CN105926673A - Method for synchronously constructing vehicle slopes and floor structures in reverse construction - Google Patents

Method for synchronously constructing vehicle slopes and floor structures in reverse construction Download PDF

Info

Publication number
CN105926673A
CN105926673A CN201610352164.XA CN201610352164A CN105926673A CN 105926673 A CN105926673 A CN 105926673A CN 201610352164 A CN201610352164 A CN 201610352164A CN 105926673 A CN105926673 A CN 105926673A
Authority
CN
China
Prior art keywords
ramp
construction
floor
car ramp
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610352164.XA
Other languages
Chinese (zh)
Other versions
CN105926673B (en
Inventor
徐磊
朱毅敏
陈韬
张星波
陈逯浩
谢晗
张旭
李筠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 1 Group Co Ltd
Original Assignee
Shanghai Construction No 1 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 1 Group Co Ltd filed Critical Shanghai Construction No 1 Group Co Ltd
Priority to CN201610352164.XA priority Critical patent/CN105926673B/en
Publication of CN105926673A publication Critical patent/CN105926673A/en
Application granted granted Critical
Publication of CN105926673B publication Critical patent/CN105926673B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/045Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H6/00Buildings for parking cars, rolling-stock, aircraft, vessels or like vehicles, e.g. garages
    • E04H6/08Garages for many vehicles
    • E04H6/10Garages for many vehicles without mechanical means for shifting or lifting vehicles, e.g. with helically-arranged fixed ramps, with movable ramps

Abstract

The invention discloses a method for synchronously constructing vehicle slopes and floor structures in reverse construction. The method comprises the following steps: (1) a floor B0 and a floor B1 of a basement structure are constructed in sequence; and temporary supports are arranged on a top plate according to the stress demands; (2) a lower-layer earthwork is excavated; and meanwhile, a vehicle slope on the floor is constructed in the floor B1 structure; (3) the steps (1) to (2) are repeated until a vehicle slope from a floor Bn-1 to a floor Bn-2 is constructed; and (4) a basement baseplate is constructed; and then, a vehicle slope on a bottommost floor of the basement structure is constructed. The method for synchronously constructing the vehicle slopes and the floor structures in reverse operation solves the difficulty that the basement structure is difficult to synchronously construct with side walls of the vehicle slopes in reverse construction, realizes synchronous reverse construction of the vehicle slopes and the basement structure, is early in forming time of the vehicle slopes, is easy to guarantee the progress, and prevents such difficulties as support replacement, drilling away of support beams and outward conveying of waste concrete caused by reverse construction of the basement and forward construction of the slopes through conventional methods.

Description

Car ramp and the method for floor structure synchronous construction in a kind of inverse work
Technical field
The present invention relates to the realm of building construction, Tong Bu with floor structure particularly to car ramp in a kind of inverse work The method of construction.
Background technology
Along with the fast development of large deep foundation pit engineering, reverse construction application is more and more.Tradition contrary sequence method In construction, car ramp both sides concrete wall is difficult to and basement structure synchronous construction, therefore car ramp Standard practice be that first adverse construction method completes basement structure again along making construction car ramp, car ramp is overall The construction deadline is the most later, it is impossible to meet basement later stage masonry project, installing engineering, eggshell finish work The lot of materials traffic requirements that journey and the engineering construction of hard-cover decorations need.Meanwhile, in Normal practice implementation process, Needing limit to tear support edge construction car ramp open, speed of application is extremely slow, and secondary deformation is big;And prop up temporarily Support is difficult to apply in car ramp structure, it is necessary to all remove a large amount of wastes causing material.
Summary of the invention
The present invention provides a kind of car ramp and the method for floor structure synchronous construction in inverse work, existing to overcome Above-mentioned technical problem present in technology.
For solving above-mentioned technical problem, the present invention provide a kind of inverse in making car ramp and floor structure Tong Bu execute The method of work, including:
Step 1: the B0 layer of basement structure of having constructed successively and B1 layer, and need on top according to stress Temporary support is set at plate;
Step 2: the excavation B2 layer earthwork, the car ramp plate of this layer of simultaneously constructing in aforementioned B1 layer and slope Road side wall, and lane plate and ramp side wall are connected with B1 layer underground structure, treat car ramp and ramp side wall Structural strength removes temporary support after reaching requirement;
Step 3: repeat step 1~2 to the Bn-1 layer car ramp to Bn-2 layer of having constructed;
Step 4: construction basement bottom board, the car ramp of the basement structure bottom of then constructing.
As preferably, every layer of basement structure is provided with lane plate and the side wall junction, ramp of car ramp Lane plate muscle and reserving rib.
As preferably, in step 2, before carrying out car ramp construction, first at car ramp construction location Place sets up landing leg hands and hangs foot hands.
As preferably, in step 2, lane plate uses concrete folding technology when being connected with basement structure.
As preferably, described temporary support is reinforced concrete support or steel structure support.
As preferably, temporary support needs to be configured according to stress, and avoids car ramp structure, makes vapour Constructed continuously in car ramp.
As preferably, temporary support uses the component of repeatable utilization, and when ramp, upper strata, dismounting of having constructed is faced Time support after, can be used for the temporary support of lower floor.
Compared with prior art, the invention have the advantages that car ramp and flooring in the inverse work of the present invention The method of structure synchronization construction solves in reverse construction, and basement structure is difficult to same with car ramp side wall A difficult problem for step construction, it is achieved that car ramp adverse construction method Tong Bu with basement structure, when car ramp is formed Between early, progress is prone to ensure.And avoid Normal practice inverse make basement along the support replacement brought as ramp, Cut the difficult problem such as support beam and discarded concrete outward transport.The invention enables basement structure and car ramp structure Being synchronized construction, car ramp can synchronize to play assistant conveyance function, improves the material of basement construction Traffic condition, it is ensured that construction speed;Using composite beam technology, node connects reliable, it is ensured that structure is pacified Entirely;Save material, little on surrounding enviroment impact, it is achieved that efficient, the green construction of car ramp.This Bright need to be provided with the prefabricated temporary support for horizontal power transmission, simple process according to stress.
Accompanying drawing explanation
Fig. 1~6 is that the every step of method against car ramp in work with floor structure synchronous construction of the present invention performs Basement structure figure after completing;
Fig. 7~Fig. 9 is car ramp construction schematic diagram.
In figure: 100-basement structure, 210-temporary support, 220-reserving rib, 230-lane plate muscle, 240- Lane plate, 250-ramp side wall.
Detailed description of the invention
Understandable for enabling the above-mentioned purpose of the present invention, feature and advantage to become apparent from, the most right The detailed description of the invention of the present invention is described in detail.It should be noted that, accompanying drawing of the present invention all uses simplification Form and all use non-ratio accurately, only in order to convenient, aid in illustrating the mesh of the embodiment of the present invention lucidly 's.
As shown in Figures 1 to 6, car ramp and floor structure synchronous construction in the inverse work that the present invention provides Method, including:
Step 1: the B0 layer of basement structure 100 of having constructed successively and B1 layer, refer to Fig. 7 to Fig. 9, Basement structure 100 and lane plate 240, ramp side wall 250 junction arrange lane plate muscle 230 and reserving rib 220, and need to arrange temporary support 210 in top board appropriate position according to stress.Described temporary support 210 Need to be arranged at every layer of top board of basement structure 100 according to stress, executing of car ramp can be avoided Territory, work area, therefore car ramp can be constructed continuously, and speed of application is faster than the construction method of routine, and relatively Decrease the quantity of temporary support in prior art, the present invention need not changing during conventional reverse construction Support, it is to avoid the foundation ditch secondary deformation that causes due to support replacement process, reduces the impact on foundation ditch surrounding enviroment.
The Rotating fields maintenance of step 2:B1 is to designing requirement, after template that Demolition Construction B1 layer is used and short framed bent, The earthwork of excavation lower floor;Set up landing leg hands simultaneously in the car ramp position that B1 Rotating fields is corresponding and hang foot hands, Construct again the lane plate 240 of B0 to B1 layer and ramp side wall 250, treat lane plate 240 and ramp side wall 250 Concrete curing require to design after, remove temporary support 210, ordinary circumstance subinverse makees one layer of basement knot Structure 100 needs 2 months, and one layer of car ramp of constructing can complete in one month, and therefore, the present invention can To realize the synchronization adverse construction method of basement structure 100 and car ramp.
Wherein, described ramp side wall 250 is the concrete wall of the Water And Earth Pressures for transmitting level, namely Being to say, the present invention uses concrete folding technology, enhances the globality of structure, and intensity is high.
Step 3: repetition step 1~2 is to the Bn-1 layer car ramp to Bn-2 layer of having constructed, and n is the most whole Number, represents the number of plies of basement;
Step 4: construction basement bottom board, the car ramp of basement structure 100 bottom of then constructing.
As preferably, the support beam upper and lower surface of every layer of described basement structure 100 is provided with reserving rib, with Just with its above or below wall construction high up in the air be attached, overcoming in conventional reverse construction support beam needs Cut or be connected with wall high up in the air the deficiency of difficulty, decrease cutting of construction period discarded concrete.
As preferably, described temporary support 210 is prefabricated reinforced concrete support or steel structure support, work Skill is easy, and further, temporary support 210 uses the component of repeatable utilization, when having constructed in ramp, upper strata Become after removing temporary support 210, can be used for the temporary support 210 of lower floor.
In sum, in the inverse work that the present invention provides, car ramp and the method for floor structure synchronous construction, wrap Include: step 1: the B0 layer of basement structure 100 of having constructed successively and B1 layer, and according to stress needs Temporary support 210 is set at top board;Step 2: the excavation lower floor earthwork, constructs in aforementioned B1 layer simultaneously The car ramp plate 240 of this layer and ramp side wall 250, and by lane plate 240 and ramp side wall 250 and B1 Layer underground structure connects, and removes temporary support 210 after car ramp and sidewall structure intensity reach requirement;Step Rapid 3: repeat step 1~2 to the Bn-1 layer car ramp to Bn-2 layer of having constructed;Step 4: construction ground Lower room base plate, the car ramp of basement structure 100 bottom of then constructing.Automobile in the inverse work of the present invention The method of ramp and floor structure synchronous construction solves in reverse construction, basement structure 100 be difficult to A difficult problem for car ramp side wall synchronous construction, it is achieved that car ramp is synchronize with basement structure 100 against executing Work, car ramp forms the time early, and progress is prone to ensure.And it is suitable against making basement to avoid Normal practice The support replacement brought as ramp, cut the difficult problem such as support beam and discarded concrete outward transport.The invention enables basement Structure 100 and car ramp structure are synchronized construction, and car ramp can synchronize to play assistant conveyance function, Improve the material transportation condition of basement construction, it is ensured that construction speed;Use composite beam technology, node Connect reliable, it is ensured that structural safety;Save material, little on surrounding enviroment impact, it is achieved that car ramp Efficient, green construction.The present invention needs to be provided with prefabricated propping up for the interim of horizontal power transmission according to stress Support 210, simple process.
Obviously, those skilled in the art can carry out various change and modification without deviating from the present invention to invention Spirit and scope.So, if the present invention these amendment and modification belong to the claims in the present invention and Within the scope of equivalent technologies, then the present invention is also intended to change and including modification include these.

Claims (7)

1. car ramp and the method for floor structure synchronous construction in an inverse work, it is characterised in that including:
Step 1: the B0 layer of basement structure of having constructed successively and B1 layer, and need on top according to stress Temporary support is set at plate;
Step 2: the excavation B2 layer earthwork, the car ramp plate of this layer of simultaneously constructing in aforementioned B1 layer and slope Road side wall, and lane plate and ramp side wall are connected with B1 layer underground structure, treat car ramp and ramp side wall Structural strength removes temporary support after reaching requirement;
Step 3: repeat step 1~2 to the Bn-1 layer car ramp to Bn-2 layer of having constructed;
Step 4: construction basement bottom board, the car ramp of the basement structure bottom of then constructing.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 1, It is characterized in that, every layer of basement structure is reserved lane plate muscle with lane plate and side wall junction, ramp and reserves Muscle.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 1, It is characterized in that, in step 2, lane plate uses concrete folding technology when being connected with basement structure.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 1, It is characterized in that, in step 2, before carrying out car ramp construction, first at car ramp construction location Set up landing leg hands and hang foot hands.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 1, It is characterized in that, described temporary support is reinforced concrete support or steel structure support.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 5, It is characterized in that, temporary support needs to be configured according to stress, and avoids car ramp structure, makes automobile Constructed continuously in ramp.
Car ramp and the method for floor structure synchronous construction in a kind of inverse work the most as claimed in claim 5, It is characterized in that, temporary support uses the component of repeatable utilization, when dismounting has been constructed temporarily in ramp, upper strata After support, can be used for the temporary support of lower floor.
CN201610352164.XA 2016-05-25 2016-05-25 A method of car ramp and floor structure synchronous construction in inverse work Active CN105926673B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610352164.XA CN105926673B (en) 2016-05-25 2016-05-25 A method of car ramp and floor structure synchronous construction in inverse work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610352164.XA CN105926673B (en) 2016-05-25 2016-05-25 A method of car ramp and floor structure synchronous construction in inverse work

Publications (2)

Publication Number Publication Date
CN105926673A true CN105926673A (en) 2016-09-07
CN105926673B CN105926673B (en) 2019-05-21

Family

ID=56842101

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610352164.XA Active CN105926673B (en) 2016-05-25 2016-05-25 A method of car ramp and floor structure synchronous construction in inverse work

Country Status (1)

Country Link
CN (1) CN105926673B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089678A (en) * 2021-04-14 2021-07-09 中国电建集团华东勘测设计研究院有限公司 Deep foundation pit unearthing ramp under complex surrounding environment and construction method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740527B1 (en) * 2007-02-01 2007-07-18 주식회사 선진엔지니어링 종합건축사 사무소 Underground driveway of road
CN101255702A (en) * 2008-02-29 2008-09-03 刘志宏 Method for mining construction of inverse practicing project using carriageway method
CN102493488A (en) * 2011-12-21 2012-06-13 上海市第一建筑有限公司 Construction method for reverse beams and normal plates in foundation pit engineering
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Construction method for full cover-excavation reverse method of underground engineering
CN104652444A (en) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100740527B1 (en) * 2007-02-01 2007-07-18 주식회사 선진엔지니어링 종합건축사 사무소 Underground driveway of road
CN101255702A (en) * 2008-02-29 2008-09-03 刘志宏 Method for mining construction of inverse practicing project using carriageway method
CN102493488A (en) * 2011-12-21 2012-06-13 上海市第一建筑有限公司 Construction method for reverse beams and normal plates in foundation pit engineering
CN104652444A (en) * 2013-11-21 2015-05-27 中冶天工上海十三冶建设有限公司 Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN103741714A (en) * 2013-12-09 2014-04-23 中国建筑第二工程局有限公司 Construction method for full cover-excavation reverse method of underground engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113089678A (en) * 2021-04-14 2021-07-09 中国电建集团华东勘测设计研究院有限公司 Deep foundation pit unearthing ramp under complex surrounding environment and construction method

Also Published As

Publication number Publication date
CN105926673B (en) 2019-05-21

Similar Documents

Publication Publication Date Title
CN100348835C (en) Construction method of subsurface excavation and layer added by using top layer of existed basement as native cover board
CN105804091B (en) Prestressing combination type steel support and earth excavation coordinative construction engineering method in deep basal pit
CN104879144B (en) The excavating construction method of the underground space is built with array push pipe in soft clay area
CN106013053B (en) A kind of steel sheet pile construction method for supporting for being used to build underground garage open caisson
CN204457792U (en) A kind ofly dig large diameter shield tunnel with many pilot tunnel methods and the subway station of building
CN110439574B (en) Tunnel structure for shield lateral translation starting and slag discharging material conveying and construction method
CN103541352B (en) A kind of at ground, sandy soil stratum major diameter Vertical spots underground continuous construction method
CN105736001A (en) Construction method for building subway station through precast parts
CN104652444B (en) Construction method for overall reverse operation of ultra-large type deep foundation pit center island type alternative earth excavation
CN208072415U (en) Deep foundation pit reinforced concrete support part changes structure
JP2001262595A (en) Building construction method of underground building frame
CN107443550A (en) Prefabricated cushion cap template and its installation method
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN105926673A (en) Method for synchronously constructing vehicle slopes and floor structures in reverse construction
CN206352348U (en) A kind of attachment structure of steel reinforced concrete board wall and steel reinforced concrete laminated floor slab
CN106065668A (en) A kind of construction techniques
CN110725343B (en) Method for preventing existing tunnel from floating upwards in process of unloading earthwork right above tunnel
CN210737607U (en) A hang braced system for reverse construction method beam slab construction
CN207672609U (en) A kind of foundation pit supporting construction also serves as the pipe gallery of main body
CN103628684B (en) A kind of construction method of simultaneously watering build floor and shear wall
CN105986830A (en) Underground-excavation building method for roadside strip-shaped underground garage
CN114922191A (en) Construction method for narrow foundation pit in multiple foundation pits
CN211038697U (en) Underground excavation small-section tunnel construction supporting device
CN107012876A (en) One kind collaboration monoblock type foundation and building enclosure and its construction method
CN206844124U (en) One kind collaboration monoblock type foundation and building enclosure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant