CN105881065B - Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods - Google Patents
Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods Download PDFInfo
- Publication number
- CN105881065B CN105881065B CN201610422487.1A CN201610422487A CN105881065B CN 105881065 B CN105881065 B CN 105881065B CN 201610422487 A CN201610422487 A CN 201610422487A CN 105881065 B CN105881065 B CN 105881065B
- Authority
- CN
- China
- Prior art keywords
- bottom plate
- sequence
- water pipe
- pipe blank
- briquetting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23Q—DETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
- B23Q3/00—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
- B23Q3/12—Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for securing to a spindle in general
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B1/00—Methods for turning or working essentially requiring the use of turning-machines; Use of auxiliary equipment in connection with such methods
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B2215/00—Details of workpieces
- B23B2215/72—Tubes, pipes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23B—TURNING; BORING
- B23B2270/00—Details of turning, boring or drilling machines, processes or tools not otherwise provided for
- B23B2270/08—Clamping mechanisms; Provisions for clamping
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Jigs For Machine Tools (AREA)
Abstract
The invention discloses a kind of engine water tube two sequence fixtures of processing, including bottom plate and the briquetting for compressing workpiece to be processed is arranged on bottom plate and is used for, briquetting is at least provided with two.The engine water tube two sequence fixtures of processing of the present invention, set bottom plate to be engaged with briquetting, can be used for the clamping of water pipe blank, so that clamping is convenient and simple for operation, and clamping reliability is high, and clamping precision is high, the production efficiency of engine water tube is improved, has saved production cost.The invention also discloses a kind of two sequence processing methods using engine water tube processing with two sequence fixtures.
Description
Technical field
The invention belongs to clamping device, specifically, is pressed from both sides the present invention relates to a kind of processing of engine water tube with two sequences
Have and use its two sequence processing methods.
Background technology
Water pipe structure in automobile engine is complicated, and water pipe blank need to be carried out first by professional Foundry Works's Molding Casting, blank
The sequence of smart car one is processed, and then carries out the processing of the sequence of smart car two.In irregular shape due to water pipe, existing centre numerically controlled lathe is not to
Regular workpiece clamping is difficult, wastes time and energy, and so as to influence the processing of the sequence of smart car two of blank, influences the production efficiency of water pipe.
The content of the invention
The present invention provides a kind of engine water tube processing with two sequence fixtures and uses its two sequence processing methods, it is therefore an objective to just
Clamping when water pipe blank is carrying out the processing of two sequences, improves production efficiency.
To achieve these goals, the technical scheme taken of the present invention is:Engine water tube two sequence fixtures of processing, including
Bottom plate and it is arranged on bottom plate and for compressing the briquetting of workpiece to be processed, briquetting is at least provided with two.
The bottom plate has the positioning hole for allowing workpiece to be processed to be embedded in.
Described engine water tube processing also includes the locating dowel being arranged on the bottom plate with two sequence fixtures.
The bottom plate is circle, and the axis of the positioning hole is parallel with the axis of bottom plate.
The briquetting is connected by bolt with the bottom plate.
The briquetting is L-shaped structure, its have with the supporting part of the contacts baseplate and with supporting part vertical connection and use
In the compressed part contacted with the workpiece to be processed, compressed part, which has, allows the through hole that bolt passes through.
The compressed part is parallel with the bottom plate.
Described engine water tube processing also includes the balancing weight being arranged on the bottom plate with two sequence fixtures.
Present invention also offers a kind of two sequence processing methods, workpiece to be processed is filled including the use of above-mentioned two sequences fixture
The clamping process of folder, workpiece to be processed are the water pipe blank processed by the sequence of smart car one.
The engine water tube two sequence fixtures of processing of the present invention, set bottom plate to be engaged with briquetting, can be used for water pipe hair
The clamping of base so that clamping is convenient and simple for operation, and clamping reliability is high, and clamping precision is high, improves engine water tube
Production efficiency, production cost is saved.
Brief description of the drawings
This specification includes the following drawings, and shown content is respectively:
Fig. 1 is the structural representation of two sequence fixtures of the invention;
Fig. 2 is the side view of two sequence fixtures of the invention;
Fig. 3 is the structural representation of bottom plate;
Fig. 4 is the structural representation of briquetting;
Fig. 5 is the structural representation of engine water tube;
Fig. 6 is the structural representation of another angle of engine water tube;
Fig. 7 is the side view of engine water tube;
In figure mark for:
1st, locating dowel;2nd, bottom plate;21st, positioning hole;3rd, briquetting;31st, supporting part;32nd, compressed part;4th, balancing weight;5th, flange
Disk;6th, the first body;7th, the second body;8th, the 3rd body;9th, first boss;10th, second boss;11st, positioning boss.
Embodiment
Below against accompanying drawing, by the description to embodiment, embodiment of the invention is made further details of
Explanation, it is therefore an objective to help those skilled in the art to have more complete, accurate and deep reason to design of the invention, technical scheme
Solution, and contribute to its implementation.
As depicted in figs. 1 and 2, it is with two sequence fixtures, engine water tube the invention provides a kind of processing of engine water tube
It is made by water pipe blank through processes such as the processing of the sequence of smart car one, the processing of the sequence of smart car two and the processing of the sequence of smart car three, two sequence fixtures
It is to be used to carry out clamping to water pipe blank when water pipe blank carries out the processing of the sequence of smart car two.The structure of water pipe blank such as Fig. 5 to Fig. 7 institutes
Show, the first body 6, the second body 7, the 3rd body 8, first that it includes a ring flange 5 and is arranged on ring flange 5 are convex
Platform 9 and second boss 10, the axis of the first body 6, the second body 7 and the three of the 3rd body 8 is parallel, the first body 6 and
Two bodys 7 stretch out towards the same side of ring flange 5, and the opposite side of the 3rd body 8 towards ring flange 5 stretches out, and the first body 6
Length be more than the length of the second body 7 and the 3rd body 8.The axis of 3rd body 8 is located at the axis and second of the first body 6
Between the axis of body 7, first boss 9, the body 6 of second boss 10 and first are arranged at the same side of ring flange 5, first boss
9 are located proximate to the first body 6, and second boss 10 is located proximate to the second body 7, first boss 9 and second boss 10 are in
On same straight line, the first body 6 and the second body 7 be in on the same straight line of the straight line intersection where two boss.First
Boss 9 and second boss 10, which are provided with, allows the through hole that bolt passes through, and through hole is disposed through ring flange 5, makes engine water tube
It can be installed on by bolt on the cylinder body of engine.When water pipe blank carries out the processing of the sequence of smart car one, mainly to the 3rd body 8
Machine.When water pipe blank carries out the processing of the sequence of smart car two, mainly the first body 6 is machined.Complete to make
Engine water tube on, the first body 6 connects the water pump on engine by flexible pipe, and the second body 7 is by jointing with soft
Water branch road on pipe connection engine, the 3rd body 8 are connected by choke valve with engine.
Specifically, as depicted in figs. 1 and 2, two sequence fixtures of the invention include bottom plate 2 and are arranged on bottom plate 2 and use
In the briquetting 3 for compressing workpiece to be processed, briquetting 3 is at least provided with two.Workpiece to be processed is the water after the processing of the sequence of smart car one
Pipe blank, as preferable, briquetting 3 is to apply thrust to water pipe blank at the ring flange 5 of water pipe blank, by water pipe blank
It is fixed.
As shown in figures 1 and 3, bottom plate 2 is circular block shape structure, and briquetting 3 is the top surface for being rotatably arranged on bottom plate 2
On.As preferable, the top surface of bottom plate 2 is provided with a circular positioning hole 21, the axis of the positioning hole 21 and the axle of bottom plate 2
Line is parallel and vertical range between vertical range between the two and the first body 6 and the 3rd body 8 is equal in magnitude.Water pipe
The sidepiece of the ring flange 5 of blank has a circular positioning boss 11, and the 3rd body 8 is coaxial fixed company with positioning boss 11
Connect, and the overall diameter of the 3rd body 8 is less than the diameter of positioning boss 11, the diameter of the diameter and positioning boss 11 of positioning hole 21 is big
It is small equal.When carrying out clamping to water pipe blank, the 3rd body 8 is directed to mobile water pipe blank after the positioning hole 21 on bottom plate 2
Until positioning boss 11 is inserted in positioning hole 21, the position being then engaged by briquetting 3 with bottom plate 2 between corresponding two boss
Locate clamping flange disk 5, and water pipe blank is maintained at the first body 6 state coaxial with bottom plate 2, now water pipe blank fills
It is correct to press from both sides position.
As shown in figure 1, as preferably, briquetting 3 is to be installed to by bolt on bottom plate 2, axis and the bottom plate 2 of bolt
Axis is parallel, is accordingly provided with screwed hole on a base plate 2, and briquetting 3, which is provided with, allows the through hole that bottom plate 2 passes through.Briquetting 3 passes through bolt
It is connected with bottom plate 2, when bolt is not tightened, briquetting 3 can be rotated and can be rotated to outside water pipe blank with the top face of bottom plate 2
Side, avoid producing interference when placing water pipe blank or removing water pipe blank.It by tightening bolt, can be fixed on briquetting 3
On bottom plate 2.As shown in figure 4, as preferably, briquetting 3 is the L-shaped string configuration in section, and briquetting 3 includes the He of supporting part 31
The compressed part 32 being fixedly connected with the side of supporting part 31.The length of compressed part 32 is more than the length of supporting part 31, supporting part 31
For being contacted with bottom plate 2, compressed part 32 is used to contact with the ring flange 5 of water pipe blank, and supporting part 31 makes compressed part 32 and bottom plate 2
Top surface between formed accommodate ring flange 5 space.
As shown in figure 1, as preferably, briquetting 3 sets two altogether, and positioning hole 21 is between two briquettings 3.In
During working condition, two briquettings 3 are in axis perpendicular and the same straight line parallel with the top surface of bottom plate 2 with positioning hole 21
On, two briquettings 3 and the same side in the axis of bottom plate 2.One of briquetting 3 is between the body 7 of first boss 9 and second
Opening position supported flange disk 5, opening position supported flange disk 5 of another briquetting 3 between the body 6 of second boss 10 and first,
The uniform force of ring flange 5, clamping reliability are high.
As depicted in figs. 1 and 2, two sequence fixtures of the invention also include the locating dowel 1 being vertically arranged on the top surface of bottom plate 2,
The axis of locating dowel 1 is parallel with the axis of bottom plate 2 and positioning hole 21, and locating dowel 1 is located closer in first boss 9 and
The briquetting 3 of opening position supported flange disk 5 between two bodys 7.Locating dowel 1 is the table for the first boss 9 with water pipe blank
Face is contacted and positioning action is played to water pipe blank, and the vertical range between the axis of locating dowel 1 and the axis of positioning hole 21 is omited
More than the vertical range on water pipe blank between the axis of the 3rd body 8 and the axis of first boss 9, the axis of locating dowel 1 with
Vertical range between the axis of bottom plate 2 is more than the vertical range between the axis of the first body 6 and the axis of first boss 9,
Enable first boss 9 to be resisted against the positioning for realizing water pipe blank in locating dowel 1, improve positioning accuracy and efficiency.
As depicted in figs. 1 and 2, two sequence fixtures of the invention also include being arranged at balancing weight 4 on the top surface of bottom plate 2, and two
Individual briquetting 3, locating dowel 1 and balancing weight 4 are distributed in the surrounding of the axis of bottom plate 2.Due to adding to the water pipe blank progress sequence of smart car two
In man-hour, two sequence fixtures need to be installed on the scroll chuck of lathe, therefore balancing weight 4 need to be set to ensure putting down during fixture rotation
Weighing apparatus.
Present invention also offers a kind of two sequence processing methods, the two sequence fixtures including the use of said structure are to workpiece to be processed
The Vehicle Processing process for carrying out the clamping process of clamping and being machined to workpiece, workpiece to be processed are to be processed by the sequence of smart car one
Water pipe blank.
The specific operation process of clamping process is:The bottom plate 2 of two sequence fixtures is installed on numerically controlled lathe by bolt
On scroll chuck, mobile water pipe blank is until convex after the positioning hole 21 that the 3rd body 8 of water pipe blank is aligned on bottom plate 2
Platform 11 is inserted in positioning hole 21, then rotates water pipe blank until making first boss 9 be resisted against in locating dowel 1, then by two
Briquetting 3 turns between the body 7 of first boss 9 and second respectively, the opening position between the body 6 of second boss 10 and first, so
After tighten bolt, two briquettings 3 is engaged clamping flange disk 5 with bottom plate 2, and water pipe blank is maintained at the first body
6 states coaxial with bottom plate 2, now in the 3rd body 8 insertion positioning hole 21 of water pipe blank, complete the clamping of water pipe blank.
The specific operation process of Vehicle Processing process is:Driven according to technological requirement, while scroll chuck rotates fixture and
Water pipe blank thereon rotates coaxially, even if the first body 6 of water pipe blank keeps coaxial state with lathe spindle, then controls
Cutter on numerically controlled lathe machines to the first body 6 of the water pipe blank after clamping.
The present invention is exemplarily described above in association with accompanying drawing.Obviously, present invention specific implementation is not by above-mentioned side
The limitation of formula.As long as employ the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress;Or not
It is improved, the above-mentioned design of the present invention and technical scheme are directly applied into other occasions, in protection scope of the present invention
Within.
Claims (6)
1. engine water tube two sequence fixtures of processing, enter luggage when carrying out the processing of the sequence of smart car two for water pipe blank to water pipe blank
Folder, it is characterised in that water pipe blank includes a ring flange and the first body being arranged on ring flange, the second body, the
Three bodys, first boss and second boss, the axis of the first body, the second body and the 3rd body three is parallel, the first pipe
Body and the second body stretch out towards the same side of ring flange, and the opposite side of the 3rd body towards ring flange stretches out, the side of ring flange
Portion has a circular positioning boss, and the 3rd body is to be fixedly and coaxially connected with positioning boss;The two sequences fixture includes bottom
Plate, the locating dowel for compressing the briquetting of workpiece to be processed and being arranged on the top surface of bottom plate is arranged on bottom plate and is used for, briquetting is extremely
Two are set less, and workpiece to be processed is water pipe blank;Bottom plate has the positioning hole for allowing workpiece to be processed to be embedded in for circular and bottom plate,
The axis of positioning hole is parallel with the axis of bottom plate, and the diameter of positioning hole is equal with the diameter of positioning boss, and locating dowel is used
Contacted in the surface of the first boss with water pipe blank and positioning action is played to water pipe blank;Clamping is being carried out to water pipe blank
When, by mobile water pipe blank after the positioning hole on the 3rd body alignment bottom plate until in positioning boss insertion positioning hole, Ran Houyou
Briquetting is engaged clamping flange disk with bottom plate, water pipe blank is maintained at the first body state coaxial with bottom plate.
2. two sequence fixtures of engine water tube processing according to claim 1, it is characterised in that the briquetting passes through bolt
It is connected with the bottom plate.
3. two sequence fixtures of engine water tube processing according to claim 1 or 2, it is characterised in that the briquetting is L-shaped
Structure, it has with the supporting part of the contacts baseplate and with supporting part vertical connection and for being contacted with the workpiece to be processed
Compressed part, compressed part, which has, allows the through hole that bolt passes through.
4. engine water tube according to claim 3 two sequence fixtures of processing, it is characterised in that the compressed part with it is described
Bottom plate is parallel.
5. two sequence fixtures of engine water tube processing according to claim 1 or 2, it is characterised in that also include being arranged at
Balancing weight on the bottom plate.
6. two sequence processing methods, it is characterised in that including the use of any two described sequence fixtures of claim 1 to 5 to be processed
Workpiece carries out the clamping process of clamping, and workpiece to be processed is the water pipe blank processed by the sequence of smart car one.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610422487.1A CN105881065B (en) | 2016-06-15 | 2016-06-15 | Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610422487.1A CN105881065B (en) | 2016-06-15 | 2016-06-15 | Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105881065A CN105881065A (en) | 2016-08-24 |
CN105881065B true CN105881065B (en) | 2018-01-30 |
Family
ID=56729783
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610422487.1A Expired - Fee Related CN105881065B (en) | 2016-06-15 | 2016-06-15 | Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105881065B (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2221271A1 (en) * | 1973-01-04 | 1974-10-11 | Beauplat Philippe | |
CN201979328U (en) * | 2011-04-12 | 2011-09-21 | 杭州千岛湖陆行泵业有限公司 | Clamp of eccentric bushing |
CN202388274U (en) * | 2011-12-09 | 2012-08-22 | 浙江科力车辆控制系统有限公司 | Rotation station turning tool for four-circuit protection valve |
CN204221470U (en) * | 2014-10-27 | 2015-03-25 | 三峡大学 | The special auxiliary clamp of a kind of lathe |
CN105328489A (en) * | 2015-11-06 | 2016-02-17 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Tool for machine tool chuck to machine eccentric workpiece |
-
2016
- 2016-06-15 CN CN201610422487.1A patent/CN105881065B/en not_active Expired - Fee Related
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2221271A1 (en) * | 1973-01-04 | 1974-10-11 | Beauplat Philippe | |
CN201979328U (en) * | 2011-04-12 | 2011-09-21 | 杭州千岛湖陆行泵业有限公司 | Clamp of eccentric bushing |
CN202388274U (en) * | 2011-12-09 | 2012-08-22 | 浙江科力车辆控制系统有限公司 | Rotation station turning tool for four-circuit protection valve |
CN204221470U (en) * | 2014-10-27 | 2015-03-25 | 三峡大学 | The special auxiliary clamp of a kind of lathe |
CN105328489A (en) * | 2015-11-06 | 2016-02-17 | 齐齐哈尔雷昂重工机械制造有限责任公司 | Tool for machine tool chuck to machine eccentric workpiece |
Also Published As
Publication number | Publication date |
---|---|
CN105881065A (en) | 2016-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205147883U (en) | Clamp for drilling hole in flange plate | |
CN111152053A (en) | Multi-station rotating disc type clamp for drilling brake pump | |
CN106825971A (en) | One kind is used for automobile triangular arm welding workstation | |
CN205927996U (en) | Engine bracket fixes a position clamping structure | |
CN205703395U (en) | Axle box double-station numerical control fixture | |
CN203418337U (en) | Fixture suitable for rapid drilling of rope clip | |
CN105881065B (en) | Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods | |
CN105817934B (en) | Engine water tube processing is with three sequence fixtures and uses its three sequence processing methods | |
CN103157829A (en) | Inner arc oblique hole machining device | |
CN205852353U (en) | Engine water tube is processed with three sequence fixtures | |
CN111922809B (en) | Automatic fixture equipment for eccentric shaft grinding of cylindrical grinding machine | |
CN205834844U (en) | Engine water tube is processed with two sequence fixtures | |
CN215546948U (en) | Motor casing's processingequipment | |
CN205111503U (en) | Five automation equipments throwing are ground in accuse of cell -phone hull number | |
CN105945524B (en) | Engine water tube processing method | |
CN203292545U (en) | Machining device for inner-circular-arc inclined hole | |
CN204248520U (en) | Main speed reducer of rear axle housing bearing cap installs thread turning fixture | |
CN105855968A (en) | First process fixture for processing engine water pipe and first process processing method adopting first process fixture | |
CN208592595U (en) | A kind of knuckle casting hydraulically operated fixture | |
CN206732290U (en) | Taper hole gear grinding clamp | |
CN202780565U (en) | Lathe clamp for datum hole of mechanical diaphragm pump | |
CN206047708U (en) | Engine water tube is processed with a sequence fixture | |
CN207189155U (en) | A kind of water knockout drum lathe | |
CN202570900U (en) | Universal tooling for pipe benders | |
CN2684990Y (en) | Equipment for processing thin sheets and like components peripheral holes |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181029 Address after: 241100 Wuhu County, Wuhu, Anhui province Anhui Town, Anhui new Wuqu Economic Development Zone, 01 West Road 99 Patentee after: Wuhu Fuli Machinery Technology Co., Ltd. Address before: 241100 Wuhu Machinery Industrial Park, Wuhu, Wuhu, Anhui Patentee before: Wuhu Jin Yuan Machinery Manufacturing Co., Ltd. |
|