CN105908779B CN201610256068.5A CN201610256068A CN105908779B CN 105908779 B CN105908779 B CN 105908779B CN 201610256068 A CN201610256068 A CN 201610256068A CN 105908779 B CN105908779 B CN 105908779B
Authority
CN
China
Prior art keywords
immersed tube
reinforcing bar
sleeper beam
connector
vertical reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610256068.5A
Other languages
Chinese (zh)
Other versions
CN105908779A (en
Inventor
胡景军
李志军
文哲
彭再勇
王秋林
柯斌
邵阳
邓小新
肖洪
刘刚
赵文龙
崔玉国
刘敏
柯友华
曾珂
胡斌
赵康林
张小红
龚学栋
谢海金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Erchu Co Ltd
Original Assignee
China Railway Tunnel Group Erchu Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Erchu Co Ltd filed Critical China Railway Tunnel Group Erchu Co Ltd
Priority to CN201610256068.5A priority Critical patent/CN105908779B/en
Publication of CN105908779A publication Critical patent/CN105908779A/en
Application granted granted Critical
Publication of CN105908779B publication Critical patent/CN105908779B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/063Tunnels submerged into, or built in, open water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/16Arrangement or construction of joints in foundation structures

Landscapes

  • Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

A kind of tunnel immersed tube joint Horizontal concrete shear key preparation method, when sleeper beam is prefabricated, axis reinforcing bar and connector are buried between steel seals up a door locking stake, vertical reinforcement and connector are buried in front end;After the completion of leading portion immersed tube docks with back segment immersed tube, remove steel closure door, adjust leading portion immersed tube, the axis reinforcing bar on back segment immersed tube sleeper beam and connector and vertical reinforcement and connector, make the axis reinforcing bar on leading portion immersed tube sleeper beam and the axis reinforcing bar cross-shear on back segment immersed tube sleeper beam, vertical reinforcement intersects with axis reinforcing bar simultaneously, and reinforcing bar colligation is carried out to axis reinforcing bar and vertical reinforcement staggeredly, after-pouring concrete.The tunnel immersed tube joint Horizontal concrete shear key preparation method of the present invention, by burying sleeper beam axis reinforcing bar and connector and vertical reinforcement and connector during prefabricated sleeper beam, plugged into full group of shearing bond structure vertical reinforcement by reinforcing bar after chisel sleeper beam in a small amount of repair, the purpose using existed concrete bridge structures is finally reached, has reached economic and environment-friendly effect.

Description

Tunnel immersed tube joint Horizontal concrete shear key preparation method
Technical field
The present invention relates to tunnel immersed tube joint technique, especially a kind of tunnel immersed tube joint Horizontal concrete shear key makes Method.
Background technology
Tunnel immersed tube joint connection is mainly cut by axis PC drag-lines, vertical Steel shear key and transverse horizontal armored concrete Cut key.Reinforcement construction concrete shearing key of the prior art, it is to cut sleeper beam after tube coupling sinking docks dismounting closure door to own Concrete, retains its vertical cage bar, is used as shear key main body vertical reinforcement after calibrated, then colligation residue reinforcing bar, pours coagulation Soil forms.Difficulty is dug out and there is concrete in this technical scheme(Immersed tube concrete strength is high), reinforcing bar is not easy to protect(Former pillow need to be retained Beam vertical reinforcement)Etc. problems.
The content of the invention
Existed concrete bridge need not be cut it is an object of the invention to provide one kind or reduces the amount of cutting, and can realize that sleeper beam mixes The recycling of soil is coagulated, to reduce the tunnel immersed tube joint Horizontal concrete shear key preparation method of production cost.
The tunnel immersed tube joint Horizontal concrete shear key preparation method of the present invention, it is characterised in that when sleeper beam is prefabricated, Axis reinforcing bar and connector are buried between existing equally distributed steel closure door locking stake, vertical steel is buried in steel closure door locking stake front end Muscle and connector;After the completion of leading portion immersed tube docks with back segment immersed tube, steel closure door, regulation leading portion immersed tube, back segment immersed tube sleeper beam are removed On axis reinforcing bar and connector and vertical reinforcement and connector, the axis reinforcing bar on leading portion immersed tube sleeper beam is rested the head on back segment immersed tube Axis reinforcing bar cross-shear on beam, while vertical reinforcement intersects with axis reinforcing bar, and to axis reinforcing bar and vertical steel staggeredly Muscle carry out reinforcing bar colligation, after-pouring concrete, formed immersed tube joint Horizontal concrete shear key.
The tunnel immersed tube joint Horizontal concrete shear key preparation method of the present invention, by burying sleeper beam during prefabricated sleeper beam Axis reinforcing bar and connector and vertical reinforcement and connector, plugged into full composition shearing bond by reinforcing bar after chisel sleeper beam in a small amount of repair Structure vertical reinforcement, the purpose using existed concrete bridge structures is finally reached, realizes the utilization to existed concrete bridge structures, The effect of economic environmental protection is reached.
Brief description of the drawings
Fig. 1 is the technology of the present invention construction shear key structural representation;
Fig. 2 is prior art construction immersed tube joint sleeper beam and steel closure door layout sectional view;
1st, leading portion immersed tube, 2, back segment immersed tube, 3, steel closure door locking stake, 4, axis reinforcing bar and connector, 5, vertical reinforcement and Connector, 6, shear key, 7, sleeper beam, 8, steel closure door.
Embodiment
A kind of tunnel immersed tube joint Horizontal concrete shear key preparation method, it is characterised in that when sleeper beam is prefabricated, existing Axis reinforcing bar and connector 4 are buried between equally distributed steel closure door locking stake 3, vertical steel is buried in steel closure door locking stake 3 front end Muscle and connector 5;After the completion of leading portion immersed tube 1 docks with back segment immersed tube 2, steel closure door 8, regulation leading portion immersed tube 1, back segment immersed tube are removed Axis reinforcing bar and connector 4 and vertical reinforcement and connector 5 on 2 sleeper beams 7, make the axis reinforcing bar on leading portion immersed tube sleeper beam with after Axis reinforcing bar cross-shear on section immersed tube sleeper beam, while vertical reinforcement intersects with axis reinforcing bar, and to axis reinforcing bar staggeredly Carry out reinforcing bar colligation with vertical reinforcement, after-pouring concrete, form immersed tube joint Horizontal concrete shear key 6.

Claims (1)

1. a kind of tunnel immersed tube joint Horizontal concrete shear key preparation method, it is characterised in that when sleeper beam is prefabricated, existing equal Axis reinforcing bar and connector are buried between the steel closure door locking stake of even distribution, steel closure door locking stake front end is buried vertical reinforcement and connect Refute device;After the completion of leading portion immersed tube docks with back segment immersed tube, remove steel and seal up a door, the axle on regulation leading portion immersed tube, back segment immersed tube sleeper beam Line reinforcing bar and connector and vertical reinforcement and connector, make on the axis reinforcing bar and back segment immersed tube sleeper beam on leading portion immersed tube sleeper beam Axis reinforcing bar cross-shear, while vertical reinforcement intersects with axis reinforcing bar, and axis reinforcing bar staggeredly and vertical reinforcement are carried out Reinforcing bar colligation, after-pouring concrete, formed immersed tube joint Horizontal concrete shear key.
CN201610256068.5A 2016-04-25 2016-04-25 Tunnel immersed tube joint Horizontal concrete shear key preparation method Expired - Fee Related CN105908779B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610256068.5A CN105908779B (en) 2016-04-25 2016-04-25 Tunnel immersed tube joint Horizontal concrete shear key preparation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610256068.5A CN105908779B (en) 2016-04-25 2016-04-25 Tunnel immersed tube joint Horizontal concrete shear key preparation method

Publications (2)

Publication Number Publication Date
CN105908779A CN105908779A (en) 2016-08-31
CN105908779B true CN105908779B (en) 2017-11-28

Family

ID=56752422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610256068.5A Expired - Fee Related CN105908779B (en) 2016-04-25 2016-04-25 Tunnel immersed tube joint Horizontal concrete shear key preparation method

Country Status (1)

Country Link
CN (1) CN105908779B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112227417B (en) * 2020-09-28 2022-04-12 中船黄埔文冲船舶有限公司 Construction method for bracket on pipe joint

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2626445B2 (en) * 1993-02-16 1997-07-02 鹿島建設株式会社 Telescopic sinking box
CN1804375A (en) * 2005-01-14 2006-07-19 上海隧道工程股份有限公司 Immersed tube tunnel final joints structure form and use method thereof

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2626445B2 (en) * 1993-02-16 1997-07-02 鹿島建設株式会社 Telescopic sinking box
CN1804375A (en) * 2005-01-14 2006-07-19 上海隧道工程股份有限公司 Immersed tube tunnel final joints structure form and use method thereof

Also Published As

Publication number Publication date
CN105908779A (en) 2016-08-31

Similar Documents

Publication Publication Date Title
CN102296507B (en) Treatment method of subgrade cracks
CN106245931A (en) The underpinning device of load bearing wall and construction method in brick mix structure
CN105736003B (en) A kind of structure of shield launching portal and the construction method of shield launching
CN204023578U (en) Retaining Structure with Double-row Piles
CN106014446A (en) Strengthening method for improving stability of high-ground-stress soft rock tunnel inverted arch structure
CN102400694A (en) Reinforcement method for combined part of shield tunnel and mining-method tunnel
CN104294769B (en) A kind of piling and the construction method increasing the built bridge abutment structure of platform cap composite reinforcement
CN203488189U (en) Tunnel structure for emptying renovation
CN201538975U (en) Seepage-proofing joint of underground continuous wall
CN101575859B (en) Anti-seepage joint of underground continuous walls and construction method thereof
CN201943086U (en) Underground building wall body
CN108590680A (en) A kind of construction method that launching shaft foundation pit vertical section pours
CN106481347B (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN205858379U (en) A kind of scalable steelframe joint being applicable to serious deformation
CN105908779B (en) Tunnel immersed tube joint Horizontal concrete shear key preparation method
CN104153460B (en) Construction method for horizontally connecting between precast concrete component and component
CN203701112U (en) Composite foundation grouting steel tube type reinforced slope
CN206071096U (en) The underpinning device of load bearing wall in brick mix structure
CN105927251B (en) Shallow buried type magnesium iron frame-reinforced concrete combination tunnel siding
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN206408654U (en) A kind of underground engineering prearrangement of deformation amount stitches connecting interface structure
CN206338075U (en) A kind of anti-internal water pressure composite shield section of jurisdiction
CN105937248B (en) Agent structure section construction and temporary plugging wall joint processing method
CN109026062A (en) A kind of double lining shield tunnel and construction method
CN205152958U (en) Novel combination steel sheet pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Hu Jingjun

Inventor after: Liu Gang

Inventor after: Zhao Wenlong

Inventor after: Cui Yuguo

Inventor after: Liu Min

Inventor after: Ke Youhua

Inventor after: Zeng Ke

Inventor after: Hu Bin

Inventor after: Zhao Kanglin

Inventor after: Zhang Xiaohong

Inventor after: Gong Xuedong

Inventor after: Li Zhijun

Inventor after: Xie Haijin

Inventor after: Wen Zhe

Inventor after: Peng Zaiyong

Inventor after: Wang Qiulin

Inventor after: Ke Bin

Inventor after: Shao Yang

Inventor after: Deng Xiaoxin

Inventor after: Xiao Hong

Inventor before: Hu Jingjun

Inventor before: Zhao Wenlong

Inventor before: Cui Yuguo

Inventor before: Wang Qiulin

Inventor before: Ke Youhua

Inventor before: Zeng Ke

Inventor before: Hu Bin

Inventor before: Zhao Kanglin

Inventor before: Ke Bin

Inventor before: Wen Zhe

Inventor before: Peng Zaiyong

Inventor before: Shao Yang

Inventor before: Li Zhijun

Inventor before: Deng Xiaoxin

Inventor before: Xiao Hong

Inventor before: Liu Gang

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171128

Termination date: 20210425