CN105869063A - Economical monitoring device and method for adjustment of operation modes of circulating water system of power station - Google Patents

Economical monitoring device and method for adjustment of operation modes of circulating water system of power station Download PDF

Info

Publication number
CN105869063A
CN105869063A CN201610147624.5A CN201610147624A CN105869063A CN 105869063 A CN105869063 A CN 105869063A CN 201610147624 A CN201610147624 A CN 201610147624A CN 105869063 A CN105869063 A CN 105869063A
Authority
CN
China
Prior art keywords
power
unit
transducer
pressure
absolute pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610147624.5A
Other languages
Chinese (zh)
Inventor
万忠海
晏涛
王小波
吴杨辉
鲁锦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Electric Power Research Institute of State Grid Jiangxi Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201610147624.5A priority Critical patent/CN105869063A/en
Publication of CN105869063A publication Critical patent/CN105869063A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Human Resources & Organizations (AREA)
  • Strategic Management (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Health & Medical Sciences (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Development Economics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Control Of Eletrric Generators (AREA)

Abstract

The invention provides an economical monitoring device and method for adjustment of operation modes of a circulating water system of a power station. The device comprises a power measuring device, an absolute pressure measuring device, a data acquiring unit and a calculating and displaying unit. The power measuring device comprises a first power transmitter (1), a second power transmitter (2), a third power transmitter (3), a fourth power transmitter (4) and a fifth power transmitter (5), which are used for measuring power of a turbo-generator and power of four circulation water pump motors. The absolute pressure measuring device comprises a first absolute pressure transmitter (6) and a second pressure transmitter (7) which are used for measuring high/low pressure condenser pressure of a turbine. According to the invention, the monitoring device is used for acquiring onsite real-time data so as to calculate economic dispatch operation indexes of a circulation water system. Thus, the system is simple; measurement and calculation results are precise; actual energy conservation results before and after adjustment of operation modes of the circulation water system can be directly displayed; and requirements of economic operation of a power station are satisfied.

