CN105884176B - A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability - Google Patents
A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability Download PDFInfo
- Publication number
- CN105884176B CN105884176B CN201610406917.0A CN201610406917A CN105884176B CN 105884176 B CN105884176 B CN 105884176B CN 201610406917 A CN201610406917 A CN 201610406917A CN 105884176 B CN105884176 B CN 105884176B
- Authority
- CN
- China
- Prior art keywords
- bearing
- load
- hot face
- brick
- face brick
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C03—GLASS; MINERAL OR SLAG WOOL
- C03B—MANUFACTURE, SHAPING, OR SUPPLEMENTARY PROCESSES
- C03B18/00—Shaping glass in contact with the surface of a liquid
- C03B18/02—Forming sheets
- C03B18/16—Construction of the float tank; Use of material for the float tank; Coating or protection of the tank wall
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Organic Chemistry (AREA)
- Resistance Heating (AREA)
- Furnace Charging Or Discharging (AREA)
Abstract
The invention discloses a kind of methods for improving tin groove roof leakproofness and stability, this method is to connect modular tile by the setting hot face brick of load-bearing, and bearing bricks suspender member is connected by mounting groove on the hot face brick of load-bearing, act on hanging stress on the hot face brick of load-bearing, modular tile and the hot face brick of load-bearing are connected with raised by the hot face brick support combinations brick of load-bearing, while by the recess that setting can correspond to occlusion.According to the tin slot top cover structure of above method building, it includes multiple modular tiles interconnected, and the two sides of modular tile are respectively connected with the hot face brick of multiple load-bearing;It is respectively connected with load-bearing light-weight brick above each hot face brick of load-bearing, is also connected with the bearing bricks suspender member of T-shape on each hot face brick of load-bearing by the mounting groove of T-shape;The side of the hot face brick of load-bearing is equipped with recess, is provided with protrusion on modular tile.The present invention can not only improve safety when use, also have the advantages that good stability, good airproof performance, at low cost and good heat insulating.
Description
Technical field
The present invention relates to a kind of method of float glass and tin slot top cover structure, especially a kind of raising molten tin bath top
The method and tin slot top cover structure of lid leakproofness and stability.
Background technique
The forming process of float glass is completed in molten tin bath, on existing floatation glass production line, is generally deposited
Tin slot top cover structure stability is undesirable and the undesirable situation of leakproofness, so as to cause stannous sulfide and stannous oxide etc.
Steam condensation, the aggregation of these condensates will fall on not fully hardened glass surface to a certain extent and form " light distortion point "
Defect influences glass quality.
Country's tin groove roof has generallyd use refractory brick couter-ceiling structure at present, there are mainly two types of structure type, one is
Four sides support construction, although this cap structure is stablized, structure is complicated, and manufacturing cost is high, and gap bridge brick easy fracture, causes
Brick drop event, safety are undesirable;Another kind is to replace gap bridge brick with lid seam brick, although structure is simple, top cover is easily shaken,
Overall stability is inadequate, causes brickwork joint not of uniform size, and then causes leakproofness poor.Therefore, existing tin slot top cover structure is deposited
Safety when using is undesirable, stability is undesirable and leakproofness is undesirable problem.
Summary of the invention
The object of the present invention is to provide a kind of methods and tin groove roof knot for improving tin groove roof leakproofness and stability
Structure.The present invention can not only improve safety when use, also have the advantages that stability is good and good airproof performance.
Technical solution of the present invention: a method of it improving tin groove roof leakproofness and stability, this method is by setting
The hot face brick of load-bearing is set to connect modular tile, and connects the bearing bricks of T-shape by the mounting groove of T-shape on the hot face brick of load-bearing
Suspender member acts on the stress of hanging on the hot face brick of load-bearing, then by the hot face brick support combinations brick of load-bearing, improves whole
Stability;The recess and the protrusion connection modular tile and hot face brick of load-bearing that occlusion can be corresponded to by setting again provide whole steady
Qualitative and leakproofness;Meanwhile sealing cover is set and stitches brick and seals the leakproofness on ceramic ring raising modular tile position, it further increases
Whole leakproofness.
According to tin slot top cover structure constructed by a kind of method for improving tin groove roof leakproofness and stability above-mentioned, packet
Multiple modular tiles interconnected are included, the two sides of modular tile are respectively connected with the hot face brick of multiple load-bearing;Each hot face brick of load-bearing it is upper
Side is respectively connected with load-bearing light-weight brick, is hung on each hot face brick of load-bearing by the bearing bricks that the mounting groove of T-shape is also connected with T-shape
Pendant;The side of the hot face brick of load-bearing is equipped with recess, corresponds on modular tile and is provided with protrusion at the position of recess.
In tin slot top cover structure above-mentioned, the modular tile includes the hot face brick of combination set gradually from the bottom up, first
Light-weight brick and the second combination light-weight brick are combined, protrusion is located at the side for combining hot face brick.
In tin slot top cover structure above-mentioned, the two sides of the hot face brick of combination are equipped with convex platform, the hot face brick of load-bearing
Side, which corresponds to, is equipped with lower convex platform at the position of convex platform.
In tin slot top cover structure above-mentioned, the thickness of the hot face brick of load-bearing, which is greater than, combines hot face brick.
In tin slot top cover structure above-mentioned, sealing cover seam brick is provided between the two neighboring second combination light-weight brick.
In tin slot top cover structure above-mentioned, the modular tile is equipped with multiple mounting holes, mounting hole connection combine hot face brick,
First combination light-weight brick and second combines light-weight brick, is connected with heating element in mounting hole.
In tin slot top cover structure above-mentioned, described combine is provided with sealing porcelain between hot face brick and the first combination light-weight brick
Ring, the position for sealing ceramic ring are corresponding with the position of mounting hole.
In tin slot top cover structure above-mentioned, the mounting groove is located at the both ends of the hot face brick of load-bearing, and the two of bearing bricks suspender member
Side is connect with two hot face bricks of load-bearing respectively.
In tin slot top cover structure above-mentioned, the both ends of the hot face brick of load-bearing are respectively arranged with tenon and tongue-and-groove, recess position
In the side of the adjacent hot face brick junction of two pieces of load-bearing.
Compared with prior art, the present invention devises a kind of method and molten tin bath for improving tin groove roof leakproofness and stability
Cap structure;By the setting hot face brick of load-bearing to connect modular tile, and connected on the hot face brick of load-bearing by the mounting groove of T-shape
The bearing bricks suspender member for connecing T-shape acts on the stress of hanging on the hot face brick of load-bearing, then passes through the hot face brick support group of load-bearing
Brick is closed, whole stability is improved;The recess of occlusion can be corresponded to by setting again and protrusion connects modular tile and the hot face of load-bearing
Brick provides whole stability and leakproofness;Gap bridge brick structure is also eliminated, brick caused by preventing gap bridge brick to be broken is fallen, and is mentioned
High safety.In addition, the present invention is provided with lower convex platform and convex platform come the hot face brick of the load-bearing that is connected and combines hot face brick, into
One step improves load-bearing capacity and whole stability, keeps seam uniform, improves leakproofness;Made by tenon and tongue-and-groove multiple
It realizes and is connected between the hot face brick of load-bearing, further increase stability and leakproofness;Meanwhile be also provided with sealing cover seam brick and
The leakproofness on ceramic ring raising modular tile position is sealed, whole leakproofness is further improved;And the thickness of the hot face brick of load-bearing
Degree, which is greater than, combines hot face brick, can not only ensure intensity when the hot face brick stress of load-bearing, additionally it is possible to avoid setting thickness biggish
It combines hot face brick and carrys out stress, reduce costs and improve thermal insulation property.Therefore, the peace when present invention can not only improve use
Quan Xing also has the advantages that good stability, good airproof performance, at low cost and good heat insulating.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention;
Fig. 2 is the explosive view at modular tile;
Fig. 3 is the explosive view at the hot face brick of load-bearing;
Fig. 4 is the hot face brick of load-bearing and the hot face brick attachment structure schematic diagram of combination;
Fig. 5 is the cross-sectional view in Fig. 4 at A-A;
Fig. 6 is the cross-sectional view in Fig. 4 at B-B;
The label in accompanying drawing is: 1- modular tile, the hot face brick of 2- load-bearing, 3- load-bearing light-weight brick, 4- mounting groove, 5- bearing bricks are hung
Pendant, 6- recess, 7- protrusion, 8- convex platform, 9- lower convex platform, 11- combine hot face brick, and 12- first combines light-weight brick, 13- second
Light-weight brick is combined, 14- sealing cover stitches brick, 15- mounting hole, and 16- seals ceramic ring, 21- tenon, 22- tongue-and-groove.
Specific embodiment
Below with reference to embodiment, the present invention is further illustrated, but is not intended as the foundation limited the present invention.
Embodiment.A method of improving tin groove roof leakproofness and stability, as shown in Fig. 1,2,3,4,5,6, the party
Method is to connect modular tile 1 by the setting hot face brick 2 of load-bearing, and connect on the hot face brick 2 of load-bearing by the mounting groove 4 of T-shape
The bearing bricks suspender member 5 for connecing T-shape acts on the stress of hanging on the hot face brick 2 of load-bearing, then passes through the hot face brick of load-bearing 2
Modular tile 1 is supportted, whole stability is improved;The recess of occlusion can be corresponded to by setting again and protrusion connects modular tile 1 and holds
It reheats face brick 2, whole stability and leakproofness is provided;Meanwhile sealing cover is set and stitches brick 14 and the sealing raising combination of ceramic ring 16
Leakproofness on 1 position of brick, further improves whole leakproofness.
According to tin slot top cover structure constructed by a kind of method for improving tin groove roof leakproofness and stability above-mentioned, structure
At as shown in Fig. 1,2,3,4,5,6, including multiple modular tiles interconnected 1, the two sides of modular tile 1 are respectively connected with multiple load-bearing
Hot face brick 2;The top of each hot face brick 2 of load-bearing is respectively connected with load-bearing light-weight brick 3, passes through T-shape on each hot face brick 2 of load-bearing
Mounting groove 4 is also connected with the bearing bricks suspender member 5 of T-shape;The side of the hot face brick 2 of load-bearing is equipped with recess 6, on modular tile 1
Protrusion 7 is provided at the position of corresponding recess 6.
The modular tile 1 includes that the hot face brick 11, first of combination set gradually from the bottom up combines light-weight brick 12 and second
Light-weight brick 13 is combined, protrusion 7 is located at the side for combining hot face brick 11.
The two sides of the hot face brick 11 of combination are equipped with convex platform 8, and the side of the hot face brick 2 of load-bearing corresponds to convex platform 8
Lower convex platform 9 is equipped at position;The thickness of the hot face brick 2 of load-bearing, which is greater than, combines hot face brick 11;Two neighboring second combination
Sealing cover seam brick 14 is provided between light-weight brick 13;The modular tile 1 is equipped with multiple mounting holes 15, the connection combination of mounting hole 15
Hot face brick 11, first combines light-weight brick 12 and the second combination light-weight brick 13, is connected with heating element in mounting hole 15;The combination
It is provided with sealing ceramic ring 16 between hot face brick 11 and the first combination light-weight brick 12, seals the position of ceramic ring 16 and the position of mounting hole 15
It sets corresponding.
The mounting groove 4 is located at the both ends of the hot face brick 2 of load-bearing, the two sides of bearing bricks suspender member 5 respectively with two load-bearing heat
Face brick 2 connects;The both ends of the hot face brick 2 of load-bearing are respectively arranged with tenon 21 and tongue-and-groove 22, and recess 6 is located at adjacent two pieces of load-bearing
The side of hot 2 junction of face brick.
Working principle: as shown in Figures 1 to 6, connecting multiple load-bearing hot face brick 2 by tenon 21 and tongue-and-groove 22 when use, and
On the mounting groove 4 that bearing bricks suspender member 5 is mounted on hot 2 link position of face brick of two load-bearing in connection, two load-bearing
Card slot is equipped at the link position of light-weight brick 3 can be clamped bearing bricks suspender member 5;Then by the hot face of combination on modular tile 1
Brick 11 is mutually twisted with the lower convex platform 9 on the hot face brick 2 of load-bearing by convex platform 8 and is connect, and will be after the hot connection of face brick 2 of two load-bearing
The recess 6 formed at hot 2 link position of face brick of two load-bearing with combine on hot face brick 11 corresponding raised 7 and be connected;From
And whole structural stability is improved, it prevents the seam because of caused by structural instability not of uniform size, improves leakproofness.This
Outside, the leakproofness that brick 14 improves two second combination 13 junctions of light-weight brick is stitched by setting sealing cover;Porcelain is sealed by setting
Ring 16 improves the leakproofness at the position of mounting hole 15, convenient to ensure leakproofness when installation heating element in mounting hole 15.
Claims (9)
1. a kind of method for improving tin groove roof leakproofness and stability, it is characterised in that: this method is by setting load-bearing heat
Face brick connects modular tile, and connects the bearing bricks suspender member of T-shape by the mounting groove of T-shape on the hot face brick of load-bearing,
It acts on the stress of hanging on the hot face brick of load-bearing, then by the hot face brick support combinations brick of load-bearing, improves whole stability;
The recess and the protrusion connection modular tile and hot face brick of load-bearing that occlusion can be corresponded to by setting again provide whole stability and close
Feng Xing;Meanwhile sealing cover is set and stitches brick and seals the leakproofness on ceramic ring raising modular tile position, it further improves whole
Leakproofness;According to tin slot top cover structure constructed by the method for a kind of above-mentioned raising tin groove roof leakproofness and stability, packet
Multiple modular tiles interconnected (1) are included, the two sides of modular tile (1) are respectively connected with the hot face brick of multiple load-bearing (2);Each load-bearing heat
It is respectively connected with above face brick (2) load-bearing light-weight brick (3), on each hot face brick of load-bearing (2) also by the mounting groove (4) of T-shape
It is connected with the bearing bricks suspender member (5) of T-shape;The side of the hot face brick of load-bearing (2) is equipped with recess (6), modular tile (1) on pair
It answers and is provided with raised (7) at the position of recess (6).
2. a kind of method for improving tin groove roof leakproofness and stability according to claim 1, it is characterised in that: described
Modular tile (1) includes that the hot face brick of combination (11) set gradually from the bottom up, the first combination light-weight brick (12) and the second combination are light
Matter brick (13), raised (7) are located at the side for combining hot face brick (11).
3. a kind of method for improving tin groove roof leakproofness and stability according to claim 2, it is characterised in that: described
The two sides for combining hot face brick (11) are equipped with convex platform (8), and the side of the hot face brick of load-bearing (2) corresponds to the position of convex platform (8)
Place is equipped with lower convex platform (9).
4. a kind of method for improving tin groove roof leakproofness and stability according to claim 2, it is characterised in that: described
The thickness of the hot face brick of load-bearing (2), which is greater than, combines hot face brick (11).
5. a kind of method for improving tin groove roof leakproofness and stability according to claim 2, it is characterised in that: adjacent
Sealing cover seam brick (14) is provided between two second combination light-weight bricks (13).
6. a kind of method for improving tin groove roof leakproofness and stability according to claim 2, it is characterised in that: described
Modular tile (1) is equipped with multiple mounting holes (15), and hot face brick (11), the first combination light-weight brick (12) are combined in mounting hole (15) connection
With the second combination light-weight brick (13), mounting hole (15) is interior to be connected with heating element.
7. a kind of method for improving tin groove roof leakproofness and stability according to claim 2, it is characterised in that: described
Combine hot face brick (11) and first combination light-weight brick (12) between be provided with sealing ceramic ring (16), seal ceramic ring (16) position with
The position of mounting hole (15) is corresponding.
8. according to claim 1 to the side of a kind of raising tin groove roof leakproofness and stability described in any claim in 7
Method, it is characterised in that: the mounting groove (4) is located at the both ends of the hot face brick of load-bearing (2), the two sides difference of bearing bricks suspender member (5)
It is connect with two hot face bricks of load-bearing (2).
9. a kind of method for improving tin groove roof leakproofness and stability according to claim 8, it is characterised in that: described
The both ends of the hot face brick of load-bearing (2) are respectively arranged with tenon (21) and tongue-and-groove (22), and recess (6) is located at the hot face brick of adjacent two pieces of load-bearing
(2) side of junction.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406917.0A CN105884176B (en) | 2016-06-12 | 2016-06-12 | A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610406917.0A CN105884176B (en) | 2016-06-12 | 2016-06-12 | A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105884176A CN105884176A (en) | 2016-08-24 |
CN105884176B true CN105884176B (en) | 2019-01-29 |
Family
ID=56730139
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610406917.0A Active CN105884176B (en) | 2016-06-12 | 2016-06-12 | A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105884176B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112194345B (en) * | 2020-10-09 | 2022-12-27 | 山东淄博沈淄耐火材料有限公司 | Calcium aluminate full-combined tin bath top cover brick for float glass tin bath and preparation method thereof |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2072535U (en) * | 1989-06-16 | 1991-03-06 | 中国新型建筑材料工业杭州设计研究院 | Tin slot top cover structure |
CN2645014Y (en) * | 2003-06-04 | 2004-09-29 | 吕志乾 | Combined type tin groove roof brick |
CN202543031U (en) * | 2012-04-01 | 2012-11-21 | 东旭集团有限公司 | Heating type glass liquid conveying channel for production of flat glass by floating method |
CN105110608A (en) * | 2015-07-23 | 2015-12-02 | 北京诠道科技有限公司 | Tin bath top cover brick |
-
2016
- 2016-06-12 CN CN201610406917.0A patent/CN105884176B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2072535U (en) * | 1989-06-16 | 1991-03-06 | 中国新型建筑材料工业杭州设计研究院 | Tin slot top cover structure |
CN2645014Y (en) * | 2003-06-04 | 2004-09-29 | 吕志乾 | Combined type tin groove roof brick |
CN202543031U (en) * | 2012-04-01 | 2012-11-21 | 东旭集团有限公司 | Heating type glass liquid conveying channel for production of flat glass by floating method |
CN105110608A (en) * | 2015-07-23 | 2015-12-02 | 北京诠道科技有限公司 | Tin bath top cover brick |
Also Published As
Publication number | Publication date |
---|---|
CN105884176A (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204612483U (en) | There is the refractory brick of composite adiabatic structure | |
CN105884176B (en) | A kind of method and tin slot top cover structure improving tin groove roof leakproofness and stability | |
CN101666147B (en) | Construction method of mixed build furnace wall | |
CN203964664U (en) | Roller-way chamber type electric resistance furnace | |
CN109694177A (en) | A kind of glass fibre tank furnace channel arch roof construction | |
CN2926230Y (en) | Coal oven firebox-carbonizing chamber unit | |
CN205662452U (en) | Snap -in sealed molten tin bath top cap structure | |
CN204346094U (en) | Assembly type tunnel cave | |
CN211977585U (en) | High-strength fire-resistant high-alumina brick | |
CN214308175U (en) | Furnace top heat preservation structure of carbon roasting furnace | |
CN107207306B (en) | Integrated self-supporting composite refractory component and method of making same | |
CN209854058U (en) | One-time dust removal gravity retaining wall of coke dry quenching furnace | |
CN204975309U (en) | Heat preservation zirconium english brick | |
CN206832034U (en) | Buckled tunnel cave kiln body | |
CN202175608U (en) | Front wall of overflow port of rolled glass melting furnace | |
CN208843934U (en) | The flat arch of melting furnaces | |
CN102759274B (en) | Kiln crown component of kiln | |
CN210070590U (en) | Porous refractory material masonry brick | |
CN2645014Y (en) | Combined type tin groove roof brick | |
CN212205616U (en) | Corundum refractory crucible | |
CN212431764U (en) | Refractory composite clay brick for blast furnace | |
CN205209258U (en) | High temperature stove pendant structure | |
CN210220672U (en) | Easily-combined refractory brick | |
CN210764973U (en) | Combined tin bath top cover brick | |
CN217953112U (en) | Anti-cracking refractory brick |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address | ||
CP03 | Change of name, title or address |
Address after: 310022 No. 208, Huazhong Road, Gongshu District, Hangzhou City, Zhejiang Province Patentee after: CNBM DESIGN & RESEARCH INSTITUTE CO.,LTD. Address before: 310003 No. 450, Zhongshan North Road, Xiacheng District, Hangzhou, Zhejiang Patentee before: CHINA NEW BUILDING MATERIALS DESIGN & Research Institute |