CN105910170A - Equipment machine - Google Patents

Equipment machine Download PDF

Info

Publication number
CN105910170A
CN105910170A CN201610099099.4A CN201610099099A CN105910170A CN 105910170 A CN105910170 A CN 105910170A CN 201610099099 A CN201610099099 A CN 201610099099A CN 105910170 A CN105910170 A CN 105910170A
Authority
CN
China
Prior art keywords
terminal board
control member
equipment machine
rotationally constrained
operating portion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610099099.4A
Other languages
Chinese (zh)
Other versions
CN105910170B (en
Inventor
佐藤郁仁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Max Co Ltd
Original Assignee
Max Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Max Co Ltd filed Critical Max Co Ltd
Publication of CN105910170A publication Critical patent/CN105910170A/en
Application granted granted Critical
Publication of CN105910170B publication Critical patent/CN105910170B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/0007Indoor units, e.g. fan coil units
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F1/00Room units for air-conditioning, e.g. separate or self-contained units or units receiving primary air from a central station
    • F24F1/0007Indoor units, e.g. fan coil units
    • F24F1/0043Indoor units, e.g. fan coil units characterised by mounting arrangements
    • F24F1/0047Indoor units, e.g. fan coil units characterised by mounting arrangements mounted in the ceiling or at the ceiling
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F11/00Control or safety arrangements
    • F24F11/89Arrangement or mounting of control or safety devices
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24FAIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
    • F24F13/00Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Air Filters, Heat-Exchange Apparatuses, And Housings Of Air-Conditioning Units (AREA)
  • Domestic Hot-Water Supply Systems And Details Of Heating Systems (AREA)
  • Central Heating Systems (AREA)
  • Connections Arranged To Contact A Plurality Of Conductors (AREA)

Abstract

The invention provides an equipment machine, wherein the number of parts is reduced to save the cost. By adopting the equipment machine, wiring connection equipment or other maintenance equipment are adapted to a terminal bench. A bathroom air conditioner (100) arranged in the ceiling of a building comprises a main body part (10) arranged in the ceiling, a terminal bench (3) supported to be capable of rotating and moving along the upper surface part (10c) of the main body part (10); an operation part (44) positioned in the side surface of the main body that is the same with the terminal bench (3) relative to a rotation shaft (42) to be served as a rotation center of the terminal bench (3) so as to drive the terminal bench (3) to rotate and move; and a holding part (5) for holding the operation part (44).

Description

Equipment machine
Technical field
The present invention relates to the equipment machine arranged at the indoor ceiling of building.
Background technology
The equipment machines such as air-conditioning device or ventilation fan it are configured with at buildings such as houses.Such as living The ceiling in the bathroom of residence is provided with and carries out heating or the bathroom air conditioner of ventilation etc..
Bathroom air conditioner with have the suction inlet of air, blow-off outlet header board to the ceiling in bathroom The mode that plate exposes, and enter top to be provided with the main part of fan etc. from the peristome of ceiling floor Mode in canopy is arranged.At the body upper surface of general bathroom air conditioner, for by remote control The terminal board that the distribution of device or power line connect with predetermine towards setting.
Many maintenance from the bathroom air conditioner side of ceiling such as above-mentioned distribution or the maintenance of part Mouth is carried out.Owing to being determined the setting direction of bathroom air conditioner by the position of air vent, because of The setting direction of the terminal board on this this apparatus main body also determines.Therefore, according to the position of air vent The difference put, terminal board is positioned at the direction separated with access hole sometimes, it is difficult to carry out above-mentioned work Industry.
Therefore, patent document 1 discloses that a kind of possess can carry out tearing open from air-conditioning apparatus main body Unload and the equipment machine of terminal board of change of installation site.Patent Document 2 discloses one Plant the upper surface at main part and possess multiple terminal boards that distribution direction is different, and at each terminal board There is the equipment machine of the shading member that wrong wire distribution prevents.
[citation]
[patent documentation]
No. 5272351 publication of [patent documentation 1] Japan's patent
No. 5026292 publication of [patent documentation 2] Japan's patent
[inventing problem to be solved]
In the equipment machine of above-mentioned patent documentation 1, in the installation site in order to change terminal board And utilize screwdriver by the case of screw disassembling, need by screwdriver relative to ceiling vertically Erect and use.But, due to the reason of the low grade of the height in ceiling, screwdriver exists and cannot hang down Directly enter the situation in ceiling, in this case, the problem that there is workability shortcoming. In order to change terminal board installation site or install towards and from air-conditioning apparatus main body dismantle terminal board Time, there is also the problem that the distribution being connected with terminal board is pulled.Deposited owing to distribution pulls Danger at distribution broken string etc..
The equipment machine of patent documentation 2, owing to possessing multiple terminal board or shielding portion, therefore exists The problem that the cost of part raises.
Summary of the invention
Therefore, the present invention solves above-mentioned problem, its object is to provide one with suitable after arranging Configuration together in the operation of the connection of distribution or maintenance etc. makes terminal board become the shape that can use State, and number of parts can be reduced and cut down the equipment machine of cost.
[for solving the scheme of problem]
The technical scheme used to solve above-mentioned problem is as described below.
A kind of equipment machine, is arranged at the ceiling of building, possesses: main part, be arranged at top Canopy;Terminal board, is supported to move along the upper surface part of main part;Operating portion, phase The body side side identical with terminal board is in for the rotary shaft of mobile route of terminal board To, and make terminal board move;And handle part, it is used for holding operating portion.
In the equipment machine of the present invention, when terminal board is towards the opposition side of access hole, inciting somebody to action After main part is arranged at the ceiling of building, electrical construction dealer is from the maintenance being arranged at ceiling Mouthful, the handle part of the front end being arranged at operating portion is held and operating portion is operated, Thus terminal board moves and its position and towards change.Thereby, it is possible to corresponding to the court of access hole To and change terminal board position and towards.
[invention effect]
According to the equipment machine of the present invention, after being arranged at building, it is possible to make terminal board move Move the configuration of the operations such as the connection or the maintenance that are suitable for distribution, and become spendable state. Above-mentioned operation can be carried out from direction, side.And, even if in the case of ceiling is low, also Can effectively carry out above-mentioned operation.By possessing single terminal board and making terminal board move Part and above-mentioned effect can be obtained, therefore can suppress number of parts, it is possible to realize low cost.
Accompanying drawing explanation
Fig. 1 is the bathroom air conditioner 100 of the first embodiment being denoted as equipment machine The top view of the structure example before and after rotation.
Fig. 2 is the axonometric chart of the structure example representing bathroom air conditioner 100.
Fig. 3 is the exploded perspective view of the structure example representing bathroom air conditioner 100.
Fig. 4 is the top view arranging example representing bathroom air conditioner 100.
Fig. 5 is the top view arranging example representing bathroom air conditioner 100.
Fig. 6 is the front view of the structure example representing terminal board 3.
Fig. 7 is the side view of the connection example of the distribution 2 representing terminal board 3.
Fig. 8 is the side view of the configuration example representing terminal board 3.
Fig. 9 is the top view of the structure example representing control member 4.
Figure 10 is the top view of the inboard structure example representing control member 4.
Figure 11 is the top view arranging action example of the bathroom air conditioner 100 before representing rotation.
Figure 12 is the top view arranging action example representing postrotational bathroom air conditioner 100.
Figure 13 is the axonometric chart arranging action example representing postrotational bathroom air conditioner 100.
Figure 14 is the exploded perspective arranging action example representing postrotational bathroom air conditioner 100 Figure.
Figure 15 is bowing of the structure example of the bathroom air conditioner 200 being denoted as the second embodiment View.
Figure 16 is the top view arranging action example representing postrotational bathroom air conditioner 200.
Figure 17 is the bathroom air conditioner 200 ' of the variation being denoted as bathroom air conditioner 200 The top view of action example.
Figure 18 is the control member 6 of the variation being denoted as control member 6 " the bowing of action example View.
[label declaration]
3 terminal boards
4,6,6 ', 6 " control member
5 handle parts
10 main parts
10a the first side
10b the second side
10c upper surface part
10d the 3rd side
13a, 23a first peristome
14a, 24a second peristome
The rotationally constrained portion of 14b, 14d, 24b, 24d
42 rotary shafts
44a, 44c, 64a, 64c abutting part
44b, 44d, 64b, 64d engaging portion
100,200,200 ' bathroom air conditioner
Detailed description of the invention
Hereinafter, referring to the drawings, the embodiment of the equipment machine of the present invention is described.
[the first embodiment]
With reference to Fig. 1~Figure 10, the structure example of the bathroom air conditioner 100 of present embodiment is described. Air-conditioning device 100 shown in Fig. 1 possesses the main part 10 covered by metal shell, is arranged at top Canopy.As shown in Figures 4 and 5, main part 10 enters the ceiling in bathroom to bathroom air conditioner 100 The inboard of 104.Be formed the suction inlet of air, blow-off outlet header board 18 to the ceiling 104 in bathroom Expose.
Bathroom air conditioner 100 is being installed on the channel connector 19 of main part 10 as shown in Figure 4 Connect and have exhaust passage 102.Exhaust passage 102 is come according to the structure etc. of the building arranging bathroom Determine pipe arrangement path.And, the ceiling 104 in bathroom offers for bathroom air conditioner 100 Arrange operation or maintenance etc. utilize access hole 103.
Therefore, bathroom air conditioner 100 selects corresponding with the structure of building towards, setting Ceiling 104 in bathroom.Such as, select shown in Fig. 4 by the first side 10a of main part 10 Towards the phase by the first side 10a of main part 10 shown in the configuration of access hole 103, Fig. 5 The second anti-side 10b is towards the configuration of access hole 103.
As shown in Figure 4, by the first side 10a towards in the case of access hole 103, such as Fig. 1 Shown in solid, terminal board 3 is by the connecting portion arranging electric wire connector 30 shown in Fig. 6~Fig. 8 31 towards the first 10a side, side, and relative to the first side 10a in the 3rd 10d side, side (opposition side of channel connector 19), is fixed on relative to upper surface part 10c in the horizontal direction Have rotated the position of 45 °.The position of this terminal board 3 is set to primary importance.The master shown in Fig. 5 Second side 10b of body 10 is towards in the case of access hole 103, as indicated by dotted lines in fig. 1, Terminal board 3 by the connecting portion 31 arranging electric wire connector 30 shown in Fig. 6~Fig. 8 towards second 10b side, side, and relative to the second side 10b in the 3rd 10d side, side, it is fixed on phase Upper surface part 10c be have rotated in the horizontal direction to the position of 45 °.The position of this terminal board 3 It is set to the second position.Terminal board 3 rotates about 90 ° and energy from primary importance along upper surface part 10c Enough move to the second position.
Upper surface part 10c of the main part 10 shown in Fig. 2 by cover component (hereinafter referred to as main body Cover 11) cover.Fig. 3 is the figure after main body cover 11 being dismantled.Upper surface part 10c possess by Connect from outside distribution 2 and be supported to can be in rotary moving single terminal board 3, make Terminal board 3 rotate operating portion 44, when action in rotary moving by staff hold operating portion 44 Handle part 5.Operating portion 44 is located at the control member 4 making terminal board 3 rotate.Upper surface part 10c has the plane of one-level lower than the end face of main part 10 as arranging terminal board 3, operating portion The installation space of 44 grades.
Main part 10 possess therein not shown fan, fan is driven electronic Machine, to the heater heated by the air of fan air-supply, control that they are driven Substrate etc..Terminal board 3 is connected by distribution 2a with not shown control substrate etc..
Terminal board 3 shown in Fig. 6 and Fig. 7 possesses multiple electric wire connector 30.Shown in Fig. 7 The part having peeled cladding of distribution 2 inserts electric wire connector 30 from connecting portion 31 side, thus will Distribution 2 is fixing and is electrically connected.
3 electric wire connectors 30 are arranged and configure in a row by the terminal board 3 of this example, by 3 Distribution 2 connects with juxtaposition.Terminal board 3 is by the peace in base portion 41a of control member 4 Dress portion 41b supports.Control member 4 is along upper surface part 10c of the main part 10 shown in Fig. 8 Main body cover 11 (the most not shown) can be rotatably mounted in the horizontal direction.
Control member 4 is configured to the installation portion 41b end relative to control member 4 of terminal board 3 Seat portion 41a is in the way of the angle inclination of regulation.Therefore, as shown in Figure 8, the 3 of terminal board 3 Individual electric wire connector 30 is installed obliquely relative to upper surface part 10c of main part 10.
Thus, when inserting distribution 2 to 3 electric wire connectors 30 of terminal board 3, even if from Side observes that terminal board 3,3 distributions 2 stagger the most along the vertical direction and distinguish the most visible, therefore Easily whether visuognosis inserts distribution 2 to each electric wire connector 30.
As it is shown in figure 9, control member 4 has the center of rotation of 1 that becomes terminal board 3 Rotary shaft 42, from rotary shaft 42 extend operation arm 43, storage terminal board 3 base portion 41a, from base portion 41a extend operating portion 44, by staff hold operating portion 44 holding Portion 5.Control member 4 is in the 3rd 10d side, side, and the 3rd 10d side, side is relative to one-tenth For terminal board 3 rotation center rotary shaft 42 and with the identical body side side of terminal board 3 To.Base portion 41a is positioned at the opposition side of rotary shaft 42 relative to operation arm 43.Operation Portion 44 on the direction that base portion 41a rotates centered by rotary shaft 42, and along with operation The circumferencial direction of the circle that arm 43 is radius and extend from base portion 41a.
In order to easily make people hold with a hand operating portion 44 and make it rotate, it is positioned at operating portion 44 The handle part 5 of front end have the plate of strip relative to the shape of long Edge Bend.
Rotary shaft 42 heart wherein of this example has protuberance 42a.Protuberance 42a is installed on Fig. 2 institute The rotating hole 12a of the main body cover 11 shown.Terminal board 3 is to be installed on the rotary shaft of rotating hole 12a Rotate centered by the protuberance 42a of 42.
As shown in Fig. 9 and Figure 14, control member 4 is in the front of operating portion 44 and is holding The abutting part 44a of screw threads for fastening it is provided with near portion 5.Abutting part 44a has by groove or hole structure Engaging portion 44b become.As shown in figure 11, when terminal board 3 is in primary importance, abutting part 44a It is arranged to parallel with the second side 10b.Abutting part 44a is in order to be fixed on first by terminal board 3 Position and arrange.
As shown in Fig. 9 and Figure 14, operating portion 44 is provided with in handle part 5 side of base portion 41a The abutting part 44c of screw threads for fastening.Abutting part 44c has engaging portion 44d being made up of groove or hole. As shown in figure 12, when terminal board 3 is in the second position, abutting part 44c and the second side 10b Parallel.Abutting part 44c is arranged in order to terminal board 3 is fixed on the second position.
As it is shown in figure 9, control member 4 has prominent in base portion 41a with the root of operating portion 44 Go out portion 45.Protuberance 45 is arranged in order to the position of the terminal board 3 before and after rotating fixes.
As shown in Figure 10, the inboard at operation arm 43 possesses the claw fastened by distribution 2a 43a、43b.Distribution 2a stretches out from terminal board 3, is being rotated by the inboard of operation arm 43 Collect near the inboard of axle 42, be connected with the control substrate etc. in main part 10.Thus, exist When terminal board 3 rotates, it is possible to the stretching of suppression distribution 2a, engaging-in, torsion.Additionally, this example The anglec of rotation of terminal board 3 be about 90 °, therefore with the situation phase rotating more than such as 90 ° Ratio, it is possible to reduce the torsion of distribution 2a.
As in figure 2 it is shown, main body cover 11 has end face 12 and side 13, utilize not shown spiral shell Follow closely and wait and be installed on upper surface part 10c of main part 10.Side 13 is relative to main part 10 Constitute the wall of the opposition side of channel connector 19, be set to the 3rd side 10d than main part 10 Short.Main body cover 11 have by the side of the terminal board 3 shown in Fig. 3, control member 4 etc. and on The shape that surface covers, is made up of the sheet material of metal.Rotate therefore, it is possible to limit terminal board 3 Time the rotation in upper and lower (vertical) direction of terminal board 3.
The end face 12 of the main body cover 11 shown in Fig. 2 has becomes the center that terminal board 3 rotates Rotating hole 12a.Become rotary shaft 42 convex of the control member 4 of the center of rotation of terminal board 3 Portion 42a is installed on the rotating hole 12a of main body cover 11.Thus, terminal board 3 is with rotary shaft 42 Centered by rotating hole 12a, rotate in the horizontal direction relative to upper surface part 10c.
Main body cover 11 is adjacent in the left and right of side 13 is provided with the first peristome 13a, the second peristome 14a.First peristome 13a is relative with the electric wire connector 30 of the terminal board 3 being in primary importance. Second peristome 14a is relative with the electric wire connector 30 of the terminal board 3 being in the second position.Top , corresponding to the position of the terminal board 3 before and after rotating, incline relative to the side 13 of end face 12 in face 12 Tiltedly incision.Terminal board 3 is between the first peristome 13a and the second peristome 14a, with side Face 13 is relative and in rotary moving.Thus, before and after the rotation of terminal board 3, it is possible to be provided with Connection or the upkeep operation etc. of distribution 2 are carried out under the state of main body cover 11.On the other hand, it is possible to Prevent from rotating these operations of midway.
Main body cover 11 have the hole 11a for the position of terminal board 3 being fixed on its end face 12, Hole 11b.As shown in figure 11, what hole 11a was arranged on when terminal board 3 is in primary importance is prominent Position on the vertical in portion 45.When terminal board 3 is in primary importance, protuberance 45 is from hole 11a Highlight and be engaged fixing.
As shown in figure 12, hole 11b is arranged on protuberance when terminal board 3 is in the second position Position on the vertical of 45.When terminal board 3 is in the second position, protuberance 45 is dashed forward from hole 11b Go out and be engaged fixing.Even if in the case of before and after rotating, terminal board 3 is not screwed, Engaging by protuberance 45 with hole 11a, 11b, it is also possible to the position of terminal board 3 is fixed.
As shown in Fig. 2 and Figure 13, main part 10 is outside the side, side 13 of the second peristome 14a Edge possesses the rotationally constrained portion 14b extended from side 13 to the inner side of main body cover 11.Rotate limit Portion 14b processed has the screwed hole 14c inserting screw 46 from the second 10b side, side.
Rotationally constrained portion 14b is parallel with the second side 10b.And, as shown in figure 11, at end When sub-platform 3 is in primary importance, the abutting part 44a and the second side 10b of control member 4 puts down OK.Therefore, now, rotationally constrained portion 14b abuts with abutting part 44a.And, rotate limit The screwed hole 14c of portion 14b processed is involutory with the position of engaging portion 44b of abutting part 44a, therefore leads to Cross screw 46 they to be fastened, limit terminal board 3 and the rotation of control member 4.
As in figure 2 it is shown, main part 10 is in second 10b side, the side outer rim of the second peristome 14a Portion possesses the rotationally constrained portion 14d extended from end face 12 to direction vertical.Rotationally constrained portion 14d There is the screwed hole 14e inserting screw 46 from the second 10b side, side.
Rotationally constrained portion 14d is parallel with the second side 10b.And, as shown in figure 12, at end When sub-platform 3 is in the second position, the abutting part 44c of base portion 41a of terminal board 3 and the second side Face 10b is parallel.Therefore, now, rotationally constrained portion 14d abuts with abutting part 44c.And, The screwed hole 14e of rotationally constrained portion 14d is involutory with the position of engaging portion 44d of abutting part 44c, Therefore by screw 46, they are fastened, limit terminal board 3 and the rotation of control member 4. It addition, rotationally constrained portion 14b, 14d can also be configured to by terminal board 3 and rotationally constrained portion 14b, 14d abut and limit terminal board 3 and the rotation of control member 4.
<bathroom air conditioner action example is set>
It follows that explanation bathroom air conditioner 100 action is set.
As shown in figure 11, in the bathroom air conditioner 100 of original state (when dispatching from the factory), end Sub-platform 3 is fixed in primary importance.Protuberance 45 is prominent from the hole 11a of main body cover 11 State.The abutting part 44a of control member 4 abuts with the rotationally constrained portion 14b of main body cover 11. The position of terminal board 3 by the screw 46 of fixing component by engaging portion 44b of abutting part 44a and The screwed hole 14c of rotationally constrained portion 14b fastens and is fixed.Thus, with rotary shaft 42 for propping up The action in rotary moving of point is restricted.
The main part 10 of the bathroom air conditioner 100 of original state with shown in Fig. 4 towards setting In the case of in ceiling 104, as shown in Figure 8, the phase of the first side 10a and terminal board 3 To face arrange with staggering obliquely with 45 ° in the horizontal direction.Thus, electric wire connector 30 from First 10a side, side it is observed that.And, terminal board 3 is relative to base portion 41a vertically side To installing obliquely, therefore 3 electric wire connectors 30 of terminal board 3 are from the first 10a side, side It is observed that.Therefore, can carry out at electric wire connector from access hole 103 (with reference to Fig. 4) side The operation of 30 connection wirings 2.Electrical construction dealer from access hole 103 can visuognosis whether Distribution 2 is inserted at electric wire connector 30, therefore can be to electric wire connector from access hole 103 side 30 reliably insert distribution 2.It is therefore not necessary to make control member 4 rotate.And, handle part 5 Towards the opposition side of access hole 103, therefore cannot be carried out the action making terminal board 3 move.By This, it is possible to prevent maloperation.
In contrast, as it is shown in figure 5, at the second side 10b of main part 10 towards access hole 103 arrange in the case of, need to make terminal board 3 rotate to the second position, with access hole 103 Relatively.
Make terminal board 3 rotate in the case of, first, electrical construction dealer as shown in figure 11, By the operation from the second 10b side, side, and dismantle terminal board 3 from engaging portion 44b The screw 46 that position is fixing.It follows that handle part 5 is gripped and by terminal by electrical construction dealer The hole 11b that the position of platform 3 is moved to protuberance 45 with main body cover 11 supports the position touched. Now, control member 4, centered by the protuberance 42a of rotary shaft 42, operating arm 43 is Radius and rotate.When terminal board 3 is for rotating midway, protuberance 45 keeps out of the way main body cover 11 Inside.Terminal board 3 passes through the inside of main body cover 11 from primary importance, rotates to Figure 12 institute The second position shown.When making terminal board rotate to the second position, abutting part 44c limits with rotating Portion 14d processed abuts, and engaging portion 44d is involutory with the position of screwed hole 14e.
After rotation, electrical construction dealer utilizes screw 46 by terminal board from the second 10b side, side The 3 screwed hole 14e being fixed on main body cover 11.Screw 46 is passed through by locking in the position of terminal board 3 The screwed hole 14e of portion 44d and rotationally constrained portion 14d fastens and is fixed.Thus, to rotate The action in rotary moving of the terminal board 3 centered by axle 42 is restricted.
So, electrical construction dealer moves operating portion 44 and makes terminal board 3 rotate to the second position, Thus from access hole 103 it is observed that 3 electric wire connectors 30 of terminal board 3.
Rotationally constrained portion 14b, 14d it is set in main body cover 11, and arranges at control member 4 and support Meet portion 44a, 44c, thus, by fixing for the position of terminal board 3 screw 46 no matter terminal board 3 Be in primary importance and the second position which, can be from the side of the second 10b side, side Fang Jinhang operates.Therefore, with shown in Fig. 5 towards be provided with bathroom air conditioner 100 it After, it is possible to dismounting and the rotation process of control member 4 of screw 46 is carried out from access hole 103.
Thus, even if after bathroom air conditioner 100 is arranged at building, electrical construction Joining of the operations such as connection or the maintenance that dealer also is able to make terminal board 3 move to be suitable for distribution 2 Put, become the state that can use.Now, it is not necessary to by screwdriver relative to end face 12 vertically Enter in ceiling 104, even if therefore in the case of ceiling 104 is low, it is also possible to expeditiously Carry out above-mentioned operation.And, the operation of the position changing terminal board 3 can also be by one hand Carry out.By possessing single terminal board 3 and the control member 4 that makes terminal board 3 move and energy Obtain above-mentioned effect, therefore, it is possible to suppression number of parts, it is possible to realize low cost.
When bathroom air conditioner 100 is arranged at bathroom, the construction of bathroom air conditioner 100 Dealer is without minding the position of exhaust passage 102 and according to the bathroom air-conditioning shown in Fig. 4 or Fig. 5 The setting direction of device 100 and carried out changing terminal board 3 before being arranged at the ceiling 104 of bath The operation of position.Therefore, it is possible to alleviate the burden of operation of construction dealer, and with by end Sub-platform 3 dismantles from main part 10, change towards and the structure again installed is compared, it is possible to shorten Activity duration.Additionally, bathroom air conditioner 100 is arranged at the construction dealer in bathroom with Between the electrical construction dealer of bathroom air conditioner 100 connection wiring 2, it is possible to clear and definite operation Responsibility is distinguished.
As it has been described above, control member 4 is relative to the rotation at the center of the rotation becoming terminal board 3 Axle 42 and be in the direction side identical with terminal board 3.Operating portion 44 is centered by rotary shaft 42 And extend with operation arm 43 as radius along direction of rotation.As shown in figure 11, at terminal When platform 3 is in primary importance, the operating portion 44 of control member 4 is with the inwall along side 13 Shape fixed.As shown in figure 12, when terminal board 3 is in the second position, control member The operating portion 44 of 4 is fixed with the shape along the outer wall of the second side 10b of main part 10.
And, terminal board 3 is from primary importance to second position half-twist, and its track is confined to main In body cover 11.Now, terminal board 3 utilize main body cover 11 to limit the movement of vertical, Rotate the most in the horizontal direction.
Thus, the space of upper surface part 10c needed for the rotation of operating portion 44 and terminal board 3 is big Body is consistent, and terminal board 3 and the apron space of control member 4 before and after rotation are confined to from rotation Axle 42 is to the scope of terminal board 3.The track of operating portion 44 is when main part 10 viewed from above Highlight the most significantly, therefore can reduce work space.Therefore, nothing around main part 10 The space for making operating portion 44 move in the horizontal direction need to be obtained significantly.And, without Obtain the space of the low one-level of upper surface part 10c of main part 10 significantly.Therefore, in order to The machine of storage in main part 10 and be able to ensure that broad space.
[the second embodiment]
It follows that explanation is as the structure example of the bathroom air conditioner 200 of the second embodiment. Compared with the operating portion 44 of the bathroom air conditioner 100 illustrated in the first embodiment, bathroom The length of the bearing of trend of the operating portion 64 of air-conditioning device 200 is set to long.Fill at bathroom air-conditioning Put in 200, for the part mark different from the bathroom air conditioner 100 of the first embodiment New mark and record explanation.In bathroom air conditioner 200, with the bath of the first embodiment Description is omitted for the identical part of room air-conditioning device 100.
Air-conditioning device 200 shown in Figure 15 possesses the main part 10 covered by metal shell, if It is placed in the ceiling 104 of building.Main part 10 has channel connector 19.
The primary importance of terminal board 3 and the second position are and the position of explanation in the first embodiment Identical position, by the position of the terminal board 3 relative with the first 10a side, side of main part 10 It is set to primary importance.Position by the terminal board 3 relative with the second 10b side, side of main part 10 Install as the second position.In this example, terminal board 3 also rotates to the second position from primary importance About 90 °.
Possess in upper surface part 10c: will connect from outside distribution 2 and be supported to can The terminal board 3 rotated;Make the operating portion 64 that terminal board 3 rotates;And when action in rotary moving Staff is utilized to hold the handle part 5 of control member 6.Upper surface part 10c has than main part 10 The plane of the low one-level of end face as the installation space arranging terminal board 3 or control member 6 etc.. Operating portion 64 is located at control member 6.
Control member 6 shown in Figure 15 is set to the behaviour than the first embodiment at operating portion 64 Make on the point that the operating portion 44 of component 4 is long different from control member 4.By by operating portion 64 It is set to longer, it is possible to the position of the handle part 5 when making terminal board 3 be in primary importance more connects Nearly access hole 103.Therefore, electrical construction dealer can enter closer to the position of access hole 103 The rotation process of row terminal board 3.
Control member 6 is in relative to the rotary shaft 62 at the center of the rotation becoming terminal board 3 The body side direction that is threeth side 10d side identical with terminal board 3.Therefore, before and after rotation Terminal board 3 and the apron space of upper surface part 10c of control member 6 be confined to from rotary shaft 62 scopes arriving terminal board 3.Thereby, it is possible to the machine bigger than conventional example is accommodated in main part In 10.
Control member 6 is in the front of operating portion 64 and is threaded tight near handle part 5 Gu abutting part 64a.Abutting part 64a has engaging portion 64b being made up of groove or hole.At end When sub-platform 3 is in primary importance, abutting part 64a is parallel with the second side 10b.Abutting part 64a Arrange in order to terminal board 3 is fixed on primary importance.
Operating portion 64 is threaded the abutting part of fastening in handle part 5 side of base portion 61a 64c.Abutting part 64c has engaging portion 64d being made up of groove or hole.It is at terminal board 3 During two positions, abutting part 64c is parallel with the second side 10b.Abutting part 64c is in order to by terminal board 3 are fixed on the second position and arrange.
The structure of the inboard of operation arm 63 is identical with the structure of the control member 4 shown in Figure 10.
As shown in figure 15, upper surface part 10c of main part 10 is covered by main body cover 21.Main body Cover 21 sides adjacent in the left and right of side 23 arrange the first peristome 23a, the second peristome 24a.The main body cover 21 of this example is direction and first embodiment of the only second peristome 24a opening The different structure of main body cover 11.Second peristome 24a and the second side 10b of main part 10 Opening abreast.
Main part 10 possess in the outer edge, side, side 23 of the second peristome 24a from side 23 to The rotationally constrained portion 24b that the inner side of main body cover 21 extends.Rotationally constrained portion 24b has and Fig. 2 The rotationally constrained shape identical for portion 14b of the first shown embodiment, plays identical effect. Rotationally constrained portion 24b has the screwed hole 24c inserting screw 66 from the second 10b side, side.? When terminal board 3 is in primary importance, rotationally constrained portion 24b and the abutting part 64a of control member 6 Abut.Engaging portion 64b of the screwed hole 24c and abutting part 64a of rotationally constrained portion 24b is by screw 66 fastenings, thus limit the terminal board 3 before rotation and the rotation of control member 6.
As shown in figure 16, main part 10 is outside the second 10b side, side of the second peristome 24a Edge possesses rotationally constrained portion 24d.It is rotationally constrained that rotationally constrained portion 24d has with shown in Fig. 2 The shape that portion 14d is identical, plays identical effect.Rotationally constrained portion 24d has from the second side The screwed hole 24e of screw 66 is inserted in 10b side, face.As shown in figure 16, it is at terminal board 3 During two positions, rotationally constrained portion 24d abuts with the abutting part 64c of base portion 61a of terminal board 3. The screwed hole 24e of rotationally constrained portion 24d and engaging portion 64d of abutting part 64c are tight by screw 66 Gu, thus limit postrotational terminal board 3 and the rotation of control member 6.
In this example, the length of the bearing of trend of operating portion 64 is set to longer, therefore at end When sub-platform 3 is in primary importance, the fixed position of screw 66 is than the screw 46 of the first embodiment Fixed position closer to access hole 103.Thus, electrical construction dealer is easier to screw 66 Dismounting.
It should be noted that the direction of rotation of terminal board 3 is not limited to above-mentioned direction.Make For the variation of bathroom air conditioner 200, Figure 17 illustrates bathroom air conditioner 200 '.Bathroom is empty Adjust device 200 ' terminal board 3 can also be the solid line from figure represent with channel connector 19 The dotted line that 3rd relative for side 10d position of opposition side rotates to figure represent with the second side The structure of the position that face 10b is relative.In this case, the operating portion 64 ' of control member 6 ' with The direction of terminal board 3 is vertical and mode with upper surface part 10c level is from base portion 61a ' extend. And, the angle that terminal board 3 rotates is not limited to right angle or acute angle, can be set to arbitrarily Angle rotate structure.
And, the shift action of control member 6 is not limited to action in rotary moving.Such as, Control member 6 is figure 18 illustrates " as the variation of control member 6.Hereinafter, end is described The situation of movement on the track 33 that sub-platform 3 single dotted broken line in the drawings represents.Now, terminal board The rotary shaft of the mobile route of 3 moves to imaginary axis O ' from imaginary axis O.
Control member 6 " terminal board 3 supported the upper surface part for moving to main part 10 10c (with reference to Figure 15).Control member 6 " possess storage terminal board 3 base portion 61a ", draw Lead the leading axle 62 of the movement of terminal board 3 ", from leading axle 62 " the operation arm 63 that extends ", Make the operating portion 64 that terminal board 3 moves ", utilize staff hold operating portion 64 " handle part 5. Operating portion 64 " it is in and terminal board relative to imaginary axis O, O of mobile route ' of terminal board 3 3 identical body side directions.
On the end face 22 of the main body cover 21 shown in Figure 16, as shown in the dotted line of Figure 18, if There is the bullport 22a that the movement to terminal board 3 guides ".At bullport 22a " it is provided with and draws Guide shaft 62 " protuberance 62a ".Leading axle 62 " along bullport 22a " mobile, thus terminal board 3 Move along track 33.
In this example, this leading axle 62 " relative to operation arm 63 " and it is arranged on base portion 61a " Opposition side, but be not limited thereto.Such as, leading axle 62 " terminal board 3 can also be arranged on Base portion 61a " vertical above.Now, it is not necessary to operation arm 63 ", therefore, it is possible to realize The further space saving in the space needed for the storage of terminal board 3 and movement.
[industrial applicibility]
The extremely preferred air-conditioning dress being applied on the ceiling of the building of house etc. arrange of the present invention Put or the equipment machine such as ventilation fan.

Claims (10)

1. an equipment machine, is arranged at the ceiling of building, wherein,
Described equipment machine possesses:
Main part, is arranged at described ceiling;
Terminal board, is supported to move along the upper surface part of described main part;
Operating portion, is in and described end relative to the rotary shaft of mobile route of described terminal board The body side direction that sub-platform is identical, and make described terminal board move;And
Handle part, is used for holding described operating portion.
Equipment machine the most according to claim 1, wherein,
Described operating portion is arranged at the control member making described terminal board rotate,
Described control member is also equipped with:
Operation arm, extends from described rotary shaft;And
Base portion, is positioned at the opposition side of described rotary shaft relative to described operation arm, and receives Receive described terminal board,
Described operating portion is along centered by described rotary shaft and with described operation arm as radius Circle circumferencial direction and extend from described base portion.
Equipment machine the most according to claim 2, wherein,
Described main part possesses rotationally constrained portion, and this rotationally constrained portion passes through described terminal board or institute State the abutting of control member and limit described terminal board and the rotation of described control member.
Equipment machine the most according to claim 3, wherein,
Described control member is provided with the abutting part abutted with described rotationally constrained portion,
By fixing component fixing to described rotationally constrained portion and described abutting part to described terminal board Position is fixed.
5. according to the equipment machine according to any one of Claims 1 to 4, wherein,
Described control member is in order to make the described terminal board the first side or second towards described main body Side, can be installed on the cover component of the upper surface part covering described main part in the way of rotating.
Equipment machine the most according to claim 5, wherein,
Described control member is installed on the installing hole arranged at described cover component.
7. according to the equipment machine described in claim 3 or claim 4, wherein,
Described rotationally constrained portion is arranged at the outer edge of described main body.
8. according to the equipment machine described in claim 3 or claim 4, wherein,
Described rotationally constrained portion is arranged at the cover component of the upper surface covering described terminal board.
9. according to the equipment machine according to any one of Claims 1 to 4, wherein, described rotation Axle is the operation by described operating portion and imaginary axis that described terminal board can be made to move.
10. according to the equipment machine according to any one of Claims 1 to 4, wherein,
Described equipment machine is arranged at bathroom.
CN201610099099.4A 2015-02-23 2016-02-23 Equipment machine Active CN105910170B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2015032531A JP6464806B2 (en) 2015-02-23 2015-02-23 Equipment
JP2015-032531 2015-02-23

Publications (2)

Publication Number Publication Date
CN105910170A true CN105910170A (en) 2016-08-31
CN105910170B CN105910170B (en) 2020-01-24

Family

ID=56744503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610099099.4A Active CN105910170B (en) 2015-02-23 2016-02-23 Equipment machine

Country Status (3)

Country Link
JP (1) JP6464806B2 (en)
CN (1) CN105910170B (en)
TW (1) TWI673462B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110873448A (en) * 2019-12-19 2020-03-10 宁波奥克斯电气股份有限公司 Terminal sealing device and air conditioner

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7324988B2 (en) * 2019-05-28 2023-08-14 株式会社ノーリツ bathroom heater dryer
CN114111011A (en) * 2021-10-15 2022-03-01 江苏盈达机电科技有限公司 Central air conditioner and air volume adjusting device thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0960940A (en) * 1995-08-21 1997-03-04 Sanden Corp Bath room air conditioner
JP2009052767A (en) * 2007-08-23 2009-03-12 Max Co Ltd Facility equipment
JP2009174764A (en) * 2008-01-23 2009-08-06 Inax Corp Equipment
KR20090122816A (en) * 2008-05-26 2009-12-01 김한나 A consolidation box used the line of battle
CN202928019U (en) * 2012-11-02 2013-05-08 广东美的电器股份有限公司 Air conditioner
CN104283507A (en) * 2014-09-29 2015-01-14 常州回天新材料有限公司 Retractable solar assembly junction box

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3085674U (en) * 2001-10-29 2002-05-17 株式会社渡辺製作所 Terminal block for communication line
JP4826193B2 (en) * 2005-09-28 2011-11-30 マックス株式会社 Equipment
JP5125746B2 (en) * 2008-05-12 2013-01-23 マックス株式会社 Equipment
TW201107685A (en) * 2009-07-14 2011-03-01 Panasonic Corp Ventilation/air-conditioning device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0960940A (en) * 1995-08-21 1997-03-04 Sanden Corp Bath room air conditioner
JP2009052767A (en) * 2007-08-23 2009-03-12 Max Co Ltd Facility equipment
JP2009174764A (en) * 2008-01-23 2009-08-06 Inax Corp Equipment
KR20090122816A (en) * 2008-05-26 2009-12-01 김한나 A consolidation box used the line of battle
CN202928019U (en) * 2012-11-02 2013-05-08 广东美的电器股份有限公司 Air conditioner
CN104283507A (en) * 2014-09-29 2015-01-14 常州回天新材料有限公司 Retractable solar assembly junction box

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110873448A (en) * 2019-12-19 2020-03-10 宁波奥克斯电气股份有限公司 Terminal sealing device and air conditioner

Also Published As

Publication number Publication date
TW201704696A (en) 2017-02-01
TWI673462B (en) 2019-10-01
CN105910170B (en) 2020-01-24
JP2016156508A (en) 2016-09-01
JP6464806B2 (en) 2019-02-06

Similar Documents

Publication Publication Date Title
AU2022202993B2 (en) Ceiling type indoor unit of air conditioner
CN105910170A (en) Equipment machine
CN102620356B (en) The off-premises station of air conditioner
KR20170061137A (en) Vertical air conditioner
EP2299190A2 (en) Indoor unit of air conditioner
KR20170063653A (en) Upright air conditioner with swing louvers
CN106016472B (en) Wall-mounted air conditioner indoor unit easy to assemble and disassemble
WO2013108652A1 (en) Air conditioner
CN104433332B (en) A kind of automatic exhausting dehumidification type cabinet
JP5026292B2 (en) Equipment
JP6115782B2 (en) Air conditioner
JP2009115360A (en) Ceiling-embedded air conditioner
CN205388349U (en) Motor support and air condensing units
JP2009052767A (en) Facility equipment
CN106716021A (en) Indoor unit for air conditioner
CN105972702B (en) Wall-hanging air conditioner indoor unit
JP5368223B2 (en) Air conditioner indoor unit
CN207570005U (en) Cabinet air-conditioner
CN207006375U (en) Indoor apparatus of air conditioner
JP7189418B2 (en) Indoor unit of air conditioner
CN208907664U (en) HVACR fan cabinet
JP2001021178A (en) Outdoor unit of air conditioner
KR102256127B1 (en) Indoor Unit of Air Conditioner
CN208804770U (en) Embedded air-conditioner indoor set
CN217004613U (en) Range hood walk line structure and range hood

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant