CN105912810B - 一种充填与综采混采面过渡支架支护参数设计方法 - Google Patents
一种充填与综采混采面过渡支架支护参数设计方法 Download PDFInfo
- Publication number
- CN105912810B CN105912810B CN201610283978.2A CN201610283978A CN105912810B CN 105912810 B CN105912810 B CN 105912810B CN 201610283978 A CN201610283978 A CN 201610283978A CN 105912810 B CN105912810 B CN 105912810B
- Authority
- CN
- China
- Prior art keywords
- filling
- working face
- mining
- changeover portion
- mixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/10—Geometric CAD
- G06F30/13—Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
- E21D23/04—Structural features of the supporting construction, e.g. linking members between adjacent frames or sets of props; Means for counteracting lateral sliding on inclined floor
- E21D23/0481—Supports specially adapted for use in combination with the placing of filling-up materials
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C39/00—Devices for testing in situ the hardness or other properties of minerals, e.g. for giving information as to the selection of suitable mining tools
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C41/00—Methods of underground or surface mining; Layouts therefor
- E21C41/16—Methods of underground mining; Layouts therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D23/00—Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21F—SAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
- E21F15/00—Methods or devices for placing filling-up materials in underground workings
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
- G06F30/20—Design optimisation, verification or simulation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Systems or methods specially adapted for specific business sectors, e.g. utilities or tourism
- G06Q50/02—Agriculture; Fishing; Mining
Abstract
本发明公开了一种充填与综采混采面过渡支架支护参数设计方法。首先根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段长度L充;然后,通过3DEC三维离散元软件建立充填与综采混合开采数值模型,模拟计算充填段采空区不同充实率变化时,过渡段顶板垮落高度H以及过渡段应力影响范围S;基于数值模拟计算结果,按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段应力影响范围S的函数关系;最后结合实际工程地质参数对过渡支架支护参数进行设计。该方法可为支架支护设计提供参考,实现混合工作面充填支架与综采支架平稳过渡,进一步丰富充填采煤理论,扩大充填采煤的应用范围。
Description
技术领域
本发明涉及一种过渡支架支护设计方法,特别是一种充填与综采混采面过渡支架支护参数设计方法。
背景技术
充填与综采混合开采是指在同一个工作面同时布置综合机械化充填采煤设备与传统综采设备,各设备之间相互协调、共同完成采煤、充填作业的采煤系统和采煤工艺。充填与综采混合开采工作面主要由充填段、过渡段和综采段组成,充填段工作面布置有充填采煤液压支架及后部多孔底卸式输送机等关键设备,工作面以矸石、粉煤灰等固体材料作为充填体充填后部采空区,达到处理固体废弃物的目的;而综采段工作面采用传统综合机械化采煤方法采煤,工作面布置传统采煤液压支架,采场顶板自然垮落,过渡段则介于两者之间。过渡段是混合工作面特有的区域,该区域覆岩裂隙发育、矿压显现特征与充填段和垮落段具有明显的差异。目前,对充填与综采混合开采工作面过渡支架支护参数设计还没有一种准确的方法,而充实率是影响过渡段垮落高度和过渡段应力影响范围的关键因素,研究充实率对垮落高度和过渡段应力影响范围的影响,可准确预计垮落高度和过渡段应力影响范围,从而计算出过渡支架的支柱强度和数量等支护参数,对充填与综采混合开采过渡支架的安全支护具有重要意义。
发明内容
技术问题:本发明的目的是针对现有技术存在的问题,提供一种方法简单,准确的充填与综采混采面过渡支架支护参数设计方法。
技术方案:本发明的充填与综采混合开采工作面过渡支架支护设计方法,首先根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面长度L充;然后,根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型,模拟计算充填段采空区不同充实率变化时,过渡段顶板垮落高度H以及过渡段应力影响范围S;基于数值模拟计算结果,按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段应力影响范围S的函数关系;最后,结合实际工程地质参数,确定过渡段支架参数;其具体的步骤如下:
(1)根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面长度L充;
(2)根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型;
(3)在确定采高M,混合工作面总长度L总与充填段工作面1长度L充前提下,模拟充填段不同充实率变化时,过渡段2顶板垮落高度H以及过渡段2应力影响范围S;
(4)按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段应力影响范围S的函数关系;
(5)根据实际工程中设计充实率计算混合工作面过渡段垮落高度H’,由以下公式计算确定过渡段支架支护强度:
F=rH'
式中:γ一般取2.5MPa/100m;
(6)根据实际工程中设计充实率计算混合工作面过渡段应力影响范围S’,由以下公式计算确定过渡段支架数量:
式中:N一大于等于n的最小正整数;
a一单个过渡支架宽度。
所述充实率的变化范围为60%~80%。
有益效果:本发明的充填与综采混采面过渡支架支护参数设计方法在实际运用时只需确定混合开采工作面充填段充实率,便可根据回归方程计算出过渡段覆岩垮落高度和过渡段应力影响范围,通过计算确定过渡支架支护强度和数量等支护参数,此方法为充填与综采混合开采工作面过渡支架支护参数设计提供了参考,为充填与综采混合开采工作面过渡支架的安全支护提供理论借鉴。此设计方法简单易行,准确性高,可为支架支护设计提供参考,实现混合工作面充填支架与综采支架平稳过渡,进一步丰富充填采煤理论,扩大充填采煤的应用范围,具有广泛的实用性。
附图说明
图1为本发明充填与综采混合工作面系统布置。
图2a为本发明充填与综采混合工作面开采数值计算模型。
图2b为本发明充填与综采混合工作面开采数值计算模型工作面俯视图。
图2c为本发明充填与综采混合工作面开采数值计算模型工作面倾向断面图。
图3为本发明充填与综采混合工作面充实率-过渡段垮落带高度曲线图。
图4为本发明充填与综采混合工作面充实率-过渡段应力影响范围曲线图。
图中,1、充填段;2、过渡段;3、垮落段;4、过渡段支架。
具体实施方式
本发明的充填与综采混合开采工作面过渡支架支护设计方法,首先根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面长度L充;然后,根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型,模拟计算充填段采空区不同充实率变化时,过渡段顶板垮落高度H以及过渡段应力影响范围S;基于数值模拟计算结果,按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段应力影响范围S的函数关系;最后,结合实际工程地质参数,确定过渡段支架参数;其具体的步骤如下:
(1)根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面长度L充;
(2)根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型;
(3)在确定采高M,混合工作面总长度L总与充填段工作面1长度L充前提下,模拟充填段不同充实率变化时,过渡段2顶板垮落高度H以及过渡段2应力影响范围S;
(4)按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段应力影响范围S的函数关系;
(5)根据实际工程中设计充实率计算混合工作面过渡段垮落高度H’,由以下公式计算确定过渡段支架支护强度:
F=rH'
式中:γ一般取2.5MPa/100m;
(6)根据实际工程中设计充实率计算混合工作面过渡段应力影响范围S’,由以下公式计算确定过渡段支架数量:
式中:N一大于等于n的最小正整数;
a一单个过渡支架宽度。
所述充实率的变化范围为60%~80%。
下面结合附图对本发明的一个实施例作进一步的描述:
实施例1,以某矿为例,具体实施步骤如下:
(1)根据该矿三水平主采煤层工作面生产能力,设计充填与垮落法混合首采工作面(如图1所示)总长度为220m;结合井下矸石年产量需求,充填段工作面长度为120m;充填段工作面充实率变化范围为60%~80%。
(2)对混合首采工作面区域煤岩样物理力学特性测试,得到煤岩体的物理力学参数,见表1。
表1
(3)根据充填与垮落混合工作面工程地质条件与煤岩体的物理力学参数,采用3DEC数值模拟软件建立数值计算模型,如图2所示;模型长×宽×高为300m×200m×80m;四周约束水平方向位移,底部约束垂直方向位移;本构关系采用摩尔-库伦模型。
(4)分别模拟计算充填段长度L充不变、充实率变化时,工作面过渡段覆岩垮落高度与过渡段应力影响范围,具体模拟方案见表2;
表2
(5)以模拟结果为基础,按相关系数R2对曲线进行拟合得到充实率与垮落高度H、过渡段2应力影响范围S的函数关系,如图3、4所示。
(6)实际现场充实率为70%左右,由图3计算混合工作面过渡段2垮落高度H’约为30.5m,计算确定过渡段2支架支护强度:
F=rH'=0.7625MPa
式中:γ取2.5MPa/100m。
(6)根据实际工程中设计充实率由图4计算混合工作面过渡段2应力影响范围S’约为6.2m,由以下公式计算确定过渡段2支架数量:
式中:N一大于等于n的最小正整数;
a一单个过渡支架宽度取1.5m。
最终考虑一定的富余系数,设计过渡段支架支护强度为0.84MPa,过渡段支架支护数量为4架。
Claims (2)
1.一种充填与综采混采面过渡支架支护参数设计方法,其特征是:首先根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面1长度L充;然后,根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型,模拟计算充填段采空区不同充实率φ变化时,过渡段顶板垮落高度H以及过渡段应力影响范围S;基于数值模拟计算结果,按相关系数R2对曲线进行拟合得到充实率φ与垮落高度H、过渡段应力影响范围S的函数关系;最后,结合实际工程地质参数,确定过渡段支架参数;其具体的步骤如下:
(1)根据混合开采工作面采煤生产能力与充填段工作面充填能力需求,确定混合工作面总长度L总与充填段工作面1长度L充;
(2)根据工作面区域煤岩物理力学参数测试,通过3DEC三维离散元软件建立充填与综采混合开采数值模型;
(3)在确定采高M,混合工作面总长度L总与充填段工作面长度L充前提下,模拟充填段不同充实率φ变化时,过渡段顶板垮落高度H以及过渡段应力影响范围S;
(4)按相关系数R2对曲线进行拟合得到充实率φ与垮落高度H、过渡段应力影响范围S的函数关系;
(5)根据实际工程中设计的充实率φ’,计算混合工作面过渡段垮落高度H’,由以下公式计算确定过渡段支架支护强度:
式中:γ为2.5MPa/100m;
(6)根据实际工程中设计的充实率φ’,计算混合工作面过渡段应力影响范围S’,由以下公式计算确定过渡段支架数量:
式中:N一大于等于n的最小正整数;
a一单个过渡支架宽度。
2.根据权利要求1所述的一种充填与综采混采面过渡支架支护参数设计方法,其特征在于:所述充实率φ的变化范围为60%~80%。
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610283978.2A CN105912810B (zh) | 2016-04-29 | 2016-04-29 | 一种充填与综采混采面过渡支架支护参数设计方法 |
US15/770,500 US10301939B2 (en) | 2016-04-29 | 2016-11-18 | Method for designing supporting parameters of transition support for mixed mining face of filling and fully-mechanized mining |
PCT/CN2016/106342 WO2017185724A1 (zh) | 2016-04-29 | 2016-11-18 | 一种充填与综采混采面过渡支架支护参数设计方法 |
AU2016405114A AU2016405114B2 (en) | 2016-04-29 | 2016-11-18 | Method for designing supporting parameters of transition support for mixed mining face of filling and fully-mechanized mining |
DE112016005692.3T DE112016005692B4 (de) | 2016-04-29 | 2016-11-18 | Ein Verfahren zum Entwurf von Stützparametern der Übergangsabstützung des Abbaustoßes beim vollmechanischen gemischten Versatzabbau |
RU2018116231A RU2679767C1 (ru) | 2016-04-29 | 2016-11-18 | Метод расчета опорных параметров переходной опоры очистного забоя смешанного типа при использовании закладки и механизированной опоры |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610283978.2A CN105912810B (zh) | 2016-04-29 | 2016-04-29 | 一种充填与综采混采面过渡支架支护参数设计方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105912810A CN105912810A (zh) | 2016-08-31 |
CN105912810B true CN105912810B (zh) | 2019-02-19 |
Family
ID=56753218
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610283978.2A Active CN105912810B (zh) | 2016-04-29 | 2016-04-29 | 一种充填与综采混采面过渡支架支护参数设计方法 |
Country Status (6)
Country | Link |
---|---|
US (1) | US10301939B2 (zh) |
CN (1) | CN105912810B (zh) |
AU (1) | AU2016405114B2 (zh) |
DE (1) | DE112016005692B4 (zh) |
RU (1) | RU2679767C1 (zh) |
WO (1) | WO2017185724A1 (zh) |
Families Citing this family (26)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105912810B (zh) | 2016-04-29 | 2019-02-19 | 中国矿业大学 | 一种充填与综采混采面过渡支架支护参数设计方法 |
CN109488301A (zh) * | 2018-09-30 | 2019-03-19 | 中国矿业大学 | 一种矿山采选充处开采方法 |
CN109214135B (zh) * | 2018-11-08 | 2022-07-15 | 淮阴工学院 | 一种充填协同垮落式综采面过渡区域局部强矿压控制方法 |
CN109815565B (zh) * | 2019-01-09 | 2022-11-22 | 天地科技股份有限公司 | 一种综采液压支架载荷的分段预测方法 |
CN109766653B (zh) * | 2019-01-22 | 2022-09-13 | 周口师范学院 | 一种基于离散元法的刨煤机综合性能评价方法 |
CN109934409B (zh) * | 2019-03-18 | 2022-12-27 | 西安科技大学 | 一种大采高煤壁工作面片帮预测网络及其预测方法 |
CN110145363B (zh) * | 2019-04-30 | 2024-03-29 | 中国矿业大学(北京) | 一种实现综采面垮落到充填开采过渡的顶板控制方法 |
CN110119574B (zh) * | 2019-05-14 | 2023-02-24 | 中国矿业大学 | 一种充填采煤隔水关键层的非线性渗流系统稳定性判别方法 |
CN110245452B (zh) * | 2019-06-25 | 2022-02-15 | 西安科技大学 | 一种黄土丘陵区采煤塌陷裂缝治理方法 |
CN110532593B (zh) * | 2019-07-15 | 2022-11-22 | 天地科技股份有限公司 | 大倾角综采工作面支护强度的确定方法及装置 |
CN110633531A (zh) * | 2019-09-18 | 2019-12-31 | 临沂大学 | 一种煤矿膏体充填法开采液压支架支护强度设计方法 |
CN110851953B (zh) * | 2019-09-30 | 2023-05-26 | 中铁十二局集团有限公司 | 穿越无填充型溶洞长锚索锚固力的计算方法、系统及介质 |
CN110689552B (zh) * | 2019-10-14 | 2022-10-21 | 安徽理工大学 | 一种基于分形理论的冒落区堆体孔隙率确定方法 |
CN110795880B (zh) * | 2019-10-29 | 2023-04-28 | 神华神东煤炭集团有限责任公司 | 支撑式垛式支架的设计方法、存储介质及电子设备 |
CN111027219B (zh) * | 2019-12-12 | 2023-07-25 | 神华准格尔能源有限责任公司 | 相邻同向协同开采露天煤矿公共运输帮的高度确定方法 |
CN111337883B (zh) * | 2020-04-17 | 2022-02-08 | 中国矿业大学(北京) | 一种矿井煤岩界面智能探测识别系统及方法 |
CN111666621B (zh) * | 2020-06-08 | 2022-06-10 | 中南大学 | 粘土地层隧道开挖面安全支护压力区间确定方法 |
CN112906093B (zh) * | 2020-10-28 | 2022-04-19 | 重庆交通大学 | 一种大跨度拱桥拱圈变截面高度的计算方法 |
CN112948991B (zh) * | 2021-01-28 | 2023-07-18 | 中国矿业大学(北京) | 一种煤矿充实率导向的胶结充填体强度需求表征模型及设计方法 |
CN113326548B (zh) * | 2021-05-08 | 2022-07-05 | 昆明理工大学 | 一种下向水平分层进路式充填体强度设计模型的构建方法 |
CN113236355B (zh) * | 2021-05-28 | 2024-02-20 | 中煤能源研究院有限责任公司 | 一种采煤工作面矸石浆体低位灌浆充填方法 |
CN113389592B (zh) * | 2021-06-30 | 2022-06-24 | 中国矿业大学 | 一种矿山固体智能充填开采方法 |
CN114033494A (zh) * | 2021-10-18 | 2022-02-11 | 中国矿业大学 | 一种基于放顶煤模拟试验系统和试验方法 |
CN113688462B (zh) * | 2021-10-26 | 2022-03-15 | 中煤科工集团西安研究院有限公司 | 一种条带式采空区控制充填关键参数设计方法 |
CN113887111B (zh) * | 2021-11-08 | 2024-03-22 | 太原理工大学 | 面向综采工作面地质、煤层与装备的虚拟综合测试方法 |
CN114183186A (zh) * | 2021-12-09 | 2022-03-15 | 中煤科工集团沈阳研究院有限公司 | 一种综采工作面干式除尘装置及方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852524A (zh) * | 2012-10-09 | 2013-01-02 | 中国铝业股份有限公司 | 利用液压支柱提高铝土矿回采率的方法 |
CN103510984A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤充采质量比设计方法 |
CN103899352A (zh) * | 2014-04-08 | 2014-07-02 | 中国矿业大学 | 煤炭开采中固体充填充实率设计及控制方法 |
CN104405437A (zh) * | 2014-10-08 | 2015-03-11 | 中国矿业大学 | 一种固体充填与综采混合式工作面开采方法 |
CN105464700A (zh) * | 2015-12-14 | 2016-04-06 | 中国矿业大学 | 综采-充填混合开采工作面充填段长度确定方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1010272A1 (ru) * | 1981-12-04 | 1983-04-07 | Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Горной Геомеханики И Маркшейдерского Дела | Стенд дл моделировани сдвижений горных пород при закладке выработанного пространства |
SU1382953A1 (ru) * | 1986-03-03 | 1988-03-23 | Университет дружбы народов им.Патриса Лумумбы | Способ моделировани подземной разработки пластовых месторождений, стенд и эквивалентный материал дл его осуществлени |
RU2296859C1 (ru) * | 2005-08-10 | 2007-04-10 | Открытое акционерное общество Научно-исследовательский институт горной геомеханики и маркшейдерского дела - Межотраслевой научный центр (ВНИМИ) | Способ разработки пологих и наклонных удароопасных пластов |
CN102116155A (zh) * | 2011-01-26 | 2011-07-06 | 郑州煤矿机械集团股份有限公司 | 大采高工作面过渡段支护、采煤方法 |
CN104063535B (zh) | 2014-04-25 | 2017-04-26 | 中国矿业大学 | 一种固体充填采煤液压支架设计流程及优化方法 |
CN105912810B (zh) * | 2016-04-29 | 2019-02-19 | 中国矿业大学 | 一种充填与综采混采面过渡支架支护参数设计方法 |
-
2016
- 2016-04-29 CN CN201610283978.2A patent/CN105912810B/zh active Active
- 2016-11-18 RU RU2018116231A patent/RU2679767C1/ru active
- 2016-11-18 US US15/770,500 patent/US10301939B2/en active Active
- 2016-11-18 AU AU2016405114A patent/AU2016405114B2/en active Active
- 2016-11-18 WO PCT/CN2016/106342 patent/WO2017185724A1/zh active Application Filing
- 2016-11-18 DE DE112016005692.3T patent/DE112016005692B4/de active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102852524A (zh) * | 2012-10-09 | 2013-01-02 | 中国铝业股份有限公司 | 利用液压支柱提高铝土矿回采率的方法 |
CN103510984A (zh) * | 2013-10-23 | 2014-01-15 | 中国矿业大学 | 固体充填采煤充采质量比设计方法 |
CN103899352A (zh) * | 2014-04-08 | 2014-07-02 | 中国矿业大学 | 煤炭开采中固体充填充实率设计及控制方法 |
CN104405437A (zh) * | 2014-10-08 | 2015-03-11 | 中国矿业大学 | 一种固体充填与综采混合式工作面开采方法 |
CN105464700A (zh) * | 2015-12-14 | 2016-04-06 | 中国矿业大学 | 综采-充填混合开采工作面充填段长度确定方法 |
Non-Patent Citations (1)
Title |
---|
综采综放混采工作面设备选型配套的研究与实践;刘昆,徐金梅;《矿山机械》;20101231;第38卷(第21期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
DE112016005692T5 (de) | 2018-09-20 |
RU2679767C1 (ru) | 2019-02-12 |
CN105912810A (zh) | 2016-08-31 |
DE112016005692B4 (de) | 2019-07-04 |
AU2016405114B2 (en) | 2020-02-06 |
US10301939B2 (en) | 2019-05-28 |
AU2016405114A1 (en) | 2018-05-10 |
WO2017185724A1 (zh) | 2017-11-02 |
US20180314770A1 (en) | 2018-11-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105912810B (zh) | 一种充填与综采混采面过渡支架支护参数设计方法 | |
Yasitli et al. | 3D numerical modeling of longwall mining with top-coal caving | |
CN105971606B (zh) | 一种巨厚煤层长壁工作面开采方法 | |
Kushwaha et al. | Empirical approach for designing of support system in mechanized coal pillar mining | |
CN103902780B (zh) | 固体充填采煤地表变形预计方法 | |
CN105388265B (zh) | 采空区瓦斯富集及运移的三维模拟方法 | |
CN105223337B (zh) | 采空区裂隙圈形态的三维模拟方法 | |
CN106014410A (zh) | 一种下向进路部分充填采矿方法 | |
AU2021101512A4 (en) | Panel area and panel area column collaborative mining method for an inclined thick and large ore body | |
CN109507393B (zh) | 一种室内覆岩离层量测量及注浆控制模拟系统及其方法 | |
CN105019902A (zh) | 一种脉内斜巷上向分层充填采矿法 | |
CN104675399B (zh) | 煤矿采掘充填一体化采煤方法 | |
JP2023535664A (ja) | 深部埋没採掘場における上層土のタイプ評価基準及び薄い岩盤の増厚改造の設計方法 | |
Liu et al. | A proposed method of coal pillar design, goaf filling, and grouting of steeply inclined coal seams under water-filled strata | |
CN102678119A (zh) | 一种控制岩移高效充填采矿方法 | |
CN104265294B (zh) | 大倾角煤层炮采面无煤柱开采方法 | |
CN105822305A (zh) | 一种用于煤矿开采的覆岩隔离柱将充填减沉方法 | |
CN108005657B (zh) | 一种含夹石急倾斜薄矿脉群/组的开采方法 | |
CN106640075A (zh) | 基于组合棋盘式底部结构的缓倾斜矿脉连续采矿法 | |
CN109779663A (zh) | 沿空留巷分区协同控制方法 | |
Pongpanya et al. | Numerical study on roadway stability under weak geological condition of PT Gerbang Daya Mandiri underground coal mine in Indonesia | |
Lu et al. | Monitoring and analysis of ground subsidence and backfill stress distribution in Jinchuan Mine, China | |
CN111768056B (zh) | 近距离煤层群上行开采可行性判别及等级评价方法 | |
Li et al. | Fracture propagation and hydraulic properties of a coal floor subjected to thick-seam longwalling above a highly confined aquifer | |
Yang et al. | Study on the characteristics of top-coal caving and optimization of recovery ratio in steeply inclined residual high sectional coal pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |