CN105881065B - Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods - Google Patents

Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods Download PDF

Info

Publication number
CN105881065B
CN105881065B CN201610422487.1A CN201610422487A CN105881065B CN 105881065 B CN105881065 B CN 105881065B CN 201610422487 A CN201610422487 A CN 201610422487A CN 105881065 B CN105881065 B CN 105881065B
Authority
CN
China
Prior art keywords
bottom plate
sequence
water pipe
pipe blank
briquetting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201610422487.1A
Other languages
Chinese (zh)
Other versions
CN105881065A (en
Inventor
胡先启
陈云明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhu Fuli Machinery Technology Co., Ltd.
Original Assignee
Wuhu Jin Yuan Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhu Jin Yuan Machinery Manufacturing Co Ltd filed Critical Wuhu Jin Yuan Machinery Manufacturing Co Ltd
Priority to CN201610422487.1A priority Critical patent/CN105881065B/en
Publication of CN105881065A publication Critical patent/CN105881065A/en
Application granted granted Critical
Publication of CN105881065B publication Critical patent/CN105881065B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23QDETAILS, COMPONENTS, OR ACCESSORIES FOR MACHINE TOOLS, e.g. ARRANGEMENTS FOR COPYING OR CONTROLLING; MACHINE TOOLS IN GENERAL CHARACTERISED BY THE CONSTRUCTION OF PARTICULAR DETAILS OR COMPONENTS; COMBINATIONS OR ASSOCIATIONS OF METAL-WORKING MACHINES, NOT DIRECTED TO A PARTICULAR RESULT
    • B23Q3/00Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine
    • B23Q3/12Devices holding, supporting, or positioning work or tools, of a kind normally removable from the machine for securing to a spindle in general
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B1/00Methods for turning or working essentially requiring the use of turning-machines; Use of auxiliary equipment in connection with such methods
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2215/00Details of workpieces
    • B23B2215/72Tubes, pipes
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23BTURNING; BORING
    • B23B2270/00Details of turning, boring or drilling machines, processes or tools not otherwise provided for
    • B23B2270/08Clamping mechanisms; Provisions for clamping

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jigs For Machine Tools (AREA)

Abstract

The invention discloses a kind of engine water tube two sequence fixtures of processing, including bottom plate and the briquetting for compressing workpiece to be processed is arranged on bottom plate and is used for, briquetting is at least provided with two.The engine water tube two sequence fixtures of processing of the present invention, set bottom plate to be engaged with briquetting, can be used for the clamping of water pipe blank, so that clamping is convenient and simple for operation, and clamping reliability is high, and clamping precision is high, the production efficiency of engine water tube is improved, has saved production cost.The invention also discloses a kind of two sequence processing methods using engine water tube processing with two sequence fixtures.

Description

Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods
Technical field
The invention belongs to clamping device, specifically, is pressed from both sides the present invention relates to a kind of processing of engine water tube with two sequences Have and use its two sequence processing methods.
Background technology
Water pipe structure in automobile engine is complicated, and water pipe blank need to be carried out first by professional Foundry Works's Molding Casting, blank The sequence of smart car one is processed, and then carries out the processing of the sequence of smart car two.In irregular shape due to water pipe, existing centre numerically controlled lathe is not to Regular workpiece clamping is difficult, wastes time and energy, and so as to influence the processing of the sequence of smart car two of blank, influences the production efficiency of water pipe.
The content of the invention
The present invention provides a kind of engine water tube processing with two sequence fixtures and uses its two sequence processing methods, it is therefore an objective to just Clamping when water pipe blank is carrying out the processing of two sequences, improves production efficiency.
To achieve these goals, the technical scheme taken of the present invention is:Engine water tube two sequence fixtures of processing, including Bottom plate and it is arranged on bottom plate and for compressing the briquetting of workpiece to be processed, briquetting is at least provided with two.
The bottom plate has the positioning hole for allowing workpiece to be processed to be embedded in.
Described engine water tube processing also includes the locating dowel being arranged on the bottom plate with two sequence fixtures.
The bottom plate is circle, and the axis of the positioning hole is parallel with the axis of bottom plate.
The briquetting is connected by bolt with the bottom plate.
The briquetting is L-shaped structure, its have with the supporting part of the contacts baseplate and with supporting part vertical connection and use In the compressed part contacted with the workpiece to be processed, compressed part, which has, allows the through hole that bolt passes through.
The compressed part is parallel with the bottom plate.
Described engine water tube processing also includes the balancing weight being arranged on the bottom plate with two sequence fixtures.
Present invention also offers a kind of two sequence processing methods, workpiece to be processed is filled including the use of above-mentioned two sequences fixture The clamping process of folder, workpiece to be processed are the water pipe blank processed by the sequence of smart car one.
The engine water tube two sequence fixtures of processing of the present invention, set bottom plate to be engaged with briquetting, can be used for water pipe hair The clamping of base so that clamping is convenient and simple for operation, and clamping reliability is high, and clamping precision is high, improves engine water tube Production efficiency, production cost is saved.
Brief description of the drawings
This specification includes the following drawings, and shown content is respectively:
Fig. 1 is the structural representation of two sequence fixtures of the invention;
Fig. 2 is the side view of two sequence fixtures of the invention;
Fig. 3 is the structural representation of bottom plate;
Fig. 4 is the structural representation of briquetting;
Fig. 5 is the structural representation of engine water tube;
Fig. 6 is the structural representation of another angle of engine water tube;
Fig. 7 is the side view of engine water tube;
In figure mark for:
1st, locating dowel;2nd, bottom plate;21st, positioning hole;3rd, briquetting;31st, supporting part;32nd, compressed part;4th, balancing weight;5th, flange Disk;6th, the first body;7th, the second body;8th, the 3rd body;9th, first boss;10th, second boss;11st, positioning boss.
Embodiment
Below against accompanying drawing, by the description to embodiment, embodiment of the invention is made further details of Explanation, it is therefore an objective to help those skilled in the art to have more complete, accurate and deep reason to design of the invention, technical scheme Solution, and contribute to its implementation.
As depicted in figs. 1 and 2, it is with two sequence fixtures, engine water tube the invention provides a kind of processing of engine water tube It is made by water pipe blank through processes such as the processing of the sequence of smart car one, the processing of the sequence of smart car two and the processing of the sequence of smart car three, two sequence fixtures It is to be used to carry out clamping to water pipe blank when water pipe blank carries out the processing of the sequence of smart car two.The structure of water pipe blank such as Fig. 5 to Fig. 7 institutes Show, the first body 6, the second body 7, the 3rd body 8, first that it includes a ring flange 5 and is arranged on ring flange 5 are convex Platform 9 and second boss 10, the axis of the first body 6, the second body 7 and the three of the 3rd body 8 is parallel, the first body 6 and Two bodys 7 stretch out towards the same side of ring flange 5, and the opposite side of the 3rd body 8 towards ring flange 5 stretches out, and the first body 6 Length be more than the length of the second body 7 and the 3rd body 8.The axis of 3rd body 8 is located at the axis and second of the first body 6 Between the axis of body 7, first boss 9, the body 6 of second boss 10 and first are arranged at the same side of ring flange 5, first boss 9 are located proximate to the first body 6, and second boss 10 is located proximate to the second body 7, first boss 9 and second boss 10 are in On same straight line, the first body 6 and the second body 7 be in on the same straight line of the straight line intersection where two boss.First Boss 9 and second boss 10, which are provided with, allows the through hole that bolt passes through, and through hole is disposed through ring flange 5, makes engine water tube It can be installed on by bolt on the cylinder body of engine.When water pipe blank carries out the processing of the sequence of smart car one, mainly to the 3rd body 8 Machine.When water pipe blank carries out the processing of the sequence of smart car two, mainly the first body 6 is machined.Complete to make Engine water tube on, the first body 6 connects the water pump on engine by flexible pipe, and the second body 7 is by jointing with soft Water branch road on pipe connection engine, the 3rd body 8 are connected by choke valve with engine.
Specifically, as depicted in figs. 1 and 2, two sequence fixtures of the invention include bottom plate 2 and are arranged on bottom plate 2 and use In the briquetting 3 for compressing workpiece to be processed, briquetting 3 is at least provided with two.Workpiece to be processed is the water after the processing of the sequence of smart car one Pipe blank, as preferable, briquetting 3 is to apply thrust to water pipe blank at the ring flange 5 of water pipe blank, by water pipe blank It is fixed.
As shown in figures 1 and 3, bottom plate 2 is circular block shape structure, and briquetting 3 is the top surface for being rotatably arranged on bottom plate 2 On.As preferable, the top surface of bottom plate 2 is provided with a circular positioning hole 21, the axis of the positioning hole 21 and the axle of bottom plate 2 Line is parallel and vertical range between vertical range between the two and the first body 6 and the 3rd body 8 is equal in magnitude.Water pipe The sidepiece of the ring flange 5 of blank has a circular positioning boss 11, and the 3rd body 8 is coaxial fixed company with positioning boss 11 Connect, and the overall diameter of the 3rd body 8 is less than the diameter of positioning boss 11, the diameter of the diameter and positioning boss 11 of positioning hole 21 is big It is small equal.When carrying out clamping to water pipe blank, the 3rd body 8 is directed to mobile water pipe blank after the positioning hole 21 on bottom plate 2 Until positioning boss 11 is inserted in positioning hole 21, the position being then engaged by briquetting 3 with bottom plate 2 between corresponding two boss Locate clamping flange disk 5, and water pipe blank is maintained at the first body 6 state coaxial with bottom plate 2, now water pipe blank fills It is correct to press from both sides position.
As shown in figure 1, as preferably, briquetting 3 is to be installed to by bolt on bottom plate 2, axis and the bottom plate 2 of bolt Axis is parallel, is accordingly provided with screwed hole on a base plate 2, and briquetting 3, which is provided with, allows the through hole that bottom plate 2 passes through.Briquetting 3 passes through bolt It is connected with bottom plate 2, when bolt is not tightened, briquetting 3 can be rotated and can be rotated to outside water pipe blank with the top face of bottom plate 2 Side, avoid producing interference when placing water pipe blank or removing water pipe blank.It by tightening bolt, can be fixed on briquetting 3 On bottom plate 2.As shown in figure 4, as preferably, briquetting 3 is the L-shaped string configuration in section, and briquetting 3 includes the He of supporting part 31 The compressed part 32 being fixedly connected with the side of supporting part 31.The length of compressed part 32 is more than the length of supporting part 31, supporting part 31 For being contacted with bottom plate 2, compressed part 32 is used to contact with the ring flange 5 of water pipe blank, and supporting part 31 makes compressed part 32 and bottom plate 2 Top surface between formed accommodate ring flange 5 space.
As shown in figure 1, as preferably, briquetting 3 sets two altogether, and positioning hole 21 is between two briquettings 3.In During working condition, two briquettings 3 are in axis perpendicular and the same straight line parallel with the top surface of bottom plate 2 with positioning hole 21 On, two briquettings 3 and the same side in the axis of bottom plate 2.One of briquetting 3 is between the body 7 of first boss 9 and second Opening position supported flange disk 5, opening position supported flange disk 5 of another briquetting 3 between the body 6 of second boss 10 and first, The uniform force of ring flange 5, clamping reliability are high.
As depicted in figs. 1 and 2, two sequence fixtures of the invention also include the locating dowel 1 being vertically arranged on the top surface of bottom plate 2, The axis of locating dowel 1 is parallel with the axis of bottom plate 2 and positioning hole 21, and locating dowel 1 is located closer in first boss 9 and The briquetting 3 of opening position supported flange disk 5 between two bodys 7.Locating dowel 1 is the table for the first boss 9 with water pipe blank Face is contacted and positioning action is played to water pipe blank, and the vertical range between the axis of locating dowel 1 and the axis of positioning hole 21 is omited More than the vertical range on water pipe blank between the axis of the 3rd body 8 and the axis of first boss 9, the axis of locating dowel 1 with Vertical range between the axis of bottom plate 2 is more than the vertical range between the axis of the first body 6 and the axis of first boss 9, Enable first boss 9 to be resisted against the positioning for realizing water pipe blank in locating dowel 1, improve positioning accuracy and efficiency.
As depicted in figs. 1 and 2, two sequence fixtures of the invention also include being arranged at balancing weight 4 on the top surface of bottom plate 2, and two Individual briquetting 3, locating dowel 1 and balancing weight 4 are distributed in the surrounding of the axis of bottom plate 2.Due to adding to the water pipe blank progress sequence of smart car two In man-hour, two sequence fixtures need to be installed on the scroll chuck of lathe, therefore balancing weight 4 need to be set to ensure putting down during fixture rotation Weighing apparatus.
Present invention also offers a kind of two sequence processing methods, the two sequence fixtures including the use of said structure are to workpiece to be processed The Vehicle Processing process for carrying out the clamping process of clamping and being machined to workpiece, workpiece to be processed are to be processed by the sequence of smart car one Water pipe blank.
The specific operation process of clamping process is:The bottom plate 2 of two sequence fixtures is installed on numerically controlled lathe by bolt On scroll chuck, mobile water pipe blank is until convex after the positioning hole 21 that the 3rd body 8 of water pipe blank is aligned on bottom plate 2 Platform 11 is inserted in positioning hole 21, then rotates water pipe blank until making first boss 9 be resisted against in locating dowel 1, then by two Briquetting 3 turns between the body 7 of first boss 9 and second respectively, the opening position between the body 6 of second boss 10 and first, so After tighten bolt, two briquettings 3 is engaged clamping flange disk 5 with bottom plate 2, and water pipe blank is maintained at the first body 6 states coaxial with bottom plate 2, now in the 3rd body 8 insertion positioning hole 21 of water pipe blank, complete the clamping of water pipe blank.
The specific operation process of Vehicle Processing process is:Driven according to technological requirement, while scroll chuck rotates fixture and Water pipe blank thereon rotates coaxially, even if the first body 6 of water pipe blank keeps coaxial state with lathe spindle, then controls Cutter on numerically controlled lathe machines to the first body 6 of the water pipe blank after clamping.
The present invention is exemplarily described above in association with accompanying drawing.Obviously, present invention specific implementation is not by above-mentioned side The limitation of formula.As long as employ the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress;Or not It is improved, the above-mentioned design of the present invention and technical scheme are directly applied into other occasions, in protection scope of the present invention Within.

Claims (6)

1. engine water tube two sequence fixtures of processing, enter luggage when carrying out the processing of the sequence of smart car two for water pipe blank to water pipe blank Folder, it is characterised in that water pipe blank includes a ring flange and the first body being arranged on ring flange, the second body, the Three bodys, first boss and second boss, the axis of the first body, the second body and the 3rd body three is parallel, the first pipe Body and the second body stretch out towards the same side of ring flange, and the opposite side of the 3rd body towards ring flange stretches out, the side of ring flange Portion has a circular positioning boss, and the 3rd body is to be fixedly and coaxially connected with positioning boss;The two sequences fixture includes bottom Plate, the locating dowel for compressing the briquetting of workpiece to be processed and being arranged on the top surface of bottom plate is arranged on bottom plate and is used for, briquetting is extremely Two are set less, and workpiece to be processed is water pipe blank;Bottom plate has the positioning hole for allowing workpiece to be processed to be embedded in for circular and bottom plate, The axis of positioning hole is parallel with the axis of bottom plate, and the diameter of positioning hole is equal with the diameter of positioning boss, and locating dowel is used Contacted in the surface of the first boss with water pipe blank and positioning action is played to water pipe blank;Clamping is being carried out to water pipe blank When, by mobile water pipe blank after the positioning hole on the 3rd body alignment bottom plate until in positioning boss insertion positioning hole, Ran Houyou Briquetting is engaged clamping flange disk with bottom plate, water pipe blank is maintained at the first body state coaxial with bottom plate.
2. two sequence fixtures of engine water tube processing according to claim 1, it is characterised in that the briquetting passes through bolt It is connected with the bottom plate.
3. two sequence fixtures of engine water tube processing according to claim 1 or 2, it is characterised in that the briquetting is L-shaped Structure, it has with the supporting part of the contacts baseplate and with supporting part vertical connection and for being contacted with the workpiece to be processed Compressed part, compressed part, which has, allows the through hole that bolt passes through.
4. engine water tube according to claim 3 two sequence fixtures of processing, it is characterised in that the compressed part with it is described Bottom plate is parallel.
5. two sequence fixtures of engine water tube processing according to claim 1 or 2, it is characterised in that also include being arranged at Balancing weight on the bottom plate.
6. two sequence processing methods, it is characterised in that including the use of any two described sequence fixtures of claim 1 to 5 to be processed Workpiece carries out the clamping process of clamping, and workpiece to be processed is the water pipe blank processed by the sequence of smart car one.
CN201610422487.1A 2016-06-15 2016-06-15 Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods Expired - Fee Related CN105881065B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610422487.1A CN105881065B (en) 2016-06-15 2016-06-15 Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610422487.1A CN105881065B (en) 2016-06-15 2016-06-15 Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods

Publications (2)

Publication Number Publication Date
CN105881065A CN105881065A (en) 2016-08-24
CN105881065B true CN105881065B (en) 2018-01-30

Family

ID=56729783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610422487.1A Expired - Fee Related CN105881065B (en) 2016-06-15 2016-06-15 Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods

Country Status (1)

Country Link
CN (1) CN105881065B (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2221271A1 (en) * 1973-01-04 1974-10-11 Beauplat Philippe
CN201979328U (en) * 2011-04-12 2011-09-21 杭州千岛湖陆行泵业有限公司 Clamp of eccentric bushing
CN202388274U (en) * 2011-12-09 2012-08-22 浙江科力车辆控制系统有限公司 Rotation station turning tool for four-circuit protection valve
CN204221470U (en) * 2014-10-27 2015-03-25 三峡大学 The special auxiliary clamp of a kind of lathe
CN105328489A (en) * 2015-11-06 2016-02-17 齐齐哈尔雷昂重工机械制造有限责任公司 Tool for machine tool chuck to machine eccentric workpiece

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2221271A1 (en) * 1973-01-04 1974-10-11 Beauplat Philippe
CN201979328U (en) * 2011-04-12 2011-09-21 杭州千岛湖陆行泵业有限公司 Clamp of eccentric bushing
CN202388274U (en) * 2011-12-09 2012-08-22 浙江科力车辆控制系统有限公司 Rotation station turning tool for four-circuit protection valve
CN204221470U (en) * 2014-10-27 2015-03-25 三峡大学 The special auxiliary clamp of a kind of lathe
CN105328489A (en) * 2015-11-06 2016-02-17 齐齐哈尔雷昂重工机械制造有限责任公司 Tool for machine tool chuck to machine eccentric workpiece

Also Published As

Publication number Publication date
CN105881065A (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN205147883U (en) Clamp for drilling hole in flange plate
CN111152053A (en) Multi-station rotating disc type clamp for drilling brake pump
CN106825971A (en) One kind is used for automobile triangular arm welding workstation
CN205927996U (en) Engine bracket fixes a position clamping structure
CN205703395U (en) Axle box double-station numerical control fixture
CN203418337U (en) Fixture suitable for rapid drilling of rope clip
CN105881065B (en) Engine water tube processing is with two sequence fixtures and uses its two sequence processing methods
CN105817934B (en) Engine water tube processing is with three sequence fixtures and uses its three sequence processing methods
CN103157829A (en) Inner arc oblique hole machining device
CN205852353U (en) Engine water tube is processed with three sequence fixtures
CN111922809B (en) Automatic fixture equipment for eccentric shaft grinding of cylindrical grinding machine
CN205834844U (en) Engine water tube is processed with two sequence fixtures
CN215546948U (en) Motor casing's processingequipment
CN205111503U (en) Five automation equipments throwing are ground in accuse of cell -phone hull number
CN105945524B (en) Engine water tube processing method
CN203292545U (en) Machining device for inner-circular-arc inclined hole
CN204248520U (en) Main speed reducer of rear axle housing bearing cap installs thread turning fixture
CN105855968A (en) First process fixture for processing engine water pipe and first process processing method adopting first process fixture
CN208592595U (en) A kind of knuckle casting hydraulically operated fixture
CN206732290U (en) Taper hole gear grinding clamp
CN202780565U (en) Lathe clamp for datum hole of mechanical diaphragm pump
CN206047708U (en) Engine water tube is processed with a sequence fixture
CN207189155U (en) A kind of water knockout drum lathe
CN202570900U (en) Universal tooling for pipe benders
CN2684990Y (en) Equipment for processing thin sheets and like components peripheral holes

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20181029

Address after: 241100 Wuhu County, Wuhu, Anhui province Anhui Town, Anhui new Wuqu Economic Development Zone, 01 West Road 99

Patentee after: Wuhu Fuli Machinery Technology Co., Ltd.

Address before: 241100 Wuhu Machinery Industrial Park, Wuhu, Wuhu, Anhui

Patentee before: Wuhu Jin Yuan Machinery Manufacturing Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180130

Termination date: 20200615