CN105863282A - Setting-out device for ceiling roof - Google Patents
Setting-out device for ceiling roof Download PDFInfo
- Publication number
- CN105863282A CN105863282A CN201610218144.3A CN201610218144A CN105863282A CN 105863282 A CN105863282 A CN 105863282A CN 201610218144 A CN201610218144 A CN 201610218144A CN 105863282 A CN105863282 A CN 105863282A
- Authority
- CN
- China
- Prior art keywords
- ceiling
- setting
- coil
- pulley
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/18—Adjusting tools; Templates
- E04G21/1808—Holders for bricklayers' lines, bricklayers' bars; Sloping braces
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention provides a setting-out device for a ceiling roof. The setting-out device comprises an ink fountain. A coil is arranged in the ink fountain. A central rotary shaft is arranged in the center of the coil. A rotary handle is externally arranged at one end of the central rotary shaft. One end of the coil is fixed to the center of a rod through a flexible wire pipe, a pulley, a wire pressing ring, a line snapping rope and a groove in the top end of the rod. The flexible wire pipe is a transparent plastic pipe. The pulley is made of hard wood. The wire pressing ring is made of galvanized round steel. A main rope of the line snapping rope is made of elastic rubber materials. The periphery of an operating rod is made of hard round wood. Compared with a former construction method, the setting-out device is simple and convenient to use, practical and reasonable in structure, the defects of conventional operation are overcome, the construction period is shortened, equipment investment is reduced, the cost is reduced, construction is arranged reasonably through the change of the objective environment, measuring and setting-out as well as installation operation can be implemented independently, and thus construction delay is avoided.
Description
Technical field
The invention belongs to field of measuring technique, relate to a kind of sky ceiling actinobacillus device.
Background technology
At present, in Building Construction, for Appropriate application space, at sky ceiling cloth
Equipment and the pipeline put are the most, in the past during pipeline construction, typically use laser vertical
Instrument throwing line is to sky ceiling, and operating personnel is constructed by visual circuit limit or sets up operating platform people
Member uses ink fountain to carry out unwrapping wire, and even by feeling to position, but there are the following problems: 1,
The use environment of laser zenith meter must be to have certain degree of darkness, the most invisible or do not see,
So using extremely inconvenience daytime.2, the substantial amounts of time is needed due to ceiling construction pipeline etc.,
Setting is many, wide, then must increase operating instrument personnel and follow the tracks of testing always, cause instrument
The outfit of device equipment is abundant, adds the workload of survey crew simultaneously.3, once survey
Amount personnel amount can not meet the situation in construction operation point face, will result in operating personnel and delays work,
Affect the duration simultaneously.4, using ink fountain unwrapping wire, need to set up operating platform, workload is big,
Operator's inconvenience simultaneously.5, by sensation construction, cause day ceiling construction pipeline relatively random,
Unsightly, construction quality is even affected.
Summary of the invention
The technical problem to be solved in the present invention is to overcome existing defect, it is provided that a kind of sky ceiling is put
Line apparatus, it is possible to be inconvenient to the ceiling jacking row unwrapping wire operated personnel, mark draws the line of measurement
Road, facilitates workman to carry out the location construction of pipeline, furred ceiling engineering, can effectively solve background skill
Problem in art.
In order to solve above-mentioned technical problem, the invention provides following technical scheme:
The present invention provides a kind of sky ceiling actinobacillus device, including ink fountain, described ink fountain internal coil,
Shaft, the external rotating handles in described shaft one end, winding wire one it is provided with in the middle of described coil
Hold by flexible cord pipe, pulley, line ball ring, snap the line rope, rod member top groove in its rod member
The heart is fixed, and described flexible cord pipe is lucite pipe, and described pulley is hard wooden, described line ball ring
For galvanized steel bar, described snap the line rope main line is elastic rubber material, action bars periphery hard round log.
As a preferred technical solution of the present invention, described rod member upper surface offers an aperture.
As a preferred technical solution of the present invention, described action bars top plan central recess
Place arranges a winding wire fixing point.
Compared with prior art the present invention is reached to provide the benefit that: the present invention and construction in the past
Method is compared, simple and practical, rational in infrastructure, changes the disadvantage of routine operation, accelerates the duration,
Save equipment investment, reduce cost, utilize the change of objective environment to carry out reasonable arrangement construction,
Surveying setting-out and operation can be installed two procedures to be performed separately, it is to avoid delay work.
Accompanying drawing explanation
Accompanying drawing is for providing a further understanding of the present invention, and constitutes a part for description,
It is used for together with embodiments of the present invention explaining the present invention, is not intended that limitation of the present invention.
In the accompanying drawings:
Fig. 1 is one sky of the present invention ceiling actinobacillus device structural representation;
Label in figure: 1. ink fountain;2. flexible cord pipe;3. pulley;4. line ball ring;5. snap the line rope;
6. action bars.
Detailed description of the invention
Below in conjunction with accompanying drawing, the preferred embodiments of the present invention are illustrated, it will be appreciated that herein
Described preferred embodiment is merely to illustrate and explains the present invention, is not intended to limit the present invention.
Embodiment: as it is shown in figure 1, the present invention provides a kind of sky ceiling actinobacillus device, including ink
Bucket 1, described ink fountain 1 internal coil, it is provided with shaft, described shaft in the middle of described coil
The external rotating handles in one end, winding wire one end by flexible cord pipe 2, pulley 3, line ball ring 4,
Snap the line rope 5, rod member top groove are also fixed at its rod member center, and described flexible cord pipe 2 is transparent
Plastic tube, described pulley 3 is hard wooden, and described line ball ring 4 is galvanized steel bar, described snap the line
5 main lines of restricting are elastic rubber material, the peripheral hard round log of action bars 6.
Ink fountain 1 uses the plastic casing that 1mm is thick, and global shape is round pie, press close to bar limit and
Be plane at base, be open-type plastics clamping ring pressing close to bar limit, by the elasticity of plastics with
Rod member takes off or holds with a firm grip, ink fountain 1 internal coil, and coil diameter 100mm, outside shaft one end
Stretch, external rotating handles, ink fountain 1 closed, offer an aperture pressing close to rod member upper surface,
A diameter of 2mm, is connected with flexible pipe 2 above, winding wire one end by flexible pipe 2, pulley 3,
Line ball ring 4, snap the line rope 5, rod member top groove are also fixed at its rod member center, winding wire one
End is wound around in order with coil recess.Flexible pipe 2 is lucite pipe, diameter 4mm, pastes with rod member
Tightly, glue is used to fix.Pulley 3 is hard wooden, a diameter of 50mm, by angle bar and rod member
Top edge connects, and makes smooth to enter flexible pipe to rolling off the production line in pulley.Line ball ring 4 is galvanized steel bar,
Ovalisation, a diameter of 4mm, top is lower than pulley groove, and 2, one end is embedding with rod member top
Enter fixing.Snap the line rope 5 main line is elastic rubber material, and linear diameter is 2mm, and one end fixes one
The zinc-plated ring of individual 3mm, winding wire passes this ring, and one end arranges a plastic pull handle.Action bars
6 is hard round log material, diameter 30mm, can be according to story height low adjustment length.Action bars
7 peripheral hard round logs, diameter 30mm, length, top plan center can be adjusted according to floor
Outwards offer a semi arch groove, groove radius 4mm, action bars top plan central recess
Place arranges a winding wire fixing point.
It ceiling actinobacillus device is implemented more convenient, holds out against on ceiling, so by an action bars
Another root action bars of rear movement, to another point of straight line needed at ceiling subscript picture, holds out against at ceiling
On, tension snap the line rope is the most loose downwards, and the straight line needed a just mark is drawn in a day ceiling, with
This analogizes, and can mark and draw all of construction location line.This device be truly realized simple structure,
Improve work efficiency, ensure attractive in appearance, quality of constructing, greatly reduce difficulty of construction and be constructed into
This, it is ensured that ceiling is measured and installment work is carried out smoothly.
Last it is noted that the foregoing is only the preferred embodiments of the present invention, and need not
In limiting the present invention, although the present invention being described in detail with reference to previous embodiment, right
For those skilled in the art, it still can be to the technology described in foregoing embodiments
Scheme is modified, or wherein portion of techniques feature is carried out equivalent.All in the present invention
Spirit and principle within, any modification, equivalent substitution and improvement etc. made, all should comprise
Within protection scope of the present invention.
Claims (3)
1. a sky ceiling actinobacillus device, including ink fountain (1), it is characterised in that described ink fountain (1)
Internal coil, is provided with shaft in the middle of described coil, the external rotating handles in described shaft one end,
Winding wire one end by flexible cord pipe (2), pulley (3), line ball ring (4), snap the line rope (5),
Rod member top groove is also fixed at its rod member center, and described flexible cord pipe (2) is lucite pipe,
Described pulley (3) is hard wooden, and described line ball ring (4) is galvanized steel bar, described snap the line rope
(5) main line is elastic rubber material, the peripheral hard round log of action bars (6).
A kind of sky the most according to claim 1 ceiling actinobacillus device, it is characterised in that described
Rod member upper surface offers an aperture.
A kind of sky the most according to claim 1 ceiling actinobacillus device, it is characterised in that described
One winding wire fixing point is set at action bars (6) top plan central recess.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610218144.3A CN105863282B (en) | 2016-04-07 | 2016-04-07 | A kind of day ceiling actinobacillus device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610218144.3A CN105863282B (en) | 2016-04-07 | 2016-04-07 | A kind of day ceiling actinobacillus device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105863282A true CN105863282A (en) | 2016-08-17 |
CN105863282B CN105863282B (en) | 2018-08-17 |
Family
ID=56637140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610218144.3A Active CN105863282B (en) | 2016-04-07 | 2016-04-07 | A kind of day ceiling actinobacillus device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105863282B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110726401A (en) * | 2018-07-17 | 2020-01-24 | 米亚索乐装备集成(福建)有限公司 | Positioning line drawing method |
CN116290849A (en) * | 2023-05-17 | 2023-06-23 | 中国二十二冶集团有限公司 | Construction method for enhancing secondary structure measurement paying-off precision |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002349072A (en) * | 2001-05-24 | 2002-12-04 | Dai Nippon Construction | Tool for erecting pillar and pillar erecting method using the same |
JP2012026175A (en) * | 2010-07-23 | 2012-02-09 | Ohbayashi Corp | Setting method of imaginary line parallel to core wire of construction component, a pair of imaginary line setting jigs for setting the imaginary line, and installation method for installing linearity measuring device on construction component |
CN202271378U (en) * | 2011-10-27 | 2012-06-13 | 刘天顺 | Ink foundation |
CN204748602U (en) * | 2015-07-23 | 2015-11-11 | 武汉科技大学 | Snapping line ink marker support |
CN204976603U (en) * | 2015-07-17 | 2016-01-20 | 中建八局第二建设有限公司 | Automatic snapping line appearance |
CN105459074A (en) * | 2015-12-16 | 2016-04-06 | 华北冶建工程建设有限公司 | Line springing tool and line springing method |
-
2016
- 2016-04-07 CN CN201610218144.3A patent/CN105863282B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2002349072A (en) * | 2001-05-24 | 2002-12-04 | Dai Nippon Construction | Tool for erecting pillar and pillar erecting method using the same |
JP2012026175A (en) * | 2010-07-23 | 2012-02-09 | Ohbayashi Corp | Setting method of imaginary line parallel to core wire of construction component, a pair of imaginary line setting jigs for setting the imaginary line, and installation method for installing linearity measuring device on construction component |
CN202271378U (en) * | 2011-10-27 | 2012-06-13 | 刘天顺 | Ink foundation |
CN204976603U (en) * | 2015-07-17 | 2016-01-20 | 中建八局第二建设有限公司 | Automatic snapping line appearance |
CN204748602U (en) * | 2015-07-23 | 2015-11-11 | 武汉科技大学 | Snapping line ink marker support |
CN105459074A (en) * | 2015-12-16 | 2016-04-06 | 华北冶建工程建设有限公司 | Line springing tool and line springing method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110726401A (en) * | 2018-07-17 | 2020-01-24 | 米亚索乐装备集成(福建)有限公司 | Positioning line drawing method |
CN116290849A (en) * | 2023-05-17 | 2023-06-23 | 中国二十二冶集团有限公司 | Construction method for enhancing secondary structure measurement paying-off precision |
CN116290849B (en) * | 2023-05-17 | 2024-04-26 | 中国二十二冶集团有限公司 | Construction method for enhancing secondary structure measurement paying-off precision |
Also Published As
Publication number | Publication date |
---|---|
CN105863282B (en) | 2018-08-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105863282A (en) | Setting-out device for ceiling roof | |
CN204461264U (en) | Special portable folding chi is surveyed and drawn in a kind of construction work | |
CN207365867U (en) | A kind of civil engineering measuring scale | |
CN204007608U (en) | A kind of for controlling the level angle measurement mechanism of ship surface moulding bed angle of assembling | |
CN207779386U (en) | Leveling rod support | |
CN205192403U (en) | High mapping device | |
CN206440229U (en) | A kind of detection means suitable for Alpine Grasslands sample prescription cover degree | |
CN104132653B (en) | Interior decoration surveying setting-out device and line-putting method thereof | |
CN210918300U (en) | Building engineering datum line pay-off | |
CN205561846U (en) | Simple and easy horizontal scribing instrument of laser | |
CN212534813U (en) | Prefabricated post of assembled | |
CN204976603U (en) | Automatic snapping line appearance | |
CN208830569U (en) | Double installing Cable-clamp support systems | |
CN109142126B (en) | Canopy rainfall interception characteristic measuring device | |
CN204414942U (en) | Mathematical education drawing tool | |
CN205279936U (en) | Building surveying device that facilitates use | |
CN202651702U (en) | Shaft cable paying-off laying limiter | |
CN206223161U (en) | A kind of planning type plant actinobacillus device | |
JP2009226912A (en) | Slant rule for slope gathering and stretching | |
CN210833353U (en) | Hydraulic engineering pipeline internal diameter measuring instrument | |
CN220366776U (en) | Building engineering planning measuring device | |
CN213874360U (en) | Survey and drawing engineering survey and drawing is with sighting rod convenient to fix | |
CN218406285U (en) | Outer wall polyurethane waterproof coating construction tool | |
CN220667176U (en) | Dust screen for building engineering | |
CN105226573A (en) | A kind of cable winding device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |