CN105909223A - Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts - Google Patents

Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts Download PDF

Info

Publication number
CN105909223A
CN105909223A CN201610286797.5A CN201610286797A CN105909223A CN 105909223 A CN105909223 A CN 105909223A CN 201610286797 A CN201610286797 A CN 201610286797A CN 105909223 A CN105909223 A CN 105909223A
Authority
CN
China
Prior art keywords
exploitation
horizontal well
gas
gas hydrate
electrical heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610286797.5A
Other languages
Chinese (zh)
Inventor
侯健
刘永革
于波
王元银
杜庆军
王玉斗
陆努
夏志增
刘璟垚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Petroleum East China
Original Assignee
China University of Petroleum East China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Petroleum East China filed Critical China University of Petroleum East China
Priority to CN201610286797.5A priority Critical patent/CN105909223A/en
Publication of CN105909223A publication Critical patent/CN105909223A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/16Enhanced recovery methods for obtaining hydrocarbons
    • E21B43/24Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection
    • E21B43/2401Enhanced recovery methods for obtaining hydrocarbons using heat, e.g. steam injection by means of electricity

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Filling Or Discharging Of Gas Storage Vessels (AREA)
  • Infusion, Injection, And Reservoir Apparatuses (AREA)
  • Media Introduction/Drainage Providing Device (AREA)

Abstract

The invention discloses a method for electric heating assisted depressurizing production of a natural gas hydrate reservoir through dual horizontal shafts. Electrodes are installed on the upper horizontal shaft and the lower horizontal shaft correspondingly, the natural gas hydrate reservoir serves as a resistor, electric energy is directly converted into heat energy for mining natural gas hydrate, and electric heating mining is carried out on the natural gas hydrate reservoir accordingly. Specifically, the method includes the steps that the electrodes are installed at the horizontal section of the upper horizontal shaft and the horizontal section of the lower horizontal shaft correspondingly, and the electrodes are connected with a ground control cabinet through cables; the upper horizontal shaft and the lower horizontal shaft form a current loop through water obtained through decomposition of the natural gas hydrate in the depressurizing production stage, the natural gas hydrate reservoir serves as the resistor, electric energy is converted into heat energy, and accordingly electric heating mining of the natural gas hydrate reservoir is achieved. The method is simple in structure, capable of saving energy, environmentally friendly and easy to control, and provides an effective measure for development of the natural gas hydrate reservoir.

Description

A kind of method that dual horizontal well electrical heating secondary buck exploitation of gas hydrate is hidden
Technical field:
A kind of method that the present invention relates to gas hydrates development field, particularly a kind of dual horizontal well electrical heating secondary buck taps natural gas hydration The method that thing is hidden.
Background technology:
Gas hydrates are to compose the one combustible ice-like crystalline material being stored in seabed and stratum, land permafrost area, little by water and methane etc. Molecular gas is formed under the conditions of cryogenic high pressure, and its distribution is wide, and energy density is high, is the following potential high-efficiency cleaning energy.
The most conventional blood pressure lowering extraction system, inhibitor injection method and heat injection method exploitation of gas hydrate.Wherein voltage drop method development rate is slow, development effectiveness Difference, the scope of application is narrower;Inhibitor injection method mainly injects the chemical agent such as methanol and synthesis polyamine group in stratum, and the method cost is high and easily causes Stratum and the destruction of environment, application is more limited to;Heat injection method needs to utilize special equipment to inject steam or hot water in stratum, and development cost is high, And easily cause reservoir destruction.Utilize dual horizontal well electrical heating exploitation of gas hydrate, the heat of exploitation gas hydrates can be converted electrical energy into Can, its development rate is fast, and capacity usage ratio is high, receives more and more attention, but does not still have a kind of dual horizontal well electrical heating secondary buck to open at present The method adopting gas hydrates, seriously constrains the progress of gas hydrates exploitation.
Summary of the invention:
Present invention is primarily targeted at a kind of method providing dual horizontal well electrical heating secondary buck exploitation of gas hydrate to hide, the method can be big Width improves the recovery ratio of gas hydrates.
The purpose of the present invention is mainly realized by the following method: the horizontal segment at upper and lower horizontal well installs electrode, and electrode is respectively by cable and control Cabinet is connected, and using the gas hydrates of blood pressure lowering exploitation decomposed as resistance, directly converts electrical energy into the heat energy that heating hydrate is hidden, it is achieved that Dual horizontal well electrical heating secondary buck exploitation of gas hydrate is hidden, and comprises the steps:
(1) it is more than the gas hydrates of 20m according to the geologic information of gas hydrates, preferably average effective caliper, drills through upper and lower Two mouthfuls of water horizontal wells, horizontal section length is 300~500m, uses insulated sleeve completion;For suggestions for improvement, improve development efficiency, upper and lower Two mouthfuls of water horizontal wells all connect gas hydrates by well-case perforating;Horizontal well inner oil tube is insulation oil pipe, and the oil jacket annular space of peupendicular hole section is at heel All utilizing packer to insulate, oil pipe is connected with gas-liquid separator, and water that gas hydrate dissociation produces is gentle to be carried out point by gas-liquid separator From process;
(2) installing ground control cabinet, ground control cabinet is made up of power supply, electric adjustment equipment and electric brake, and wherein power supply is used for providing gas water Compound hides the electric energy needed for exploitation, and the supply voltage used is 480V, and current frequency range is 50~60Hz, and electric adjustment equipment is used for controlling Electrical output power is 100~120kW, installs electric brake and carry out connecting control between power supply with electric adjustment equipment;
(3) horizontal segment of horizontal well and lower horizontal well uniformly installs 10~20 electrodes up, for strengthening electrical heating effect, upper horizontal well The electrode of electrode and described lower horizontal well use staggered mode, electrode is connected with described ground control cabinet by cable;
(4) according to the geological conditions of gas hydrates, the pressure parameter that horizontal well blood pressure lowering exploitation of gas hydrate is hidden and electrical heating exploitation The critical parameters of gas hydrates are designed, and when exploiting including blood pressure lowering, Horizontal Well bottom pressure is 1.5~4.5MPa, critical day during blood pressure lowering exploitation Gas production is 1000m3/ d~2000m3/ d, the critical day gas production of electrical heating exploitation is 2500m3/ d~3500m3/d;
(5) pressure parameter hidden according to described horizontal well blood pressure lowering exploitation of gas hydrate, uses described two mouthfuls of water horizontal wells to gas hydrates Tibetan carries out blood pressure lowering exploitation, when two mouthfuls water horizontal well day gas production be below blood pressure lowering exploitation critical day gas production time, blood pressure lowering exploitation terminate;
(6) electric brake in described ground control cabinet is closed, proceed by electrical heating exploitation of gas hydrate and hide, when two mouthfuls of water horizontal well day gas production When amount is below the critical day gas production of electrical heating exploitation, described electric brake is disconnected, stop exploitation.
First the present invention carries out blood pressure lowering exploitation to gas hydrates, makes gas hydrates decomposed, is reduced to critical daily output in daily output tolerance After tolerance, gas hydrates being electrically heated auxiliary exploitation, capacity usage ratio is high, simple in construction, it is easy to control, and is hydrated for natural gas The exploitation that thing is hidden provides effective ways.
Accompanying drawing illustrates:
Fig. 1 is the schematic diagram that dual horizontal well electrical heating secondary buck exploitation of gas hydrate is hidden.
Wherein, 1, ground control cabinet;2, cable;3, cable;4, gas-liquid separator;5, insulated sleeve;6, packer;7, electrode;8、 Perforation;9, natural gas pool;10, insulation oil pipe;11, electric adjustment equipment;12, power supply;13, electric brake;14, threeway;15 electrodes.
Detailed description of the invention:
Describe the present invention in detail below in conjunction with accompanying drawing, but do not limit the practical range of the present invention.
(1) it is the gas hydrates of 40m according to the geologic information of gas hydrates, preferably average effective caliper, drills through upper and lower two Saliva horizontal well, horizontal section length is 500m, uses insulated sleeve 5 completion;For suggestions for improvement, improve development efficiency, upper and lower two mouthfuls Horizontal well all passes through well-case perforating 8 and connects gas hydrates;Horizontal well inner oil tube is insulation oil pipe 10, and the oil jacket annular space of peupendicular hole section all utilizes Packer 6 insulates, and oil pipe 10 is connected with gas-liquid separator 4, and the water of gas hydrate dissociation generation is gentle to be entered by gas-liquid separator 4 Row separating treatment;
(2) installing ground control cabinet 1, ground control cabinet 1 is made up of power supply 12, electric adjustment equipment 11 and electric brake 13, and wherein power supply 12 is used Thering is provided the electric energy needed for gas hydrates exploitation, the supply voltage used is 480V, and current frequency range is 60Hz, utilizes electric power to adjust It is 100kW that joint equipment 11 controls electrical output power, installs electric brake 13 and carry out connecting control between power supply with electric adjustment equipment;
(3) net horizontal section of horizontal well uniformly installs 10 electrodes 7 up, and the net horizontal section of lower horizontal well uniformly installs 10 electrodes 15, For strengthening electrical heating effect, the electrode 7 of upper horizontal well uses staggered mode, electrode 7 and electricity with the electrode 15 of described lower horizontal well Pole 15 is connected with described ground control cabinet 1 with cable 2 by cable 3 respectively;
(4) according to the geological conditions of gas hydrates, the pressure parameter that horizontal well blood pressure lowering exploitation of gas hydrate is hidden and electrical heating exploitation The critical parameters of gas hydrates are designed, and when exploiting including blood pressure lowering, Horizontal Well bottom pressure is 4MPa, critical day gas production during blood pressure lowering exploitation Amount is 1000m3/ d, the critical day gas production of electrical heating exploitation is 3000m3/d;
(5) pressure parameter hidden according to described horizontal well blood pressure lowering exploitation of gas hydrate, uses described two mouthfuls of water horizontal wells to gas hydrates Tibetan carries out blood pressure lowering exploitation, when two mouthfuls water horizontal well day gas production be below 1000m3During/d, blood pressure lowering exploitation terminates;
(6) electric brake 13 in described ground control cabinet 1 is closed, proceed by electrical heating exploitation of gas hydrate and hide, when two mouthfuls of water horizontal well days Gas production is below 3000m3During/d, described electric brake is disconnected, stop exploitation.

Claims (8)

1. the method that a dual horizontal well electrical heating secondary buck exploitation of gas hydrate is hidden, it is characterised in that horizontal well and lower horizontal well up Horizontal segment be respectively mounted electrode, electrode is connected with ground control cabinet by cable respectively, and upper and lower horizontal well is by blood pressure lowering mining phase gas water Compound decomposes the water obtained and forms current loop, using gas hydrates as resistance, converts electrical energy into heat energy, thus realizes natural gas hydration The electrical heating exploitation that thing is hidden, comprises the steps:
(1) it is more than the gas hydrates of 20m according to the geologic information of gas hydrates, preferably average effective caliper, drills through upper and lower Two mouthfuls of water horizontal wells, two mouthfuls of water horizontal wells use cased hole completion, and connect gas hydrates by well-case perforating;
(2) installing ground control cabinet, ground control cabinet is made up of power supply, electric adjustment equipment and electric brake, and wherein power supply is used for providing gas water Compound hides the electric energy needed for exploitation, and electric adjustment equipment is used for controlling electrical output power, installs electric brake and carry out between power supply and electric adjustment equipment Connection controls;
(3) net horizontal section of horizontal well and lower horizontal well the most uniformly installs 10~20 electrodes up, and electrode is by cable and described ground Switch board is connected;
(4) according to the geological conditions of gas hydrates, the pressure parameter that horizontal well blood pressure lowering exploitation of gas hydrate is hidden and electrical heating exploitation The critical parameters of gas hydrates are designed, Horizontal Well bottom pressure when exploiting including blood pressure lowering, blood pressure lowering exploitation time critical day gas production with And critical day gas production during electrical heating exploitation;
(5) pressure parameter hidden according to described horizontal well blood pressure lowering exploitation of gas hydrate, uses described two mouthfuls of water horizontal wells to gas hydrates Tibetan carries out blood pressure lowering exploitation, when two mouthfuls water horizontal well day gas production be below blood pressure lowering exploitation critical day gas production time, blood pressure lowering exploitation terminate;
(6) electric brake in described ground control cabinet is closed, proceed by electrical heating exploitation of gas hydrate and hide, when two mouthfuls of water horizontal well day gas production When amount is below the critical day gas production of electrical heating exploitation, described electric brake is disconnected, stop exploitation.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that institute Stating horizontal well design between 300m~500m, sleeve pipe is insulated sleeve, and horizontal well inner oil tube is insulation oil pipe.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that for Suggestions for improvement, improves production efficiency, and the horizontal segment of upper and lower two mouthfuls of water horizontal wells all carries out perforation completion.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that institute Stating horizontal well inner oil tube to be connected with gas-liquid separator, the water of gas hydrate dissociation generation is gentle carries out separating treatment by gas-liquid separator.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that for Strengthening electrically heated effect, the electrode of described upper horizontal well uses staggered mode with the electrode of described lower horizontal well.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that institute The heel stating upper horizontal well and lower horizontal well peupendicular hole section all utilizes packer packing oil removal to overlap annular space.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that institute The supply voltage used is 480V, and current frequency range is 50~60Hz, and output power range is 100~120kW.
The method that a kind of dual horizontal well electrical heating secondary buck exploitation of gas hydrate the most according to claim 1 is hidden, it is characterised in that institute Horizontal Well bottom pressure scope when stating blood pressure lowering exploitation is 1.5~4.5MPa, and critical day gas production during described blood pressure lowering exploitation is 1000m3/ d~2000 m3/ d, critical day gas production during described electrical heating exploitation is 2500m3/ d~3500m3/d。
CN201610286797.5A 2016-05-03 2016-05-03 Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts Pending CN105909223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610286797.5A CN105909223A (en) 2016-05-03 2016-05-03 Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610286797.5A CN105909223A (en) 2016-05-03 2016-05-03 Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts

Publications (1)

Publication Number Publication Date
CN105909223A true CN105909223A (en) 2016-08-31

Family

ID=56752404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610286797.5A Pending CN105909223A (en) 2016-05-03 2016-05-03 Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts

Country Status (1)

Country Link
CN (1) CN105909223A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337675A (en) * 2016-11-21 2017-01-18 重庆科技学院 Formation electric eddy current heating thick oil recovery system and the mining method
CN106640005A (en) * 2016-12-20 2017-05-10 中国石油天然气股份有限公司 Downhole electric heating horizontal well pipe column structure and oil layer heating method thereof
CN107083943A (en) * 2017-06-01 2017-08-22 中国石油大学(华东) A kind of hot CO of segment level well2The method that the heterogeneous hydrate of exploitation of handling up is hidden
CN107143313A (en) * 2017-07-14 2017-09-08 中国石油大学(华东) A kind of water filling exploitation of geothermal energy and hydrate are hidden simultaneously well construction design and method
CN107676060A (en) * 2017-10-23 2018-02-09 大庆东油睿佳石油科技有限公司 A kind of method of the U-shaped well microwave heating exploitation of gas hydrates
CN108005626A (en) * 2017-11-27 2018-05-08 华南理工大学 A kind of gas hydrate exploitation device and method based on hot pipe technique
CN110273663A (en) * 2019-06-18 2019-09-24 李宏丽 Well head bridge-type reheating technique
CN110344801A (en) * 2018-04-03 2019-10-18 齐鲁工业大学 Fracturing work method, recovery method and mining system for combustible ice exploitation
CN110821448A (en) * 2019-11-14 2020-02-21 中国科学院广州能源研究所 Exploitation method and exploitation device for marine natural gas hydrate
CN111720100A (en) * 2020-06-29 2020-09-29 陕西工业职业技术学院 Unconventional natural gas combined mining method for frozen soil area
CN111734358A (en) * 2020-06-29 2020-10-02 陕西工业职业技术学院 Comprehensive exploitation method for combustible ice in frozen soil area

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2138619C1 (en) * 1998-05-08 1999-09-27 Колчин Владимир Николаевич Method for liquidation of hydrate and paraffin sediments and plugs in oil and gas wells
CN1944949A (en) * 2006-08-09 2007-04-11 中国石油大学(华东) Method for recovering sea bottom hydrate by single well heat injection circulation
CN201953359U (en) * 2011-02-23 2011-08-31 中国地质科学院勘探技术研究所 Automatic exploitation system of natural gas hydrate
CN102213090A (en) * 2011-06-03 2011-10-12 中国科学院广州能源研究所 Method and device for exploiting natural gas hydrate in permafrost region
CN105041271A (en) * 2015-07-29 2015-11-11 大连理工大学 Decompression marine natural gas hydrate mining method and submarine mining system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2138619C1 (en) * 1998-05-08 1999-09-27 Колчин Владимир Николаевич Method for liquidation of hydrate and paraffin sediments and plugs in oil and gas wells
CN1944949A (en) * 2006-08-09 2007-04-11 中国石油大学(华东) Method for recovering sea bottom hydrate by single well heat injection circulation
CN201953359U (en) * 2011-02-23 2011-08-31 中国地质科学院勘探技术研究所 Automatic exploitation system of natural gas hydrate
CN102213090A (en) * 2011-06-03 2011-10-12 中国科学院广州能源研究所 Method and device for exploiting natural gas hydrate in permafrost region
CN105041271A (en) * 2015-07-29 2015-11-11 大连理工大学 Decompression marine natural gas hydrate mining method and submarine mining system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
HIDEKI MINAGAWA等: "Depressurization and electrical heating of hydrate sediment for gas production", 《INTERNATIONAL OCEAN AND POLAR ENGINEERING CONFERENCE》 *
樊栓狮等: "水平井高效开采Class 3天然气水合物研究", 《天然气工业》 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106337675A (en) * 2016-11-21 2017-01-18 重庆科技学院 Formation electric eddy current heating thick oil recovery system and the mining method
CN106640005B (en) * 2016-12-20 2019-07-09 中国石油天然气股份有限公司 Downhole electric heating horizontal well pipe column structure and oil layer heating method thereof
CN106640005A (en) * 2016-12-20 2017-05-10 中国石油天然气股份有限公司 Downhole electric heating horizontal well pipe column structure and oil layer heating method thereof
CN107083943A (en) * 2017-06-01 2017-08-22 中国石油大学(华东) A kind of hot CO of segment level well2The method that the heterogeneous hydrate of exploitation of handling up is hidden
CN107083943B (en) * 2017-06-01 2019-10-18 中国石油大学(华东) A kind of hot CO of segment level well2It handles up and exploits the method that heterogeneous hydrate is hidden
CN107143313A (en) * 2017-07-14 2017-09-08 中国石油大学(华东) A kind of water filling exploitation of geothermal energy and hydrate are hidden simultaneously well construction design and method
CN107143313B (en) * 2017-07-14 2018-11-16 中国石油大学(华东) A kind of water filling exploitation of geothermal energy and hydrate are hidden simultaneously well construction design and method
CN107676060A (en) * 2017-10-23 2018-02-09 大庆东油睿佳石油科技有限公司 A kind of method of the U-shaped well microwave heating exploitation of gas hydrates
CN108005626A (en) * 2017-11-27 2018-05-08 华南理工大学 A kind of gas hydrate exploitation device and method based on hot pipe technique
CN110344801A (en) * 2018-04-03 2019-10-18 齐鲁工业大学 Fracturing work method, recovery method and mining system for combustible ice exploitation
CN110273663A (en) * 2019-06-18 2019-09-24 李宏丽 Well head bridge-type reheating technique
CN110821448A (en) * 2019-11-14 2020-02-21 中国科学院广州能源研究所 Exploitation method and exploitation device for marine natural gas hydrate
CN110821448B (en) * 2019-11-14 2022-02-18 中国科学院广州能源研究所 Exploitation method and exploitation device for marine natural gas hydrate
CN111720100A (en) * 2020-06-29 2020-09-29 陕西工业职业技术学院 Unconventional natural gas combined mining method for frozen soil area
CN111734358A (en) * 2020-06-29 2020-10-02 陕西工业职业技术学院 Comprehensive exploitation method for combustible ice in frozen soil area

Similar Documents

Publication Publication Date Title
CN105909223A (en) Method for electric heating assisted depressurizing production of natural gas hydrate reservoir through dual horizontal shafts
CN105840159B (en) A kind of gas hydrate exploitation device and recovery method based on heliotechnics
US7753122B2 (en) Method of developing and producing deep geothermal reservoirs
US4037655A (en) Method for secondary recovery of oil
RU2414592C1 (en) Procedure and device for extracting hydrocarbon substance from underground deposit and for reducing substance viscocity
US10648307B2 (en) Systems and methods for enhanced recovery of hydrocarbonaceous fluids
AU2007293564A1 (en) Electro thermal energy storage for in situ recovery of fluid fuel from hydro carbonaceous earth formations
CN105587303A (en) Green mining method and mining device for submarine shallow non-diagenetic natural gas hydrate
RU2011119093A (en) SYSTEMS AND METHODS OF TREATMENT OF THE UNDERGROUND STRESS USING ELECTRICAL CONDUCTORS
CN105134152A (en) Method and system for extracting natural gas hydrate through thermal jet flow
CN107635301B (en) Coiled tubing type microwave heater for exploiting natural gas hydrate
CN103321618A (en) Oil shale in-situ mining method
CN106968644A (en) A kind of Gas Hydrate In Sea Areas hot extractor based on thermal generator
CN203335050U (en) Steam generating device for seabed natural gas hydrate exploitation
CN115306364B (en) Natural gas hydrate in-situ heating extraction device and extraction method thereof
CA2886977C (en) Em and combustion stimulation of heavy oil
CN105114045A (en) CCUS system for extracting oil based on gas lifting method and application thereof
CN215057293U (en) Oil gas is micrite electric heat membrane heating device in pit
US11905805B2 (en) Low emissions well pad with integrated enhanced oil recovery
CN103114836B (en) A kind of Apparatus for () and method therefor of steam heavy oil heat production
CN206280060U (en) Coal-bed-gas production-increase equipment
WO2014182628A2 (en) Systems and methods for enhanced recovery of hydrocarbonaceous fluids
CN114382444A (en) Combined CO2Gas-buried natural gas hydrate exploitation system and method
CN105863589A (en) Method for vertical shaft electric-heating-assisted depressurizing production of natural gas hydrate reservoir
RU2516303C2 (en) Device for thermal processing of hydrated gas accumulation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hou Jian

Inventor after: Wang Yuanyin

Inventor after: Liu Yongge

Inventor after: Yu Bo

Inventor after: Du Qingjun

Inventor after: Wang Yudou

Inventor after: Lu Nu

Inventor after: Xia Zhizeng

Inventor after: Liu Jingyao

Inventor before: Hou Jian

Inventor before: Liu Yongge

Inventor before: Yu Bo

Inventor before: Wang Yuanyin

Inventor before: Du Qingjun

Inventor before: Wang Yudou

Inventor before: Lu Nu

Inventor before: Xia Zhizeng

Inventor before: Liu Jingyao

WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160831