CN105863188A - Prefabricated staircase integrated with guardrail, prefabricated air conditioner plate and construction method thereof - Google Patents

Prefabricated staircase integrated with guardrail, prefabricated air conditioner plate and construction method thereof Download PDF

Info

Publication number
CN105863188A
CN105863188A CN201610369121.2A CN201610369121A CN105863188A CN 105863188 A CN105863188 A CN 105863188A CN 201610369121 A CN201610369121 A CN 201610369121A CN 105863188 A CN105863188 A CN 105863188A
Authority
CN
China
Prior art keywords
guardrail
built
fitting
air
conditioning plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201610369121.2A
Other languages
Chinese (zh)
Other versions
CN105863188B (en
Inventor
龙莉波
马跃强
何飞
赵波
李峰
刘成涛
刘国顺
濮佳林
施春峰
戚健文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 2 Group Co Ltd
Original Assignee
Shanghai Construction No 2 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 2 Group Co Ltd filed Critical Shanghai Construction No 2 Group Co Ltd
Priority to CN201610369121.2A priority Critical patent/CN105863188B/en
Publication of CN105863188A publication Critical patent/CN105863188A/en
Application granted granted Critical
Publication of CN105863188B publication Critical patent/CN105863188B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/003Balconies; Decks
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/18Balustrades; Handrails
    • E04F11/181Balustrades
    • E04F11/1812Details of anchoring to the wall or floor

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Fencing (AREA)
  • Steps, Ramps, And Handrails (AREA)

Abstract

The invention discloses a prefabricated staircase integrated with a guardrail, a prefabricated air conditioner plate and a construction method thereof. The construction method of the prefabricated staircase integrated with the guardrail comprises the following steps of S1, accurately positioning and setting a guardrail embedding element on one side edge of a staircase section, and installing staircase section embedding elements and hanging points at two ends of the staircase section; S2, conveying the prefabricated staircase completed in the step S1 to a construction site, and fixedly connecting the straight section of the guardrail and the guardrail embedding element; S3, hanging the prefabricated staircase completed in the step S2 to a floor construction surface so that the two ends of the staircase section are respectively lapped on a support seat of the corresponding cast-in-plate structures, and fixedly connecting the staircase section embedding elements arranged at the two ends of the staircase section with embedded element gaskets arranged on the corresponding cast-in-place structure; S4, welding platform connecting elements between guardrails of the two adjacent prefabricated staircases; S5, using fine gravel concrete for filling, and leveling construction seams of the hanging points in the staircase section. The prefabricated staircase has the advantages that the hanging is convenient; the safety is high; the construction work procedures are reduced.

