CN105888067B - Bamboo rib-ring-shaped sphere net case and method - Google Patents
Bamboo rib-ring-shaped sphere net case and method Download PDFInfo
- Publication number
- CN105888067B CN105888067B CN201610436410.XA CN201610436410A CN105888067B CN 105888067 B CN105888067 B CN 105888067B CN 201610436410 A CN201610436410 A CN 201610436410A CN 105888067 B CN105888067 B CN 105888067B
- Authority
- CN
- China
- Prior art keywords
- node
- ring
- bar
- types
- bamboo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/32—Arched structures; Vaulted structures; Folded structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/32—Arched structures; Vaulted structures; Folded structures
- E04B2001/3229—Arched structures; Vaulted structures; Folded structures constructed using a boom
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/32—Arched structures; Vaulted structures; Folded structures
- E04B2001/3235—Arched structures; Vaulted structures; Folded structures having a grid frame
- E04B2001/3241—Frame connection details
- E04B2001/3247—Nodes
Abstract
The present invention relates to a kind of bamboo rib-ring-shaped sphere net case and method, by the rib-ring-shaped sphere bamboo net in top, lowermost strut system, concrete foundation forms, multiple broadwise annular construction members are arranged evenly with one heart as the center of circle using the steel node at center, the steel node at center is sequentially connected multiple broadwise annular construction members by more radial bars, purlin is connected in radial bars between two layers of broadwise annular construction member and forms purlin ring, vertical supporting is connected by the steel node on outermost broadwise bar annular construction member with the rib-ring-shaped sphere bamboo net in top, support is connected by the broadwise burr of two layers of outermost to the steel node on component with the rib-ring-shaped sphere bamboo net in top in Y types, support connects Y types lower supporting rod by steel node and laterally links bar in Y types, vertical supporting and Y types lower supporting rod are connected by steel node with concrete foundation;The bamboo rib-ring-shaped sphere net case of the present invention has the advantages that from heavy and light, span is big, rigidity is big, structural integrity is good, easy construction, green and good economy performance.
Description
Technical field
The present invention relates to a kind of bamboo wood building, more particularly to a kind of main structure sphere net suitable for Long Span Roof Structures
Structure type, node connection and its installation method of shell.
Background technology
At present, the main material of Building Trade in China is based on concrete and steel, and either the prefabricated processing of steel construction is also
It is pouring for concrete structure, belongs to the industry of high pollution, highly energy-consuming, and does not meet the target of national sustainable development.
In this year, with the proposition of green building theory, green building is increasingly subject to social extensive concern.It is light-duty in recent years
Timber structure is increasingly favored by people, however, China's Forest Resources are very deficient, and trees cycle of becoming a useful person is longer, thus
Construction timber is very limited, and the unfavorable exploitation of production line, therefore, it is difficult to widely popularize light-duty wooden.And simultaneously, the bamboo wood in China
Resource is very abundant.Becoming a useful person, the cycle is short, bamboo wood fertility is strong, tension, compressive property are strong, can be that a large amount of construction of bamboo structure carry
For the raw material of abundance.To sum up, bamboo wood is developed and utilized, it is to realize building environmental protection that bamboo wood is widely used in into building structure field
Green, the requisite measure for ensureing social sustainable development.
Bamboo wood building it is long-standing with the topic of sustainable development, bamboo wood has many good qualities, as it is in light weight, solid, have it is tough
Property, it is a very environmentally friendly construction material, bamboo wood building has the unrivaled superiority of other building materials:
1 resource is renewable.Bamboo wood is a kind of fabulous renewable resource, can forever continue and use again.Bamboo wood possesses growth cycle
It hurry up, yield high-performance.
2 environment-friendly products are pollution-free.Bamboo wood is extremely important member to the balance of oxygen and carbon dioxide in large natural environment
Element, carbon sequestration capacity are strong.As construction material, masonry, coagulation great soil group are far smaller than in terms of energy consumption, pollution during construction
Building, it is good green material.
3 tensions, resistance to compression.Bamboo has very high intensity, and tensile strength is 2 times of steel, and compression strength is concrete
2 times.
4 shock resistances are strong.Due to light weight, elasticity is good, and the function of seismic resistance of bamboo is very prominent, even in strong ground
Earthquake centre overall structure deforms, and also will not fall apart or collapse.
5 traditional & are modern to be combined.Bamboo wood building is reasonable application of the conventional art in modern building design, when having complied with
The trend in generation.
However, the bamboo structure in engineering is mainly based on the less structure of span, but be difficult in some special forms at present
Used in the space structure such as reticulated shell of formula.And in some public buildings(Such as cinema, large-scale meeting-place, exhibition center),
The space form of large span has larger demand.
The content of the invention
The present invention is in view of the above-mentioned problems, propose a kind of structure type and method of bamboo rib-ring-shaped sphere net case.
To achieve the above object, the technical scheme is that:A kind of bamboo rib-ring-shaped sphere net case, it is rib-ring-shaped by top
Sphere bamboo net, lowermost strut system, concrete foundation composition, the rib-ring-shaped sphere bamboo net in top include multiple first by broadwise bar
Tail connects the broadwise annular construction member to be formed, more radial bars, multiple steel nodes, more purlins, multiple purlin bolt joints;It is described
Multiple broadwise annular construction members are arranged evenly with one heart as the center of circle using the steel node at center, the steel node at center by more radial bars according to
The multiple broadwise annular construction members of secondary connection, purlin is connected in the radial bars between two layers of broadwise annular construction member and forms purlin ring, broadwise
Connected by steel node between bar, between radial bars and broadwise bar, be bolted between purlin and radial bars respectively;It is described
Lowermost strut system includes one and links annular construction member by laterally linking the transverse direction that is formed of bar head and the tail, supports in more Y types, more
Y types lower supporting rod, more vertical supportings, multiple steel nodes;The vertical supporting passes through on outermost broadwise bar annular construction member
Steel node is connected with the rib-ring-shaped sphere bamboo net in top, in Y types support by the broadwise burr of two layers of outermost to the steel section on component
Point is connected with the rib-ring-shaped sphere bamboo net in top, is supported in Y types and connects Y types lower supporting rod by steel node and laterally link bar, perpendicular
It is connected to support and Y types lower supporting rod by steel node with concrete foundation;The radial bars, broadwise bar, purlin, vertical supporting, Y
Strut, Y types lower supporting rod, the horizontal mao bamboon bar for linking bar and being treated using passing through in type.
The steel node is divided into:Centroid, internal layer annular component node, intermediate layer annular construction member node, outer annular
Component node, Y types support node, V-type base node;The Centroid connects all radial bars;The internal layer annular construction member
Node, intermediate layer annular construction member node, outer annular component node are pre-manufactured steel node.
The quantity of the radial bars of the rib-ring-shaped sphere bamboo net in top in the Y types in lowermost strut system with supporting, under Y types
The quantity of strut is identical.
The quantity of broadwise bar in each broadwise annular construction member of the rib-ring-shaped sphere bamboo net in top and lowermost strut body
The lateral ties bar quantity of system is identical.
A kind of preparation method of mao bamboon bar for bamboo rib-ring-shaped sphere net case, it is characterised in that:
1)Processing early stage of mao bamboon bar:When the juice sugar content of mao bamboon cane is relatively low, bamboo wood is gathered in cutter, by mao bamboon
Sub- end is whittled into inclined plane shape, prevents that rainwater from entering and rhizome lower caustically, by the time of sub- drying 2-3 weeks of mao bamboon, for filtering
Except sugar remaining in juice, preservative treatment then is carried out to bamboo wood, culm bar is erected in wooden barrel, from top to bottom by barrier film
Perforation, from top to penultimate ring, is subsequently poured into impregnating fluid, after the completion of, by last septal perforator, and collect residual
Remaining liquid;
2)Make mao bamboon bar:Installation mao bamboon boom end connector, pre-buried otic placode at mao bamboon bar both ends, and three steel bushings are set
Hoop, is bolted connection steel hoop, in end concrete perfusion.
A kind of installation method of bamboo rib-ring-shaped sphere net case, its step are:
1)In the relevant position pre-embedded bolt of concrete foundation, the base-plate of concrete foundation is installed;
2) set up the supporting construction of outermost support node, internal layer annular construction member node, intermediate layer annular construction member node,
Falsework is set up under outermost layer annular construction member node;
3)V-type base node and vertical supporting are installed:The otic placode of vertical supporting is connected to bearing bottom by high-strength bolt
Plate, the oblique branch otic placode of V-type is fixed with three steel hoops;
4)Y supports are installed:Y types lower support bar is connected by high-strength bolt with the oblique branch otic placode of V-type, the mao bamboon that will be processed
Bar is connected to Y type support nodes by high-strength bolt;
5)Installation laterally links bar:The transverse direction processed is linked into bar Y type support nodes are connected to by high-strength bolt.It is complete
Into lowermost strut system;
6)Outer annular component node, intermediate layer annular construction member node, internal layer annular component node are installed successively, by broadwise
Bar, radial bars are bolted to outer annular component node, intermediate layer annular construction member node, internal layer annular component node
On otic placode;
7)Installation center node:Connected radial bars are all bolted on the otic placode for being fixed on Centroid,
Complete the installation of the rib-ring-shaped sphere bamboo net in top;
8)Mounting purlines:Purlin is connected by high-strength bolt with radial bars;
9)Remove interim under internal layer annular component node, intermediate layer annular construction member node, outermost layer annular construction member node
Support, complete integrally-built installation.
The invention has the advantages that:
Main structure body primary structure member of the present invention is using by treated Mao bamboo tube material members, mao bamboon barrel member, material
Expect wide material sources, cheap, processing and treating method is simple and easy to operate, does not destroy bamboo bar appearance skin structure, prevent bamboo bar by
Insect pest influences, anti-corrosion, insect-prevention treatment mistake, the effective service life length of bamboo bar, is more than 4 times of untreated mao bamboon.
The present invention is attached at multiple nodes using the steel node of special shape, improves the stress of node region
Can, enhance globality and reliability that node connects;Steel node connects prefabricated steel rod elements and can recycled simultaneously, is advantageous to
Reduce the construction cost of component.
Bamboo bar used in the present invention can customize with steel node connector in factory to be processed, can be directly assembled to scene,
Scene is without concrete perfusion, welding steel etc., therefore construction speed is fast, while removes building also simplicity, can be widely used for one
Temporary building in a little large-scale exhibition and post-disaster reconstruction engineerings.
Brief description of the drawings
Fig. 1 is the rib-ring-shaped sphere bamboo net top view in top;
Fig. 2 is the integrally-built profile of the present invention;
Fig. 3 is annular construction member top view;
The schematic diagram of node centered on Fig. 4;
Fig. 5 is the schematic diagram of internal layer annular component node;
Fig. 6 is the schematic diagram of intermediate layer annular construction member node;
Fig. 7 is the schematic diagram of outer annular component node;
Fig. 8 is the schematic diagram of Y type support nodes;
Fig. 9 is the diagrammatic cross-section of V-type base node;
Figure 10 is base-plate top view;
Figure 11 is the schematic diagram of purlin bolt joint.
In figure:1- Centroids;2- internal layer annular component nodes;3- intermediate layers annular construction member node;4- outer annular structures
Part node;5-Y type support nodes;6- purlin bolt joints;7-V type base nodes;8- radial bars;9- broadwise bars;10- purlins;
11- vertical supportings;Supported in 12-Y types;13- annular construction members;14- stirrup sets;15- mao bamboon bars;16- mao bamboon boom end connectors;
The pre-buried otic placodes of 17-;18- high-strength bolts;19- steel node bottom plates;Supported under 20-Y types;The oblique branch otic placodes of 21-;;The oblique journal stirrup of 23-V types
Plate;24- base-plates.
Embodiment
The present invention is further elaborated with reference to Figure of description and embodiment.
Such as Fig. 1, shown in 2,3, bamboo rib-ring-shaped sphere net case of the invention, including the rib-ring-shaped sphere bamboo net in top, bottom
Strut system, concrete foundation.
The rib-ring-shaped sphere bamboo net in top include it is multiple by the end to end broadwise annular construction member 13 formed of broadwise bar 9, more
Radial bars 8, multiple steel nodes, more purlins 10, multiple purlin bolt joints 6.Multiple broadwise annular construction members 13 are with the steel at center
Node is that the center of circle is arranged evenly with one heart, and the steel node at center is sequentially connected multiple broadwise annular construction members 13 by more radial bars 8,
Purlin 10 is connected in radial bars 8 between two layers of broadwise annular construction member 13 and forms purlin ring, between broadwise bar 9, radial bars 8 and latitude
To being connected respectively by steel node between bar 9, it is bolted between purlin 10 and radial bars 8;
Lowermost strut system includes one and links annular construction member, in more Y types by laterally linking the transverse direction that is formed of bar head and the tail
Support 12, more Y types lower supporting rods 20, more vertical supportings 11, multiple steel nodes.Vertical supporting 11 passes through outermost broadwise ring
Steel node on shape component 13 is connected with the rib-ring-shaped sphere bamboo net in top, and the 12 broadwise rings by two layers of outermost are supported in Y types
Steel node on component 13 is connected with the rib-ring-shaped sphere bamboo net in top, supports 12 to connect Y type lower supporting rods by steel node in Y types
20 link bar with horizontal, and vertical supporting 11 and Y types lower supporting rod 20 are connected by steel node with concrete foundation.
Steel node can be divided into:Centroid 1, internal layer annular component node 2, intermediate layer annular construction member node 3, outer annular
Component node 4, Y types support node 5, V-type base node 7.Centroid 1 connects all radial bars 8.Internal layer annular component node
2nd, intermediate layer annular construction member node 3, outer annular component node 4 are pre-manufactured steel node.Per adjacent two layers annular construction member at least
It is bolt connection between purlin 10 and radial bars 8 including a purlin 10.
The Y types lower supporting rod 20 of lowermost strut system is connected with laterally linking by Y types support node 5.Lowermost strut system
Vertical supporting 11 be connected with Y types lower supporting rod 20 by V-type base node 7 with concrete foundation.
Radial bars 8, broadwise bar 9, purlin 10, vertical supporting 11, strut 12, Y types lower supporting rod 20 in Y types, laterally link bar
Using by treated mao bamboon bar 15.
The presence of Y types support enriches the load bang path of structure, and rib-ring-shaped space net shell passes through radial direction pull bar, ring
Rod member, purlin are transmitted outside the mode of load.Upper strata load can be transferred to by vertical supporting or by the support of Y types
Load, the lateral rigidity that bar improves structure is laterally linked, the globality of structure is enhanced, reduces deformation deflection.
Y types support and vertical supporting:Vertical supporting is by the nodes of outermost ring bars, with rib-ring-shaped sphere net case
It is connected.The support of Y types is connected by the steel node of the ring rod member with two layers of outermost with rib-ring-shaped sphere net case.Two supports are balls
The crucial primary structure member of veil shell structure.Under vertical uniform load q, resilient support, the entirety of reinforcement structure are provided for upper strata
Property and rigidity.
As shown in figure 4, Centroid 1 includes steel node bottom plate 19, high-strength bolt 18.Lead on the excircle of steel node bottom plate 19
Cross pre-buried otic placode 17 and connect all radial bars 8, radial bars 8 are fastened on mao bamboon by the steel hoop 14 of 8 external application of radial bars three and bolt
On boom end connector 16, pre-buried otic placode 17 is fixed on steel node bottom plate 19 by high-strength bolt 18.
As shown in figure 5, internal layer annular component node 2 includes steel node bottom plate 19, high-strength bolt 18.Outside steel node bottom plate 19
Broadwise bar 9 is connected by pre-buried otic placode 17 on circumference, above and below connects radial bars 8, radial bars by otic placode and pre-buried otic placode 17
8th, the steel hoop 14 of 9 external application of broadwise bar three and bolt are fastened on mao bamboon boom end connector 16, the excircle of steel node bottom plate 19
On pre-buried otic placode 17 be fixed on by high-strength bolt 18 on steel node bottom plate 19.
As shown in fig. 6, intermediate layer annular construction member node 3 includes steel node bottom plate 19, high-strength bolt 18.Steel node bottom plate 19
Broadwise bar 9 is connected by pre-buried otic placode 17 on excircle, radial bars 8 is connected above with otic placode and pre-buried otic placode 17, leads to below
Cross otic placode and pre-buried otic placode 17 connects radial bars 8, Y types lower supporting rod 20, radial bars 8, broadwise bar 9 and the external application three of Y types lower supporting rod 20
Road steel hoop 14 and bolt are fastened on mao bamboon boom end connector 16, and the pre-buried otic placode 17 on the excircle of steel node bottom plate 19 is logical
High-strength bolt 18 is crossed to be fixed on steel node bottom plate 19.
As shown in fig. 7, outer annular component node 4 includes steel node bottom plate 19, high-strength bolt 18.Outside steel node bottom plate 19
Broadwise bar 9 is connected by pre-buried otic placode 17 on circumference, radial bars 8 are connected above with oblique branch otic placode 21 and pre-buried otic placode 17, under
Face passes through strut 12 on oblique branch otic placode 21 and the connection of pre-buried otic placode 17 vertical supporting 11, Y types, broadwise bar 9, vertical supporting 11, Y types
The upper steel hoop 14 of 12 external application of strut three and bolt are fastened on mao bamboon boom end connector 16, on the excircle of steel node bottom plate 19
Pre-buried otic placode 17 be fixed on by high-strength bolt 18 on steel node bottom plate 19.
As shown in figure 8, Y types support node 5 includes steel node bottom plate 19, high-strength bolt 18, oblique branch otic placode 21.Steel node bottom
Connected on the excircle of plate 19 by pre-buried otic placode 17 and laterally link bar, above with oblique branch otic placode 21 and the connection of pre-buried otic placode 17 two
Root Y types lower supporting rod 20, Y types lower supporting rod 20 is connected below by otic placode and pre-buried otic placode 17, laterally links bar, Y types lower supporting rod 20
The steel hoop 14 of external application three and bolt are fastened on mao bamboon boom end connector 16, the pre-buried ear on the excircle of steel node bottom plate 19
Plate 17 is fixed on steel node bottom plate 19 by high-strength bolt 18.
Such as Fig. 9, shown in 10, V-type base node 7 includes base-plate 24, the oblique branch otic placode 23 of V-type, pre-buried otic placode 17, high-strength
Bolt 18.Base-plate 24 connects the oblique branch otic placode 23 of V-type by high-strength bolt 18, and the oblique side of branch otic placode 23 of V-type passes through pre-buried ear
Plate 17 connects Y types lower supporting rod 20, opposite side connection vertical supporting 11, Y types lower supporting rod 20, the steel hoop of 11 external application of vertical supporting three
14 and bolt be fastened on mao bamboon boom end connector 16.Base-plate 24 is fixed on concrete foundation with four high-strength bolts 18
On.
As shown in figure 11, purlin bolt joint 6 includes high-strength bolt 18.Pass through high-strength bolt between purlin 10 and radial bars
18 are fixedly connected.
The processing and fabricating process of the present invention:
1)Processing early stage of mao bamboon bar 15:Gathered in when the juice sugar content of mao bamboon cane is relatively low, can effectively reduce the plague of insects
Possibility.Using cutter gather in bamboo wood when, the sub- end of mao bamboon should be whittled into inclined plane shape, prevent rainwater enter and caustically under
Rhizome.The most key process " leaching " of Mao bamboo timber processing, handles by filtrate, filters out sugar remaining in juice.The present invention
The straightforward procedure of use is simple, easy to operate, i.e., using drying, the time of 2-3 weeks.Bamboo wood also needs preservative treatment, and culm bar is erected
Stand in wooden barrel, from top to bottom by septal perforator, from top to penultimate ring, be subsequently poured into impregnating fluid, after the completion of, will
Last septal perforator, and collect remnants liquid.
2)Make mao bamboon bar 15:Installation mao bamboon boom end connector 16, pre-buried otic placode 17 at the both ends of mao bamboon bar 15, and set
Three steel hoops 14, are bolted connection steel hoop 14, in end concrete perfusion, treat that concrete solidifies completely, can make
With mao bamboon rod member.In the middle part link position auger shell keyhole of radial bars 8.
3)The steel node bottom plate 19 of Centroid is made, prepared screw-bolt hole, processes hole slot and its internal thread.
4)Make purlin 10:By by the treated both ends of mao bamboon bar 15, auger shell keyhole.
5)Make internal layer annular component node 2, intermediate layer annular construction member node 3, the pre-manufactured steel of outer annular component node 4
Component:Steel node bottom plate 19 is processed, prepared screw-bolt hole, processing hole slot and its internal thread, welds oblique branch otic placode 21.
6)Make the prefabricated steel member of support node:Make steel sole plate, prepared screw-bolt hole, processing hole slot and its internal thread.
The installation procedure of structure of the present invention:
1)The size of rod member and each stress node connecting rod of node is determined according to design conditions such as structural span, loads.
2)Node connector and each stress bamboo bar are made in factory process;
3)In the relevant position pre-embedded bolt of concrete foundation, the base-plate 24 of concrete foundation is installed;
4)The supporting construction of outermost support node is set up, in internal layer annular construction member node 2, intermediate layer annular construction member node
3rd, falsework is set up under outermost layer annular construction member node 4.
5)V-type base node 7 and vertical supporting 11 are installed:The otic placode of vertical supporting 11 is connected to branch by high-strength bolt
Seat bottom plate 24, the oblique branch otic placode 23 of V-type is fixed with three steel hoops 14.
6)Y supports are installed:Y types lower support bar 20 is connected by high-strength bolt with the oblique branch otic placode 23 of V-type, by what is processed
Mao bamboon rod member is connected to Y types support node 5 by high-strength bolt.
7)Installation laterally links bar:The transverse direction processed is linked into bar Y types support node 5 is connected to by high-strength bolt.
Complete lowermost strut system.
8)Outer annular component node 4, intermediate layer annular construction member node 3, internal layer annular component node 2 are installed successively, will
Broadwise bar 9, radial bars 8 are bolted to outer annular component node 4, intermediate layer annular construction member node 3, internal layer annular structure
On the otic placode of part node 2.
8)Installation center node:Connected radial bars 8 are all bolted to the otic placode for being fixed on Centroid 1
On, complete the installation of the rib-ring-shaped sphere bamboo net in top.
9)Mounting purlines 10:Purlin 10 is connected by high-strength bolt with radial bars 8.
10)Remove under internal layer annular component node 2, intermediate layer annular construction member node 3, outermost layer annular construction member node 4
Falsework, complete integrally-built installation.
Stressed member used in the present invention is treated Mao bamboo tube, and effective life is grown.In the juice of culm bar
Gathered in when sugar content is relatively low, can effectively reduce the possibility of the plague of insects.When gathering in bamboo wood using cutter, bamboo end should be whittled into tiltedly
Planar, prevent rainwater enter and caustically under rhizome.The most key process " leaching " of bamboo wood processing, is handled by filtrate,
Filter out sugar remaining in juice.The straightforward procedure that the present invention uses is simple, easy to operate, i.e., using drying, the time of 2-3 weeks.
Bamboo wood also needs preservative treatment, and culm bar is erected in wooden barrel, from top to bottom by septal perforator, from top to penultimate bamboo
Section, is subsequently poured into impregnating fluid, after the completion of, by last septal perforator, and collect remnants liquid.Great mass of data shows, bamboo
The maintenance of cane has material impact to their validity periods under construction, and the effective life of the bamboo wood without maintenance is 2.5
Year, and the term of validity for passing through the bamboo wood safeguarded is 10 years or so.
Rib-ring-shaped network structure in the present invention is the primary structure part of the force of space structure, in vertical load or ought be held
When by evenly loads such as wind loads, radial direction rod member bears larger pressure, and most of load is transferred into Y type branch by node
Support and vertical supporting.Purlin and ring rod member are then rib-ring-shaped sphere net case to being formed radially the lateral support of Dual Stabilization
Globality provides good ring Confinement effect.When wind load is born, radial direction bamboo bar tension, and ring rod member, purlin
Pressure suffered by bar then forms stable clossing pressure ring, and belt tie-rod also form one layer of clossing pressure ring, be advantageous to prevent
Structure is started by wind suction and causes to destroy.
Claims (5)
- A kind of 1. bamboo rib-ring-shaped sphere net case, by the rib-ring-shaped sphere bamboo net in top, lowermost strut system, concrete foundation group Into, it is characterised in that:The rib-ring-shaped sphere bamboo net in top includes multiple by the end to end broadwise annular formed of broadwise bar (9) Component (13), more radial bars (8), multiple steel nodes, more purlins (10), multiple purlin bolt joints (6);The multiple latitude Arranged evenly with one heart as the center of circle using the steel node at center to annular construction member (13), the steel node at center passes through more radial bars (8) It is sequentially connected multiple broadwise annular construction members (13), purlin is connected in the radial bars (8) between two layers of broadwise annular construction member (13) (10) purlin ring is formed, is connected respectively by steel node between broadwise bar (9), between radial bars (8) and broadwise bar (9), purlin (10) it is bolted between radial bars (8);The lowermost strut system includes one by laterally linking bar (22) head and the tail The transverse direction of formation link annular construction member, strut (12) in more Y types, more Y types lower supporting rods (20), more vertical supportings (11), Multiple steel nodes;The vertical supporting (11) passes through the steel node on outermost broadwise bar annular construction member (13) and top gilled rings Type sphere bamboo net connects, in Y types strut (12) by the broadwise burr of secondary outer layer to the steel node on component (13) and top rib Ring-like sphere bamboo net is connected, and strut (12) connects Y types lower supporting rod (20) by steel node and laterally links bar (22) in Y types, Vertical supporting (11) and Y types lower supporting rod (20) are connected by steel node with concrete foundation;The radial bars (8), broadwise bar (9), purlin (10), vertical supporting (11), strut (12), Y types lower supporting rod (20) in Y types, laterally link bar (22) using warp Cross treated mao bamboon bar (15).
- 2. bamboo rib-ring-shaped sphere net case according to claim 1, it is characterised in that:The steel node is divided into:Centromere Point (1), internal layer annular component node (2), intermediate layer annular construction member node (3), outermost layer annular construction member node (4), the support of Y types Node (5), V-type base node (7);The Centroid (1) connects all radial bars (8);The internal layer annular component node (2), intermediate layer annular construction member node (3), outermost layer annular construction member node (4) are pre-manufactured steel node.
- 3. bamboo rib-ring-shaped sphere net case according to claim 1, it is characterised in that:The rib-ring-shaped sphere bamboo net in top The quantity of radial bars (8) it is identical with the quantity of strut (12) in the Y types in lowermost strut system, Y types lower supporting rod (20).
- 4. bamboo rib-ring-shaped sphere net case according to claim 1, it is characterised in that:The rib-ring-shaped sphere bamboo net in top Each broadwise annular construction member in the quantity of broadwise bar (9) with the transverse direction of lowermost strut system to link bar (22) quantity identical.
- A kind of 5. installation method of any described bamboo rib-ring-shaped sphere net cases of claim 1-4, it is characterised in that its step For:1)In the relevant position pre-embedded bolt of concrete foundation, the base-plate (24) of concrete foundation is installed;2) outermost layer annular construction member node is set up(4)Supporting construction, in internal layer annular construction member node (2), intermediate layer annular structure Falsework is set up under part node (3), outermost layer annular construction member node (4);3)V-type base node (7) and vertical supporting (11) are installed:The otic placode of vertical supporting (11) is connected to by high-strength bolt Base-plate (24), with the oblique branch otic placode (23) of the fixed V-type of three steel hoops (14);4)Y supports are installed:Y types lower support bar (20) is connected by high-strength bolt branch otic placode (23) oblique with V-type, will be propped up under Y types Strut (20) is connected to Y types support node (5) by high-strength bolt;5)Installation laterally links bar (22):The transverse direction processed is linked into bar (22) Y types support section is connected to by high-strength bolt Point (5), complete lowermost strut system;6)Outer annular component node (4), intermediate layer annular construction member node (3), internal layer annular component node (2) are installed successively, By broadwise bar (9), radial bars (8) be bolted to outer annular component node (4), intermediate layer annular construction member node (3), On the otic placode of internal layer annular component node (2);7)Installation center node:Connected radial bars (8) are all bolted to the otic placode for being fixed on Centroid (1) On, complete the installation of the rib-ring-shaped sphere bamboo net in top;8)Mounting purlines (10):Purlin (10) is connected by high-strength bolt with radial bars (8);9)Remove under internal layer annular component node (2), intermediate layer annular construction member node (3), outermost layer annular construction member node (4) Falsework, complete integrally-built installation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610436410.XA CN105888067B (en) | 2016-06-17 | 2016-06-17 | Bamboo rib-ring-shaped sphere net case and method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610436410.XA CN105888067B (en) | 2016-06-17 | 2016-06-17 | Bamboo rib-ring-shaped sphere net case and method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105888067A CN105888067A (en) | 2016-08-24 |
CN105888067B true CN105888067B (en) | 2017-11-21 |
Family
ID=56731172
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610436410.XA Expired - Fee Related CN105888067B (en) | 2016-06-17 | 2016-06-17 | Bamboo rib-ring-shaped sphere net case and method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105888067B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113653334B (en) * | 2021-10-09 | 2022-06-24 | 中建八局第二建设有限公司 | Method for installing dome structure of single-layer metal reticulated shell |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US868879A (en) * | 1906-09-07 | 1907-10-22 | Edmond Molloy | Timber-roof structure. |
CN1219952C (en) * | 1998-12-28 | 2005-09-21 | 房屋恒产株式会社 | Polyhedral fabricated structure and method of constructing the same |
CN202324282U (en) * | 2011-11-23 | 2012-07-11 | 中国民航大学 | Square single-layer spherical reticulated housing with wood structure |
CN103147532A (en) * | 2013-03-21 | 2013-06-12 | 东南大学 | Double-layer dome structure of space made of bamboo |
CN103469890B (en) * | 2013-09-26 | 2016-03-30 | 南京林业大学 | A kind of bamboo structure Reticulated Domes and assemble method |
CN204456570U (en) * | 2014-12-17 | 2015-07-08 | 中国石油天然气集团公司 | A kind of Dome roof tank net shell of steel mixed type |
-
2016
- 2016-06-17 CN CN201610436410.XA patent/CN105888067B/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN105888067A (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103225423B (en) | A kind of existing building encloses shell type adding storey structure and construction method thereof | |
CN106968342B (en) | Super-large span overlapping structure | |
CN109113181B (en) | Large-span upper-layer-connected square inner ring saddle-shaped double-layer cable rod tensioning structure | |
CN105863060B (en) | Bamboo three-way grid type reticulated shell | |
CN206902921U (en) | A kind of assembled energy-dissipating type height beam abnormal joint | |
CN106836490A (en) | A kind of prestressing force assembled high-performance concrete-filled steel square tubular column concrete girder connection and its construction method | |
CN103147532A (en) | Double-layer dome structure of space made of bamboo | |
CN102653965A (en) | High-redundancy beam-string truss structure and implementation method | |
CN106968332A (en) | A kind of prestressing force assembled high-performance concrete-filled circular steel tube column concrete girder connection and its construction method | |
CN106545111A (en) | For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method | |
CN104372967A (en) | Raking prop structure used for natural draft cooling tower and construction method thereof | |
CN105888067B (en) | Bamboo rib-ring-shaped sphere net case and method | |
CN110185184B (en) | Spoke type tension structure system | |
CN106284644B (en) | A kind of residential architecture structural system and its method of construction suitable for industrialized production | |
CN103114671A (en) | Chord tensioning truss structure capable of preventing collapsing caused by cable breakage | |
CN208650258U (en) | A kind of outer hoop assembled connecting node for the light steel increasing layer mixed structure of RC- | |
CN204357167U (en) | A kind of cooling stack inclined strut structure | |
CN206457955U (en) | A kind of oblique close rib composite wall board structure | |
CN103643738B (en) | A kind of Frame-Shear wall with flexible cable | |
CN205976087U (en) | Can dismantle shear force wall assembly structure system | |
CN207268022U (en) | A kind of three-dimensional network structure | |
CN207377233U (en) | A kind of triple Aseismic Structure Systems of preprocessing | |
CN213509081U (en) | Rammed earth wall based on FRP (fiber reinforced plastic) ribs | |
CN211257553U (en) | Steel-wood combined trapezoidal luxury roof truss based on node connection | |
CN209482464U (en) | A kind of high intensity round tube assembled beam-column connecting node steel construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 Termination date: 20200617 |
|
CF01 | Termination of patent right due to non-payment of annual fee |