Summary of the invention
Based on this, the present invention provides a kind of method and system for improving control plane dispatching in LTE system, passes through frequency domain
Scheduling shifts to an earlier date, and shortens current schedulable TTI (Transmission Time Interval, Transmission Time Interval) frequency domain dispatching knot
The output time of fruit, the dispatching of control plane is improved, to improve the user capacity of cell, improves user experience.
To achieve the above object, the embodiment of the present invention uses following technical scheme:
The method of control plane dispatching, includes the following steps: in a kind of raising LTE system
In current schedulable TTI, according to when domain scheduling and the mapping relations of frequency domain dispatching determine that current subframe is corresponding
Time domain scheduling subframe, and according in the corresponding schedulable TTI of the time domain scheduling subframe by when user's tune for exporting of domain scheduling
It spends priority and scheduling quantum carries out frequency domain dispatching;
Domain scheduling when being carried out according to received scheduling request in current schedulable TTI to the user of application scheduling.
The present invention also provides a kind of systems of control plane dispatching in raising LTE system, comprising:
Frequency domain dispatching module, in current schedulable TTI, according to when domain scheduling and frequency domain dispatching mapping relations it is true
Determine the corresponding time domain scheduling subframe of current subframe, and according to passing through time domain in the corresponding schedulable TTI of the time domain scheduling subframe
The dispatching priority of users and scheduling quantum for dispatching output carry out frequency domain dispatching;
Time domain scheduler module, for according to received scheduling request in current schedulable TTI to the user of application scheduling into
Domain scheduling when row.
According to the above technical scheme, the present invention according to when domain scheduling and frequency domain dispatching mapping relations, schedulable TTI will
Frequency domain dispatching shifts to an earlier date, and shortens the output time of frequency domain dispatching result, domain scheduling and frequency domain dispatching superimposed influence when avoiding
The problem of control plane scheduling performance, the dispatching of control plane is improved, to improve the user capacity of cell, satisfaction increasingly increases
Long LTE user demand, and it is effectively improved user experience.
Specific embodiment
The contents of the present invention are described in further detail below in conjunction with preferred embodiment and attached drawing.Obviously, hereafter institute
The examples are only for explaining the invention for description, rather than limitation of the invention.Based on the embodiments of the present invention, this field is general
Logical technical staff every other embodiment obtained without making creative work belongs to what the present invention protected
Range.It should be noted that for ease of description, only some but not all contents related to the present invention are shown in the drawings.
Fig. 1 is that the process of the method for control plane dispatching in raising LTE system of the invention in one embodiment is shown
It is intended to, the method for control plane dispatching can be executed by processing entities in the raising LTE system of the present embodiment, such as monokaryon
Or multi-core CPU.As shown in Figure 1, the method for control plane dispatching includes following step in raising LTE system in the present embodiment
It is rapid:
Step S100, in current schedulable TTI, according to when domain scheduling and the mapping relations of frequency domain dispatching determine current son
The corresponding time domain scheduling subframe of frame, and according in the corresponding schedulable TTI of the time domain scheduling subframe by when domain scheduling export
Dispatching priority of users and scheduling quantum carry out frequency domain dispatching;
Step S200 carries out time domain tune to the user of application scheduling according to received scheduling request in current schedulable TTI
Degree calculates dispatching priority of users.
In the present embodiment, the mapping relations of domain scheduling and frequency domain dispatching when refer to the time domain scheduling result of subframe n at which
A subframe carries out this corresponding relationship of frequency domain dispatching, in LTE system, domain scheduling and frequency domain dispatching when can preset
Mapping relations.It optionally, can be (fixed relative to eating dishes without rice or wine according to the configuration parameter of LTE system and the scheduling lead of LTE system
When lead) come the mapping relations of domain scheduling when determining and frequency domain dispatching, wherein configuration parameter may include that standard and time slot are matched
Than wherein standard is FDD (Frequency Division Duplexing, frequency division duplex) or TDD (Time Division
Duplexing, time division duplex).
Above-mentioned scheduling request may include uplink scheduling request and descending scheduling request, i.e., raising provided in this embodiment
The method of control plane dispatching is applicable not only to uplink scheduling in LTE system, is also applied for descending scheduling, can improve control comprehensively
The dispatching in face processed.Scheduling request can be just initiated in schedulable TTI, and schedulable TTI can be according to the configuration of LTE system
Parameter and scheduling lead (lead relative to timing of eating dishes without rice or wine) determine, wherein configuration parameter may include standard (FDD or
) and time slot proportion TDD.Domain scheduling and frequency domain dispatching when processing entities can carry out in schedulable TTI.
In a schedulable TTI, after control plane receives interrupt signal, frequency domain dispatching is carried out first, according to time domain
Scheduling determines the corresponding time domain scheduling subframe of current subframe with the mapping relations of frequency domain dispatching, and according to the time domain scheduling subframe pair
In the schedulable TTI that answers by when the dispatching priority of users that exports of domain scheduling and scheduling quantum carry out frequency domain dispatching, for user
Distribute frequency domain resource, position and size including frequency domain resource.Wherein, in the corresponding schedulable TTI of the time domain scheduling subframe
By when the dispatching priority of users that exports of domain scheduling and scheduling quantum can be stored in a certain memory block.It is completed in frequency domain dispatching
Afterwards, domain scheduling when carrying out further according to received scheduling request in current schedulable TTI to the user of application scheduling, dispatches application
User be ranked up, calculate dispatching priority of users.When domain scheduling result can be stored in above-mentioned memory block, according to upper
When stating progress frequency domain dispatching in the corresponding schedulable TTI of subframe that mapping relations determine, then user's tune can be obtained from the memory block
Spend priority and scheduling quantum.It recycling in the above manner, realization shifts to an earlier date frequency domain dispatching in each schedulable TTI, thus
Shorten the output time of frequency domain dispatching result.
It is exemplified below, reference by taking the descending scheduling of TD-LTE as an example, in Fig. 2 as shown in Fig. 2, show one wirelessly
Frame includes in total 10 subframes, and number is 0 to 9, and wherein D indicates that downlink TTI, S indicate special TTI, and U indicates uplink TTI.It is false
If uplink and downlink physical layer process time-consuming respectively accounts for a TTI, the L2 (i.e. the Layer2 of protocol stack) including control plane handles consumption
Mono- TTI of Shi Zhanyong, the scheduling lead of LTE system be 2 subframes (one of TTI is used to complete the operation of L2, in addition one
A TTI is for completing downlink processing).N indicates that corresponding TTI is non-scheduling TTI in Fig. 2, and Y then indicates that corresponding TTI is can
Dispatch TTI.For some user, if the user dispatches in subframe y application, when subframe y carries out the user
Domain scheduling just carries out frequency domain dispatching, mapping relations such as Fig. 3 institute of time domain scheduling subframe y to frequency domain dispatching subframe y1 in subframe y1
Show.Such as user, in the when domain scheduling for the subframe 2 that System Frame Number is n, corresponding frequency domain dispatching is in the subframe that System Frame Number is n
3 carry out;For another example, user is the when domain scheduling of the subframe 9 of n in System Frame Number, due to the subframe 0 and subframe 1 that System Frame Number is n+1
Corresponding TTI is non-scheduling, then user is being in the corresponding frequency domain dispatching of when domain scheduling for the subframe 9 that System Frame Number is n
Unite frame number be n+1 subframe 2 carry out, that is to say, that in the present embodiment frequency domain dispatching be when domain scheduling it is next schedulable
What TTI was executed.For some user, after control plane receives scheduling request, time domain tune is completed in current schedulable TTI
Degree, and frequency domain dispatching is then carried out in next schedulable TTI.
Again referring to figure 4., Fig. 4 is the schematic diagram of domain scheduling and frequency domain dispatching sequencing when in the prior art, it is assumed that packet
Include that the L2 processing including control plane is time-consuming to occupy a TTI (time is 1 millisecond), control plane is in a processing entities, and in L2
Not comprising control plane other parts (hereafter summary be L2 in other parts) in another processing entities, as shown in figure 4,
In a schedulable TTI, at the time of 0.7 millisecond of moment is that control plane exports frequency domain dispatching result to other parts in L2,
In order to guarantee the real-time of whole system, control plane be must assure that in 0.7 millisecond to the other parts output frequency domain tune in L2
Spend result.When the number of users of application scheduling is more, the dispatch deal time-consuming of control plane is necessarily increased, if the scheduling of control plane
Processing time-consuming just will affect the processing time of the other parts and physical layer descending in L2 more than 0.7 millisecond, to influence entire
The operation of system.Referring to Figure 5, and together referring to Figure 2 to Figure 4, in the present embodiment by shifting to an earlier date frequency domain dispatching, also
It is after interrupt signal of the control plane in P0 reception to 1ms, control plane is first depending on the time domain of a schedulable TTI
Scheduling result carries out frequency domain dispatching, can export frequency domain dispatching at P1 time point at this time as a result, the P0-P1 period is less than 0.7 milli
Second, therefore the present embodiment is by that quickly can export frequency domain dispatching in advance for frequency domain dispatching as a result, its advantage is that control on the one hand can be improved
The dispatching in face processed, still further aspect can be to other parts and the physical layer descending remaining processing times more out of L2.Work as control
After P1 time point exports frequency domain dispatching result, the remaining P1-P3 period can be used for handling domain scheduling when including in face processed
Other control plane functions including function, in this way will not in the presence of domain scheduling and frequency domain dispatching the problem of being overlapped mutually influence.
Preferably, if frequency domain dispatching has been carried out to some user in some schedulable TTI, after frequency domain dispatching is completed, if the use
Family has issued scheduling request, then can update user according to the result and the scheduling request of frequency domain dispatching in current schedulable TTI
The scheduling quantum of request subtracts the scheduling quantum of user's current request in current schedulable TTI through frequency domain dispatching distribution
The scheduling quantum that frequency domain resource amount is requested as the user, can be according to updated scheduling quantum when carrying out corresponding frequency domain dispatching
Frequency domain resource is distributed, avoids the waste of frequency domain resource.
In conclusion it is provided in this embodiment improve LTE system in control plane dispatching method, according to when domain scheduling
With the mapping relations of frequency domain dispatching, frequency domain dispatching is shifted to an earlier date in schedulable TTI, shortens the output time of frequency domain dispatching result,
Domain scheduling and the problem of frequency domain dispatching superimposed influence control plane scheduling performance when avoiding, improves the scheduling energy of control plane
Power meets growing LTE user demand to improve the user capacity of cell.
According to the method for control plane dispatching in the raising LTE system of aforementioned present invention, the present invention also provides one kind to mention
The system of control plane dispatching in high LTE system, with reference to the accompanying drawing and preferred embodiment is to raising LTE system of the invention
The system of middle control plane dispatching is described in detail.
Fig. 6 is that the structure of the system of control plane dispatching in raising LTE system of the invention in one embodiment is shown
It is intended to.As shown in fig. 6, the system of control plane dispatching includes: in raising LTE system in the embodiment
Frequency domain dispatching module 1, in current schedulable TTI, according to when domain scheduling and frequency domain dispatching mapping relations
Determine the corresponding time domain scheduling subframe of current subframe, and when according to passing through in the corresponding schedulable TTI of the time domain scheduling subframe
The dispatching priority of users and scheduling quantum of domain scheduling output carry out frequency domain dispatching;
Time domain scheduler module 2, for according to received scheduling request in current schedulable TTI to the user of application scheduling into
Domain scheduling when row calculates dispatching priority of users.
In the present embodiment, the mapping relations of domain scheduling and frequency domain dispatching when refer to the time domain scheduling result of subframe n at which
A subframe carries out this corresponding relationship of frequency domain dispatching, in LTE system, domain scheduling and frequency domain dispatching when can preset
Mapping relations.Optionally, referring to shown in Fig. 6, the system of control plane dispatching can also be wrapped in the raising LTE system of the present embodiment
Configuration module 3 is included, for determining the schedulable TTI according to the configuration parameter of LTE system and the scheduling lead of LTE system
And when described domain scheduling and frequency domain dispatching mapping relations, wherein configuration parameter may include that standard (FDD or TDD) and time slot are matched
Than.
In a kind of optional embodiment, time domain scheduler module 2 includes uplink time domain scheduler module and downlink time domain tune
Module is spent, wherein uplink time domain scheduler module can be according to received uplink scheduling request in current schedulable TTI to application uplink
The domain scheduling when user of scheduling carries out calculates dispatching priority of users, and downlink time domain scheduler module then can be according to current adjustable
Domain scheduling when received descending scheduling request carries out the user of application descending scheduling in TTI is spent, dispatching priority of users is calculated.
The system i.e. provided in this embodiment for improving control plane dispatching in LTE system is applicable not only to uplink scheduling, is also applied for
Descending scheduling can improve the dispatching of control plane comprehensively.Wherein, scheduling request can be just initiated in schedulable TTI, matches
Schedulable TTI can be determined according to the configuration parameter of LTE system and the scheduling lead of LTE system by setting module 3, wherein configuration ginseng
Number may include standard (FDD or TDD) and time slot proportion.Domain scheduling and frequency domain dispatching when can be carried out in schedulable TTI.
In a schedulable TTI, after control plane receives interrupt signal, carried out first by frequency domain dispatching module 1
Frequency domain dispatching, frequency domain dispatching module 1 according to when domain scheduling and the mapping relations of frequency domain dispatching determine the corresponding time domain of current subframe
Scheduling subframe, and according in the corresponding schedulable TTI of the time domain scheduling subframe by when user's dispatching priority for exporting of domain scheduling
Grade and scheduling quantum carry out frequency domain dispatching, distribute frequency domain resource, position and size including frequency domain resource for user.Wherein, institute
State in the corresponding schedulable TTI of time domain scheduling subframe by when the dispatching priority of users that exports of domain scheduling and scheduling quantum can deposit
It is placed on a certain memory block.After frequency domain dispatching completion, time domain scheduler module 2 is further according to received tune in current schedulable TTI
Domain scheduling when degree request carries out the user of application scheduling is ranked up the user of application scheduling, calculates user's dispatching priority
Grade, then can by when domain scheduling result be stored in memory block.The storage that can use configuration module 3 in the present embodiment is empty
Between come when storing domain scheduling as a result, the scheduling quantum that dispatching priority of users and user request is stored in configuration module 3.
When frequency domain dispatching module 1 works, the result of domain scheduling carries out frequency domain dispatching when can obtain corresponding from configuration module 3.
Preferably, the system of control plane dispatching may be used also in the raising LTE system of the present embodiment referring now still to shown in Fig. 6
Including update module 4, for updating user's request according to the result and the scheduling request of frequency domain dispatching in current schedulable TTI
Scheduling quantum.Specifically, if having carried out frequency domain dispatching to some user in some schedulable TTI frequency domain dispatching module 1, distribution
Frequency domain resource, after frequency domain dispatching completion, if the user has issued scheduling request, update module 4 can be according to current
The result of frequency domain dispatching and the scheduling request update the scheduling quantum of user's request in schedulable TTI, i.e., currently ask the user
The scheduling quantum asked subtracts the scheduling requested by the frequency domain resource amount that frequency domain dispatching distributes as the user in current schedulable TTI
Amount.When the scheduling quantum of memory space storage user's request using configuration module 3, update module 4 can directly update configuration
The scheduling quantum stored in module 3.When frequency domain dispatching module 1 works in this way in some schedulable TTI, so that it may from configuration module
Updated scheduling quantum is obtained in 3 and carries out frequency domain resource distribution, avoids the waste of frequency domain resource.
The system of control plane dispatching can be performed and improve provided by the embodiment of the present invention in above-mentioned raising LTE system
The method of control plane dispatching in LTE system has the corresponding functional module of execution method and beneficial effect.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.