20211207

Granted publication date: 20180612

Pledgee: Yantai financing guarantee Group Co.,Ltd.

Pledgor: YANTAI ZHIBEN INTELLECTUAL PROPERTY MANAGEMENT Co.,Ltd.

Registration number: Y2021980014167

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20220609

Granted publication date: 20180612

Pledgee: Yantai financing guarantee Group Co.,Ltd.

Pledgor: YANTAI ZHIBEN INTELLECTUAL PROPERTY MANAGEMENT Co.,Ltd.

Registration number: Y2021980014167

PC01 Cancellation of the registration of the contract for pledge of patent right