CN105926650B - Slope surface building concrete layer landslide-proofing fixing device - Google Patents

Slope surface building concrete layer landslide-proofing fixing device Download PDF

Info

Publication number
CN105926650B
CN105926650B CN201610515988.4A CN201610515988A CN105926650B CN 105926650 B CN105926650 B CN 105926650B CN 201610515988 A CN201610515988 A CN 201610515988A CN 105926650 B CN105926650 B CN 105926650B
Authority
CN
China
Prior art keywords
slope surface
anchoring section
anchor
fixing device
concrete layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610515988.4A
Other languages
Chinese (zh)
Other versions
CN105926650A (en
Inventor
孙从磊
方建文
韩新亭
曹淑涛
张岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201610515988.4A priority Critical patent/CN105926650B/en
Publication of CN105926650A publication Critical patent/CN105926650A/en
Application granted granted Critical
Publication of CN105926650B publication Critical patent/CN105926650B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/202Securing of slopes or inclines with flexible securing means
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The invention discloses a kind of slope surface building concrete layer landslide-proofing fixing devices, it is inclined at including one in the anchor hole that rock stratum opens up, pass through concrete and the fixed anchoring section of anchor hole, multiple anchor cables being rigidly connected to each other are equipped in anchoring section, anchor cable is equipped with shelf, the Grouting Pipe for injecting concrete is extended at along anchoring section to 50 100mm of anchor hole bottom, slope surface matrix has been poured above rock stratum, a casing being embedded in slope surface matrix is connected with anchoring section, a flexible prestressing rope that outside of sleeve is fixedly connected with and extended to anchor cable is equipped in casing, a prestressed slab is connected at casing nozzle, prestressing force rope passes through prestressed slab, an anchor head acted on prestressed slab is connected with prestressing force rope.The present invention can improve the mechanical property on rock mass and slope, be effectively prevented rock mass and be subjected to displacement with slope, promote its stabilization, reach regulation concordant, landslide and crag, danger stone purpose.

Description

Slope surface building concrete layer landslide-proofing fixing device
Technical field
The present invention relates to technical field of building construction more particularly to a kind of slope surface building concrete layer landslide-proofing to fix dress It puts.
Background technology
With the development of society, construction industry has become inseparable with our life, in building construction process often Needing the casting concrete slope on rock mass, the junction on rock mass and slope can usually generate crack or with reference to defective tightness, Slope easily shifts, it is impossible to ensure the overall stability of slope and rock mass, how fundamentally improve the mechanical property of rock mass Can, the displacement of rock mass is efficiently controlled, promotes its stabilization, achievees the purpose that renovate concordant, landslide and crag, danger stone, is current Technical problem to be solved.
Invention content
Above-mentioned to solve the problems, such as, the present invention provides a kind of mechanical property that can improve rock mass and slope, effectively Ground prevents rock mass to be subjected to displacement with slope, promotes its stabilization, reaches regulation concordant, landslide and crag, danger stone purpose slope surface building Concrete layer landslide-proofing fixing device.
The present invention solve the technical solution that uses of above-mentioned technical problem for:Slope surface building concrete layer landslide-proofing fixes dress It puts, is inclined in the anchor hole that rock stratum opens up, by concrete and the fixed anchoring section of anchor hole including one, in anchoring section Interior to be equipped with multiple anchor cables being rigidly connected to each other, the anchor cable is equipped with the shelf for increasing with anchoring section bonding strength, edge Anchoring section has poured slope surface base to the Grouting Pipe being extended at the 50-100mm of anchor hole bottom for injecting concrete above rock stratum Body is connected with a casing being embedded in slope surface matrix with anchoring section, is fixedly connected and extends with anchor cable equipped with one in casing To the flexible prestressing rope of outside of sleeve, a prestressed slab is connected at casing nozzle, the prestressing force rope is worn Prestressed slab is crossed, being connected with one with prestressing force rope acts on prestressed slab for increasing rock stratum and slope surface matrix pretightning force Anchor head.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, the Grouting Pipe include being set in anchoring section to anchoring Duan Jinhang once groutings simultaneously step up the once grouting pipe for being detached from anchoring section and in anchoring section when once grouting pipe is noted Secondary high-pressure slip-casting closely knit secondary grouting pipe is carried out when slurry is completed to anchoring section, the secondary grouting tube wall is equipped with slip casting Hole, injected hole are equipped with the sealing paste for preventing concrete mortar during once grouting from entering secondary grouting pipe.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, the shelf include the annular connection with connecting cavity Part, the circular connector circumferentially multiple reinforcing ribs extended to anchor hole, forms between adjacent two reinforcing rib to set Put the isolated area of secondary grouting pipe.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, the anchor cable cylindricality thick for the thin bottom end in top or cone Shape structure, the shelf are set on anchor cable bottom end.
The junction of above-mentioned slope surface building concrete layer landslide-proofing fixing device, described sleeve pipe and anchoring section is equipped with and prevents The sealing ring of concrete mortar sleeve pipe when pouring slope surface matrix.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, described sleeve pipe tube wall extend outwardly be useful for increase with The reinforcing rib of slope surface matrix bonding strength.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, the inclination of the anchor hole and casing and level ground Angle is 30 ° and is in same angled straight lines.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, the anchorage length of the anchoring section is 4-8m.
Above-mentioned slope surface building concrete layer landslide-proofing fixing device, prestressing force rope lengths are 6-14m.
The beneficial effects of the present invention are:That is opened in rock stratum sets in anchor hole through concrete and the fixed anchoring of anchor hole Section, can be such that anchoring section is preferably fixed in hole, solid and reliable;Anchor cable setting is multiple, and shelf is equipped between anchor cable and anchor cable, For increasing and hole inner concrete bonding strength;Sleeve is connected with anchoring section, one is connected at casing nozzle and in advance should Power plate is equipped with a flexible prestressing rope that outside of sleeve is fixedly connected with and extended to anchor cable, by in advance should in casing The anchor head locking of power rope connection, makes rock mass be connect with slope surface matrix even closer, ensure that whole bonding strength;Using one Secondary Grouting Pipe and secondary grouting pipe carry out slip casting to anchor hole, make anchoring section more closely knit, no cavitation;Anchoring section and casing Angle of inclination with level ground is 30 °, convenient for the connection of slope surface matrix and rock mass;The junction of casing and anchoring section is equipped with Sealing ring prevents the concrete sleeve pipe when pouring slope surface matrix.
Description of the drawings
Fig. 1 is the attachment structure schematic diagram of the present invention;
Fig. 2 is the partial structural diagram of the present invention;
Fig. 3 is Section A-A figure in the present invention;
Fig. 4 is section B-B figure in the present invention;
Fig. 5 is the structure diagram of middle sleeve of the present invention.
Specific embodiment
Below in conjunction with the accompanying drawings and specific embodiment is described in further details the present invention.
As shown in Fig. 1,2,3,4,5, slope surface building concrete layer landslide-proofing fixing device is inclined at rock stratum including one In 1 anchor hole 2 opened up, by 2 fixed anchoring section 3 of concrete and anchor hole, the anchorage length of the anchoring section 3 is 4- 8m is equipped with multiple anchor cables 4 being rigidly connected to each other in anchoring section 3, to increase the bonding strength of anchor cable 4 and anchor hole 2, anchor cable 4 cylindricalitys or pyramidal structure thick for the thin bottom end in top, anchor cable 4 are equipped with the shelf 5 for increasing with 3 bonding strength of anchoring section, The shelf 5 include with connecting cavity circular connector, the circular connector circumferentially it is multiple to anchor hole 2 extend Reinforcing rib, forms the isolated area for setting secondary grouting pipe 7 between adjacent two reinforcing rib, and the shelf 5 is set on 4 bottom of anchor cable End, along anchoring section 3 to 2 bottom 50-100mm of anchor hole at be extended with Grouting Pipe for injecting concrete, the Grouting Pipe includes Once grouting is carried out to anchoring section 3 in anchoring section 3 and is stepped up to be detached from the once grouting pipe 6 of anchoring section 3 and be set on The closely knit secondary grouting pipe 7 of secondary high-pressure slip-casting, institute are carried out to anchoring section 3 when 6 slip casting of once grouting pipe is completed in anchoring section 3 7 tube wall of secondary grouting pipe is stated equipped with injected hole, injected hole, which is equipped with, prevents concrete mortar during once grouting from entering secondary injection The sealing paste of pipe 7 is starched, sealing paste is the prior art, is well known to those skilled in the art, and sealing paste can be adhesive tape or modeling Expect film, slope surface matrix 8 poured above rock stratum 1, a casing 9 being embedded in slope surface matrix 8 is connected with anchoring section 3, The angle of inclination of anchor hole 2 and casing 9 and level ground is 30 ° and in same angled straight lines, 9 tube wall of described sleeve pipe to Outer extension is useful for increasing the reinforcing rib 13 with 8 bonding strength of slope surface matrix, and described sleeve pipe 9 and the junction of anchoring section 3 are equipped with The sealing ring of the concrete mortar sleeve pipe 9 when pouring slope surface matrix 8 is prevented, sealing ring is coarse cloth or rubber ring, is being covered A flexible prestressing rope 10 that 9 outside of casing is fixedly connected with and extended to anchor cable 4 is equipped in pipe 9, prestressing force rope 10 is adopted With double joint steel strand wires, 10 length of prestressing force rope is 6-14m, and a prestressed slab 11 is connected at 9 nozzle of casing, described Prestressing force rope 10 passes through prestressed slab 11, and being connected with one with prestressing force rope 10 acts on prestressed slab 11 for increasing rock Layer 1 and the anchor head 12 of 8 pretightning force of slope surface matrix.
Construction procedure is as follows:
(1), rock stratum trepanning:Anchor hole 2 is opened up on rock stratum 1, anchor hole 2 is obliquely installed, the slope surface 15 with slope surface matrix 8 Vertically;
(2), setting anchoring section:After anchor hole 2 opens up, multiple anchor cables 4 being connected to each other, anchor cable 4 are put into anchor hole 2 2 port position of anchor hole is left in advance, shelf 5 is added between anchor cable 4 and anchor cable, increases the bonding strength of anchor cable 4 and anchor hole 2, Grouting Pipe is put into away from 2 bottom 0.05-0.1m of anchor hole;
(3), anchoring section slip casting:After Grouting Pipe is put into anchor hole, concrete progress is injected into anchor hole 2 by Grouting Pipe Once grouting, until be poured into 2 port position of anchor hole, using once grouting pipe 6,6 nozzle of once grouting pipe during once grouting Always in 50-100mm positions below slurry, marginal not slurry side is moved at 2 port of anchor hole until detaching anchor hole 2, once Slip casting is completed in 1h, and once grouting pressure is 5Mp;After the completion of once grouting, at the cavity of 2 inner concrete of anchor hole generation It is closely knit to carry out secondary grouting, injected hole is opened up, and to slip casting using secondary grouting pipe 7,7 tube wall of secondary grouting pipe during secondary grouting Hole is blocked, and secondary grouting pressure is 0.25Mp;
(4), setting pre-tighten section:After the completion of secondary grouting, prestressing force rope 10 and the anchor cable 14 at 2 port of anchor hole are consolidated Fixed, prestressing force rope 10 using derusting, and in its surface brush pitch, finally wraps up pitch glass-fiber-fabric, package before pouring The number of plies is no less than two layers, and casing 9 is placed at 2 port of anchor hole, is filled in 9 both ends socket of casing with butter, depth of cracking closure is 100-200mm, 9 tube wall of casing outside welding reinforcing rib 13, prestressing force rope 10 passes through casing 9 and extends to outside casing 9, to set Pipe 9 and the junction of prestressing force rope 10 are sealed, and sealing is using coarse cloth or sealing rubber ring;
(5), pour slope surface matrix:After preload section is provided with, concreting is carried out to 9 surrounding of casing, concrete is extremely It is poured at 9 nozzle of casing more, makes with angled slope surface matrix 8, slope surface 15 and the casing 9 of slope surface matrix 8 are vertically arranged;
(6), pre-tighten anchoring:After the completion of slope surface matrix 8 pours, prestressed slab 11, prestress rope are placed at 9 nozzle of casing Rope 10 passes through prestressed slab 11, when the coagulation grade of the concrete at slope surface matrix 8 is more than 80%, tensioning pretightning force rope 10 Tension is made to reach 1.1-1.2N, tensioning 2 times keeps 15min, is offloaded to locking load every time, will be in preload using anchor head 12 The prestressing force rope 10 of power state is fixed on prestressed slab 11, after anchor head 12 locks, if finding to have apparent pretightning force to lose During in relaxation, tensioning should be compensated, if find that pretightning force increment is more than the 10% of design axle power, is opened again after should loosening It draws to turn down prestress value;
(7), block:After the completion of pre-tightening anchoring, to exposed casing 9, prestressed slab 11 and anchor head 12 outside concrete Concreting closure is carried out, anchor head 12 using derusting, applies anti-decaying paint and carry out antirust, during closure, be placed above before closure Reinforcing steel net cover increases the bonding strength between slope surface matrix 8, and the concrete at anchor head 12 blocks thickness not less than 100mm, complete Into construction.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (7)

1. slope surface building concrete layer landslide-proofing fixing device, it is characterised in that:The anchor that rock stratum opens up is inclined at including one In solid hole, by concrete and the fixed anchoring section of anchor hole, equipped with multiple anchor cables being rigidly connected to each other, institute in anchoring section State anchor cable be equipped with for increase with the shelf of anchoring section bonding strength, along anchoring section to anchor hole bottom 50-100mm at be extended with For injecting the Grouting Pipe of concrete, slope surface matrix is poured above rock stratum, being connected with one with anchoring section is embedded in slope surface base Internal casing is equipped with a flexible prestressing rope that outside of sleeve is fixedly connected with and extended to anchor cable in casing, is covering A prestressed slab is connected at pipe nozzle, the prestressing force rope passes through prestressed slab, one is connected with prestressing force rope It acts on prestressed slab and is used to increase rock stratum and the anchor head of slope surface matrix pretightning force, the solidification of the concrete at slope surface matrix When degree is more than 80%, tensioning pretightning force rope makes tension reach 1.1-1.2N, and tensioning 2 times keeps 15min, is offloaded to lock every time Determine load, the prestressing force rope for being in pretightning force state is fixed on prestressed slab using anchor head, after anchor head locking, if finding When having apparent pretightning force loss in relaxation, tensioning should be compensated, pretightning force increment is more than the 10% of design axle power if finding When, after should loosening again tensioning to turn down prestress value;The Grouting Pipe, which includes being set in anchoring section, carries out once anchoring section Slip casting simultaneously steps up the once grouting pipe for being detached from anchoring section and in anchoring section when the slip casting of once grouting pipe is completed pair Anchoring section carries out the closely knit secondary grouting pipe of secondary high-pressure slip-casting, and the secondary grouting tube wall is equipped with injected hole, injected hole The sealing paste for preventing concrete mortar during once grouting from entering secondary grouting pipe is equipped with, the shelf is included with connecting cavity Circular connector, the circular connector circumferentially multiple reinforcing ribs extended to anchor hole, shape between adjacent two reinforcing rib Into for setting the isolated area of secondary grouting pipe.
2. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:The anchor cable is The thin bottom end in top thick cylindricality or pyramidal structure, the shelf are set on anchor cable bottom end.
3. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:Described sleeve pipe with The junction of anchoring section is equipped with the sealing ring for preventing the concrete mortar sleeve pipe when pouring slope surface matrix.
4. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:Described sleeve pipe pipe Wall, which extends outwardly, to be useful for increasing the reinforcing rib with slope surface matrix bonding strength.
5. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:The anchor hole And the angle of inclination of casing and level ground is 30 ° and is in same angled straight lines.
6. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:The anchoring section Anchorage length be 4-8m.
7. slope surface building concrete layer landslide-proofing fixing device according to claim 1, it is characterised in that:Prestressing force rope Length is 6-14m.
CN201610515988.4A 2016-07-04 2016-07-04 Slope surface building concrete layer landslide-proofing fixing device Expired - Fee Related CN105926650B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610515988.4A CN105926650B (en) 2016-07-04 2016-07-04 Slope surface building concrete layer landslide-proofing fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610515988.4A CN105926650B (en) 2016-07-04 2016-07-04 Slope surface building concrete layer landslide-proofing fixing device

Publications (2)

Publication Number Publication Date
CN105926650A CN105926650A (en) 2016-09-07
CN105926650B true CN105926650B (en) 2018-07-06

Family

ID=56828828

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610515988.4A Expired - Fee Related CN105926650B (en) 2016-07-04 2016-07-04 Slope surface building concrete layer landslide-proofing fixing device

Country Status (1)

Country Link
CN (1) CN105926650B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110634374B (en) * 2019-08-27 2021-03-26 中国地质大学(武汉) Physical model experiment device for simulating deformation and damage process of building on landslide
CN111206599A (en) * 2019-12-05 2020-05-29 邓婧 Landslide prevention structure of building
CN113174977B (en) * 2021-05-19 2022-05-10 核工业华南花都建设工程公司 Slope support construction process

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6499267B1 (en) * 1999-11-19 2002-12-31 Hilti Aktiengesellschaft Rods secured in anchorage by at least one of organic and inorganic mortar composition
CN103147440A (en) * 2013-03-14 2013-06-12 黄河勘测规划设计有限公司 Construction method of prestressed anchor cable
CN104775428A (en) * 2015-04-23 2015-07-15 万军利 Compound-type prestressed anchor cable structure and construction method thereof
CN105422150A (en) * 2015-11-23 2016-03-23 浙江工业大学工程设计集团有限公司 FRP sprinkling irrigation combined anchor bolt
CN205822204U (en) * 2016-07-04 2016-12-21 青岛一建集团有限公司 Domatic building concrete layer landslide-proofing fixing device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6499267B1 (en) * 1999-11-19 2002-12-31 Hilti Aktiengesellschaft Rods secured in anchorage by at least one of organic and inorganic mortar composition
CN103147440A (en) * 2013-03-14 2013-06-12 黄河勘测规划设计有限公司 Construction method of prestressed anchor cable
CN104775428A (en) * 2015-04-23 2015-07-15 万军利 Compound-type prestressed anchor cable structure and construction method thereof
CN105422150A (en) * 2015-11-23 2016-03-23 浙江工业大学工程设计集团有限公司 FRP sprinkling irrigation combined anchor bolt
CN205822204U (en) * 2016-07-04 2016-12-21 青岛一建集团有限公司 Domatic building concrete layer landslide-proofing fixing device

Also Published As

Publication number Publication date
CN105926650A (en) 2016-09-07

Similar Documents

Publication Publication Date Title
CN104790393B (en) Double-anchoring-section prestress anchor cable structure and constructing method thereof
US7740417B2 (en) Construction method for installing underground pipes for high-tension cables by using trough
CN106498950B (en) Anchor head is placed in the implementation method of the Pile-Anchor Supporting for Deep Excavation system of pile body
CN111733828A (en) Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology
CN105201514B (en) A kind of water-bearing stratum shaft wall structure and construction method
CN105926650B (en) Slope surface building concrete layer landslide-proofing fixing device
CN109403371A (en) A kind of Steep Slope Embankment retaining structure and construction method
CN108560580B (en) Earth-retaining wall construction method
CN111733837B (en) Rock slope filling and sealing protection system and construction method
CN106988328A (en) A kind of C c-types opening locked steel tube pilecofferdam and construction method
CN108612110A (en) A kind of Deep Foundation Pit of Metro Stations combined type construction method for supporting
CN103774687A (en) Single-pipe tower prefabricated spiral steel pipe pile foundation
CN108867690A (en) The reverse construction of peg board barricade of big foundation pit
CN206408630U (en) Anchor head is placed in the Pile-Anchor Supporting for Deep Excavation system of pile body
CN109519193A (en) A kind of Existing Railway Line tunnel set lining structure and its construction method
CN110258549B (en) Repair structure and repair construction method for foundation pit supporting pile
WO2020151348A1 (en) Prefabricated prestressed anchor rod construction method
CN205822204U (en) Domatic building concrete layer landslide-proofing fixing device
CN107542086B (en) Anchor cable construction method for filling slope
CN205617390U (en) A softer side of sears layer excavation supporting system for loess area
CN110004927A (en) Prestressing force miniature pile construction method
CN106120817B (en) A kind of slope surface building concrete layer landslide-proofing construction technology
CN107191196A (en) Through the anti-skidding shearing resistance administration structure of the inter-laminar dislocation band of great burying underground chamber and construction method
CN111877369A (en) Construction method for slope support reinforcement
US20230258085A1 (en) Composite support system based on steel-concrete support and shotcrete arch and construction process thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180706