Description

A kind of Circulating-Water System in Power Station method of operation adjusting economy property monitoring device and method
Technical field
The present invention relates to a kind of Circulating-Water System in Power Station method of operation adjusting economy property monitoring device and method, belong to Power plant auxiliary machine running technology field.
Background technology
Circulation is the important component part of power station steam turbine group, and its consumed electric energy accounts for steamer and sends out About the 1.0% of group of motors generated energy.Principal tunable as turbine condenser pressure saves factor, rationally selects Select the method for operation of circulation, to saving station service power consumption rate, improving power station heat-economy important in inhibiting. At present, the circulation optimizing operating mode scheme that the widely used test unit in power station is recommended carrys out guide field Produce.It is known that Steam Turbine and auxiliary device running status, cooling water quality, environment temperature etc. Boundary condition is the most complicated and changeable, and this makes the prioritization scheme drawn based on experimental condition may be in certain feelings Do not correspond with on-site actual situations under shape, it is contemplated that energy-saving potential will be weakened.Meanwhile, rate for incorporation into the power network with The irregular fluctuation of mark coal unit price also directly affects the energy-conservation effect that the Circulating-Water System in Power Station method of operation adjusts Really.How to monitor the circulation method of operation and adjust forward and backward economy situation of change, be power station circulation Water system operational management problem demanding prompt solution.
Summary of the invention
The technical problem that the present invention intends to solve is to provide that a kind of system is simple and direct, stable, power station recirculated water accurately System operation mode adjusting economy property monitoring device and method.
The technical scheme is that, a kind of Circulating-Water System in Power Station method of operation adjusting economy property monitoring device, Including power-measuring device, absolute pressure measurement apparatus, data acquisition unit and calculating and display unit.
Described power-measuring device includes measuring turbine generator acc power and four circulation-water pump electric machine power respectively First power transducer the 1, second power transducer the 2, the 3rd power transducer the 3, the 4th power transducer 4, the 5th power transducer 5;Described absolute pressure measurement apparatus includes that measuring steam turbine high and low pressure respectively coagulates First absolute pressure transducer the 6, second absolute pressure transducer 7 of vapour device pressure;Described calculating and display are single Unit comprises circulation economic load dispatching operating index calculation procedure and interface;Described first power transducer 1, Second power transducer the 2, the 3rd power transducer the 3, the 4th power transducer the 4, the 5th power transducer 5, First absolute pressure transducer 6 and the second absolute pressure transducer 7 connect the input of data acquisition unit respectively End;The output of described data acquisition unit connects calculating and the input of display unit.
The precision of all power transducers is ± 0.2%;The precision of all absolute pressure transducers is ± 0.1%;The precision of data acquisition unit is ± 0.05%, and is furnished with standard RS232/485/USB communication interface, Support standard MODBUS communications protocol, supports the multiple communication modes such as wired connection, LAN connection.
A kind of Circulating-Water System in Power Station adjusting economy property of method of operation monitoring monitoring method is entered as steps described below OK:
1) described monitoring device of stating correctly is mounted and connected;Gather steam turbine generator and four recirculated waters The power signal of pump motor and high pressure, low pressure condenser pressure signal, and the signal of collection is passed through data acquisition Unit is sent to calculate and display unit;
2) according to the signal gathered to circulation economic load dispatching operating index entrance calculation procedure:
Average condenser pressure before the circulation method of operation adjusts is:
p ‾ 0 = p h 0 + p l 0 - - - ( 1 )
In formula,Be respectively the circulation method of operation adjust before average condenser pressure, High pressure condenser pressure, low pressure condenser pressure, unit kPa;
Average condenser pressure after the circulation method of operation adjusts is:
p ‾ 1 = p h 1 + p l 1 - - - ( 2 )
In formula,Be respectively the circulation method of operation adjust after average condenser pressure, High pressure condenser pressure, low pressure condenser pressure, unit kPa;
The circulation method of operation adjusts the difference of forward and backward average condenser pressure:
Δ p ‾ = p ‾ 1 - p ‾ 1 - - - ( 3 )
In formula,The difference of forward and backward average condenser pressure, unit is adjusted for the circulation method of operation kPa;
For using the circulation of Expanding Unit Element System:
Before the circulation method of operation adjusts, single unit consumed water circulating pump power is:
Σ W 0 = ( W 2 0 + W 3 0 + W 4 0 + W 5 0 ) / 2 - - - ( 4 )
In formula, ∑ W0It is respectively before the circulation method of operation adjusts single Platform unit consumed water circulating pump power and four circulation-water pump electric machine power, unit kW;
After the circulation method of operation adjusts, single unit consumed water circulating pump power is:
Σ W 1 = ( W 2 1 + W 3 1 + W 4 1 + W 5 1 ) / 2 - - - ( 5 )
In formula, ∑ W1It is respectively after the circulation method of operation adjusts single Platform unit consumed water circulating pump power and four circulation-water pump electric machine power, unit kW;
The circulation method of operation adjusts forward and backward single unit consumed water circulating pump power difference:
Δ ∑ W=∑ W1-∑W2 (6)
In formula, Δ ∑ W adjusts forward and backward single unit by the circulation method of operation and is consumed water circulating pump merit Rate difference, unit kW;
The unit that condenser pressure unit change amount under matching typical condition difference turbine generator acc power is corresponding The amplitude of variation of gross coal consumption rate is:
δ B=f (N, p) * 10-2*g(N) (7)
In formula, δ B is the amplitude of variation of unit generation coal consumption corresponding to condenser pressure unit change amount, and unit is g/(kPa*kW.h);(N p) is the condenser pressure correction factor under different turbine generator acc power to function f Fitting formula, unit is %/(kPa);Function g (N) is the gross coal consumption rate under different turbine generator acc power Fitting formula, unit is g/ (kW.h);N is turbine generator acc power, and unit is kW;P is condensing Device pressure, unit kPa.
For Turbo-generator Set, the most aging shadow for condenser pressure correction factor of unit performance Ringing less, but relatively big on the impact of gross coal consumption rate, this will cause machine corresponding to condenser pressure unit change amount There is significant change in the amplitude of variation δ B of group gross coal consumption rate;Therefore, refer in the operation of circulation economic load dispatching Can be according to regular conventional thermodynamic performance test in mark calculation procedure, matching replace gross coal consumption rate function again g(N)。
The circulation method of operation adjusts forward and backward because of the operating cost change caused by condenser pressure change Amount:
In formula, Δ $coal, $coalIt is respectively the circulation method of operation and adjusts forward and backward because of condenser pressure Operating cost variable quantity caused by power change, mark coal unit price, unit is respectively unit/h, unit/t;
When mark coal unit price occur change time, should in circulation economic load dispatching operating index calculation procedure phase $ should be revisedcoal
The circulation method of operation adjusts caused by forward and backward single unit consumed water circulating pump changed power Operating cost variable quantity:
Δ $pump=Δ ∑ W*$elec (9)
Δ $ in formulapump, $elecIt is respectively the circulation method of operation and adjusts the consumed circulation of forward and backward single unit Operating cost variable quantity caused by pump power change, power supply price, unit is respectively unit/h, unit /(kW.h);
When rate for incorporation into the power network occur change time, should in circulation economic load dispatching operating index calculation procedure phase $ should be revisedelec
The circulation method of operation forward and backward comprehensive variable quantity of unit operation cost of adjustment:
Δ $=Δ $coal+ Δ $pump (10)
In formula, the Δ $ circulation method of operation adjusts the forward and backward comprehensive variable quantity of unit operation cost, and unit is Unit/h.
3) if comprehensive variation delta $ of operating cost is negative, representing that cost of electricity-generating declines, power station economy improves; If comprehensive variation delta $ of operating cost is just, representing that cost of electricity-generating rises, power station economy reduces;Meanwhile, Adjust forward and backward in the method for operation, keep Turbo-generator Set power constant as far as possible.
The invention has the beneficial effects as follows, show that the circulation method of operation adjusts forward and backward reality intuitively Energy-saving effect and the amount of money are how many, and system is simple and direct, survey calculation result is stable, reliable, can be to instruct recirculated water Systematic economy runs provides foundation, meets the needs of Power Plant Energy Saving, economical operation.
Accompanying drawing explanation
Fig. 1 is the functional block diagram of the present invention;
Fig. 2 is the calculation procedure interface of the present invention.
Detailed description of the invention
The present invention is further detailed explanation with detailed description of the invention below in conjunction with the accompanying drawings:
Two ultra supercritical 700MW Turbo-generator Set circulations of certain power plant use Expanding Unit Element System circulation Water system, is configured with four 92LKSA-23.8 type water circulating pumps altogether.For reducing unit generation cost, should Factory's consignment test unit completes No. 1 unit circulation economic load dispatching test, and pushes away according to test unit Recommend circulation optimizing operating mode scheme and carry out guide field production.Exist for accurately calculating assay optimization scheme Concrete energy-saving effect in actual moving process, improves circulation operation and management level, is badly in need of exploitation one The set circulation method of operation adjusting economy property monitoring device.
The present embodiment one Circulating-Water System in Power Station method of operation adjusting economy property monitoring device and method include merit Rate measurement apparatus, absolute pressure measurement apparatus, data acquisition unit and calculating and display unit.Power measurement Device includes the first power transducer measuring turbine generator acc power and four circulation-water pump electric machine power respectively 1, the second power transducer the 2, the 3rd power transducer the 3, the 4th power transducer the 4, the 5th power transducer 5。
The absolute pressure measurement apparatus of the present embodiment includes measuring steam turbine high and low pressure condenser pressure respectively First absolute pressure transducer the 6, second absolute pressure transducer 7;Calculate and display unit comprises circulating water System economic load dispatching operating index calculation procedure and interface;First power transducer the 1, second power transducer 2, 3rd power transducer the 3, the 4th power transducer the 4, the 5th power transducer the 5, first absolute pressure pick-up Device 6 and the second absolute pressure transducer 7 connect the input of data acquisition unit respectively;Data acquisition unit Output connects calculating and the input of display unit.
In the present embodiment, the precision of power transducer is ± 0.2%;The precision of absolute pressure transducer is ± 0.1%; The precision of data acquisition unit is ± 0.05%, and is furnished with standard RS232/485/USB communication interface, supports mark Quasi-MODBUS communications protocol, supports the multiple communication modes such as wired connection, LAN connection.
The calculating of the present embodiment and display unit are notebook computer or host computer and display.
The notebook computer of the present embodiment or host computer are mounted with circulation economic load dispatching operating index meter Calculation program and interface.
The power transducer of the present embodiment, absolute pressure transducer can provide the output signal of 4~20mA, data Collecting unit can receive the output signal of described power transducer, absolute pressure transducer;
The connecting line of the present embodiment all measurements device is fastened by bolts and inputs at described data acquisition unit End;Between described data acquisition unit output and calculating and display unit input by usb communication line even Connecing, communications protocol uses USB2.0;
To sum up, the method using the device of technique scheme to be monitored, carry out as steps described below:
Above-mentioned monitoring device is correctly mounted and connected;
The power letter of steam turbine generator and four circulation-water pump electric machines is gathered respectively with above-mentioned five power transducers Number, gather high pressure, low pressure condenser pressure signal, and the letter that will gather with above-mentioned two absolute pressure transducers Number by data acquisition unit be sent to calculate and display unit.
The present embodiment is forward and backward at recycling water formulation system operation mode, should keep Turbo-generator Set merit as far as possible Rate is constant;After on-site parameters is stable, at price data hurdle the 1st~2 row at Fig. 2 calculation procedure interface Input current electricity prices and mark coal unit price respectively;On-the-spot survey is inserted at data input part subfield the 3rd~15 row Examination data;Subsequently, automatically calculate in result display field the 16th~22 guild, show that circulation is transported Line mode adjusts forward and backward relevant parameter;Wherein, the 22nd row display circulation method of operation is forward and backward The comprehensive variable quantity of operating cost.Illustrate: if the comprehensive variable quantity of operating cost is negative, represent that cost of electricity-generating declines, Power station economy improves;If the comprehensive variable quantity of operating cost is just, represent that cost of electricity-generating rises, power station economy Property reduce.
The present embodiment can be according to regular conventional thermodynamic in circulation economic load dispatching operating index calculation procedure Performance test, again matching replace gross coal consumption rate function g (N);When becoming occur in rate for incorporation into the power network or mark coal unit price During change, $ can be revised accordingly on price data hurdleelecOr $coal

Claims (3)

1. the Circulating-Water System in Power Station method of operation adjusting economy a property monitoring device, it is characterised in that: described Device includes power-measuring device, absolute pressure measurement apparatus, data acquisition unit and calculating and display unit;
Described power-measuring device includes measuring turbine generator acc power and four circulation-water pump electric machine power respectively The first power transducer, the second power transducer, the 3rd power transducer, the 4th power transducer and Five power transducers;
Described absolute pressure measurement apparatus includes the first absolute pressure measuring turbine high-pressure condenser pressure respectively Power transmitter and the second absolute pressure transducer of steam turbine low-pressure condenser pressure;
Described first power transducer, the second power transducer, the 3rd power transducer, the 4th power pick-up Device, the 5th power transducer, the first absolute pressure transducer and the second absolute pressure transducer connect number respectively Input according to collecting unit;
The output of described data acquisition unit connects calculating and the input of display unit;
Described calculating and display unit comprise circulation economic load dispatching operating index calculation procedure and interface.
A kind of Circulating-Water System in Power Station method of operation adjusting economy property monitoring device, It is characterized in that: the precision of described first power transducer to the 5th power transducer is ± 0.2%;Described The precision of the first absolute pressure transducer and the second absolute pressure transducer is ± 0.1%;Described data acquisition The precision of unit is ± 0.05%, and is furnished with standard RS232/485/USB communication interface, supports standard MODBUS Communications protocol, supports the multiple communication modes that wired connection, LAN connect.
3. the Circulating-Water System in Power Station method of operation adjusting economy a property monitoring method, it is characterised in that: described Monitoring method comprises the steps:
1) above-mentioned monitoring device is correctly mounted and connected;Gather steam turbine generator and four water circulating pumps The power signal of motor and high pressure, low pressure condenser pressure signal, and the signal gathered is passed through data acquisition list Unit is sent to calculate and display unit;
2) machine that the condenser pressure unit change amount under matching typical condition difference turbine generator acc power is corresponding The amplitude of variation of group gross coal consumption rate is:
δ B=f (N, p) * 10-2*g(N)
In formula, δ B is the amplitude of variation of unit generation coal consumption corresponding to condenser pressure unit change amount, unit For g/ (kPa*kW.h);(N p) is the condenser pressure correction system under different turbine generator acc power to function f The fitting formula of number, unit is %/(kPa);Function g (N) is the generating coal under different turbine generator acc power The fitting formula of consumption, unit is g/ (kW.h);N is turbine generator acc power, and unit is kW;P is solidifying Vapour device pressure, unit kPa;
3) the forward and backward comprehensive variable quantity of unit operation cost of circulation method of operation adjustment is counted as the following formula Calculate:
Δ $=Δ $coal+ Δ $pump
In formula, the Δ $ circulation method of operation adjusts the forward and backward comprehensive variable quantity of unit operation cost, single Position is unit/h;Δ $coalFor the circulation method of operation adjust forward and backward because of condenser pressure change caused Operating cost variable quantity, unit is unit/h;Δ $pumpFor the circulation method of operation adjust forward and backward because of Operating cost variable quantity caused by single unit consumed water circulating pump changed power, unit is unit/h;
4) if comprehensive variation delta $ of operating cost is negative, representing that cost of electricity-generating declines, power station economy improves; If comprehensive variation delta $ of operating cost is just, representing that cost of electricity-generating rises, power station economy reduces;Meanwhile, Adjust forward and backward in the method for operation, keep Turbo-generator Set power constant as far as possible.
CN201610147624.5A 2016-03-16 2016-03-16 Economical monitoring device and method for adjustment of operation modes of circulating water system of power station Pending CN105869063A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610147624.5A CN105869063A (en) 2016-03-16 2016-03-16 Economical monitoring device and method for adjustment of operation modes of circulating water system of power station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610147624.5A CN105869063A (en) 2016-03-16 2016-03-16 Economical monitoring device and method for adjustment of operation modes of circulating water system of power station

Publications (1)

Publication Number Publication Date
CN105869063A true CN105869063A (en) 2016-08-17

Family

ID=56625508

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610147624.5A Pending CN105869063A (en) 2016-03-16 2016-03-16 Economical monitoring device and method for adjustment of operation modes of circulating water system of power station

Country Status (1)

Country Link
CN (1) CN105869063A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113701519A (en) * 2021-08-16 2021-11-26 中国能源建设集团江苏省电力设计院有限公司 Method for optimizing circulating water system under condenser with main steam turbine and small steam turbine arranged separately

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305107A (en) * 2011-09-20 2012-01-04 河北省电力建设调整试验所 Turboset heat rate online monitoring device and method based on cold side heat loss
CN202471305U (en) * 2012-03-01 2012-10-03 河北省电力研究院 Heat rate monitoring device of heat-engine plant turboset
CN103244433A (en) * 2013-05-09 2013-08-14 国家电网公司 Operation optimizing and monitoring method for variable-frequency circulating water pump of power plant

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102305107A (en) * 2011-09-20 2012-01-04 河北省电力建设调整试验所 Turboset heat rate online monitoring device and method based on cold side heat loss
CN202471305U (en) * 2012-03-01 2012-10-03 河北省电力研究院 Heat rate monitoring device of heat-engine plant turboset
CN103244433A (en) * 2013-05-09 2013-08-14 国家电网公司 Operation optimizing and monitoring method for variable-frequency circulating water pump of power plant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113701519A (en) * 2021-08-16 2021-11-26 中国能源建设集团江苏省电力设计院有限公司 Method for optimizing circulating water system under condenser with main steam turbine and small steam turbine arranged separately
CN113701519B (en) * 2021-08-16 2023-09-29 中国能源建设集团江苏省电力设计院有限公司 Method for optimizing circulating water system under condenser separately arranged on main turbine and small turbine

Similar Documents

Publication Publication Date Title
CA2764451C (en) Available power estimator
CN101902195A (en) Method for modeling generator excitation system
CN106948796A (en) Pumping control device and method for pumping unit during non-stop
CN107060695A (en) Energy-saving control system and method for beam-pumping unit
CN102645915A (en) Energy-saving method and system for monitoring, diagnosing and controlling energy efficiency
CN103488132A (en) Automatic optimized parameter-tuning method based on indicator diagram
CN103954843B (en) One does not disconnect ground lead pole tower ground resistance and measures injection power frequency method of determining range
CN111005880A (en) Centrifugal pump energy efficiency assessment method and device
CN104319795A (en) Nuclear power unit excitation and PSS parameter optimization setting method enhancing system damping
CN105673474A (en) Water pump efficiency, flow and lift detection method and system
CN102967758A (en) Separating method for indirect subentry measurement of building energy consumption
CN105141253A (en) Photovoltaic output curve slope-based photovoltaic electricity-sealing identification method
CN209011802U (en) A kind of pumping unit group system
CN114033617B (en) Controllable wind power generation method and system with control parameters adjusted in self-adaptive mode
CN103557117B (en) Power curves of wind-driven generator sets acquisition device
CN101737310B (en) Method for measuring and calculating pump efficiency based on soft flow measurement for drainage pump
CN105869063A (en) Economical monitoring device and method for adjustment of operation modes of circulating water system of power station
CN206376832U (en) Energy-saving control system of beam-pumping unit
CN205721962U (en) A kind of Circulating-Water System in Power Station method of operation adjusting economy property monitoring device
CN103468860B (en) Device and method for metering calorific value of converter gas
CN115544455A (en) Method for determining water-electricity conversion coefficient of irrigation motor-pumped well
CN102393631B (en) Lubricating oil temperature control system based on fuzzy control
CN206957665U (en) Pumping control device of pumping unit during non-stop
CN116245296A (en) Cooperative scheduling method for comprehensive energy system
CN113357139B (en) Automatic performance test system for electronic water pump of recovery engine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20160817

WD01 Invention patent application deemed withdrawn after publication