Description

A kind of with the precast stair of guardrail integral, prefabricated air-conditioning plate and construction method thereof
Technical field
The present invention relates to prefabricated building components construction field, be specifically related to a kind of and guardrail integral prefabricated building Air-conditioning plate terraced, prefabricated and construction method thereof.
Background technology
Face in the work progress of limit at prefabricated assembled stair, air-conditioning plate, generally require and take appropriate measures Ensure the site safety in work progress and construction quality.
In traditional construction, generally use the method gone along with sb. to guard him, mainly have a two ways: set up scaffold and Set up plug-in overhanging type guardrail on existing body of wall, but set up scaffold and not only need to waste substantial amounts of raw material, Increasing the cost of construction, also can take a large amount of construction site, effect on environment is the biggest, and at scaffold Set up during, in order to fixing scaffold, toward contact will perforate on the most prefabricated wallboard, The globality of this meeting heavy damage body of wall and aesthetic property, affect the quality of precast wall body.And overhanging type fence exists Though comparing setting up of traditional pin hand cradle in setting up to have simplified, but in order to guardrail is fixed, need also exist for Perforate on existing Side fascia, causes damage to the globality of existing body of wall.Reparation construction is by workman's industry simultaneously Business quality influence is relatively big, and mend construction in later period easily makes exterior wall surface uneven, and coating application has aberration, Exterior wall perception is poor, and Seepage easily occurs.
Afterwards, prior art occurs in that again and a kind of uses steel tube fastener as the method facing limit guardrail, executing First remove steel tube component scaffold when work is complete, building body structure is slotted, use expansion bolt to fix and protect Hurdle is welded to connect sheet, welds guardrail.But use steel tube fastener loaded down with trivial details as the method operation facing limit guardrail, Also need to remove temporary steel circumference of cannon bone to protect when installing permanent structure guardrail;In permanent structure guardrail construction Shi Xu building Punch on ladder or air-conditioning plate, expansion bolt is installed, these meeting heavy damage stair or the globality of air-conditioning plate and U.S. The property seen, affects prefabricated building or the quality of air-conditioning plate, and also needs repairing reserved when the fixing end construction of later stage guardrail Locate, and mend easily occurs surface irregularity, the problem of appearance difference in construction in later period.Additionally, The construction of other operations of work surface cross influence is easily caused when precast stair or the rendering of air-conditioning plate, reparation construction.
Summary of the invention
The present invention is to solve the problems referred to above, it is proposed that a kind of lifting is convenient, and safety is high, reduce construction work Sequence, save construction cost with the precast stair of guardrail integral, prefabricated air-conditioning plate and construction method thereof.
In order to solve above-mentioned technical problem, the technical scheme is that a kind of prefabricated with guardrail integral Stair, the guardrail including bench, being located on a described bench wherein side, are located at described bench two ends Bench built-in fitting and the some lifting points near described bench two ends, between described guardrail and described bench Connect by some guardrail built-in fittings are fixing.
Further, described bench offering several sulculuses, the lower end of described guardrail built-in fitting is embedded in In described sulculus, its upper end is exposed from described sulculus.
The present invention also provides for the construction method of a kind of precast stair with guardrail integral, comprises the following steps:
S1: position and arrange guardrail built-in fitting on a wherein side of bench, is arranged at the two ends of bench Bench built-in fitting and lifting point;
S2: the precast stair completed in step S1 is transported to job site, by straight section and the correspondence position of guardrail The guardrail built-in fitting at place is fixing to be connected;
S3: the precast stair in step S2 being completed lifts to floor construction surface, makes the two ends of described bench divide Do not ride upon on the support seat of corresponding cast-in-place structural, by cast-in-place with corresponding for the bench built-in fitting at described bench two ends Built-in fitting pad in structure is fixing to be connected;
S4: jig connecting rod between the guardrail of adjacent two described precast staiies;
S5: the construction gap of the lifting point in employing pea gravel concreten filling floating described bench.
Further, described step S1 arranges guardrail built-in fitting particularly as follows: first in described bench with protect Sulculus is offered in the position that the straight section on hurdle is corresponding, is embedded in described sulculus the lower end of described guardrail built-in fitting, Its upper end is made to expose in described sulculus.
Further, in described step S2, it is additionally included in brushing anticorrosive paint on described guardrail, uses cement Mortar is by floating for described sulculus and it is carried out maintenance.
Further, in described step S2, the straight section of described guardrail passes through with the upper end of described guardrail built-in fitting Full weld connects.
The present invention also provides for a kind of and guardrail integral prefabricated air-conditioning plate, including air-conditioning plate, is located at described sky Air-conditioning plate built-in fitting on a tuned plate wherein side, the guardrail being located on other three sides of described air-conditioning plate And it is located at the some lifting points on described air-conditioning plate and the pipe built-in fitting that leaks, described guardrail and described sky Connect by some guardrail built-in fittings are fixing between tuned plate.
Further, described air-conditioning plate being offered several sulculuses, the lower end of described guardrail built-in fitting is embedded in In described sulculus, its upper end is exposed from described sulculus.
The present invention also provides for the construction method of a kind of prefabricated air-conditioning plate with guardrail integral, comprises the following steps:
S1: air-conditioning plate built-in fitting is set on a wherein side of described air-conditioning plate, at described air-conditioning plate Position and arrange some guardrail built-in fittings on other three sides, and some liftings are set on described air-conditioning plate Point and the pipe built-in fitting that leaks;
S2: the prefabricated air-conditioning plate completed in step S1 is transported to job site, by the straight section of guardrail and corresponding position Put the fixing connection of guardrail built-in fitting at place;
S3: the prefabricated air-conditioning plate completed in step S2 is lifted to floor construction surface, by described air-conditioning plate Air-conditioning plate built-in fitting is fixing with agent structure to be connected;
S4: the construction gap of the lifting point in employing pea gravel concreten filling floating described air-conditioning plate.
Further, described step S1 arranges described guardrail built-in fitting particularly as follows: first at described air-conditioning plate Sulculus is offered in upper and guardrail straight section corresponding position, is embedded in described sulculus the lower end of guardrail built-in fitting, Its upper end is made to expose.
The present invention propose with the precast stair of guardrail integral, prefabricated air-conditioning plate and construction method thereof, with existing There is technology to compare, there is some advantage following:
(1) face skirt when efficiently solving precast stair, prefabricated air-conditioning plate hight sky without scaffold construction to protect and protect The problem of hurdle constructional difficulties, it is not necessary to set up scaffold and carry out temporary fence construction, saving material and place, The dangerous matter sources of construction is reduced or is transferred to ground construction, reduce high-altitude working safety hidden danger;
(2) in bench or air-conditioning plate install guardrail time without perforate and use expansion bolt, protect prefabricated Stair and the integrity of prefabricated air-conditioning plate so that it is smooth surface is smooth, elegant in appearance;
(3) in the main structure construction of after-stage, after putty criticized by prefabricated air-conditioning plate, painting of can directly constructing Material;And only need to paint floating with mortar with the lap-joint of cast-in-place structural for precast stair, construction effect Rate is high;
(4) lifting is convenient, and safety is high, decreases working procedure, saves construction cost.
Accompanying drawing explanation
Fig. 1 is the structural representation of the present invention and the precast stair of guardrail integral;
Fig. 2 is the sectional view in Fig. 1 at A;
Fig. 3 is the enlarged drawing in Fig. 1 at A;
Fig. 4 is the scheme of installation of the present invention precast stair with guardrail integral and cast-in-place structural;
Fig. 5 is the end view of the present invention and the precast stair of guardrail integral;
Fig. 6 is the structural representation of the present invention and the prefabricated air-conditioning plate of guardrail integral;
Fig. 7 is the scheme of installation of the present invention and the prefabricated air-conditioning plate of guardrail integral.
Shown in figure: 1, bench;11, tread plate;2, guardrail;21, straight section;3, bench built-in fitting; 4, lifting point;5, guardrail built-in fitting;6, sulculus;7, seat is supported;71, built-in fitting pad;8, air-conditioning Plate;9, air-conditioning plate built-in fitting;10, leak pipe built-in fitting.
Detailed description of the invention
The present invention is described in detail below in conjunction with the accompanying drawings:
As Figure 1-5, a kind of precast stair with guardrail integral of the present invention, including bench 1, it is located at institute State the guardrail 2 on a bench 1 wherein side, be located at described bench 1 two ends bench built-in fitting 3 and Near some lifting points 4 at described bench 1 two ends, protected by some between described guardrail 2 and described bench 1 Hurdle built-in fitting 5 is fixing to be connected.Preferably, described bench 1 offering several sulculuses 6, described guardrail is pre- The lower end of embedded part 5 is embedded in described sulculus 6, and its upper end is exposed from described sulculus 6.Concrete, institute The upper end of the straight section 21 and described guardrail built-in fitting 5 of stating guardrail 2 is connected by full weld, protecting permanent structure The molding that is connected in one of hurdle 2 and bench 1 is installed, it is to avoid the later stage repeat construction, save the duration, Improve construction quality, it is not necessary to setting up scaffold and carry out temporary fence construction, intensity is high, safe and reliable, Efficiency of construction is high.Bench built-in fitting 3 is steel plate, and the often end of bench 1 is at least provided with two pieces, is welded in institute State in the vertical face at bench 1 two ends, for the two ends of bench 1 are installed to cast-in-place structural.Need explanation , described bench 1 is additionally provided with drip and tread plate 11, described drip, tread plate 11 pass through mould Having one-body molded with bench 1, efficiency is high, elegant in appearance.
Present invention also offers the construction method of a kind of precast stair with guardrail integral, comprise the following steps:
S1: be accurately positioned and arrange guardrail built-in fitting 5 on a wherein side of bench 1, specifically, first First in described bench 1, sulculus 6 is offered, by pre-buried for described guardrail in the position corresponding with the straight section 21 of guardrail 2 The lower end of part 5 is embedded in described sulculus 6 so that it is upper end is exposed in described sulculus 6.Simultaneously in bench 1 Two ends bench built-in fitting 3 and some lifting points 4 are set, in the present embodiment, lifting point 4 is provided with 4, two Two are respectively arranged at the bench built-in fitting 3 at two ends, for hoisting prefabricated stair.It should be noted that This step also include by mould molding drip and tread plate 11 in described bench 1, described drip, Tread plate 11 is one-body molded with bench 1, elegant in appearance.Bench built-in fitting 3 is steel plate, and bench 1 is every End, at least provided with two pieces, is welded on the vertical surface at described bench 1 two ends, for by the two ends of bench 1 Install to cast-in-place structural.
S2: the precast stair completed in step S1 is transported to job site, by the straight section 21 of guardrail 2 with right Answer that the guardrail built-in fitting 5 of position is fixing to be connected, will straight section 21 and guardrail built-in fitting 5 upper of guardrail 2 End carries out full weld connection, is additionally included in brushing anticorrosive paint on described guardrail 2, uses cement mortar by described Sulculus 6 is floating and it is carried out maintenance, and be connected in one molding by guardrail 2 and the bench 1 of permanent structure Install, it is to avoid the later stage repeat construction, save the duration, improve construction quality, it is not necessary to set up foot hands Frame and carry out temporary fence construction, intensity is high, safe and reliable, and efficiency of construction is high.
S3: the precast stair in step S2 being completed lifts to floor construction surface, makes the two ends of described bench 1 Ride upon on the support seat 7 of corresponding cast-in-place structural respectively, by the bench built-in fitting 3 at described bench 1 two ends with The fixing connection of built-in fitting pad 71 on corresponding cast-in-place structural;Concrete, described support seat 7 is sliding support, Can need to adjust the position at bench 1 two ends according to design, easy for installation, also the most pre-buried in described bench Filled and process material between part 3 and corresponding built-in fitting pad 71, to leave certain deformation space, enters one Step improves safety in utilization and the stability of precast stair, finally at the overlap joint of precast stair Yu cast-in-place structural Place's mortar paints floating.
S4: jig connecting rod between the guardrail 2 of adjacent two described precast staiies, will adjacent two Individual precast stair is attached by platform connecting rod so that it is be integrally forming, it should be noted that in step Also include the weld of described guardrail 2 and platform connecting rod polishes smooth rear covering protection thin film, such as brushing One layer of antirust paint, in order to avoid it is polluted in after-stage concrete construction, affects its outward appearance and using effect.
S5: the construction gap of the lifting point 4 in employing pea gravel concreten filling floating described bench 1, protects The planarization of card precast stair and aesthetic property.
As shown in fig. 6-7, the present invention also provides for a kind of and guardrail integral prefabricated air-conditioning plate, including air-conditioning plate 8, be located at the air-conditioning plate built-in fitting 9 on a described air-conditioning plate 8 wherein side, to be located at described air-conditioning plate 8 another Guardrail 2 on outer three sides and the some lifting points 4 being located on described air-conditioning plate 8 and the pipe that leaks Built-in fitting 10, is connected by some guardrail built-in fittings 5 are fixing between described guardrail 2 with described air-conditioning plate 8. Preferably, described air-conditioning plate 8 being offered several sulculuses 6, the lower end of described guardrail built-in fitting 5 is embedded in institute Stating in sulculus 6, its upper end is exposed from described sulculus 6.Concrete, the straight section 21 of described guardrail 2 and institute The upper end stating guardrail built-in fitting 5 is connected by full weld, is connected into air-conditioning plate 8 by the guardrail 2 of permanent structure Be formed in one and install, it is to avoid the later stage repeat construction, save the duration, improve construction quality, nothing Need to set up scaffold and carry out temporary fence construction, intensity is high, safe and reliable, and efficiency of construction is high.Air-conditioning plate Built-in fitting 9 includes some reinforcing bars, is provided with 8 in the present embodiment, is parallel to each other and spacing is arranged, and being used for will Air-conditioning plate 9 is installed in agent structure.It should be noted that be additionally provided with drip on described air-conditioning plate 8, Described drip is one-body molded with air-conditioning plate 8 by mould, and efficiency is high, elegant in appearance.
The present invention also provides for the construction method of a kind of prefabricated air-conditioning plate with guardrail integral, comprises the following steps:
S1: air-conditioning plate built-in fitting 9 is set on a wherein side of described air-conditioning plate 8, specifically, first On described air-conditioning plate 8, sulculus 6 is offered in the position corresponding with the straight section 21 of guardrail 2, by pre-buried for described guardrail The lower end of part 5 is embedded in described sulculus 6 so that it is upper end is exposed in described sulculus 6.At described air-conditioning It is accurately positioned and arranges some guardrail built-in fittings 5 on 8 other three sides of plate, and on described air-conditioning plate 8 Some lifting points 4 and the pipe built-in fitting 10 that leaks are set, for installing the pipe that leaks on air-conditioning, this enforcement In example, lifting point 4 is provided with 4, is respectively arranged at two, the left and right side edge near air-conditioning plate 8 two-by-two, For hoisting prefabricated air-conditioning plate.It should be noted that this step also includes by mould at described air-conditioning plate 8 Upper molding drip, described drip is one-body molded with air-conditioning plate 8, elegant in appearance.
S2: the prefabricated air-conditioning plate completed in step S1 is transported to job site, by the straight section of guardrail 2 with corresponding The guardrail built-in fitting 5 of position is fixing to be connected, will the upper end of straight section 21 and guardrail built-in fitting 5 of guardrail 2 Carry out full weld connection, be additionally included in brushing anticorrosive paint on described guardrail 2, use cement mortar by described little Groove 6 is floating and it is carried out maintenance, guardrail 2 and air-conditioning plate 8 is connected to become an entirety and constructs, Without setting up scaffold and carrying out temporary fence construction, intensity is high, safe and reliable, and efficiency of construction is high.
S3: the prefabricated air-conditioning plate completed in step S2 is lifted to floor construction surface, by described air-conditioning plate 8 Air-conditioning plate built-in fitting 9 and agent structure fixing is connected, also include when agent structure is painted, elder generation is prefabricated On air-conditioning plate, a batch putty, then carries out coating application to it.
S4: use the construction gap of the lifting point 4 of pea gravel concreten filling floating described air-conditioning plate 8.
In sum, the present invention propose with the precast stair of guardrail integral, prefabricated air-conditioning plate and construction thereof Method, compared with prior art, has some advantage following:
(1) face skirt when efficiently solving precast stair, prefabricated air-conditioning plate hight sky without scaffold construction to protect and protect The problem of hurdle constructional difficulties, it is not necessary to set up scaffold and carry out temporary fence construction, saving material and place, The dangerous matter sources of construction is reduced or is transferred to ground construction, reduce high-altitude working safety hidden danger;
(2) in bench 1 or air-conditioning plate 8 install guardrail 2 time without perforate and use expansion bolt, protection Precast stair and the integrity of prefabricated air-conditioning plate so that it is smooth surface is smooth, elegant in appearance;
(3) in the main structure construction of after-stage, after putty criticized by prefabricated air-conditioning plate, painting of can directly constructing Material;And only need to paint floating with mortar with the lap-joint of cast-in-place structural for precast stair, construction effect Rate is high;
(4) lifting is convenient, and safety is high, decreases working procedure, saves construction cost.
Although in description being illustrated embodiments of the present invention, but these embodiments are intended only as Prompting, should not limit protection scope of the present invention.Carry out various province without departing from the spirit and scope of the present invention Slightly, replace and change should be included in protection scope of the present invention.

Claims (10)

1. one kind with the precast stair of guardrail integral, it is characterised in that include bench, be located at described bench The wherein guardrail on a side, the bench built-in fitting being located at described bench two ends and close described bench Some lifting points at two ends, are connected by some guardrail built-in fittings are fixing between described guardrail with described bench.
Precast stair with guardrail integral the most according to claim 1, it is characterised in that described ladder Offering some sulculuses on Duan, the lower end of described guardrail built-in fitting is embedded in described sulculus, and its upper end is from institute State in sulculus and expose.
3. one kind with the construction method of the precast stair of guardrail integral, it is characterised in that comprise the following steps:
S1: be accurately positioned and arrange guardrail built-in fitting, at the two ends of bench on a wherein side of bench Bench built-in fitting and lifting point are set;
S2: the precast stair completed in step S1 is transported to job site, by straight section and the correspondence position of guardrail The guardrail built-in fitting at place is fixing to be connected;
S3: the precast stair in step S2 being completed lifts to floor construction surface, makes the two ends of described bench divide Do not ride upon on the support seat of corresponding cast-in-place structural, by cast-in-place with corresponding for the bench built-in fitting at described bench two ends Built-in fitting pad in structure is fixing to be connected;
S4: jig connecting rod between the guardrail of adjacent two described precast staiies;
S5: use the construction gap of lifting point in pea gravel concreten filling floating described bench.
The construction method of the precast stair with guardrail integral the most according to claim 3, its feature exists In, described step S1 arranges guardrail built-in fitting particularly as follows: first in described bench with the straight section pair of guardrail Sulculus is offered in the position answered, and is embedded in described sulculus the lower end of described guardrail built-in fitting so that it is upper end from Expose in described sulculus.
The construction method of the precast stair with guardrail integral the most according to claim 4, its feature exists In, in described step S2, it is additionally included in brushing anticorrosive paint on described guardrail, uses cement mortar by described Sulculus is floating and it is carried out maintenance.
The construction method of the precast stair with guardrail integral the most according to claim 4, its feature exists In, in described step S2, the straight section of described guardrail is connected by full weld with the upper end of described guardrail built-in fitting.
7. one kind with the prefabricated air-conditioning plate of guardrail integral, it is characterised in that include air-conditioning plate, be located at described Air-conditioning plate built-in fitting on an air-conditioning plate wherein side, it is located at protecting on other three sides of described air-conditioning plate Hurdle and be located at the some lifting points on described air-conditioning plate and the pipe built-in fitting that leaks, described guardrail is with described Connect by some guardrail built-in fittings are fixing between air-conditioning plate.
Prefabricated air-conditioning plate with guardrail integral the most according to claim 7, it is characterised in that described Offering some sulculuses on air-conditioning plate, the lower end of described guardrail built-in fitting is embedded in described sulculus, its upper end from Described sulculus exposes.
9. one kind with the construction method of the prefabricated air-conditioning plate of guardrail integral, it is characterised in that include following step Rapid:
S1: air-conditioning plate built-in fitting is set on a wherein side of described air-conditioning plate, at described air-conditioning plate Position and arrange some guardrail built-in fittings on other three sides, and some liftings are set on described air-conditioning plate Point and the pipe built-in fitting that leaks;
S2: the prefabricated air-conditioning plate completed in step S1 is transported to job site, by the straight section of guardrail and corresponding position Put the fixing connection of guardrail built-in fitting at place;
S3: the prefabricated air-conditioning plate completed in step S2 is lifted to floor construction surface, by described air-conditioning plate Air-conditioning plate built-in fitting is fixing with agent structure to be connected;
S4: use the construction gap of lifting point in pea gravel concreten filling floating described air-conditioning plate.
The construction method of the prefabricated air-conditioning plate with guardrail integral the most according to claim 9, its Be characterised by, described step S1 arranges described guardrail built-in fitting particularly as follows: first on described air-conditioning plate with Sulculus is offered in the straight section corresponding position of guardrail, is embedded in described sulculus the lower end of guardrail built-in fitting, makes Its upper end is exposed.
CN201610369121.2A 2016-05-30 2016-05-30 A kind of and the precast stair and its construction method of guardrail integral Active CN105863188B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610369121.2A CN105863188B (en) 2016-05-30 2016-05-30 A kind of and the precast stair and its construction method of guardrail integral

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610369121.2A CN105863188B (en) 2016-05-30 2016-05-30 A kind of and the precast stair and its construction method of guardrail integral

Publications (2)

Publication Number Publication Date
CN105863188A true CN105863188A (en) 2016-08-17
CN105863188B CN105863188B (en) 2018-04-13

Family

ID=56642556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610369121.2A Active CN105863188B (en) 2016-05-30 2016-05-30 A kind of and the precast stair and its construction method of guardrail integral

Country Status (1)

Country Link
CN (1) CN105863188B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869313A (en) * 2017-04-16 2017-06-20 北京天恒建设工程有限公司 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method
CN107503479A (en) * 2017-09-05 2017-12-22 平湖万家兴建筑工业有限公司 Precast stair plate and its concrete formulation
CN109779169A (en) * 2019-01-30 2019-05-21 南通科达建材股份有限公司 The precast stair and its construction method of Spliced type
CN110411003A (en) * 2019-07-01 2019-11-05 东莞市建安集团有限公司 Air-conditioning plate shutter and installation method
CN110759237A (en) * 2018-07-27 2020-02-07 上海公路桥梁(集团)有限公司 Hoisting method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087697A (en) * 1993-10-27 1994-06-08 温小才 Stair and handrail that industry and civilian construction are used
CN204510650U (en) * 2015-01-22 2015-07-29 华南理工大学 A kind of precast splice type stringer type stairway
CN205024993U (en) * 2015-08-21 2016-02-10 卓达新材料科技集团有限公司 Whole stair
CN205918017U (en) * 2016-05-30 2017-02-01 上海建工二建集团有限公司 With prefabricated staircase of guardrail integration, prefabricated air conditioner board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1087697A (en) * 1993-10-27 1994-06-08 温小才 Stair and handrail that industry and civilian construction are used
CN204510650U (en) * 2015-01-22 2015-07-29 华南理工大学 A kind of precast splice type stringer type stairway
CN205024993U (en) * 2015-08-21 2016-02-10 卓达新材料科技集团有限公司 Whole stair
CN205918017U (en) * 2016-05-30 2017-02-01 上海建工二建集团有限公司 With prefabricated staircase of guardrail integration, prefabricated air conditioner board

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106869313A (en) * 2017-04-16 2017-06-20 北京天恒建设工程有限公司 Cast-in-place shear wall structure armored concrete interlayer air-conditioning plate construction system and method
CN107503479A (en) * 2017-09-05 2017-12-22 平湖万家兴建筑工业有限公司 Precast stair plate and its concrete formulation
CN110759237A (en) * 2018-07-27 2020-02-07 上海公路桥梁(集团)有限公司 Hoisting method
CN110759237B (en) * 2018-07-27 2022-05-17 上海公路桥梁(集团)有限公司 Hoisting method
CN109779169A (en) * 2019-01-30 2019-05-21 南通科达建材股份有限公司 The precast stair and its construction method of Spliced type
CN110411003A (en) * 2019-07-01 2019-11-05 东莞市建安集团有限公司 Air-conditioning plate shutter and installation method

Also Published As

Publication number Publication date
CN105863188B (en) 2018-04-13

Similar Documents

Publication Publication Date Title
CN105863188A (en) Prefabricated staircase integrated with guardrail, prefabricated air conditioner plate and construction method thereof
CN101225667A (en) Design of settlement joint provided inside underground continuous wall and construction method thereof
CN106088478A (en) Tilt strength steel concrete cylinder construction method
CN104131688B (en) The special external hanging type job platform of assembled architecture and method of operating thereof
CN105908889A (en) Construction method for prefabrication and reverse installation of cornice concrete decoration members of archaistic building
CN104727564A (en) Method for installation construction of roof free-form surface single-layer latticed shell structure of super high-rise building
JP4947779B2 (en) Laying concrete products
KR100579440B1 (en) Mold-Reinforcing Rod One Body Type Precast Concrete Pannel and Fabrication Structure of The Same
CN113236307B (en) Urban subway tunnel steel lining reinforcement construction method
KR101303870B1 (en) PFP execution method for grating facilities of offshore platform
CN104153576B (en) The construction method of building combination type building
CN106013784A (en) Angle iron frame template and construction method
CN205918017U (en) With prefabricated staircase of guardrail integration, prefabricated air conditioner board
CN202559618U (en) Multi-step connection type cage staircase
CN110761560A (en) Mounting and construction method for steel bracket-arch lifting composite structure of pseudo-classic architecture
CN102839803A (en) Construction method for installing decorating and modeling concrete slab
CN215631157U (en) Prefabricated staircase protection device
CN113668885B (en) Plastering anti-cracking construction method for large-area arc-shaped stand
JP3924313B2 (en) Stair repair material and stair repair method using the same
CN105501400B (en) A kind of residential area manhole ladder
CN107246066A (en) It is a kind of to carry the method that steel column is assembled with combined light floor modules
JP5574335B2 (en) Seismic reinforcement method for roof
CN210152306U (en) Protective barrier without influence on construction of staircase
CN205369755U (en) Prefabricated half assembled stair of ladder step
CN117846295B (en) Construction method of stair railing with hyperboloid and arc chamfer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant