CN105883953A - Automatic plugging eliminating dissolved gas releaser - Google Patents
Automatic plugging eliminating dissolved gas releaser Download PDFInfo
- Publication number
- CN105883953A CN105883953A CN201510016988.5A CN201510016988A CN105883953A CN 105883953 A CN105883953 A CN 105883953A CN 201510016988 A CN201510016988 A CN 201510016988A CN 105883953 A CN105883953 A CN 105883953A
- Authority
- CN
- China
- Prior art keywords
- sleeve pipe
- nozzle
- spring
- pull bar
- electromagnetic controller
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Nozzles (AREA)
Abstract
The invention provides an automatic plugging eliminating dissolved gas releaser. The automatic plugging eliminating dissolved gas releaser is composed of a nozzle, a sprayer, a pull rod, a spring, a sleeve, an electromagnetic controller and a pulse control instrument. The pull rod is arranged in the sleeve, the nozzle is connected with the lower end of the sleeve, the sprayer is arranged in the nozzle to be connected with the pull rod, the contact portions of the sprayer and the nozzle have certain pressure through the spring, the electromagnetic controller is arranged at the top end of the sleeve, the outer portion of the electromagnetic controller is provided with the pulse control instrument, and the electromagnetic controller and the pulse control instrument are connected through a wire. During operation, high-pressure gas dissolved water flows into the sleeve from a liquid inflow pipe and flows out of a jet to generate micro-nano bubbles, when the jet is blocked, the pulse control instrument supplies power to the electromagnetic controller to push the sprayer of the pull rod to move downwards to increase the distance of the jet, blocked impurities are rapidly discharged out of the nozzle under push of the high-pressure gas dissolved water in the pipe, then power supply is stopped, and the sprayer of the pull rod is kept in a constant-pressure working state, so that the purpose of automatic plugging eliminating is achieved.
Description
Technical field
The present invention relates to the dissolved air release in a kind of sewage-treatment plant, during sewage disposal, pressure air-dissolving water is only
Have and just can discharge substantial amounts of micro air bubble by after this device blood pressure lowering energy dissipating.
Background technology
Dissolved air release device is in operation process, and the foreign material blocking taken by sewage is normal phenomenon,
After blocked, how to solve automatically to get rid of the problem of the foreign material that are blocked, molten gas release the most used
Device does not solves.
For with the most more advanced TV type third generation dissolved air release, it, after release blocking, is used
Artificial breather valve of opening outside flotation tank, connection compressed air gas source, with pressure air-dissolving water by release
Stifled thing is rinsed well, this only by manually just finding when to be blocked and use manually to close down breather valve
The method of unimpeded considerably increases the workload of operative employee, and this is the shortcoming existing for existing dissolved air release.
Summary of the invention
Present disclosure is: solving existing dissolved air release needs the shortcoming of artificial unimpeded, makes molten gas discharge
Device is when being blocked, it is possible to the periodically automatically tackling blockage dissolved air release of automatically tackling blockage, and its technical scheme is: it by
Nozzle, shower nozzle, pull bar, spring, sleeve pipe, electromagnetic controller, pulse control instrument form, and arrange in sleeve pipe
Having pull bar, nozzle to be connected with its lower end, shower nozzle is arranged in nozzle, and its center is connected with stay-bolt,
Being provided with spring in sleeve upper end, be provided with pull bar in spring, electromagnetic controller is arranged on cannula tip, electricity
Magnetic controller power lead is connected with the pulse control instrument being arranged on outside this dissolved-gas release.During operation, enter
High pressure dissolved air water in sleeve pipe toward the spout between lower end shower nozzle and nozzle from pipe inner high voltage district suddenly to pipe often
Nip discharge, sewage produces a large amount of micro-nano bubble, the pressure of spout by pull bar upper end spring to
Upper elasticity is shower nozzle and sealed nozzle, and electromagnetic controller is by the Infinite Cyclic set in pulse control instrument
The control program that time opening is closed with timing is operated, when spout is blocked by sewage foreign material, and pulse control
Instrument processed instruction electromagnetic controller enters unlatching energising work and pull bar is down pushed away certain distance, at this moment tight with nozzle
The shower nozzle that contiguity is touched also moves down certain distance under the promotion of pull bar, but the spray in the middle of nozzle and shower nozzle
Mouthful distance becomes big at once, the stifled foreign material of institute under the promotion of sleeve pipe inner high voltage dissolved air water rapidly outside discharge nozzle, when
After the stifled foreign material of institute are drained, pulse control instrument at once instructs electromagnetic controller entrance closedown power-off and quits work, this
Time by spring elastic reset up, pull bar and shower nozzle are up retracted original state and continue normal operation,
So Infinite Cyclic, thus reach automatically tackling blockage purpose.When waiting as shower nozzle unimpeded opening time and closedown
Between how much to come actual to determine according to the content of sewage foreign material, the instruction being arranged in pulse control instrument come
Become.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings, and accompanying drawing is that local structure of the present invention cuts open
Depending on schematic diagram:
In figure: 1, electromagnetic controller, 2, pulse control instrument, 3, top flange, 4, fixing bolt, 5,
Drawhead, 6, spring base, 7, spring, 8, oil sealing, 9, feed tube, 10, inlet, 11, fixing
Flange, 12, pull bar, 13, sleeve pipe, 14, external screw teeth, 15, inner screw tooth hole, 16, limbers, 17,
Hold circle, 18, inlet opening, 19, nozzle, 20, spout, 21, shower nozzle, 22, centre bore, 23, supporting
Hole, 24, spring pad, 25, fixing nut, 26, half tooth bolt.
Detailed description of the invention
Automatically tackling blockage dissolved air release of the present invention mainly by electromagnetic controller 1, pulse control instrument 2, sleeve pipe 13,
The parts such as spring 7, pull bar 12, nozzle 19, shower nozzle 21 are constituted.
Structural principle and operation principle work to automatically tackling blockage dissolved air release of the present invention have below in conjunction with the accompanying drawings
Body illustrates:
One, sleeve pipe 13 is the main element of the present invention, and sleeve pipe 13 is in elongate tubular, and its upper end embedded SMA actuators has
Larger than diameter of inner pipe place the spring base 6 of spring, away from sleeve pipe 13 top, certain distance is provided with molten gas
Liquid enters the inlet 10 in pipe, and inlet 10 is above provided with feed tube 9 and with welding manner and sleeve pipe
13 fixing connections, inlet 10 distance below is provided with and the present invention is fixed on sewage disposal device use
Mounting flange 11, mounting flange 11 is mutually permanently connected with welding manner with sleeve pipe 13, sleeve pipe 13 lower end
Being machined with the external screw teeth 14 installing nozzle 19, sleeve pipe 13 top is provided with the top installing electromagnetic controller
End flanges 3, top flange 3 is mutually permanently connected with welding manner with sleeve pipe 13.
Two, nozzle 19 and shower nozzle 21 are arranged on its lower end, are the critical pieces of the present invention, and it is mutual
The size of the precision of the Guan Bi micro-nano bubble to producing has direct relation, and nozzle 19 is in its inner chamber cylindrical
The first half is processed into the inner screw tooth hole 15 matched with sleeve pipe 13 lower end external screw teeth 14, arranges below inner screw tooth hole 15
Have less than its certain diameter for entering the inlet opening 18 of solution, be provided with below inlet opening 18 be processed into little under
The cone-shaped spout 20 of big constant slope, inlet opening 18 is provided above the support ring of supporting rod location
17, support ring 17 center has the limbers 16 of support holes 23 and several water flowing, nozzle 19 and sleeve pipe
13 by internal screw thread 15 and external screw teeth 14 in fixing connection, shower nozzle 21 is arranged on the lower section of inlet opening 18,
In coniform, the inclined-plane of its coniform gradient and the spout 20 on nozzle 19 mutually one to, during its center has
Central hole 22 is for the fixing use of bolt.
Three, pull bar 12 is arranged in the middle of sleeve pipe, and lower end is provided with the half tooth spiral shell less than pull bar 12 certain diameter
Bolt 26, pull bar 12 upper end is provided with the drawhead 5 larger than its diameter and mutually connects with welding manner is fixing
Connect, in drawhead 5 upper end puts in electromagnetic controller 1 and be provided with spring 7 below, arrange below spring 7
Having oil sealing 8, in being used for stoping sleeve pipe 13, air water flows up, and 8, oil sealing 8 is placed on spring base 6 outside it
Footpath and spring base 6 tight fit, internal diameter seals with pull bar 12 and coordinates, and during installation, pull bar 12 is from sleeve pipe 13 upper end
Center down passes spring 7, oil sealing 8, support holes 23, shower nozzle 21, is passed through spring pad by half tooth bolt 26
24 and 25 springs 7 of fixing nut be compressed to certain elastic force and simultaneously shower nozzle 21 be fixed on pull bar 12
Lower end, the spring 7 at this moment compressed can control shower nozzle 21 when flexible work in nozzle 19 by pull bar
Constant voltage work produces micro-nano bubble and can move up and down and carry out automatically tackling blockage work.
Four, electromagnetic controller 1 is arranged on sleeve pipe 13 upper end, the most solid with fixing bolt 4 with top flange 3
Fixed connection, electromagnetic controller is outside equipped with pulse control instrument 2, and is connected with each other with wire, at pulse control instrument
Time opening and the control programmed instruction of timing closedown of Infinite Cyclic it is provided with, when electromagnetic controller 1 connects in 2
Receiving starts working after pulse control instrument 2 opens energising at once down elapses the drawhead 5 inserting into the inner portion
Certain distance, and pull bar 12 also synchronizes to drive shower nozzle 21 to move down, at this moment spout 20 is apart from increase, quilt
Discharge from spout 20, when certain time quilt rapidly under the promotion of the stifled foreign material high pressure solution gas-liquid in sleeve pipe 13
Stifled foreign material drained afterpulse controller 2 makes electromagnetic controller 1 power-off quit work automatically into bolt down procedure,
At this moment reset stretched by the spring 7 up bullet owing to being compressed, and synchronizes to pull shower nozzle 21 to recover original pressure constant state
Work on, such Infinite Cyclic, reach automatically tackling blockage purpose of the present invention.
During automatically tackling blockage dissolved air release operation of the present invention, high pressure solution gas flows in sleeve pipe 13 from feed tube 9,
The most down flow through limbers 16 and inlet opening 18 and be discharged into the nozzle 19 micro-nano gas of outer formation through spout 20 again
Bubble, is carried out Infinite Cyclic unlatching and closes by the program arranged to electromagnetic controller 1 by pulse control instrument 2
Close power supply control, during unlatching, make also the most punctual increasing of the spout 20 on shower nozzle 21 carry out unimpeded, during Guan Bi
Restore constant voltage normally to work generation micro-nano bubble, thus reach automatically tackling blockage purpose of the present invention.
Claims (4)
1. an automatically tackling blockage dissolved air release mainly by electromagnetic controller 1, pulse control instrument 2, sleeve pipe 13,
The parts such as spring 7, pull bar 12, nozzle 19, shower nozzle 21 are constituted, and are provided with pull bar 12 in its sleeve pipe 13,
Nozzle 19 is connected with sleeve pipe 13 lower end, and shower nozzle 21 is arranged in nozzle 19, its center and pull bar half tooth spiral shell
Bolt 26 connects, and is provided with spring 7, is provided with pull bar 12, Electromagnetic Control in spring 7 in sleeve pipe 13 upper end
Device 1 is arranged on sleeve pipe 13 top, electromagnetic controller 1 power lead and the arteries and veins being arranged on outside this dissolved-gas release
Rush controller 2 to connect, it is characterized in that: sleeve pipe 13 is the main element of the present invention, and sleeve pipe 13 is in elongate tube
Shape, its upper end embedded SMA actuators has the spring base 6 of the placement spring larger than diameter of inner pipe, pushes up away from sleeve pipe 13
End certain distance is provided with molten gas-liquid and enters the inlet 10 in pipe, and inlet 10 is above provided with feed tube 9
And be connected with welding manner is fixing with sleeve pipe 13, inlet 10 distance below is provided with the present invention solid
The mounting flange 11 being scheduled on sewage disposal device, mounting flange 11 is mutual with welding manner with sleeve pipe 13
Fixing connection, sleeve pipe 13 lower end is machined with the external screw teeth 14 installing nozzle 19, and sleeve pipe 13 top is provided with
Installing the top flange 3 of electromagnetic controller, top flange 3 interfixes even with sleeve pipe 13 welding manner
Connect.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: nozzle 19 and spray
21 are arranged on its lower end, are the critical pieces of the present invention, and precision of its Guan Bi each other is to producing
The size of micro-nano bubble has direct relation, and nozzle 19 is processed into and sleeve pipe 13 in its inner chamber first half cylindrical
From the end inner screw tooth hole 15 that matches of external screw teeth 14, be provided with below inner screw tooth hole 15 less than its certain diameter for
Enter the inlet opening 18 of solution, below inlet opening 18, be provided with the cone-shaped spray being processed into up-small and down-big constant slope
Mouth 20, inlet opening 18 is provided above the support ring 17 of supporting rod location, and support ring 17 center has
The limbers 16 of support holes 23 and several water flowing, nozzle 19 and sleeve pipe 13 are by internal screw thread 15 and outer spiral shell
Tooth 14 is in fixing connection, and shower nozzle 21 is arranged on the lower section of inlet opening 18, in coniform, and its coniform gradient
Mutually with the inclined-plane of the spout 20 on nozzle 19 one have centre bore 22 to, its center and use for bolt is fixing.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: pull bar 12 is arranged
In the middle of sleeve pipe, lower end is provided with half tooth bolt 26 less than pull bar 12 certain diameter, and pull bar 12 upper end sets
Being equipped with the drawhead 5 larger than its diameter and mutually connect with welding manner is fixing, drawhead 5 upper end is stretched
In entering electromagnetic controller 1 and be provided with spring 7 below, being provided with oil sealing 8 below spring 7, oil sealing 8 is put
Putting on spring base 6, its external diameter and spring base 6 tight fit, internal diameter seals with pull bar 12 and coordinates, during installation
Pull bar 12 from sleeve pipe 13 upper end center down through spring 7, oil sealing 8, support holes 23, shower nozzle 21, by
Half tooth bolt 26 is compressed to certain elastic force the most simultaneously by spring pad 24 and 25 springs 7 of fixing nut
Shower nozzle 21 is fixed on pull bar 12 lower end, and the spring 7 at this moment compressed passes through pull bar energy when flexible work
Control shower nozzle 21 constant voltage work in nozzle 19 produce micro-nano bubble and can move up and down and carry out automatically tackling blockage
Work.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: electromagnetic controller 1
It is arranged on sleeve pipe 13 upper end, is mutually permanently connected, outside electromagnetic controller with fixing bolt 4 with top flange 3
It is provided with pulse control instrument 2, and is connected with each other with wire, in pulse control instrument 2, be provided with Infinite Cyclic
The control programmed instruction that time opening and timing are closed, opens when electromagnetic controller 1 receives pulse control instrument 2
At once start working after unblank electricity and the drawhead 5 inserting into the inner portion is down elapsed certain distance, and pull bar 12
Also synchronizing to drive shower nozzle 21 to move down, at this moment spout 20 is apart from increase, is blocked foreign material in sleeve pipe 13
Discharge from spout 20 rapidly under the promotion of high pressure solution gas-liquid, when certain time be blocked the drained afterpulse of foreign material control
Instrument 2 makes electromagnetic controller 1 power-off quit work automatically into bolt down procedure, at this moment due to the spring 7 compressed
Up reset stretched by bullet, and synchronizes to pull shower nozzle 21 to recover original pressure constant state and work on, such Infinite Cyclic,
Reach automatically tackling blockage purpose of the present invention.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510016988.5A CN105883953B (en) | 2015-01-08 | 2015-01-08 | Automatically tackling blockage dissolved air release |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510016988.5A CN105883953B (en) | 2015-01-08 | 2015-01-08 | Automatically tackling blockage dissolved air release |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105883953A true CN105883953A (en) | 2016-08-24 |
CN105883953B CN105883953B (en) | 2019-08-09 |
Family
ID=56999483
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510016988.5A Active CN105883953B (en) | 2015-01-08 | 2015-01-08 | Automatically tackling blockage dissolved air release |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105883953B (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106186145A (en) * | 2016-09-26 | 2016-12-07 | 大庆市海油庆石油科技有限公司 | Sedimentation pot type is from rinsing air supporting |
CN106277152A (en) * | 2016-10-24 | 2017-01-04 | 无锡海拓环保装备科技有限公司 | A kind of without the elastic release of pressure assembly of blocking |
CN106380019A (en) * | 2016-10-24 | 2017-02-08 | 无锡海拓环保装备科技有限公司 | Novel water body purification device |
CN108905663A (en) * | 2018-09-19 | 2018-11-30 | 佛山市通海卫浴设备有限公司 | It can automatic pollution discharge anticlogging efficiently micro-nano bubble generator and method for generation |
CN110280156A (en) * | 2019-06-26 | 2019-09-27 | 中实泰广(北京)环保科技有限公司 | Anti-blocking gas-liquid discharges system and anti-blocking gas-liquid method for releasing |
CN110589925A (en) * | 2019-09-24 | 2019-12-20 | 徐育平 | Non-blocking dissolved air releaser |
CN117142559A (en) * | 2023-10-26 | 2023-12-01 | 无锡工源环境科技股份有限公司 | Adjustable anti-blocking energy dissipation device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87212732U (en) * | 1987-10-21 | 1988-04-20 | 济南市水处理技术实验所 | Dissolved gas releaser of water purifier |
JPH08323253A (en) * | 1995-04-24 | 1996-12-10 | Maruyama Mfg Co Ltd | Apparatus for preventing nozzle from clogging |
CN2635652Y (en) * | 2003-08-29 | 2004-08-25 | 阎海锁 | Blocking-resistant dissolved air releaser |
CN1931473A (en) * | 2006-10-10 | 2007-03-21 | 陈华 | Nozzle device with automatic on-line dirt eliminating function |
CN201183029Y (en) * | 2008-03-24 | 2009-01-21 | 陈华 | Pneumatic self-cleaning nozzle |
CN202022767U (en) * | 2010-12-29 | 2011-11-02 | 鹤壁市通用机械电气有限公司 | Novel anti-clogging dissolved-air releaser producing uniformly-distributed microbubbles |
US20120292347A1 (en) * | 2011-05-18 | 2012-11-22 | Ya-Tsan Wang | Push-type nozzle assembly |
CN204474363U (en) * | 2015-01-08 | 2015-07-15 | 沈智奇 | Automatically tackling blockage dissolved air release |
-
2015
- 2015-01-08 CN CN201510016988.5A patent/CN105883953B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN87212732U (en) * | 1987-10-21 | 1988-04-20 | 济南市水处理技术实验所 | Dissolved gas releaser of water purifier |
JPH08323253A (en) * | 1995-04-24 | 1996-12-10 | Maruyama Mfg Co Ltd | Apparatus for preventing nozzle from clogging |
CN2635652Y (en) * | 2003-08-29 | 2004-08-25 | 阎海锁 | Blocking-resistant dissolved air releaser |
CN1931473A (en) * | 2006-10-10 | 2007-03-21 | 陈华 | Nozzle device with automatic on-line dirt eliminating function |
CN201183029Y (en) * | 2008-03-24 | 2009-01-21 | 陈华 | Pneumatic self-cleaning nozzle |
CN202022767U (en) * | 2010-12-29 | 2011-11-02 | 鹤壁市通用机械电气有限公司 | Novel anti-clogging dissolved-air releaser producing uniformly-distributed microbubbles |
US20120292347A1 (en) * | 2011-05-18 | 2012-11-22 | Ya-Tsan Wang | Push-type nozzle assembly |
CN204474363U (en) * | 2015-01-08 | 2015-07-15 | 沈智奇 | Automatically tackling blockage dissolved air release |
Non-Patent Citations (1)
Title |
---|
刘利军: "《电气控制与节电系统设计》", 31 January 2013, 中国电力出版社 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106186145A (en) * | 2016-09-26 | 2016-12-07 | 大庆市海油庆石油科技有限公司 | Sedimentation pot type is from rinsing air supporting |
CN106186145B (en) * | 2016-09-26 | 2022-11-04 | 大庆市海油庆石油科技有限公司 | Settling tank type automatic flushing dissolved air flotation device |
CN106277152A (en) * | 2016-10-24 | 2017-01-04 | 无锡海拓环保装备科技有限公司 | A kind of without the elastic release of pressure assembly of blocking |
CN106380019A (en) * | 2016-10-24 | 2017-02-08 | 无锡海拓环保装备科技有限公司 | Novel water body purification device |
CN106380019B (en) * | 2016-10-24 | 2022-10-18 | 无锡海拓环保装备科技有限公司 | Novel water purifies device |
CN108905663A (en) * | 2018-09-19 | 2018-11-30 | 佛山市通海卫浴设备有限公司 | It can automatic pollution discharge anticlogging efficiently micro-nano bubble generator and method for generation |
CN110280156A (en) * | 2019-06-26 | 2019-09-27 | 中实泰广(北京)环保科技有限公司 | Anti-blocking gas-liquid discharges system and anti-blocking gas-liquid method for releasing |
CN110280156B (en) * | 2019-06-26 | 2022-03-08 | 中实泰广(北京)环保科技有限公司 | Anti-blocking gas-liquid release system and anti-blocking gas-liquid release method |
CN110589925A (en) * | 2019-09-24 | 2019-12-20 | 徐育平 | Non-blocking dissolved air releaser |
CN110589925B (en) * | 2019-09-24 | 2022-02-08 | 刘春平 | Non-blocking dissolved air releaser |
CN117142559A (en) * | 2023-10-26 | 2023-12-01 | 无锡工源环境科技股份有限公司 | Adjustable anti-blocking energy dissipation device |
CN117142559B (en) * | 2023-10-26 | 2024-04-02 | 无锡工源环境科技股份有限公司 | Adjustable anti-blocking energy dissipation device |
Also Published As
Publication number | Publication date |
---|---|
CN105883953B (en) | 2019-08-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105883953A (en) | Automatic plugging eliminating dissolved gas releaser | |
CN105454001A (en) | Lifting column for multifunctional irrigation and fertilization system | |
CN102373894B (en) | Feeding and refloating integrated type plunger tool and working method thereof | |
CN204474363U (en) | Automatically tackling blockage dissolved air release | |
CN103644323B (en) | One efficiently takes out filling automatic switch | |
CN103274346A (en) | Liquid quantitative feeding device | |
CN203269543U (en) | Quantitative feeding device for liquid materials | |
CN205685262U (en) | Oil well cement paste thickening experiment slurry cup provision for disengagement | |
CN205120542U (en) | Automatic water system that adds of concrete penetrometer | |
CN211419748U (en) | High-efficient disk diaphragm aerator | |
CN204619441U (en) | A kind of can silt cleaning device at the bottom of the pond of effective adjusting water outlet pressure versus flow | |
CN210035448U (en) | Coil assembly for steam generator | |
CN201962764U (en) | Water-saving closestool | |
CN202266305U (en) | Adjustable steam pressure matcher with multiple nozzles | |
CN203618523U (en) | Water-saving water dispenser for livestock | |
CN207784940U (en) | Heating device for preventing dry heating | |
CN201181264Y (en) | Water quality sampling instrument | |
CN204373431U (en) | Water-stop intercepts flue gas mechanism | |
CN205383930U (en) | Cooling tower automatic water supply controlling means | |
CN105066488B (en) | The incubator of the solar water heater of automatic water supplement | |
CN109931428A (en) | A kind of magnetic control automatic intermittent water supplying and saving device | |
CN107218228A (en) | A kind of water tower device of fetching water | |
CN108061235A (en) | A kind of high leakproofness Double-wire distributor | |
CN204469948U (en) | Atomization cooling sprayer backwater protective device | |
CN207204691U (en) | A kind of aeroengine thrust augmentation pilot jet flusher |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190708 Address after: 226100 Guangzhou Road 999 Haimen Economic and Technological Development Zone, Nantong City, Jiangsu Province Applicant after: Nantong North Bund Construction Engineering Co., Ltd. Address before: 364100 No. 6, Bai Lou group, Xikou village, Lake Lei Town, Yongding County, Fujian Applicant before: Shen Zhiqi |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |