CN105883953A - Automatic plugging eliminating dissolved gas releaser - Google Patents

Automatic plugging eliminating dissolved gas releaser Download PDF

Info

Publication number
CN105883953A
CN105883953A CN201510016988.5A CN201510016988A CN105883953A CN 105883953 A CN105883953 A CN 105883953A CN 201510016988 A CN201510016988 A CN 201510016988A CN 105883953 A CN105883953 A CN 105883953A
Authority
CN
China
Prior art keywords
sleeve pipe
nozzle
spring
pull bar
electromagnetic controller
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201510016988.5A
Other languages
Chinese (zh)
Other versions
CN105883953B (en
Inventor
沈智奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nantong North Bund Construction Engineering Co., Ltd.
Original Assignee
沈智奇
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 沈智奇 filed Critical 沈智奇
Priority to CN201510016988.5A priority Critical patent/CN105883953B/en
Publication of CN105883953A publication Critical patent/CN105883953A/en
Application granted granted Critical
Publication of CN105883953B publication Critical patent/CN105883953B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Nozzles (AREA)

Abstract

The invention provides an automatic plugging eliminating dissolved gas releaser. The automatic plugging eliminating dissolved gas releaser is composed of a nozzle, a sprayer, a pull rod, a spring, a sleeve, an electromagnetic controller and a pulse control instrument. The pull rod is arranged in the sleeve, the nozzle is connected with the lower end of the sleeve, the sprayer is arranged in the nozzle to be connected with the pull rod, the contact portions of the sprayer and the nozzle have certain pressure through the spring, the electromagnetic controller is arranged at the top end of the sleeve, the outer portion of the electromagnetic controller is provided with the pulse control instrument, and the electromagnetic controller and the pulse control instrument are connected through a wire. During operation, high-pressure gas dissolved water flows into the sleeve from a liquid inflow pipe and flows out of a jet to generate micro-nano bubbles, when the jet is blocked, the pulse control instrument supplies power to the electromagnetic controller to push the sprayer of the pull rod to move downwards to increase the distance of the jet, blocked impurities are rapidly discharged out of the nozzle under push of the high-pressure gas dissolved water in the pipe, then power supply is stopped, and the sprayer of the pull rod is kept in a constant-pressure working state, so that the purpose of automatic plugging eliminating is achieved.

Description

Automatically tackling blockage dissolved air release
Technical field
The present invention relates to the dissolved air release in a kind of sewage-treatment plant, during sewage disposal, pressure air-dissolving water is only Have and just can discharge substantial amounts of micro air bubble by after this device blood pressure lowering energy dissipating.
Background technology
Dissolved air release device is in operation process, and the foreign material blocking taken by sewage is normal phenomenon, After blocked, how to solve automatically to get rid of the problem of the foreign material that are blocked, molten gas release the most used Device does not solves.
For with the most more advanced TV type third generation dissolved air release, it, after release blocking, is used Artificial breather valve of opening outside flotation tank, connection compressed air gas source, with pressure air-dissolving water by release Stifled thing is rinsed well, this only by manually just finding when to be blocked and use manually to close down breather valve The method of unimpeded considerably increases the workload of operative employee, and this is the shortcoming existing for existing dissolved air release.
Summary of the invention
Present disclosure is: solving existing dissolved air release needs the shortcoming of artificial unimpeded, makes molten gas discharge Device is when being blocked, it is possible to the periodically automatically tackling blockage dissolved air release of automatically tackling blockage, and its technical scheme is: it by Nozzle, shower nozzle, pull bar, spring, sleeve pipe, electromagnetic controller, pulse control instrument form, and arrange in sleeve pipe Having pull bar, nozzle to be connected with its lower end, shower nozzle is arranged in nozzle, and its center is connected with stay-bolt, Being provided with spring in sleeve upper end, be provided with pull bar in spring, electromagnetic controller is arranged on cannula tip, electricity Magnetic controller power lead is connected with the pulse control instrument being arranged on outside this dissolved-gas release.During operation, enter High pressure dissolved air water in sleeve pipe toward the spout between lower end shower nozzle and nozzle from pipe inner high voltage district suddenly to pipe often Nip discharge, sewage produces a large amount of micro-nano bubble, the pressure of spout by pull bar upper end spring to Upper elasticity is shower nozzle and sealed nozzle, and electromagnetic controller is by the Infinite Cyclic set in pulse control instrument The control program that time opening is closed with timing is operated, when spout is blocked by sewage foreign material, and pulse control Instrument processed instruction electromagnetic controller enters unlatching energising work and pull bar is down pushed away certain distance, at this moment tight with nozzle The shower nozzle that contiguity is touched also moves down certain distance under the promotion of pull bar, but the spray in the middle of nozzle and shower nozzle Mouthful distance becomes big at once, the stifled foreign material of institute under the promotion of sleeve pipe inner high voltage dissolved air water rapidly outside discharge nozzle, when After the stifled foreign material of institute are drained, pulse control instrument at once instructs electromagnetic controller entrance closedown power-off and quits work, this Time by spring elastic reset up, pull bar and shower nozzle are up retracted original state and continue normal operation, So Infinite Cyclic, thus reach automatically tackling blockage purpose.When waiting as shower nozzle unimpeded opening time and closedown Between how much to come actual to determine according to the content of sewage foreign material, the instruction being arranged in pulse control instrument come Become.
Accompanying drawing explanation
The invention will be further described with embodiment below in conjunction with the accompanying drawings, and accompanying drawing is that local structure of the present invention cuts open Depending on schematic diagram:
In figure: 1, electromagnetic controller, 2, pulse control instrument, 3, top flange, 4, fixing bolt, 5, Drawhead, 6, spring base, 7, spring, 8, oil sealing, 9, feed tube, 10, inlet, 11, fixing Flange, 12, pull bar, 13, sleeve pipe, 14, external screw teeth, 15, inner screw tooth hole, 16, limbers, 17, Hold circle, 18, inlet opening, 19, nozzle, 20, spout, 21, shower nozzle, 22, centre bore, 23, supporting Hole, 24, spring pad, 25, fixing nut, 26, half tooth bolt.
Detailed description of the invention
Automatically tackling blockage dissolved air release of the present invention mainly by electromagnetic controller 1, pulse control instrument 2, sleeve pipe 13, The parts such as spring 7, pull bar 12, nozzle 19, shower nozzle 21 are constituted.
Structural principle and operation principle work to automatically tackling blockage dissolved air release of the present invention have below in conjunction with the accompanying drawings Body illustrates:
One, sleeve pipe 13 is the main element of the present invention, and sleeve pipe 13 is in elongate tubular, and its upper end embedded SMA actuators has Larger than diameter of inner pipe place the spring base 6 of spring, away from sleeve pipe 13 top, certain distance is provided with molten gas Liquid enters the inlet 10 in pipe, and inlet 10 is above provided with feed tube 9 and with welding manner and sleeve pipe 13 fixing connections, inlet 10 distance below is provided with and the present invention is fixed on sewage disposal device use Mounting flange 11, mounting flange 11 is mutually permanently connected with welding manner with sleeve pipe 13, sleeve pipe 13 lower end Being machined with the external screw teeth 14 installing nozzle 19, sleeve pipe 13 top is provided with the top installing electromagnetic controller End flanges 3, top flange 3 is mutually permanently connected with welding manner with sleeve pipe 13.
Two, nozzle 19 and shower nozzle 21 are arranged on its lower end, are the critical pieces of the present invention, and it is mutual The size of the precision of the Guan Bi micro-nano bubble to producing has direct relation, and nozzle 19 is in its inner chamber cylindrical The first half is processed into the inner screw tooth hole 15 matched with sleeve pipe 13 lower end external screw teeth 14, arranges below inner screw tooth hole 15 Have less than its certain diameter for entering the inlet opening 18 of solution, be provided with below inlet opening 18 be processed into little under The cone-shaped spout 20 of big constant slope, inlet opening 18 is provided above the support ring of supporting rod location 17, support ring 17 center has the limbers 16 of support holes 23 and several water flowing, nozzle 19 and sleeve pipe 13 by internal screw thread 15 and external screw teeth 14 in fixing connection, shower nozzle 21 is arranged on the lower section of inlet opening 18, In coniform, the inclined-plane of its coniform gradient and the spout 20 on nozzle 19 mutually one to, during its center has Central hole 22 is for the fixing use of bolt.
Three, pull bar 12 is arranged in the middle of sleeve pipe, and lower end is provided with the half tooth spiral shell less than pull bar 12 certain diameter Bolt 26, pull bar 12 upper end is provided with the drawhead 5 larger than its diameter and mutually connects with welding manner is fixing Connect, in drawhead 5 upper end puts in electromagnetic controller 1 and be provided with spring 7 below, arrange below spring 7 Having oil sealing 8, in being used for stoping sleeve pipe 13, air water flows up, and 8, oil sealing 8 is placed on spring base 6 outside it Footpath and spring base 6 tight fit, internal diameter seals with pull bar 12 and coordinates, and during installation, pull bar 12 is from sleeve pipe 13 upper end Center down passes spring 7, oil sealing 8, support holes 23, shower nozzle 21, is passed through spring pad by half tooth bolt 26 24 and 25 springs 7 of fixing nut be compressed to certain elastic force and simultaneously shower nozzle 21 be fixed on pull bar 12 Lower end, the spring 7 at this moment compressed can control shower nozzle 21 when flexible work in nozzle 19 by pull bar Constant voltage work produces micro-nano bubble and can move up and down and carry out automatically tackling blockage work.
Four, electromagnetic controller 1 is arranged on sleeve pipe 13 upper end, the most solid with fixing bolt 4 with top flange 3 Fixed connection, electromagnetic controller is outside equipped with pulse control instrument 2, and is connected with each other with wire, at pulse control instrument Time opening and the control programmed instruction of timing closedown of Infinite Cyclic it is provided with, when electromagnetic controller 1 connects in 2 Receiving starts working after pulse control instrument 2 opens energising at once down elapses the drawhead 5 inserting into the inner portion Certain distance, and pull bar 12 also synchronizes to drive shower nozzle 21 to move down, at this moment spout 20 is apart from increase, quilt Discharge from spout 20, when certain time quilt rapidly under the promotion of the stifled foreign material high pressure solution gas-liquid in sleeve pipe 13 Stifled foreign material drained afterpulse controller 2 makes electromagnetic controller 1 power-off quit work automatically into bolt down procedure, At this moment reset stretched by the spring 7 up bullet owing to being compressed, and synchronizes to pull shower nozzle 21 to recover original pressure constant state Work on, such Infinite Cyclic, reach automatically tackling blockage purpose of the present invention.
During automatically tackling blockage dissolved air release operation of the present invention, high pressure solution gas flows in sleeve pipe 13 from feed tube 9, The most down flow through limbers 16 and inlet opening 18 and be discharged into the nozzle 19 micro-nano gas of outer formation through spout 20 again Bubble, is carried out Infinite Cyclic unlatching and closes by the program arranged to electromagnetic controller 1 by pulse control instrument 2 Close power supply control, during unlatching, make also the most punctual increasing of the spout 20 on shower nozzle 21 carry out unimpeded, during Guan Bi Restore constant voltage normally to work generation micro-nano bubble, thus reach automatically tackling blockage purpose of the present invention.

Claims (4)

1. an automatically tackling blockage dissolved air release mainly by electromagnetic controller 1, pulse control instrument 2, sleeve pipe 13, The parts such as spring 7, pull bar 12, nozzle 19, shower nozzle 21 are constituted, and are provided with pull bar 12 in its sleeve pipe 13, Nozzle 19 is connected with sleeve pipe 13 lower end, and shower nozzle 21 is arranged in nozzle 19, its center and pull bar half tooth spiral shell Bolt 26 connects, and is provided with spring 7, is provided with pull bar 12, Electromagnetic Control in spring 7 in sleeve pipe 13 upper end Device 1 is arranged on sleeve pipe 13 top, electromagnetic controller 1 power lead and the arteries and veins being arranged on outside this dissolved-gas release Rush controller 2 to connect, it is characterized in that: sleeve pipe 13 is the main element of the present invention, and sleeve pipe 13 is in elongate tube Shape, its upper end embedded SMA actuators has the spring base 6 of the placement spring larger than diameter of inner pipe, pushes up away from sleeve pipe 13 End certain distance is provided with molten gas-liquid and enters the inlet 10 in pipe, and inlet 10 is above provided with feed tube 9 And be connected with welding manner is fixing with sleeve pipe 13, inlet 10 distance below is provided with the present invention solid The mounting flange 11 being scheduled on sewage disposal device, mounting flange 11 is mutual with welding manner with sleeve pipe 13 Fixing connection, sleeve pipe 13 lower end is machined with the external screw teeth 14 installing nozzle 19, and sleeve pipe 13 top is provided with Installing the top flange 3 of electromagnetic controller, top flange 3 interfixes even with sleeve pipe 13 welding manner Connect.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: nozzle 19 and spray 21 are arranged on its lower end, are the critical pieces of the present invention, and precision of its Guan Bi each other is to producing The size of micro-nano bubble has direct relation, and nozzle 19 is processed into and sleeve pipe 13 in its inner chamber first half cylindrical From the end inner screw tooth hole 15 that matches of external screw teeth 14, be provided with below inner screw tooth hole 15 less than its certain diameter for Enter the inlet opening 18 of solution, below inlet opening 18, be provided with the cone-shaped spray being processed into up-small and down-big constant slope Mouth 20, inlet opening 18 is provided above the support ring 17 of supporting rod location, and support ring 17 center has The limbers 16 of support holes 23 and several water flowing, nozzle 19 and sleeve pipe 13 are by internal screw thread 15 and outer spiral shell Tooth 14 is in fixing connection, and shower nozzle 21 is arranged on the lower section of inlet opening 18, in coniform, and its coniform gradient Mutually with the inclined-plane of the spout 20 on nozzle 19 one have centre bore 22 to, its center and use for bolt is fixing.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: pull bar 12 is arranged In the middle of sleeve pipe, lower end is provided with half tooth bolt 26 less than pull bar 12 certain diameter, and pull bar 12 upper end sets Being equipped with the drawhead 5 larger than its diameter and mutually connect with welding manner is fixing, drawhead 5 upper end is stretched In entering electromagnetic controller 1 and be provided with spring 7 below, being provided with oil sealing 8 below spring 7, oil sealing 8 is put Putting on spring base 6, its external diameter and spring base 6 tight fit, internal diameter seals with pull bar 12 and coordinates, during installation Pull bar 12 from sleeve pipe 13 upper end center down through spring 7, oil sealing 8, support holes 23, shower nozzle 21, by Half tooth bolt 26 is compressed to certain elastic force the most simultaneously by spring pad 24 and 25 springs 7 of fixing nut Shower nozzle 21 is fixed on pull bar 12 lower end, and the spring 7 at this moment compressed passes through pull bar energy when flexible work Control shower nozzle 21 constant voltage work in nozzle 19 produce micro-nano bubble and can move up and down and carry out automatically tackling blockage Work.
Automatically tackling blockage the most according to claim 1 molten device release, is characterized in that: electromagnetic controller 1 It is arranged on sleeve pipe 13 upper end, is mutually permanently connected, outside electromagnetic controller with fixing bolt 4 with top flange 3 It is provided with pulse control instrument 2, and is connected with each other with wire, in pulse control instrument 2, be provided with Infinite Cyclic The control programmed instruction that time opening and timing are closed, opens when electromagnetic controller 1 receives pulse control instrument 2 At once start working after unblank electricity and the drawhead 5 inserting into the inner portion is down elapsed certain distance, and pull bar 12 Also synchronizing to drive shower nozzle 21 to move down, at this moment spout 20 is apart from increase, is blocked foreign material in sleeve pipe 13 Discharge from spout 20 rapidly under the promotion of high pressure solution gas-liquid, when certain time be blocked the drained afterpulse of foreign material control Instrument 2 makes electromagnetic controller 1 power-off quit work automatically into bolt down procedure, at this moment due to the spring 7 compressed Up reset stretched by bullet, and synchronizes to pull shower nozzle 21 to recover original pressure constant state and work on, such Infinite Cyclic, Reach automatically tackling blockage purpose of the present invention.
CN201510016988.5A 2015-01-08 2015-01-08 Automatically tackling blockage dissolved air release Active CN105883953B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510016988.5A CN105883953B (en) 2015-01-08 2015-01-08 Automatically tackling blockage dissolved air release

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510016988.5A CN105883953B (en) 2015-01-08 2015-01-08 Automatically tackling blockage dissolved air release

Publications (2)

Publication Number Publication Date
CN105883953A true CN105883953A (en) 2016-08-24
CN105883953B CN105883953B (en) 2019-08-09

Family

ID=56999483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510016988.5A Active CN105883953B (en) 2015-01-08 2015-01-08 Automatically tackling blockage dissolved air release

Country Status (1)

Country Link
CN (1) CN105883953B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106186145A (en) * 2016-09-26 2016-12-07 大庆市海油庆石油科技有限公司 Sedimentation pot type is from rinsing air supporting
CN106277152A (en) * 2016-10-24 2017-01-04 无锡海拓环保装备科技有限公司 A kind of without the elastic release of pressure assembly of blocking
CN106380019A (en) * 2016-10-24 2017-02-08 无锡海拓环保装备科技有限公司 Novel water body purification device
CN108905663A (en) * 2018-09-19 2018-11-30 佛山市通海卫浴设备有限公司 It can automatic pollution discharge anticlogging efficiently micro-nano bubble generator and method for generation
CN110280156A (en) * 2019-06-26 2019-09-27 中实泰广(北京)环保科技有限公司 Anti-blocking gas-liquid discharges system and anti-blocking gas-liquid method for releasing
CN110589925A (en) * 2019-09-24 2019-12-20 徐育平 Non-blocking dissolved air releaser
CN117142559A (en) * 2023-10-26 2023-12-01 无锡工源环境科技股份有限公司 Adjustable anti-blocking energy dissipation device

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87212732U (en) * 1987-10-21 1988-04-20 济南市水处理技术实验所 Dissolved gas releaser of water purifier
JPH08323253A (en) * 1995-04-24 1996-12-10 Maruyama Mfg Co Ltd Apparatus for preventing nozzle from clogging
CN2635652Y (en) * 2003-08-29 2004-08-25 阎海锁 Blocking-resistant dissolved air releaser
CN1931473A (en) * 2006-10-10 2007-03-21 陈华 Nozzle device with automatic on-line dirt eliminating function
CN201183029Y (en) * 2008-03-24 2009-01-21 陈华 Pneumatic self-cleaning nozzle
CN202022767U (en) * 2010-12-29 2011-11-02 鹤壁市通用机械电气有限公司 Novel anti-clogging dissolved-air releaser producing uniformly-distributed microbubbles
US20120292347A1 (en) * 2011-05-18 2012-11-22 Ya-Tsan Wang Push-type nozzle assembly
CN204474363U (en) * 2015-01-08 2015-07-15 沈智奇 Automatically tackling blockage dissolved air release

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN87212732U (en) * 1987-10-21 1988-04-20 济南市水处理技术实验所 Dissolved gas releaser of water purifier
JPH08323253A (en) * 1995-04-24 1996-12-10 Maruyama Mfg Co Ltd Apparatus for preventing nozzle from clogging
CN2635652Y (en) * 2003-08-29 2004-08-25 阎海锁 Blocking-resistant dissolved air releaser
CN1931473A (en) * 2006-10-10 2007-03-21 陈华 Nozzle device with automatic on-line dirt eliminating function
CN201183029Y (en) * 2008-03-24 2009-01-21 陈华 Pneumatic self-cleaning nozzle
CN202022767U (en) * 2010-12-29 2011-11-02 鹤壁市通用机械电气有限公司 Novel anti-clogging dissolved-air releaser producing uniformly-distributed microbubbles
US20120292347A1 (en) * 2011-05-18 2012-11-22 Ya-Tsan Wang Push-type nozzle assembly
CN204474363U (en) * 2015-01-08 2015-07-15 沈智奇 Automatically tackling blockage dissolved air release

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
刘利军: "《电气控制与节电系统设计》", 31 January 2013, 中国电力出版社 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106186145A (en) * 2016-09-26 2016-12-07 大庆市海油庆石油科技有限公司 Sedimentation pot type is from rinsing air supporting
CN106186145B (en) * 2016-09-26 2022-11-04 大庆市海油庆石油科技有限公司 Settling tank type automatic flushing dissolved air flotation device
CN106277152A (en) * 2016-10-24 2017-01-04 无锡海拓环保装备科技有限公司 A kind of without the elastic release of pressure assembly of blocking
CN106380019A (en) * 2016-10-24 2017-02-08 无锡海拓环保装备科技有限公司 Novel water body purification device
CN106380019B (en) * 2016-10-24 2022-10-18 无锡海拓环保装备科技有限公司 Novel water purifies device
CN108905663A (en) * 2018-09-19 2018-11-30 佛山市通海卫浴设备有限公司 It can automatic pollution discharge anticlogging efficiently micro-nano bubble generator and method for generation
CN110280156A (en) * 2019-06-26 2019-09-27 中实泰广(北京)环保科技有限公司 Anti-blocking gas-liquid discharges system and anti-blocking gas-liquid method for releasing
CN110280156B (en) * 2019-06-26 2022-03-08 中实泰广(北京)环保科技有限公司 Anti-blocking gas-liquid release system and anti-blocking gas-liquid release method
CN110589925A (en) * 2019-09-24 2019-12-20 徐育平 Non-blocking dissolved air releaser
CN110589925B (en) * 2019-09-24 2022-02-08 刘春平 Non-blocking dissolved air releaser
CN117142559A (en) * 2023-10-26 2023-12-01 无锡工源环境科技股份有限公司 Adjustable anti-blocking energy dissipation device
CN117142559B (en) * 2023-10-26 2024-04-02 无锡工源环境科技股份有限公司 Adjustable anti-blocking energy dissipation device

Also Published As

Publication number Publication date
CN105883953B (en) 2019-08-09

Similar Documents

Publication Publication Date Title
CN105883953A (en) Automatic plugging eliminating dissolved gas releaser
CN105454001A (en) Lifting column for multifunctional irrigation and fertilization system
CN102373894B (en) Feeding and refloating integrated type plunger tool and working method thereof
CN204474363U (en) Automatically tackling blockage dissolved air release
CN103644323B (en) One efficiently takes out filling automatic switch
CN103274346A (en) Liquid quantitative feeding device
CN203269543U (en) Quantitative feeding device for liquid materials
CN205685262U (en) Oil well cement paste thickening experiment slurry cup provision for disengagement
CN205120542U (en) Automatic water system that adds of concrete penetrometer
CN211419748U (en) High-efficient disk diaphragm aerator
CN204619441U (en) A kind of can silt cleaning device at the bottom of the pond of effective adjusting water outlet pressure versus flow
CN210035448U (en) Coil assembly for steam generator
CN201962764U (en) Water-saving closestool
CN202266305U (en) Adjustable steam pressure matcher with multiple nozzles
CN203618523U (en) Water-saving water dispenser for livestock
CN207784940U (en) Heating device for preventing dry heating
CN201181264Y (en) Water quality sampling instrument
CN204373431U (en) Water-stop intercepts flue gas mechanism
CN205383930U (en) Cooling tower automatic water supply controlling means
CN105066488B (en) The incubator of the solar water heater of automatic water supplement
CN109931428A (en) A kind of magnetic control automatic intermittent water supplying and saving device
CN107218228A (en) A kind of water tower device of fetching water
CN108061235A (en) A kind of high leakproofness Double-wire distributor
CN204469948U (en) Atomization cooling sprayer backwater protective device
CN207204691U (en) A kind of aeroengine thrust augmentation pilot jet flusher

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20190708

Address after: 226100 Guangzhou Road 999 Haimen Economic and Technological Development Zone, Nantong City, Jiangsu Province

Applicant after: Nantong North Bund Construction Engineering Co., Ltd.

Address before: 364100 No. 6, Bai Lou group, Xikou village, Lake Lei Town, Yongding County, Fujian

Applicant before: Shen Zhiqi

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant