CN105926588A - 一种新型建筑钢桩 - Google Patents
一种新型建筑钢桩 Download PDFInfo
- Publication number
- CN105926588A CN105926588A CN201610295983.5A CN201610295983A CN105926588A CN 105926588 A CN105926588 A CN 105926588A CN 201610295983 A CN201610295983 A CN 201610295983A CN 105926588 A CN105926588 A CN 105926588A
- Authority
- CN
- China
- Prior art keywords
- pile
- pile body
- filling tube
- sidewall
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 14
- 239000010959 steel Substances 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 claims description 9
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000002347 injection Methods 0.000 abstract 3
- 239000007924 injection Substances 0.000 abstract 3
- 239000000463 material Substances 0.000 abstract 3
- 239000002689 soil Substances 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/28—Prefabricated piles made of steel or other metals
- E02D5/285—Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/62—Compacting the soil at the footing or in or along a casing by forcing cement or like material through tubes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/72—Pile shoes
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610295983.5A CN105926588B (zh) | 2016-05-07 | 2016-05-07 | 一种建筑钢桩 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610295983.5A CN105926588B (zh) | 2016-05-07 | 2016-05-07 | 一种建筑钢桩 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105926588A true CN105926588A (zh) | 2016-09-07 |
CN105926588B CN105926588B (zh) | 2017-12-22 |
Family
ID=56834331
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610295983.5A Expired - Fee Related CN105926588B (zh) | 2016-05-07 | 2016-05-07 | 一种建筑钢桩 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105926588B (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284494A (zh) * | 2019-06-24 | 2019-09-27 | 中铁大桥勘测设计院集团有限公司 | 一种用于破除礁灰岩地层的钢管桩及其施工方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828509A (zh) * | 2012-09-26 | 2012-12-19 | 长沙学院 | 预应力管桩桩底桩侧联合注浆方法 |
CN103603346A (zh) * | 2013-10-15 | 2014-02-26 | 中铁三局集团有限公司 | 一种抗拉拔刺桩的施工方法 |
CN104594357A (zh) * | 2015-01-19 | 2015-05-06 | 赵连平 | 静压或锤击混凝土预制管桩桩底后注浆装置及注浆方法 |
CN205188944U (zh) * | 2015-11-21 | 2016-04-27 | 浙江航天管桩有限公司 | 一种加固混凝土圆桩 |
CN205742155U (zh) * | 2016-05-25 | 2016-11-30 | 中建七局第一建筑有限公司 | 一种新型建筑钢桩 |
-
2016
- 2016-05-07 CN CN201610295983.5A patent/CN105926588B/zh not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102828509A (zh) * | 2012-09-26 | 2012-12-19 | 长沙学院 | 预应力管桩桩底桩侧联合注浆方法 |
CN103603346A (zh) * | 2013-10-15 | 2014-02-26 | 中铁三局集团有限公司 | 一种抗拉拔刺桩的施工方法 |
CN104594357A (zh) * | 2015-01-19 | 2015-05-06 | 赵连平 | 静压或锤击混凝土预制管桩桩底后注浆装置及注浆方法 |
CN205188944U (zh) * | 2015-11-21 | 2016-04-27 | 浙江航天管桩有限公司 | 一种加固混凝土圆桩 |
CN205742155U (zh) * | 2016-05-25 | 2016-11-30 | 中建七局第一建筑有限公司 | 一种新型建筑钢桩 |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284494A (zh) * | 2019-06-24 | 2019-09-27 | 中铁大桥勘测设计院集团有限公司 | 一种用于破除礁灰岩地层的钢管桩及其施工方法 |
CN110284494B (zh) * | 2019-06-24 | 2021-04-06 | 中铁大桥勘测设计院集团有限公司 | 一种用于破除礁灰岩地层的钢管桩及其施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN105926588B (zh) | 2017-12-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203977582U (zh) | 一种钢管混凝土柱与梁连接节点 | |
CN210827451U (zh) | 一种注浆式钢管桩 | |
CN205742155U (zh) | 一种新型建筑钢桩 | |
CN105926588A (zh) | 一种新型建筑钢桩 | |
CN204676523U (zh) | 一种新型建筑钢桩 | |
CN204551434U (zh) | 一种新型抗拔微型钢管桩结构 | |
CN205444232U (zh) | 一种锚杆-重力式渗水挡土墙 | |
CN206667240U (zh) | 一种土木建筑桩 | |
CN207176411U (zh) | 一种适用于软土地基可重复使用的组合式路基板 | |
CN208201865U (zh) | 柱锤及夯扩桩设备 | |
CN206752460U (zh) | 一种管桩端板 | |
CN206070373U (zh) | 一种桥梁施工用加固锚杆 | |
CN205804330U (zh) | 一种混凝土桩 | |
CN204475320U (zh) | 一种螺丝桩 | |
CN208899473U (zh) | 一种抗拔桩接桩连接节点 | |
CN203904983U (zh) | 机械式连接预应力实心方桩 | |
CN206941576U (zh) | 一种建筑桩 | |
CN205557506U (zh) | 一种新型建筑桩 | |
CN205591213U (zh) | 一种施工树枝桩的简易装置 | |
CN203741835U (zh) | 一种预制管桩的桩尖结构 | |
CN206015677U (zh) | 一种锚杆对中支架 | |
CN204441497U (zh) | 地桩结构 | |
CN107842031A (zh) | 一种大承载力的复合桩基 | |
CN105369821B (zh) | 一种输电线路钢管桩基础抗侧压装置 | |
CN203097753U (zh) | 快穿透隔水导管管鞋 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171115 Address after: 401346, Banan District of Chongqing City bounded Stone Street South 2-2-2 Applicant after: Chongqing Sheng Zan Technology Co. Ltd. Address before: 150001 Harbin Province, Xiangfang District, an area of the security zone, building 3, unit 5, layer 1, No., No. 802 Applicant before: HARBIN GONGYANG TECHNOLOGY CONSULTING CO., LTD. |
|
TA01 | Transfer of patent application right | ||
CB03 | Change of inventor or designer information |
Inventor after: Shao Shumin Inventor after: Ling Dexiang Inventor after: Li Guangming Inventor after: Ling Hui Inventor before: Zhang Zhihai |
|
CB03 | Change of inventor or designer information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20171123 Address after: 224011 Jiangsu province Yancheng City District Longgang Zhen Ding Yancun Yancheng City Longgang Phoenix High Tech Park Applicant after: Yancheng City Shuangqiang Stake Co., Ltd. Address before: 401346, Banan District of Chongqing City bounded Stone Street South 2-2-2 Applicant before: Chongqing Sheng Zan Technology Co. Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20180507 |
|
CF01 | Termination of patent right due to non-payment of annual fee |