CN105863192A - Balcony guardrail - Google Patents

Balcony guardrail Download PDF

Info

Publication number
CN105863192A
CN105863192A CN201610406283.9A CN201610406283A CN105863192A CN 105863192 A CN105863192 A CN 105863192A CN 201610406283 A CN201610406283 A CN 201610406283A CN 105863192 A CN105863192 A CN 105863192A
Authority
CN
China
Prior art keywords
cross rod
sheer pole
support column
pilot sleeve
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610406283.9A
Other languages
Chinese (zh)
Other versions
CN105863192B (en
Inventor
邓永莲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fengyang Yongyuan Electronic Technology Co., Ltd
Original Assignee
Suzhou Lianjing Mechanical Engineering Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Lianjing Mechanical Engineering Technology Co Ltd filed Critical Suzhou Lianjing Mechanical Engineering Technology Co Ltd
Priority to CN201610406283.9A priority Critical patent/CN105863192B/en
Publication of CN105863192A publication Critical patent/CN105863192A/en
Application granted granted Critical
Publication of CN105863192B publication Critical patent/CN105863192B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/1865Collapsible or portable balustrades

Abstract

The invention discloses a balcony guardrail which comprises an upper cross rod and a lower cross rod in up-down parallel arrangement. A plurality of equidistantly-arranged uprights are arranged between the upper cross rod and the lower cross rod, an external thread joint is arranged at the top of each upright, a polished rod is arranged at the bottom of each upright, an internal thread connection hole in threaded fit with the external thread joint at the top of each upright is formed in the undersurface of the upper cross rod, limiting holes corresponding to the internal thread connection holes in the upper cross rod and in embedded fit with the polished rods at the bottoms of the uprights are formed in to top surface of the lower cross rod, an elastic supporting member is arranged at the bottom of the lower cross rod, guide positioning plates in mutual symmetry are arranged at two ends of the lower cross rod, a guide groove is formed in one side, corresponding to the lower cross rod, of each guide positioning plate, the lower cross rod and the guide grooves are in up-down sliding fit, and positioning holes are formed in the guide positioning plates on the upper sides and the lower sides of the guide grooves. The uprights of the balcony guardrail can be detached for replacement once being damaged, so that the balcony guardrail is low in maintenance and repair cost, convenient to mount, firm in structure and convenient for popularization and use.

Description

A kind of balcony guardrail
Technical field
The present invention relates to civil engineering field, particularly relate to a kind of balcony guardrail.
Background technology
Civil engineering generally refers to civil engineering, and civil engineering refers to all He Shui, soil, the plan of cultural relevant capital construction, builds and keep in repair.The civil engineering said now the most typically refers exclusively to little Civil Specialities, the once construction including house, public building, structures etc..In fields such as house, public building, structures, designer can be provided with balcony or balcony etc., daylighting for convenience, mostly these balconies or balcony are glass guardrail or aluminum alloy guardrail or install aluminum alloy guardrail inside glass guardrail again additional, and this balcony guardrail plays safety protection function, therefore, also use in other regions.
Balcony guardrail is that balcony beautifies and protective equipment outer peripheral, alloy pipe through welding or assemble.Common low windowsill, away from about 0.5 meter of ground, increases by 0.4 meter of guardrail or fence certainly reach the safeguard procedures of code requirement if being close to interior wall.If windowsill table top is too big, such as bay window etc., child often stands on windowsill and looks into the distance, the window opened via on windowsill and user also must stand, and at this moment, the guardrail being attached on windowsill height itself should reach 0.9 meter.
But, current civil engineering being all now guardrail is welded or assemble when installing guardrail, then the two ends of guardrail are fixed on metope or other stationary planes, bottom is fixed with ground, firmly installs.But, the balcony guardrail after installing cannot be dismantled again, and column the most therein damages, it has not been convenient to changes, even and if after the dismounting of this balcony guardrail, it is also difficult to secondary utilizes again, and maintenance cost is high.
Summary of the invention
The technical problem to be solved is to provide a kind of convenient dismounting and the balcony guardrail changed.
In order to solve above-mentioned technical problem, the present invention is achieved by the following technical solutions: a kind of balcony guardrail, there is the cross tube and sheer pole be arrangeding in parallel up and down, there is between described cross tube and sheer pole the column of some spaced sets, the top of described column is provided with male connection, bottom is polished rod, the bottom surface of described cross tube is provided with the internal thread coordinated with column tip male thread joint screw thread and connects hole, and the end face of described sheer pole is provided with and connects hole spacing hole that is corresponding and that coordinate with column bottom polished rod embedded with internal thread on cross tube;The bottom of described sheer pole is provided with elastic supporting member for supporting optical member, and two ends are provided with symmetrical guide positioning plate;In described guide positioning plate, the one side of corresponding sheer pole is provided with gathering sill, slides up and down and coordinate between described sheer pole and gathering sill, and the guide positioning plate of the upper and lower both sides of gathering sill is provided with hole, location.
As preferably, described elastic supporting member for supporting optical member is made up of support column, pilot sleeve and spring;The end of described support column is plugged in pilot sleeve, spring is arranged on the bottom of support column, the bottom surface surrounding of described support column is provided with outside flange guide pad, it is slidably matched between described flange guide pad and pilot sleeve, being provided with stop collar outside support column above it, described stop collar is connected to the top outer of pilot sleeve, prevents support column from departing from pilot sleeve, and the bottom surrounding of described pilot sleeve is provided with outside expanding surface, this expanding surface is provided with fixing hole.
As preferably, the bottom surface of described sheer pole is provided with the support that coordinate embedded with support column top and connects hole.
As preferably, for threadeding between described stop collar and pilot sleeve.
As preferably, the spacing between described cross tube two ends is longer than the spacing between the guide positioning plate of sheer pole two ends.
Compared with prior art, the invention have benefit that: its column of this balcony guardrail once damages to disassemble and is replaced, safeguard and maintenance cost compares at the end, easy for installation, sound construction, it is simple to promote the use of.
Accompanying drawing explanation
The present invention is further described below in conjunction with the accompanying drawings.
Fig. 1 is one balcony guardrail external structure schematic diagram of the present invention;
Fig. 2 is one balcony guardrail plan structure schematic diagram of the present invention;
Fig. 3 is the structure sectional view of A-A in Fig. 2;
Fig. 4 is the partial enlarged drawing of B in Fig. 3.
In figure: 1, cross tube;2, sheer pole;3, column;4, guide positioning plate;5, gathering sill;6, hole, location;7, elastic supporting member for supporting optical member;71, support column;72, pilot sleeve;73, spring;74, stop collar;75, flange guide pad;76, fixing hole;8, internal thread connects hole;9, male connection;10, spacing hole;11, support connects hole.
Detailed description of the invention
Describe the present invention with detailed description of the invention below in conjunction with the accompanying drawings.
A kind of balcony guardrail shown in Fig. 1, Fig. 2 and Fig. 3, there is the cross tube 1 and sheer pole 2 be arrangeding in parallel up and down, there is between described cross tube 1 and sheer pole 2 column 3 of some spaced sets, the top of described column 3 is provided with male connection 9, bottom is polished rod, the internal thread that the bottom surface of described cross tube 1 is provided with column 1 tip male thread joint 9 threaded engagement connects hole 8, and the end face of described sheer pole 2 is provided with and connects hole 8 spacing hole 10 that is corresponding and that coordinate with polished rod embedded bottom column 3 with internal thread on cross tube 1;The bottom of described sheer pole 2 is provided with elastic supporting member for supporting optical member 7, and two ends are provided with symmetrical guide positioning plate 4;In described guide positioning plate 4, the one side of corresponding sheer pole 2 is provided with gathering sill 5, slides up and down and coordinate between described sheer pole 2 and gathering sill 5, and the guide positioning plate 4 of gathering sill about 5 both sides is provided with hole 6, location;Consolidating to ensure to install, the spacing between described cross tube 1 two ends is longer than the spacing between sheer pole 2 two ends guide positioning plate 4.
As shown in Figure 4, described elastic supporting member for supporting optical member 7 is made up of support column 71, pilot sleeve 72 and spring 73;nullInstall between support column 71 and sheer pole 2 for convenience,The bottom surface of described sheer pole 2 is provided with the support that coordinate embedded with support column 71 top and connects hole 11,The end of described support column 71 is plugged in pilot sleeve 72,Spring 73 is arranged on the bottom of support column 71,The bottom surface surrounding of described support column 71 is provided with outside flange guide pad 75,It is slidably matched between described flange guide pad 75 and pilot sleeve 72,Support column 71 above it is outside is provided with stop collar 74,Described stop collar 74 is connected to the top outer of pilot sleeve 72,Prevent support column 71 from departing from pilot sleeve 72,And the bottom surrounding of described pilot sleeve 72 is provided with outside expanding surface,Fixing hole 76 it is provided with on this expanding surface,Install between support column 71 and pilot sleeve 72 for convenience and dismantle,For threadeding between described stop collar 74 and pilot sleeve 72.
nullDuring installation,Now cross tube 1 two ends are fixed in installed surface,Then two pieces be directed to location-plate 4 be symmetrically mounted on symmetry installed surface on,Guide positioning plate 4 is connected fixing by bolt through hole 6, location with installed surface,In sheer pole 2 two ends are arranged on the gathering sill 5 of two pieces of guide positioning plate 4 symmetries simultaneously,Then column 3 top is screwed in the internal thread bottom cross tube 1 to connect in hole 8,By sheer pole 2 upwards jack-up,Make together with the spacing hole 10 on cross tube 2 embeds it with the end of column 3,Then elastic supporting member for supporting optical member 7 is arranged on bottom sheer pole 2,Wherein the slotting support being embedded in sheer pole 2 bottom surface of support column 71 in elastic supporting member for supporting optical member 7 connects in hole 11,In elastic supporting member for supporting optical member 7, pilot sleeve 71 is fixed on the ground through fixing hole 76 by bolt,Complete to install,Effect due to the spring 73 in pilot sleeve 71,It promotes support column 71 upwards,So that sheer pole 72 upwards pushes up pressure,Column 3 is made to be fixed between cross tube 1 and sheer pole 2.To dismounting column 3, sheer pole 2 is pressed down on, sheer pole 2 is downward under the compression of elastic supporting member for supporting optical member 7 inner spring 73, the bottom of column 3 is made to depart from the spacing hole 10 on sheer pole 2, then column 3 to be dismantled is rotated so that it is the male connection 9 at top connects hole 8 with the internal thread on cross tube 1 and separates.
Its column 3 of this balcony guardrail once damages, and can disassemble and be replaced, and safeguards and maintenance cost compares at the end, easy for installation, sound construction, it is simple to promote the use of.
It is emphasized that: be the most only presently preferred embodiments of the present invention, not the present invention is made any pro forma restriction, every any simple modification, equivalent variations and modification made above example according to the technical spirit of the present invention, all still falls within the range of technical solution of the present invention.

Claims (5)

1. a balcony guardrail, there is the cross tube (1) and sheer pole (2) be arrangeding in parallel up and down, there is between described cross tube (1) and sheer pole (2) column (3) of some spaced sets, it is characterized in that: the top of described column (3) is provided with male connection (9), bottom is polished rod, the internal thread that the bottom surface of described cross tube (1) is provided with column (1) tip male thread joint (9) threaded engagement connects hole (8), the end face of described sheer pole (2) is provided with internal thread upper with cross tube (1) and connects hole (8) spacing hole (10) that is corresponding and that coordinate with column (3) bottom polished rod embedded;The bottom of described sheer pole (2) is provided with elastic supporting member for supporting optical member (7), and two ends are provided with symmetrical guide positioning plate (4);The one side of the upper corresponding sheer pole (2) of described guide positioning plate (4) is provided with gathering sill (5), slide up and down between described sheer pole (2) with gathering sill (5) and coordinate, the guide positioning plate (4) of gathering sill (5) both sides up and down is provided with hole, location (6).
Balcony guardrail the most according to claim 1, it is characterised in that: described elastic supporting member for supporting optical member (7) is made up of support column (71), pilot sleeve (72) and spring (73);The end of described support column (71) is plugged in pilot sleeve (72), spring (73) is arranged on the bottom of support column (71), the bottom surface surrounding of described support column (71) is provided with outside flange guide pad (75), it is slidably matched between described flange guide pad (75) and pilot sleeve (72), support column (71) above it is outside is provided with stop collar (74), described stop collar (74) is connected to the top outer of pilot sleeve (72), prevent support column (71) from departing from pilot sleeve (72), and the bottom surrounding of described pilot sleeve (72) is provided with outside expanding surface, fixing hole (76) it is provided with on this expanding surface.
Balcony guardrail the most according to claim 2, it is characterised in that: the bottom surface of described sheer pole (2) is provided with the support that coordinate embedded with support column (71) top and connects hole (11).
Balcony guardrail the most according to claim 2, it is characterised in that: for threadeding between described stop collar (74) with pilot sleeve (72).
Balcony guardrail the most according to claim 1, it is characterised in that: the spacing between described cross tube (1) two ends is longer than the spacing between sheer pole (2) two ends guide positioning plate (4).
CN201610406283.9A 2016-06-12 2016-06-12 A kind of balcony guardrail Active CN105863192B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610406283.9A CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610406283.9A CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Publications (2)

Publication Number Publication Date
CN105863192A true CN105863192A (en) 2016-08-17
CN105863192B CN105863192B (en) 2018-01-09

Family

ID=56677330

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610406283.9A Active CN105863192B (en) 2016-06-12 2016-06-12 A kind of balcony guardrail

Country Status (1)

Country Link
CN (1) CN105863192B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288280A (en) * 2017-08-22 2017-10-24 长兴华煜金属制品科技有限公司 A kind of balcony guardrail
KR101858666B1 (en) * 2017-11-10 2018-05-17 주식회사 종합건축사사무소가전 Window constructions for high-rise apartment houses

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927156B1 (en) * 2009-05-22 2009-11-24 주식회사 건보엔지니어링종합건축사사무소 Multi-functional balcony railing
CN103362261A (en) * 2012-03-30 2013-10-23 周国民 Novel balcony guardrail
CN204920045U (en) * 2015-08-18 2015-12-30 南通市达欣工程股份有限公司 Balcony guardrail
CN105317182A (en) * 2014-07-24 2016-02-10 无锡盛鸿金属科技有限公司 Balcony guardrail
CN205712841U (en) * 2016-06-12 2016-11-23 苏州莲敬机械工程科技有限公司 Balcony guardrail

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927156B1 (en) * 2009-05-22 2009-11-24 주식회사 건보엔지니어링종합건축사사무소 Multi-functional balcony railing
CN103362261A (en) * 2012-03-30 2013-10-23 周国民 Novel balcony guardrail
CN105317182A (en) * 2014-07-24 2016-02-10 无锡盛鸿金属科技有限公司 Balcony guardrail
CN204920045U (en) * 2015-08-18 2015-12-30 南通市达欣工程股份有限公司 Balcony guardrail
CN205712841U (en) * 2016-06-12 2016-11-23 苏州莲敬机械工程科技有限公司 Balcony guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107288280A (en) * 2017-08-22 2017-10-24 长兴华煜金属制品科技有限公司 A kind of balcony guardrail
KR101858666B1 (en) * 2017-11-10 2018-05-17 주식회사 종합건축사사무소가전 Window constructions for high-rise apartment houses

Also Published As

Publication number Publication date
CN105863192B (en) 2018-01-09

Similar Documents

Publication Publication Date Title
CN105863192A (en) Balcony guardrail
CN205712841U (en) Balcony guardrail
CN204609341U (en) A kind of staircase temporary protective railing
CN104213707B (en) All steel climbing frame inside contracts attached climbing device and the mounting method thereof at place in structure
TW201912904A (en) Method of outer wall cantilever construction platform capable of smoothening the movement flow of the construction site, shortening the construction period and reducing the construction cost
CN108360830B (en) On-site construction protector
CN204663021U (en) Detachablely face limit early warning movable rail device
CN105040869A (en) Ultra-long floor glass rib curtain wall system and mounting method thereof
CN205591504U (en) Stair railing installs auxiliary device
CN205000618U (en) Novel scaffold
CN105113415B (en) Hydraulic pressure sliding sash climbing frame
CN203334567U (en) Guard bar horizontal pipe and stand column connecting piece
CN204510652U (en) Multi-angle rotary railing post
CN210463622U (en) Support of balcony type solar water heater
CN205652958U (en) Be applied to derrick on villa elevator
CN113235844A (en) Shock-absorbing structure of house building
CN205805025U (en) node underpinning device
CN210105123U (en) Column base node reinforcing structure of bidirectional inclined supporting column
CN204778118U (en) High security elevator cab rail guard
CN219343967U (en) Externally hung scaffold mounting device
CN104975707A (en) Shed frame and triangular support frame body of shed frame
CN213510353U (en) Novel telescopic window guardrail
CN209924479U (en) Building site is with facing limit entrance to a cave protector
CN217631720U (en) Safety guardrail
CN210530386U (en) Assembly type building temporary guardrail system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200929

Address after: 233100 No. 305 South Ring Road, Fucheng Town, Fengyang County, Chuzhou City, Anhui Province

Patentee after: Fengyang Yongyuan Electronic Technology Co., Ltd

Address before: Guo Xiang Street Wuzhong Economic Development Zone in Suzhou City, Jiangsu province 215100 Suzhou Antique City building 11 room 217

Patentee before: SUZHOU LIANJING MECHANICAL ENGINEERING TECHNOLOGY Co.,Ltd.

TR01 Transfer of patent right