CN105926618A - 一种预制桩的施工方法 - Google Patents
一种预制桩的施工方法 Download PDFInfo
- Publication number
- CN105926618A CN105926618A CN201610233740.9A CN201610233740A CN105926618A CN 105926618 A CN105926618 A CN 105926618A CN 201610233740 A CN201610233740 A CN 201610233740A CN 105926618 A CN105926618 A CN 105926618A
- Authority
- CN
- China
- Prior art keywords
- pile
- prefabricated
- prefabricated pile
- construction method
- sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D13/00—Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
- E02D13/10—Follow-blocks of pile-drivers or like devices
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/08—Drop drivers with free-falling hammer
Abstract
本发明的目的在于提供一种预制桩的施工方法,首先进行桩位处的预成孔施工,然后采用重锤夯击的方式在桩孔中沉入预制桩身至设计深度,实现工效的提高和成本的节约,并避免出现桩身强度受损的质量问题。其步骤为:1)在桩位处,采用振动或者锤击或者螺旋引孔的方式之一或者组合,进行预成孔;2)将预制桩垂直放置并对准桩孔,在预制桩的桩顶套置特制击打帽;3)在预制桩的上方,提升重锤以低落距轻夯特制击打帽,使预制桩以桩孔为导向在土体中向下沉入;4)反复进行上述步骤3)的锤击操作,直至将预制桩沉入至设计深度。
Description
技术领域
本发明涉及土木工程领域,尤其涉及桩基施工技术。
背景技术
预制桩,是我国建筑领域中常用的桩型之一,主要有混凝土方桩、预应力混凝土管桩、钢桩等,其中预应力混凝土管桩应用最为广泛,其优势在于能承受较大的荷载、施工速度快,特别是避免现浇混凝土桩基的缩径、断桩等问题。目前将预制桩打入地基中的方法主要是柴油锤击和静压法,这两种方法各有优势但也有缺点,柴油锤击法的噪声和油烟污染严重,在城市中已基本不能使用,静压法所需的静压桩机因质量较大故运输成本高,施工速度也较慢。而且这两种方法均不能避免的质量和施工风险是:当遇有砂层、碎石层等土层较硬的地质情况,穿透能力低,施工工效慢,特别是在沉桩过程中对预制桩的桩头和桩底会产生巨大的应力集中,不可避免的出现桩身强度受损,在施工中就易出现桩头劈裂、酥裂等现象,在建筑物长期施压的情况下将严重影响建筑结构安全。
发明内容
本发明是为了解决上述的问题而提出的,目的在于提供一种预制桩的施工方法,首先进行桩位处的预成孔施工,然后采用重锤夯击的方式在桩孔中沉入预制桩身至设计深度,实现工效的提高和成本的节约,并避免出现桩身强度受损的质量问题。
为了实现上述目的,本发明的一种预制桩的施工方法,其步骤包括:
1)在桩位处,采用振动或者锤击或者螺旋引孔的方式之一或者组合,进行预成孔;
2)将预制桩垂直放置并对准桩孔,在预制桩的桩顶套置特制击打帽;
3)在预制桩的上方,提升重锤以低落距轻夯特制击打帽,使预制桩以桩孔为导向在土体中向下沉入;
4)反复进行上述步骤3)的锤击操作,直至将预制桩沉入至设计深度。
上述预制桩的施工方法的步骤1)中,预成孔的深度和直径,均等于或者小于将要植入的预制桩的长度和直径。
上述预制桩的施工方法的步骤2)中,预制桩包括预制的混凝土实心桩,预应力混凝土空心管桩,钢管桩和H型钢桩。
上述预制桩的施工方法的步骤2)中,特制击打帽由钢质的击打板和套筒组成,击打板在套筒的顶端或者内部与套筒焊接为一体,套筒的内径大于预制桩的外径,套筒的内腔中填充有缓震物如胶垫、棉垫、油丝绳。
上述预制桩的施工方法的步骤3)中,上述低落距是指重锤提升的高度不超过2.5m。
上述混凝土桩的预制方法及其施工方法的特点和优势在于:
①采用先成孔后植入预制桩身的方法,即使遇有较硬土层也可以容易快速的成桩,能够完全避免施工中桩顶部和桩底部的应力集中而出现桩身受损;②采用重锤以低落距轻夯的方式,施工效率高而成本较低,且施工过程无污染无噪声,在预先成孔的情况下,甚至仅通过重锤的重量就可以将预制桩压入地基中;③采用特制击打帽,避免重锤直接夯击桩头,进一步避免桩身强度受损和噪声传出。
附图说明
图1是本发明的预制桩的施工方法的一个实施例的工序图;
图2是本发明的预制桩的施工方法中所采用的特制击打帽的剖面图。
具体实施方式
下面通过具体实施例对本发明作进一步说明。
图1是本发明的预制桩的施工方法的一个实施例的工序图,如图1中a所示,在桩位处,利用重锤1的自由落体动能冲击土体成孔,直至设计深度;然后,如图1中b所示,将预制桩2垂直放置并对准桩孔;然后,如图1中c所示,在预制桩2的桩顶端套置特制击打帽3;然后,如图1中d所示,在预制桩2的上方,提升重锤1以低落距轻夯特制击打帽3,重锤1的提升高度为1m,使预制桩2以桩孔为导向在土体中向下沉入;然后,如图1中e所示,反复进行提升重锤1以低落距轻夯特制击打帽3的操作,在此过程中如预制桩的下沉阻力较大,可适当加大重锤1提升的高度,但提升高度始终不超过2m,直至将预制桩2沉入至设计深度。
图2是本发明的预制桩的施工方法中所采用的特制击打帽的剖面图,如图2a所示,特制击打帽3由钢质的击打板5和套筒6组成,击打板5在套筒6的顶端与套筒6焊接为一体,套筒6的内腔中填充有由胶垫和棉垫组成的缓震物7;如图2b所示,特制击打帽3由钢质的击打板5和套筒6组成,击打板5在套筒6的内部中间位置与套筒6焊接为一体,套筒6的上内腔和下内腔中均填充有由胶垫和棉垫组成的缓震物7。
Claims (5)
1.一种预制桩的施工方法,包括下述步骤:
1)在桩位处,采用振动或者锤击或者螺旋引孔的方式之一或者组合,进行预成孔;
2)将预制桩垂直放置并对准桩孔,在预制桩的桩顶套置特制击打帽;
3)在预制桩的上方,提升重锤以低落距轻夯特制击打帽,使预制桩以桩孔为导向在土体中向下沉入;
4)反复进行上述步骤3)的锤击操作,直至将预制桩沉入至设计深度。
2.根据权利要求1所述的施工方法,其特征在于上述步骤1)中,上述预成孔的深度和直径,均等于或者小于将要植入的预制桩的长度和直径。
3.根据权利要求1所述的施工方法,其特征在于上述步骤2)中,预制桩包括预制的混凝土实心桩,预应力混凝土空心管桩,钢管桩和H型钢桩。
4.根据权利要求1所述的施工方法,其特征在于上述步骤2)中,上述特制击打帽由钢质的击打板和套筒组成,击打板在套筒的顶端或者内部与套筒焊接为一体,套筒的内径大于预制桩的外径,套筒的内腔中填充有缓震物如胶垫、棉垫、油丝绳。
5.根据权利要求1所述的施工方法,其特征在于上述步骤3)中,上述低落距是指重锤提升的高度不超过2.5m。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610233740.9A CN105926618A (zh) | 2016-04-15 | 2016-04-15 | 一种预制桩的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610233740.9A CN105926618A (zh) | 2016-04-15 | 2016-04-15 | 一种预制桩的施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105926618A true CN105926618A (zh) | 2016-09-07 |
Family
ID=56838219
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610233740.9A Pending CN105926618A (zh) | 2016-04-15 | 2016-04-15 | 一种预制桩的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926618A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351592A (zh) * | 2016-10-12 | 2017-01-25 | 王继忠 | 一种变径螺旋钻杆及混凝土桩的施工方法 |
CN106884429A (zh) * | 2017-04-10 | 2017-06-23 | 浙江省现代建筑设计研究院有限公司 | 一种预制桩施工方法及辅助支架 |
CN108612102A (zh) * | 2018-04-27 | 2018-10-02 | 中国二十冶集团有限公司 | 一种穿透地质硬层的综合沉桩方法 |
CN112681310A (zh) * | 2020-12-28 | 2021-04-20 | 中交二公局第一工程有限公司 | 长螺旋钻机进行引孔后插打拉森钢板桩的施工方法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725146A (zh) * | 2009-12-02 | 2010-06-09 | 江守慈 | 管内螺旋引孔与静压沉桩交替分段渐进的静压沉桩施工工艺 |
KR20120096838A (ko) * | 2011-02-23 | 2012-08-31 | 비에이치아이 주식회사 | 강관 파일 시공방법 |
CN102720198A (zh) * | 2012-05-25 | 2012-10-10 | 中冶交通工程技术有限公司 | 用于预制管桩的振动装置及预制管桩施工方法 |
CN104099925A (zh) * | 2014-07-25 | 2014-10-15 | 王继忠 | 混凝土桩的施工装置及其施工方法 |
CN204690750U (zh) * | 2015-05-19 | 2015-10-07 | 中石化胜利建设工程有限公司 | 一种筒式柴油锤桩帽及送桩器 |
CN105239574A (zh) * | 2014-06-17 | 2016-01-13 | 刘易 | 应用于填海地质的静压预应力管桩的施工方法 |
-
2016
- 2016-04-15 CN CN201610233740.9A patent/CN105926618A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101725146A (zh) * | 2009-12-02 | 2010-06-09 | 江守慈 | 管内螺旋引孔与静压沉桩交替分段渐进的静压沉桩施工工艺 |
KR20120096838A (ko) * | 2011-02-23 | 2012-08-31 | 비에이치아이 주식회사 | 강관 파일 시공방법 |
CN102720198A (zh) * | 2012-05-25 | 2012-10-10 | 中冶交通工程技术有限公司 | 用于预制管桩的振动装置及预制管桩施工方法 |
CN105239574A (zh) * | 2014-06-17 | 2016-01-13 | 刘易 | 应用于填海地质的静压预应力管桩的施工方法 |
CN104099925A (zh) * | 2014-07-25 | 2014-10-15 | 王继忠 | 混凝土桩的施工装置及其施工方法 |
CN204690750U (zh) * | 2015-05-19 | 2015-10-07 | 中石化胜利建设工程有限公司 | 一种筒式柴油锤桩帽及送桩器 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106351592A (zh) * | 2016-10-12 | 2017-01-25 | 王继忠 | 一种变径螺旋钻杆及混凝土桩的施工方法 |
CN106884429A (zh) * | 2017-04-10 | 2017-06-23 | 浙江省现代建筑设计研究院有限公司 | 一种预制桩施工方法及辅助支架 |
CN108612102A (zh) * | 2018-04-27 | 2018-10-02 | 中国二十冶集团有限公司 | 一种穿透地质硬层的综合沉桩方法 |
CN112681310A (zh) * | 2020-12-28 | 2021-04-20 | 中交二公局第一工程有限公司 | 长螺旋钻机进行引孔后插打拉森钢板桩的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105926618A (zh) | 一种预制桩的施工方法 | |
CN102733377B (zh) | 混凝土桩的施工方法 | |
CN101608448A (zh) | 水泥浆喷射多向加芯搅拌桩成桩方法 | |
CN104074186A (zh) | 一种建筑地基中成孔的护筒装置及其施工方法 | |
CN101831908A (zh) | 大直径超深度静压单管沉管夯扩灌注桩施工工艺及设备 | |
CN102808407B (zh) | 软土地基钢筋混凝土灌注桩施工方法 | |
CN104929125A (zh) | 一种载体桩的施工设备及其施工方法 | |
CN104294818A (zh) | 混凝土桩的施工方法 | |
CN107938666B (zh) | 带桩靴管桩桩端内锤击沉桩及同步端测注浆结构及工艺 | |
CN104099925A (zh) | 混凝土桩的施工装置及其施工方法 | |
CN110055948A (zh) | 一种深大岩溶地基处理方法和装置 | |
CN109853564A (zh) | 一种挤密桩的施工方法及专用內夯管锤 | |
CN103741690B (zh) | 一种土塞补偿管桩拔出施工方法及其所用的土塞补偿管桩拔桩装置 | |
JP2009167734A (ja) | 耐震補強工事における補強鋼板の地中貫入方法及び補強鋼板貫入装置 | |
CN105064332A (zh) | 一种方形桩身载体桩的施工方法 | |
CN206090541U (zh) | 一种冲击成孔的施工装置 | |
CN112240022A (zh) | 一种静压沉管桩的施工方法及施工设备 | |
CN104153355B (zh) | 混凝土桩的施工装置及其施工方法 | |
CN106759289A (zh) | 一种桩的施工方法及施工设备 | |
CN205444176U (zh) | 一种爆炸注浆防沉降管桩 | |
CN213173700U (zh) | 一种用于软基处理的预制桩 | |
CN109339044A (zh) | 一种混凝土管桩施工设备 | |
CN112663610B (zh) | 用于破碎带微型桩高效施工的振动冲压设备的施工方法 | |
CN212670554U (zh) | 一种全套管液压锤击挤土灌注桩装置 | |
CN105649015A (zh) | 一种爆炸注浆防沉降管桩 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160907 |
|
RJ01 | Rejection of invention patent application after publication |